Text of the determination
Determination
Case number 831357
Financial firm AAI Limited
Case number: 831357 26 July 2022
Determination | Case number: 831357 Page 2 of 8
1 Determination overview
1.1 Complaint
The complainant and his wife hold home and contents insurance with the financial firm
(insurer). In December 2020, the complainant lodged a claim on the policy for damage
caused by water leaking from an upper-level bathroom. A second claim was lodged after a
further leak in April 2021 caused additional damage. The insurer accepted the claims.
A dispute has arisen over the amount the insurer paid to settle the claims. The insurer said it
could not warrant repairs due to pre-existing issues with the floor. On 13 September 2021, it
paid the complainant $70,490.10 as a total cash settlement for the cost of repairing the
damage caused by the leaks. It also paid $4,000 for ten nights’ future temporary
accommodation (TA) to allow for furniture removal, floor sanding /finishing and cleaning.
The complainant says that the floor was in good condition and must be replaced due to the
water damage. He wants the insurer to cover the replacement cost, estimated as at least
$231,000, and pay ancillary amounts. He also wants to be reimbursed expert report costs.
1.2 Issues and key findings
Is the insurer required to replace the complainant’s floor?
No. T he issues with the complainant’s floor were predominatel y pre-existing. The insurer
reasonably assessed the damage for which it is liable under the policy.
Is the complainant entitled to any additional payments?
Yes. In cash settling the claims, the insurer should have applied a 20% contingencies uplift
and paid $435.97 for electricity used during drying work. The insurer is to pay the complainant
the uplift and the electricity cost, plus interest. However, the complainant is not entitled to
costs as his expert reports did not assist in establishing more extensive coverage.
Why is the outcome fair?
It would not be fair to require the insurer to replace the entire floor when only a portion was
damaged by the insured events. The insurer acted reasonably in cash settling the claims but
should have applied a contingencies uplift. It is fair that it now pays the uplift as well as the
overlooked electricity cost plus interest.
1.3 Determination
This determination is partially in favour of the complainant.
Within 21 days of receiving written notice the complainant accepts this determination, the
insurer is to pay him:
$15,333.99 (20% uplift on the $74,490.10 total cash settlement paid on 13 September
2021, plus $435.97 in electricity costs)
interest on that amount pursuant to section 57 of the Insurance Contracts Act,1984 (Cth)
from 14 September 2021 to the date payment is made.
Determination | Case number: 831357 Page 3 of 8
2 Reasons for determination
2.1 Is the insurer required to replace the complainant’s floor?
No. The issues with the complainant’s floor were predominately pre -existing. The insurer
reasonably assessed the damage for which it is liable under the policy.
The complainant has established a valid claim under the policy
The complainant is required to show on the balance of probabilities (that it is more likely than
not) that he suffered a loss caused by an insured event covered by the policy. This is known
as a valid claim.
The complainant and his wife, BC, hold a home and contents policy. Subject to its terms and
conditions, the policy provides cover for loss or damage caused by the insured events listed
in the product disclosure statement (PDS), which include ‘Escape of liquid’ (EOL).
There is no dispute that EOL occurred at the insured property on 15 December 2020 (the first
leak) and on 12 April 2021 (the second leak). The insurer accepts that is liable for the
resultant damage.
In the circumstances, the panel is satisfied that the complainant has established a valid claim.
Once the complainant establishes a valid claim, the insurer is liable for the loss unless it
shows an exclusion or limiting condition applies. The insurer has the onus of proof in
establishing that an exclusion applies. The standard of proof is the balance of probabilities.
The proximate cause of the damage must be determined
The primary issue in dispute between the parties is whether the EOLs were the proximate
cause of damage to the flooring to the extent that it requires replacement.
Proximate cause is the dominant, efficient or operative cause of a loss. It is not required to be
last in time or the sole cause. It is a question of fact that depends on the circumstances of
each case. It requires a common-sense evaluation of the evidence.
The insurer says that prior to the EOL events, the flooring had already been adversely
affected by moisture and past installation, sanding and coating practices. It says the pre-
existing issues had caused damage, including floorboard ‘cupping’ and ‘crowning’,
unevenness and rot. It says that sanding and recoating is sufficient to address the EOL
damage and that, to the extent replacement is required, that is due to the pre-existing issues.
The complainant says before the EOL events the floors were visibly flat, level over their total
surface and without any gaps. He says the leaks caused all of the damage to the flooring and
that the insurer must replace the floor entirely to return it to pre-damaged condition.
