Escape of liquid claim partially declined; bathroom damage unrelated; delay in advising separate claim
Text of the determination
Determination
Case number 827173
Financial firm AAI Limited
Determination | Case number: 827173 Page 1 of 9
Case number: 827173 6 May 2022
1 Determination overview
1.1 Complaint
The complainant holds a landlord’s insurance policy with the financial firm (the insurer).
On 3 March 2021, the complainant lodged a claim after a pipe leaked in the upstairs ensuite
bathroom (ensuite). The complainant had already begun repair work, including removal and
disposal of the ensuite ’s shower as the complainant said it was mould affected. The
complainant says the leak caused damage to the ensuite, and to the downstairs ceilings,
bathroom (bathroom) and kitchen.
The insurer only agreed to cover the damage to the ceilings and part of the kitchen, and costs
to repair damage from exploratory investigations. The insurer said the damage to the ensuite
was likely from a long term cause, given mould was found. It also said disposal of the shower
prejudiced its ability to assess the claim. The insurer concluded the bathroom damage was
unrelated. It said a separate claim could be lodged, for which it would waive the excess.
The complainant wants the insurer to accept the claim in full and to also pay loss of rent
(LOR), temporary accommodation (TA) and non-financial loss compensation for its delays.
The complainant is represented by his lawyer, T. Unless context otherwise requires, the
complainant and T are referred to in this determination as ‘the complainant’.
1.2 Issues and key findings
Is the insurer ’s coverage position reasonable ?
Yes. The disputed damage relating to the ensuite leak is likely excluded and the insurer’s
ability to assess the claim has been prejudiced. The bathroom damage is arguably unrelated.
The insurer is to open a new claim for that damage and promptly assess the claim.
Is the complainant entitled to LOR or TA?
No. The damage did not render the property unliveable so an entitlement to LOR has not
been triggered. The policy does not cover TA for tenants.
Is the complainant entitled to non-financial loss compensation?
Yes. The insurer ’s offer of an excess waiver for its delay in telling the complainant he had to
lodge a separate claim for the bathroom damage is fair. However, the insurer should have
proactively opened and started to assess a separate claim given the complainant was clearly
continuing to claim for that damage. The insurer acted unreasonably. It is to pay the
complainant $1,000 in compensation.
Why is the outcome fair?
The outcome is fair because:
when a cash settlement is being paid, an uplift is appropriate to allow for contingencies
and, in this case, possible increases in price since the claim was partially approved
Determination | Case number: 827173 Page 2 of 9
except potentially in relation to the bathroom damage, the insurer has shown the disputed
damage relating to the ensuite leak is likely excluded
removal of the ensuite shower prejudiced the insurer’ s ability to assess the claim
the bathroom damage needs to be separately assessed before the insurer can make a
final decision on that, but the insurer should promptly assess that as a new claim
the insurer should pay non-financial loss due to the effect on the complainant of how it has
handled the claim.
1.3 Determination
This determination is partially in favour of the complainant.
If the complainant accepts this determination, the insurer is to:
within seven days of receiving notice of the acceptance, open a new claim for the
bathroom damage then:
> waive the applicable excess for the new claim
> promptly assess the new claim under the terms and conditions of the policy
within 21 days of receiving notice of the acceptance, pay the complainant a total of
$7,318.68, made up of a cash settlement of $5,400.06 for the covered damage (including a
20% uplift), a cash settlement of $1,390.62 for exploratory work rectification costs
(including a 20% uplift) and $528 for the emergency plumbing call out fee
within 21 days of receiving notice of the acceptance, pay the complainant $1,000 in non-
financial loss compensation.
Determination | Case number: 827173 Page 3 of 9
2 Reasons for determination
2.1 Is the insurer ’s coverage position reasonable ?
Yes. The disputed damage relating to the ensuite leak is likely excluded and the insurer’s
ability to assess the claim has been prejudiced. The bathroom damage is arguably unrelated.
The insurer is to open a new claim for that damage and promptly assess the claim.
Complainant has shown a valid claim under the policy exists
The complainant is required to show, on the balance of probabilities, that he suffered a loss
caused by an insured event covered by the policy. This is known as a valid claim.
The complainant holds a landlord’s policy. Subject to its conditions and exclusions, the policy
provides cover for loss or damage caused by the insured events listed i n the policy’s product
disclosure statement (PDS). The insured events include ‘Escape of Liquid’ .
The available information shows that on 26 February 2021, a pipe in the ensuite burst,
resulting in a significant volume of water escaping. The insurer has accepted and agreed to
partially cover the claim.
In the circumstances, I am satisfied that the complainant has established a valid claim.
Once the complainant establishes a valid claim, the insurer is liable for the loss unless it
shows an exclusion or limiting condition applies. The insurer has the onus of proof in
establishing that an exclusion applies. The standard of proof is the balance of probabilities.
Insurer said some of the damage is excluded and its interests were prejudiced
On 3 March 2021, the complainant lodged the claim with the insurer. It was subsequently
confirmed that the claim event occurred on 26 February 2021. The complainant provided
repair estimates and invoices totalling over $50,000.
