Home / Suncorp Group / Determination 830009

Determination 830009

Claim declined for cracking damage attributed to ground movement; complainant alleged inadequate 2017 underpinning repairs

FirmSuncorp Group
Decided2022-06-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed cracking damage to his home was caused by inadequate 2017 underpinning repairs by the insurer, and the insurer declined the 2021 claim as caused by excluded ground movement. AFCA found in favour of the insurer.

The complainant failed to establish a valid claim, and the insurer established that the damage was caused by excluded ground movement, relying on expert reports.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination | Case number: 830009 Page 1 of 12 Determination Case number 830009 Financial firm AAI Limited Determination | Case number: 830009 Page 2 of 12 Case number: 830009 3 June 2022 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) for damage caused to his home by a leaking pipe. The insurer assessed and accepted the claim in 2016 and carried out repairs in October 2017. Repairs included underpinning in January 2017. I n March 2021 the complainant reported further cracking damage. The insurer assessed the damage and said it is because of ground movement unrelated to the earlier claim. It declined the claim saying the damage was not caused by an insured event or by the ea rlier repairs but by ground movement which is excluded from cover. The complainant disputes this. He says the cracking damage is a result of failed or inadequate repairs completed by the insurer following the earlier claim. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the insurer. The insurer accepted the recommendation, but it was not accepted by the complainant. In the circumstances, the complaint has been referred to me for determination. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The available material does not establish on the balance of probabilities the claimed damage was caused by an insured event or by inadequate work in 2017. As the com plainant has not established a valid claim the insurer is entitled to decline the claim. Why is the outcome fair? The insurer is entitled to rely on its expert reports and the policy terms. The complainant has provided no independent expert reports to rebu t the insurer’s expert material. In the circumstances as the complainant has not established a valid claim and the insurer has established an exclusion applies, based on the available material, it would not be fair to require the insurer to pay the claim. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 830009 Page 3 of 12 2 Reasons for determination I have decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). I have considered all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. No new material after recommendation After the recommendation was rejected, the complainant telephoned the case manager to advise of his reasons for the rejection of the recommendation. Essentially, he reiterated his position which is set out below. No new material was provided. 2.1 Is the insurer entitled to decline the claim? Submissions and material considered The complainant wants the insurer to repair the damage caused by previous faulty workmanship. He says the underpinning work done in 2017 failed or was inadequate resulting in the cracking damage reappearing. He says:  in March 2021 he noticed damage in the same area of the house which was damaged by a burst water pipe in 2015 which was repaired in 2017  the damage is not widespread but concentrated in the front of the house at the site of the original repairs  the identified tree/tree roots are too far from the house to adversely affect it  the insurer’s engineer told him the underpinning should have been done to the entire front of the house After the recommendation he telephoned the case manager and advised the underpinning could not have reached a depth of 2.3 meters as:  it was carried out by a single person using only a shovel and pick  the person had no excavation equipment, or a ladder which would have been needed to excavate a 2.3m excavation  the work was done on a hot day when the ground was extremely hard  the single person only spent 3 to 4 hours on the job  the trees are far from the home and could not have caused movement  the current damage is limited to cracking and movement of the internal plaster which was damaged in the initial leak The complainant has provided no expert or other evidence in support of his contentions. The insurer has provided several expert reports from both this claim and the earlier claim. A summary of the relevant material is set out in supporting section 3.3 of this determination The insurer says it is entitled to decline the claim because the current damage is due to ongoing ground movement and not due to faulty previous repairs or an insured event. Its Determination | Case number: 830009 Page 4 of 12 experts point to trees at the property which they say changed the soil moisture and caused ground movement which in turn caused the cracking damage. The insurer also says the 2017 repairs were appropriately engineered, scoped and performed. The insurer submits the recent cracking was seen in and around the kitchen area, back billiard room and opposite side of the house near the other garage (left of the entrance hallway). It says this cracking is away from the original underpinning. Complainant has not established damage caused by an insured event The complainant must establish on the balance of probabilities that he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. In the context of this claim the complainant must establish the claimed current damage is because of an insured event or that the previous repairs were inadequate. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. In the context of this claim the insurer must establish the current damage is due to ongoing ground movement. The complainant does not dispute receiving the policy terms. In the circumstances the insurer is entitled to rely on the policy terms. The relevant policy terms are set out in supporting section 3.2 of this determination. The complainant is covered for insured events. The available information does not establish the claimed damage was caused by an insured event. The insurer arranged for a plumber to inspect the property in 2021. The plumber inspected the subfloor and found no moisture or dampness and no leaks. The policy provides cover for escape of liquid, but the available information does not establish any damage caused by a leak in 2021. Policy provides a lifetime guarantee on repairs As the insurer undertook the underpinning and repairs in 2017 it guaranteed the quality of materials and workmanship of repairs for the lifetime of the building. The insurer guarantees the material used and the standard of work to be free of defects. If a defect arises, it will rectify the problem. The complainant says the insurer should rectify the cracking damage now present at the house. He says this is because the underpinning work done in 2017 was inadequate. There is no dispute there is cracking damage to the house. Complainant has not established damage caused by inadequate repairs Based on the available information I am not satisfied the complainant has established on the balance of probabilities the underpinning work done in 2017 was inadequate. Although he makes several assertions about how the work was done he has provided no independent expert evidence or photographs or other material in support of his assertions. Determination | Case number: 830009 Page 5 of 12 The insurer has provided information in relation to the earlier claim. From that material I accept a suitably qualified engineer designed the underpinning which complied with relevant standards and codes. A builder scoped the work. The work was carried out by a re-stumping and underpinning contractor in January 2017. When the complainant made the present claim in 2021 the insurer arranged for the property to be inspected by an engineer (KE). He required soil surveys and plumbing tests. The plumbing investigation confirmed the property was free from leaks. The soil survey indicated the property was subject to highly reactive soil. The engineer reviewed the drawings and said the existing underpinning was satisfactory. He also said even with underpinning minor cracks can occur on highly reactive soil. He commented the house was designed on strip footings which system has potential to move a lot especially in the site conditions. Although the complainant has made several assertions about the inadequacy of the underpinning and the work done, he has provided no independent expert evidence in support of his contentions. I acknowledge KE indicated the cracking may be occurring due to the underpinning not returning around the corner towards the garage. But this was before he reviewed the drawings. Once he reviewed the drawings KE said the extent of the existing underpinning was sufficient. Based on the available expert evidence, I am not satisfied the complainant has established on the balance of probabilities the 2017 underpinning work was inadequate. As stated earlier, the complainant has also not established the claimed damage was caused by an insured event. In these circumstances, I am not satisfied the complainant has established a valid claim. The insurer is entitled to decline the claim. Insurer has established a policy exclusion applies In support of his position, the complainant asserts the damage is in the same place as the damage in the earlier claim. I accept some of the claimed damage is in the same place as the earlier claim. But the available information and photographs also establish damage to other parts of the house which were not damaged in the earlier claim. The engineer, the plumber, and the geotechnical site investigator all posit an alternative explanation for the cause of damage. The site is subject to abnormal moisture conditions in the soil. There are large trees at the front and side of the property which are drying out the soil. This causes the ground to move which caused the cracking damage. The complainant says the trees are too far from the house to cause the damage. But, he has not provided any expert opinion in support of this contention. Insurer entitled to decline the claim In the circumstances based on the available material I am satisfied the insurer has established on the balance of probabilities the claimed damage was caused by ground movement. As this cause of damage is excluded from cover, the insurer is entitled to decline the claim. Determination | Case number: 830009 Page 6 of 12 2.2 Why is the outcome fair? The insurer is entitled to rely on