Insu rer’s expert says floor was affected by pre-existing issues
The insurer engaged a timber flooring specialist (AT) to provide expert commentary. AT has
provided a report dated 10 February 2021 following inspection of the property, and a
supplementary report dated 25 August 2021 commenting on the complainant’s expert reports.
AT ’s reports provide detailed analysis on the causes of the floor damage. AT concludes:
Determination | Case number: 831357 Page 4 of 8
In conclusion, it is considered that some areas of the floor on both levels have
been impacted by water ingress with remediation resulting from the event
considered possible with the replacement of the missing flooring on the lower
level and the sanding and coating of a larger area, and this necessary on both
levels. Having said that, significant sections of the floor on both levels were
reported by the owner as unaffected (testing confirmed this), and with the
appearance of the floor in these areas an indicator as to the general, overall
condition of the floor prior to the event. As such, it is considered that past
installation, sanding and coating practices have significantly influenced the
appearance and performance of the floor over time (with the crowning, irregular
gapping at board edges and the undulations in some areas related to said) and
this consequently unrelated to the event.
Complainant’s flooring experts recommend replacing entire floor
The complainant relies on a range of expert reports to support his position that the floors
should be entirely replaced at a cost of at least $231,000. The complainant’s experts include
AW and TI, timber flooring specialists, and MF, floorer.
While t he panel has carefully considered all of the complainant’s e xpert reports, it particularly
notes the following:
AW admits to being unaware of the condition of th e floor ing prior to the event, but notes
the complainant says the floor was flat and presented as an outstanding featur e, whereas
it is now badly cupped
AW says a combination of the hot water involved in the leak and the drying methods
adopted created extr eme hu midity in the home and caused significant flooring expansion
AW conclude s the floor will never return to its pre - loss condition and must be replaced
TI says moisture could have been taken up by the floorboards, potentiall y over an
extended period. T he resulting expansion would have caused doming and for the board s
to move sideways
o nce moi sture levels return to n ormal, the floorbo ards would go back to near their original
size but not return to their original positions
the crowned and cupped sections of the floors if sanded should remain flat providing there
are minimal changes in moisture content. The domed sections which may have lost
contact with their supports may require additional fixing .
Insurer is not required to pay for floor replacement
Having carefully reviewed all of the available information, the panel is satisfied the insurer is
not required to cover the cost of replacing the flooring.
The reasons for the panel’s finding include:
the insurer’s builder, RC , attended the property less than 48 hours after the first leak and
observed rot, which must have been present prior to the leak
AT reports are persuasive and logical and include photographs, diagrams, microscopic
imagery and detailed technical descriptions
AT’s first report was prepared within eight weeks of the first leak. The earliest of the
complainant’s expert reports was prepared more than six months after the leak
AT has provided detailed commentary on and rebuttal of the complainant’s expert findings.
The complainant’s experts do not comment on AT’s reports
TI’s conclusions are somewhat equivocal but nevertheless lend some support to
rectification through sanding
Determination | Case number: 831357 Page 5 of 8
t he flooring shows signs of damage over a wide area, well beyond the aspects affected by
t he leak .
The panel notes that the complainant has been highly critical of AT, suggesting their reports
are inaccurate and unprofessional. However, the panel is not satisfied the criticisms are
justified.
In the circumstances, the panel is satisfied that sanding and recoating is sufficient to address
the EOL damage. To the extent replacement is required, the proximate cause of that need is
the pre-existing issues. Accordingly, the insurer is entitled to limit its liability for the claims as
it has done.
2.2 Is the complainant entitled to any additional payments?
Yes. In cash settling the claims, the insurer should have applied a 20% contingencies uplift
and paid $435.97 for electricity used during drying work. The insurer is to pay the complainant
the uplift and the electricity cost, plus interest. However, the complainant is not entitled to
costs as his expert reports did not assist in establishing more extensive coverage.
Insurer’s cash settlement payments
Prior to 13 September 2021, the insurer paid the complainant various cash settlement
amounts. Those payments are not the subject of complaint.
Based on scopes of work (SOWs) and quotes from RC, on 13 September 2021, the insurer
paid the complainant:
$51,078.28 to cash settle the repairs required due to the first EOL event
$4,000.00 for ten nights ’ future TA to allow for furniture removal, floor sanding /finishing
and cleaning
$20,411.82 to cash settle the additional repairs required due to the second EOL event.
The cash settlement payments made on 13 September 2021, totalling $74,490.10, are not
accepted by the complainant as being reasonable.
