Home / Allianz Australia / Determination 831305

Determination 831305

Hail damage to roof claim partly denied due to foot traffic, wear and tear and gradual deterioration

FirmAllianz Australia
Decided2022-12-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$20,185
Non-financial loss—
Amount claimed$76,457
SourceAFCA PDF

Summary

The complainant claimed for hail damage to the roof of his home after a storm, and the insurer denied the claim as caused by foot traffic, wear and tear and gradual deterioration. AFCA found about 24% of the roof was hail damaged and covered, ordering a cash settlement with a 10% uplift and refund of the engineer's report fee up to $5,000.

Once the complainant establishes a prima facie storm claim the insurer bears the onus to show an exclusion applies, and the insurer failed to show none of the damage was hail-caused, so the covered 24% portion of the repair cost is payable.

Issues

Subjects and remedies

home or building damagenatural disasterthird party authoritypay claimrefund fees or charges

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 831305 Financial firm Allianz Australia General Insurance Limited Determination | Case number: 831305 Page 2 of 8 Case number: 831305 31 October 2022 1 Determination overview 1.1 Complaint The complainant holds a Listed Insured Events policy providing coverage to his house. The complainant lodged a claim for loss or damage due to hail, his claim was lodged on 23 June 2021. The insurer denied the claim on the basis that the damage to the roof was due to foot traffic, wear and tear and gradual deterioration from hail over a numerous storm event. The insurer says this is excluded under the terms and conditions of the policy. The complainant says it is likely the repairs to the roof will require a building permit and this will require the roof to be brought up to code. This matter was the subject of a preliminary partially in favour of the complainant. This was rejected by the complainant and the matter has been referred for determination. 1.2 Issues and key findings Has the complainant established a valid claim? Yes. The complainant holds a Listed Insured Events policy with the insurer. This includes coverage for storm. It is therefore up to the insurer to show that the claim is excluded. Is the insurer responsible for all damage to the roof? On the information provided, on balance, I am not satisfied that the insurer has established that none of the damage to the roof occurred due to hail. I am, however, satisfied that there is substantial damage to the roof that was not caused in circumstances which are covered under the policy. I consider that it would be fair and reasonable for the insurer to contribute 24% of the cost of repairing the roof. If the reroofing requires a building permit and requirements to comply with laws, bylaws, regulations and standards, the insurer is to apply the provisions of the policy. It is appropriate to cash settle this matter and the insurer is to add 10% uplift to cover contingencies and loss of guarantee. If there are no requirements as set out above, the insurer is to pay the sum of $18,349.68 plus an uplift of 10% to cover contingencies and loss of guarantee. Total sum of $20,184.65 Why is the outcome fair? The complainant has been given opportunities to address all issues raised by the insurer. I am not satisfied that the entire damage to the roof was caused in a manner that is covered under the policy. I am satisfied that the roof suffered some damage which would be attributable to hail, coverage which is provided under the policy. Determination | Case number: 831305 Page 3 of 8 1.3 Determination This determination is substantially in favour of the insurer. Upon acceptance of this determination, the insurer is to cash settle the repairs as set out 2.1. The insurer is also to refund the fee paid for EC’s r eport up to $5,000, upon proof of payment. Determination | Case number: 831305 Page 4 of 8 2 Reasons for determination 2.1 Has the complainant established a valid claim? Onus on complainant The complainant held a Listed Insured Events policy including coverage for storm. The complainant contacted the insurer on 23 June 2021 to report hail damage to his property which he says was likely caused by a hail event on 31 October 2020. As the onus is on the complainant to prove that he has established a valid or prima facie claim, I am satisfied that the events described establish such a claim. The onus is therefore upon the insurer to show that the damage is excluded under the policy or otherwise. The complainant says that the damage requires total roof replacement. Expert reports The insurer appointed M to undertake an assessment report. M inspected the property on 28 June 2021. At the time of the inspection by M, an expert employed by the complainant (PB) was also on site. M notes that there was no evidence of hail damage to the Decramastic metal roof linings of the main dwelling. M however noted significant indents which M stated was associated with wear and tear to the roof linings of the main dwelling. PB pointed out to M the damage which he said was in his opinion hail damage. M stated they found no evidence of weather related damage to the roof linings that are consistent with hail or storm damage. M also noted that the roof had been examined for a previous claim in 2011. A copy of the previous report was provided, and M had noted maintenance items including gradual deterioration to the decromastic roof sheets and flashing to the first storey roof and gradual deterioration to the decromastic roof sheets adjacent to the solar hot water system to the second storey roof. Certain of the damage to the roof was accepted by the insurer. M concluded in the report that they had advised the complainant that there was no evidence of hail damage to decromastic metal roof linings or any other roof linings that had been discovered during the inspection. M also confirmed in 2011 that the resultant damage to the roof at that time that was covered under the policy had been