its expert reports and the policy terms. The complainant has p rovided no independent expert reports to rebut the insurer’s expert material. In the circumstances as the complainant has not established a valid claim and the insurer has established an exclusion applies, based on the available material, it would not be fair to require the insurer to pay the claim. Determination | Case number: 830009 Page 7 of 12 3 Supporting information 3.1 The AFCA process It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. AAMI Home Building Insurance offers guaranteed repair quality The quality of workmanship and the materials used in any repair or rebuilding of your home that we arrange and authorise will be guaranteed for the life of the home. What you are covered for - Insured Events Escape of liquid We cover We do not cover Loss or dam age to the building caused by liquid leaking, overflowing or bursting from any of the following:  refrigerators, freezers, dishwas hers and washing machines;  any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage systems;  fixed tanks;  swimming pools or spas;  waterbeds;  baths, sinks, toilets and basins;  fixed heating or cooling system;  water main, fire hydrant or water supply pipe;  loss or damage caus ed by flood or storm surge;  wear and tear, or loss or damage by the escape of liquid occurring as a result of a gradual proc ess of leaking, splashing, dripping or overflowing over a period  of time when you could reas onably be expected to be aware of this condition;  the cost of repairing or replacing the item from which the liquid escaped;  fixing leaks that have not caused permanent damage to the building;  leaks from agricultural pipes;  loss or damage caus ed by liquid from a Determination | Case number: 830009 Page 8 of 12  an aquarium. portable cont ainer, such as plant pot, vase, terrarium, fis h bowl, beverage container, saucepan, bucket or watering can;  loss or damage caus ed by liquid from a watering system or hos e;  loss or damage to retaining walls;  loss or damage to, or caused by, a leaking shower floor or base, shower cubicle walls, shower glass screening or doors;  co sts if you repair or renovate a damaged area of the building before we can inspect it and find the cause;  broken, worn or aged tiles or grouting in walls in bathrooms, kitchens or laundries unless the damage is caused by liquid leaking from pipes in walls or floors (not forming part of a shower cubicle wall, floor or base);  loss or damage caus ed by wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot. What we do not cover – general exclusions You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events:  ‘Storm’;  ‘Flood’ (but only if you have cover for insured event ‘Flood’);  ‘Earthquake and Tsunami’;  ‘Explosion’. Lifetime guarantee on building repairs When we repair or rebuild the building, we guarantee the quality of materials and workmanship of that work for the lifetime of the building if we: • authorise; • arrange; and • pay the builder or repairer directly for this work. What we guarantee We guarantee the material used and standard of the workmanship to be free of defects. If a defect arises in the lifetime of the building as a result of poor quality workmanship or use of incorrect materials, then we will rectify the problem. It is a condition of our guarantee that we reserve the right to decide who will undertake the rectification work. Determination | Case number: 830009 Page 9 of 12 3.3 Extracts from material relied on by the parties Report Summary Insurer’s engineer (FM) E ngineering investigation report 24 May 2016  Inspected and photographed property 18 April 2016  Floor level survey indicated settlement towards the front south - east corner of the house (bedroom 1)  About 10 months earlier cellar was flooded. Plumber repaired the leak - the stormwater pipe in the groun d connecting to the down downpipe in the corner of bedroom one was leaking.  L eaking underground storm water drain caused or contributed to crack damage to the front two rooms to the southeast corner of the property  S uitable qualified engineer should desig n conc rete underpins, and it is expected the minimum founding dept h of concrete underpins is the deeper of: > 2300mm > Line projected from base of cellar footings at 45 degrees plus 200mm > Dept h to natural undisturbed soil plus 200mm Insurer ’ s engineer (FM) Forensi c Geotechnical Investigation 22 July 2016  Soils are mostly very stiff (regardless of whether moist or not)  Fine tree roots were visible in the subsurface layer of borehole 1 (near the affected area)  The site is a problem site due to the presence of large trees  The site is highly reactive and additional abnormal moisture conditions caused by trees may lead to expected surface movements of up to 105mm. Insurer ’ s engineer (FM) Proposed remedial work Plan 2 August 2016  Describes pins location to ensure 1200 max clear span between underpins  500mm wide and 1000mm long  Specification for bulk pier underpin installation set out Insurer ’ s engineer (FM) Certificate of compliance 2 August 2016  Certified underpinning complies with relevant standard codes Insurer ’ s engineer (FM) Structural computations 3 August 2016  Existing strip footing is okay to span 1200mm  Adopt 1000L by 500w pins  Founded 2.3m in1 50 natural material Builder’s scope (BB) 29 August 2016  Installation of 5 x pins to south elevation of residence as per engineering and geotechnical detail provided.  