Complainant says the insurer’s cash settlement is insufficient
The complainant says the insurer should pay him the cost to replace the entire floor and that
its allowances for TA, moving and cleaning costs are inadequate. He says the insurer should
pay him close to $270,000 to put him in a position equal to that prior to the EOL events.
In addition, the complainant notes that the insurer failed to reimburse him for electricity used
when the insurer’s trades operated drying equipment.
Insurer is entitled to pay the complainant what it would cost to carry out repairs
The PDS gives the insurer the option to pay (cash settle) an insured the cost of covered
repairs rather than attend to the repair work. However, the insurer must act reasonably in
choosing whether to exercise that option.
The PDS also says the insurer is not required to fix a fault that existed before the claimed loss
or damage occurred.
Noting that the pre-existing issues have created a situation where repair works cannot be
warranted, and that the policy allows the insurer to choose how to settle claims and does not
Determination | Case number: 831357 Page 6 of 8
require the insurer to rectify a pre-existing fault, the panel is satisfied the insurer is entitled to
cash settle the complainant for the cost of repairs directly resulting from the EOL events.
The complainant has questioned the adequacy of the SOWs and quotes the insurer has
relied on in formulating the cash settlement payments it made on 13 September 2021.
However, his alternative assessments are based on replacing the flooring. The panel is
satisfied that the insurer is not liable to replace the flooring.
In the circumstances, the panel considers it was reasonable to rely on RC’s quotes in
calculating the cash settlement payments it made on 13 September 2021.
Insurer should have added an uplift when it cash settled
When an insurer cash settles a claim, it transfers to the insured the risk that the cost of
repairs may unexpectedly increase and/or that additional works not quoted are required. The
insured also loses the insurer’s warranty that would apply to repairs arranged by the insurer.
In the circumstances, there is a reasonable expectation that when cash settling a claim an
insurer will increase (uplift) the quoted figure by applying a fair percentage, to allow for the
transfer of risk, contingencies and loss of access to a warranty from the insurer.
The insurer did not apply a cash settlement uplift when it made the payments on 13
September 2021. The panel considers it should have done so and that a fair uplift would have
been 20%.
Electricity usage was overlooked
The insurer has acknowledged that it should have paid the complaint for electricity used by its
drying equipment but appears to have overlooked doing so. It has calculated the cost payable
to be $435.97.
The panel considers that payment should have been included at the latest with the cash
settlement on 13 September 2021.
Additional amounts to be paid
Accordingly, the panel is satisfied that the insurer should pay the complainant:
$15,333.99 (20% uplift on the $74,490.10 total cash settlement paid on 13 September
2021, plus $435.97 in electricity costs)
interest on that amount pursuant to section 57 of the Insurance Contracts Act,1984 (Cth)
from 14 September 2021 to the date payment is made.
AFCA may require insurer to contribute to complainant’s professional costs
The AFCA rules enable AFCA to require an insurer to contribute to the professional costs
incurred by the complainant. These costs are, however, usually capped at a total of $5,000,
unless special circumstances apply.
When considering whether to require an insurer to make a costs contribution, AFCA takes
into account the complexity of the complaint and whether the particular complainant needed
to incur costs to understand or establish their claim.
Determination | Case number: 831357 Page 7 of 8
Insurer is not required to reimburse the complainant’s costs
The complainant says the insurer should reimburse his costs in pursuing the complaint.
These include his expert report fees as well fees charged by his advocate, IP. He says
approval was received from the insurer to incur these costs via a letter dated 11 May 2021.
The letter of 11 May 2021 is a review by the insurer of its decision to limit payment for the
claims. The insurer maintained its position was correct, but indicated it was willing to consider
any quotes and reports the complainant provides. The panel does not agree this constitutes
an assurance that costs would be reimbursed.
The submissions from IP are lengthy, yet largely simply re-state the opinions provided by
various experts. IP’s discourse on insurance principles does not deal with complex issues,
and its position regarding defects is irrelevant given the insurer does not rely on a defects
exclusion to decline the claim. Given this, the panel does not consider the insurer should be
required to reimburse IP’s costs.
The panel has outlined why it prefers evidence supplied by AT. As reports supplied by the
complainant did not help resolve the complaint, the panel is not satisfied the insurer should
reimburse these costs.
2.3 Why is the outcome fair?
It would not be fair to require the insurer to replace the entire floor when only a portion was
damaged by the insured events. The insurer acted reasonably in cash settling the claims but
should have applied a contingencies uplift. It is fair that it now pays the uplift as well as the
overlooked electricity cost plus interest.
Determination | Case number: 831357 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.