repaired under a scope of works. M also noted in an email on 21 July 2021 that foot traffic damage had been observed during its inspection. M also provided photograph to which he says show the damage caused by foot traffic and not by the storm. The complainant arranged for the roof to be inspected by an engineer (EC) and a builder (TB). EC provided a report dated 4 August 2021. He noted that the roof has been clad in decromastic roof tiles installed asbestos roof sheeting. Determination | Case number: 831305 Page 5 of 8 He provided a background from the complainant indicating that a large storm had passed through the region bringing heavy rain, wind and gusts together with hail. EC noted approximately 30 hail dents were observed on the roof structure lining but also noted there was foot traffic dents observed from people accessing the hot water system some years ago. EC estimated that approximately 24% of the roof structure had been damaged by hailstones. Due to the age and construction style of the main dwelling, EC concluded it is ‘highly assumed roof framing upgrades will be required once the hail damaged roof is exposed ’ . EC also noted that there was damage to the air conditioning units, air ventilation units and TV antennas consisted with hail damage. PB provided a quotation dated 30 July 2021. The quotation was to supply new Colorbond custom orb roofing. The quotation came to a total of $76,457. The complainant says the Queensland Building and Construction Commission (QBCC) requires a building approval when more than 20 % re-roofing takes place. The complainant says that the approval may require that the building be brought up to the current code. Product Disclosure Statement (PDS) The insurer referred to the PDS and the following terms: The insurer has also referred to the home and contents SPDS effective 30 June 2018 which states: Determination | Case number: 831305 Page 6 of 8 The PDS deals with building laws and regulations as follows: Benefits paid as part of your building sum insured. Professional fees. Essential Care Quality Care Premier Care We will cover the cost of employing an architect, surv eyor, engineer, building consultant, and/or lawyer that might be necessary for the repair or replacement of your building following an insured ev ent. ✓ Up to 10% of the sum insured ✓ Up to 10% of the sum insured ✓ Up to 10% of the sum insured Building laws and regulations. We will cov er the costs incurred to comply with local or state gov ernment building laws, bylaws, regulations and standards following the destruction or partial destruction of your home. We will only pay those costs that directly apply to the part of your building that has been damaged. Insurer’s position The insurer has referred to a report from M dated 24 August 2021 which M states that the postcode of the complainant’s property has not been listed by the Insurance Council Australia as affected by a storm event on 31 October 2020. M also stated that they are of the opinion that the damage identified by PB and EC are not as a result of a storm on 31 October 2020 but damage which has occurred over numerous years and events and are not the result of a single weather event. The insurer denies the claim on the basis that the damage was caused by a combination of:  foot traffic  wear and tear  gradual deterioration from hail over numerous storm events. Insurer liable for 24% of the damage to the roof On the information provided to me, on balance, I am satisfied that the complainant has established that there was damage to the roof caused by hail. Whilst I am satisfied that it is likely that it occurred on 31 October 2020, hail damage is covered under the policy and would be covered had it been on another date. However, whilst the insurer has argued that the damage was as a result of gradual deterioration from hail over numerous storm events, no information has been given that satisfies me this is in fact correct. I do however accept that there is some wear and tear and foot traffic that has caused damage to the roof. The report by the complainant’s expert (EC) identified some hail damage to the roof. EC observed approximately 30 hail dents and came to the conclusion that approximately 24% of the roof structure had been damaged by hailstones. I am not satisfied that the insurer has provided any information that disputes this. This percentage equates to $18,349.68 of PB’s quote. However, it is likely that a building approval may require that the roof further work under the building regulations. The complainant is to obtain the permit and if building works are required, the insurer is the arrange for a scope of works and quotation for those works which are necessary under the terms and conditions of the policy. Determination | Case number: 831305 Page 7 of 8 It is appropriate that this matter be cash settled. I have taken into account the issues and contingencies and loss of guarantee and in the circumstances, it is fair that the insurer pays a 10 % uplift on the quotation obtained above. If no further building works are required, then the insurer is to pay $18,349.68 plus 10% uplift. The report prepared by EC was important in establishing the damage. The insurer is to refund the fee paid for EC’s report , up to $5,000. The complainant is to provide proof of the fee and payment. The insurer is to pay the sum within seven days of receiving this proof. 2.2 Why is the outcome fair? The complainant has been given opportunities to address all issues raised by the insurer. The complainant has provided expert reports in support of his claim. I am not satisfied that the entire damage to the roof was caused in a manner that is covered under the policy. The complainant’s expert has considered that 24% of the roof was hail damaged. I am satisfied the damage which would be attributable to hail is covered under the policy. At the same time, I am satisfied that the balance of the damage to the roof is not covered under the policy Determination | Case number: 831305 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.