Expanding grout underpinning or double pour and lift technique to be used.  Allowance for 5 x pins to be used. Pin Size allo wed for 500 x 1200 x Determination | Case number: 830009 Page 10 of 12 2300mm max. Insurer’s engineer (KE) Engineering report 3 May 2021  Inspected and photographed 13 April 21  Described external and internal damage to the front of the house at the underpinning loc ation, garage, kitchen wall, pool room, family room, hallway.  Need 2017 engineering material as cracking may be occurring due to not returning the underpinning around the corner towards the garage  The claimed damage is due to variations in soil moisture cont ent  Need a detailed plumbing report and if no leaking then uncapped soil around perimeter could be creating movement to highly reactive soil  Soil sample arranged 1 3 May 2021  Large canopy trees to front and sides have large roots that suck moisture from the ground which can lead to abnormal moisture conditions and contribute to cracking  Original underpinning that took place can lead to differential movement due to s urrounding footings being found in another type of soil characteristic  Trees may contribute to movement  A soil survey and plumbing test should be arranged. If there are no leaks, the cause could be uncapped soil Builder’s report (BB) 07 May 2021  Confirms plumbing investigation free from any leaks  In the subfloor noticed large gaps between the strip footings and surrounding soil  Caus e of damage possible soil movement  Recommended engineer be engaged and that a pressure limiting valve be installed at the water meter to reduce water pressure Insurer’s engineer (ST) Geotechnical Site Investigation 10 May 2021  Took samples and said site classified as class P (Problem site)  Site could be subject to abnormal moisture conditions  Trees could cause abnormal moisture conditions and should be removed as soon as possible  Existing strip footings at depths of 940mm and 1060mm below ground and into silty clay  Front of house is s howing slight signs of abnormal moisture conditions due to the large trees at the front of the property drying out the soil.  As an alternative to removing trees, root barriers or footings should be deepened to a founding depth of 2000mm or rock Builder’s e stimate (BB) 19 May 2021  Estimate ($21,089.10) to repair damage to garage, rear entry, kitchen, entry hallway, lounge room Insurer’s engineer (KE) Engineering report 7 July 2021  Reviewed plumber report and soil test  Wall that was underpinned in 2017 is cracking which may be due to not returning the underpinning around the corner towards the garage – need 2017 engineering Determination | Case number: 830009 Page 11 of 12  Based on site inspection and information to date majority of damage caused to external and intern al cracking is due to the change of moisture conditions to a highly reactive soil.  Large canopy trees to the front and side have large roots that suck moisture which can lead to abnormal moisture conditions and cracking  Original underpinning can lead to d ifferential movement due to surrounding footings being found in another type of soil  Trees are the likely cause. Solution is to remove trees, or to isolate the structure from tree roots drying by a root barrier or deepen ing affected footings to 2000mm bel ow ground, or rock. Plumber report (BB) 4 August 2021  C ompleted an inspection of the subfloor around subsidenc e and found no moisture or dampness  T raced the sewer drain and could not locate any leaks.  Two types of wat er supply one is a pump line from the stormwater storage tanks and the ot her is mains pressure for the internal plumbing. I did not complete a pressure test to the external water supply as l did not detect the pressure pumps working if ther e was a leak.  C omplete d a pressure test to the main water supply which passed.  While in the subfloor area notice d large gaps between the strip footings and surrounding soil.  Recommended engineer be engaged and that a pressure limiting valve be installed at the water meter to reduce water pressure  Caus e of damage possible soil movement Letter BB to insurer 27 September 21  Engineer commented that he had reviewed the drawings and said the extent of existing underpinning is sufficient.  On site complainant said underpinning was only done to the wall in question but based on the drawings this isn’t the case  Present cracking is minor, not structural, and even with underpinning minor cracks like this can occur on a highly reactive site  Pre vious underpinning does not affect the cracks shown to me in the middle and opposite side of the house internally. These cracks have occurred as per my report. These cracks were present previously prior to the underpinning and re - patched at the time as par t of the works.  Hous e designed on strip footings. This type of system has a potential to move a lot more than a conventional slab especially with the site conditions 3.4 Other relevant material considered and relied on  Parties’ submissions /emails and all attachments to all submissions/emails before and after the recommendation. Determination | Case number: 830009 Page 12 of 12  Expert reports.  Photographs.  Material from contractors engaged in 2016.  Correspondence between the parties.