At the time the claim was lodged, the complainant provided video footage of water flowing
through the downstairs ceiling, of water flowing onto a kitchen bench and of a bulge
developing on the side of the bench.
The complainant also provided a report dated 26 February 2021 from SP, plumbers. The
complainant had arranged for SP to attend the property on an emergency basis that day. It
reported that:
a pipe in the ensuite had suddenly ruptured
Leaking water had penetrated through to the downstairs kitchen, lounge room, hallway,
dining areas and bathroom
the ensuite’s tiles, shower area, plaster, waterproofing, timber framing and skirting were
water damaged
mould in the ensuite’s shower area necessitated its immediate removal due to ‘health
is sues and the current pandemic’
downstairs, there was significant water damage to ceilings, the kitchen and the bathroom
the damage to the ensuite and the bathroom meant the property was unliveable pending
reinstatement.
SP provided photographs of the ensuite after the shower area had been removed as well as
of large holes it had cut in the downstairs ceiling during the course of its investigations. There
were no pre-work photographs of the water damage or of the water damaged materials after
Determination | Case number: 827173 Page 4 of 9
they had been removed. SP disposed of the water damaged materials prior to the insurer
having the opportunity to inspect them.
On 9 March 2021, the insurer’s expert builder, MM, insp ected the property. MM confirmed
that there had been an escape of water event and that repair work had already commenced.
MM also said:
As we did not inspect shower prior to removal we cannot determine if all damages
were caused by a burst pipe as reports supplied advise of mould present and it is
unlikely mould would form so quickly, it is likely there was a contributing factor.
The insurer appointed WI, leak detection specialists, to investigate the cause of the bathroom
damage. WI performed leak detection testing on 11 June 2021 and reported:
a large amount of damage to the bathroom door frame
large amounts of mould and water damage behind the shower in the laundry cupboard
a large crack in the shower wall tile grouting and lack of sealant around the shower screen
the shower breach pipe did not hold pressure and a leak sound could clearly be heard
the shower screen and wall tiles failed spray testing, resulting in escape of water onto the
bathroom floor and into the area behind the shower.
By reference to the video footage the complainant provided, the insurer agreed to cover the
resultant damage to the ceilings and to the end panel of the kitchen bench. Relying on a
quote from MM, the insurer offered to cash settle those items for $4,500.05. In addition, it
offered $1,158.85 for exploratory work reinstatement costs.
The insurer said the remainder of the claim was not covered because:
the PDS excludes cover for:
> wear, tear, gradual deterioration mould, mildew, rising damp, corrosion or rot
> damage due to gradual leaking over time, of which the insured should reasonably have
been aware
> loss or damage to or caused by a leaking shower floor, base, walls, screen or door
> costs if the insured repairs damage before the insurer can inspect it and find the cause
> broken tiles or grouting in bathroom walls unless the damage is caused by liquid leaking
from pipes in walls or floors (not forming part of a shower cubicle wall, floor or base).
the reported presence of mould in the ensuite’s shower indicated it was likely there was a
longer term issue causing damage
the PDS describes an insured’s obligations, including not to without the insurer’s consent:
> dispose of damaged parts or items
> carry out or authorise repairs unless the insured cannot contact the insurer and
emergency repairs are needed to protect the building or the insured’s contents
in performing repair work, including the removal and disposal of damaged items, before
notifying the insurer, the complainant breached his obligations under the PDS and
prejudiced the insurer’s ability to assess the claim
WI’s report established that the bathroom damage was due to a separate escape of liquid
event and excluded causes, meaning it required further assessment.
Complainant disagreed
The complainant disagreed w ith the insurer’s position .
Determination | Case number: 827173 Page 5 of 9
He provided an email from SP in which SP maintained that all of the damage claimed was
due to a sudden pipe rupture in the ensuite. SP also said the mould that necessitated the
removal of the ensuite’s shower was due to the pipe rupture, not a longer term leak.
The parties obtained the opinion of an expert engineer
In its notice of response to AFCA dated 21 September 2021 (NOR), the insurer offered to
appoint an engineer to assess and report on the cause of the damage to the ensuite and the
bathroom.
The parties agreed to the appointment of AL, structural and civil engineers. In its report dated
18 January 2022, AL said:
the exact cause of the leak in the ensuite could not be determined given SP’s repair work
there was water damage to the bathroom (particularly the shower base), the laundry
cupboard behind the shower, timber skirting boards in the adjacent corridor and to the
kitchen cupboard and joinery
the ensuite leak caused the water damage given the ensuite is directly above the corridor
and a reduction in ceiling height would result in water flowing towards the bathroom,
laundry and kitchen.
AL provided additional commentary in an email dated 27 January 2022. AL confirmed it
agreed with WI that the bathroom’s shower base had leaked. However, AL considered that
the ensuite leak would have caused significantly more damage given the volume of water
involved. AL also noted that the corridor’s floor tiles fell slightly towards the bathroom and
laundry. Further, the areas with the most damage were low points, leading to water ponding.
The insurer said AL’s commentary did not c ause it to change its position because AL:
was unable to provide a cause of damage to the ensuite
did not take into account WI’s report (presumably, sufficiently)
confirmed it is likely the bathroom shower base leaked
used photographs from WI’s report to d emonstrate water ponding, meaning the pooled
water was from the bathroom’s shower base.
AL provided a responding report dated 12 February 2022. AL said its professional opinion
was that the water burst identified by SP caused damage to the ensuite. In relation to the
bathroom, AL said it could not be ‘categorically proven the water has come from the
downstairs shower only’ and maintained it is likely the ensuite leak caused significantly more
damage. AL also provided photographs to show the flooring falls it had noted previously.
The insurer is entitled to limit its liability
On balance, I am satisfied that the insurer is entitled to limit its liability concerning the damage
related to the ensuite leak.
The complainant’s video footage demonstrates that a sudden escape of water event occurred
on 26 February 2021. SP says there was a pipe rupture in the ensuite shower.
However, SP’s observation of mould in the ensuite shower suggests there was (also) a longer
term process involved. I do not accept S P’s claim that the mould was related to the pipe
rupture given that the sudden escape of water event occurred on 26 February 2021, which
was the day SP attended the property, performed emergency work and saw the mould.
The presence of mould and the likely longer term process leading to it, means it is more
probable than not that one or more of the exclusions relied on by the insurer would apply.
Determination | Case number: 827173 Page 6 of 9
However, it is not possible to assess whether that is in fact the case given the repair work,
including removal and disposal of damaged items, performed before the insurer was notified.
In permitting those works to be done, the complainant triggered the exclusion relating to costs
if repairs are undertaken before the insurer can inspect damage and find the cause. He also
failed to meet his obligations not to repair or dispose of items without the consent of the
insurer.
I do not accept the complainant’s submission that his obligation under the PDS to take
reasonable steps to prevent further damage overrode the requi rement to seek the insurer’s
consent first. The complainant does not suggest he made any attempt to contact the insurer
before notifying it of the claim five days after SP performed the works.
T he complainant has significantly prejudiced the insurer’s abil ity to assess the claim.
In the circumstances, subject to the comments below concerning the bathroom, the insure r’s
coverage position is reasonable. It is entitled to cash settle the complainant by reference to
MM’s quote dated 27 July 2021 totalling $4,500.05. However, taking into account the passage
of time since then and contingencies, a 20% cash settlement uplift is to apply, meaning the
insurer is to pay the complainant $5,400.06.
The insurer is also to pay the exploratory work reinstatement costs assessed by MM at
$1,158.85. Again, given the passage of time a 20% cash settlement uplift is appropriate,
taking the payment figure to $1,390.62. In addition, the complainant is to reimburse to the
complainant SP’ s emergency call out fee of $528 inclusive of GST.
I note that the insurer’s claim notes record that the policy excess has already been paid.
The insurer is to open a new claim for the bathroom claim
Since lodging the claim on 3 March 2021, the complainant has claimed for the bathroom
damage. On 11 June 2021, WI reported to the insurer that the bathroom damage was
unrelated to the claim event. The insurer did not inform the complainant that it would require a
separate claim to be lodged for the bathroom damage until 22 July 2021.
In its NOR, the insurer acknowledged it should have informed the complainant earlier of its
requirement for a separate claim. It offered to waive the excess that would apply to the
separate claim if the complainant wished to proceed.
The available information suggests that it is arguable the bathroom damage may be unrelated
to the ensuite leak. While the complainant has refused to lodge a separate claim, it is
abundantly clear that he seeks to claim for the damage. Given that it has offered to waive the
applicable excess, there would appear to be no reasonable basis for the insurer to not open a
separate claim and proceed with assessment.
Accordingly, the insurer is to open a new claim for the bathroom damage, waive the excess (if
any), and promptly assess the new claim under the terms and conditions of the policy.
2.2 Is the complainant entitled to LOR or TA?
No. The claimed damage did not render the property unliveable so an entitlement to LOR has
not been triggered. The policy does not cover TA for tenants.
The policy provides LOR cover
The policy provides an LOR benefit if the insurer:
Determination | Case number: 827173 Page 7 of 9
accepts a claim for damage to the insured property due to an insured event occurring
during the period of insurance, and
agrees the property cannot be lived in as a result.
The rent covered is for the reasonable amount of time the insurer decides it should take to
repair or rebuild the property so it can be lived in again. The maximum LOR period for one
event is 52 weeks and the maximum amount payable by the insurer is $25,000.
The complainant is not entitled to LOR
The complainant submits he is entitled to LOR since the date of loss.
The insurer maintains that the damage claimed did not render the property unfit to be lived in.
Further, it says the property will remain liveable during repairs. According to the insurer, the
damage is aesthetic rather than structural.
I agree with the insurer. In addition to the ensuite and the bathroom, the property contains
another bathroom and a WC that have no water damage. Further, the kitchen has remained
functional and there is no suggestion repair work will change that. Finally, while reference has
been made to the presence of mould, its relationship with the claim event is not clear and no
reports from appropriately qualified experts have been provided.
Accordingly, I am satisfied that the complainant is not entitled to payment of LOR.
The complainant is not entitled to TA for tenants
The complainant says the insurer should cover temporary accommodation for his tenants
during the time repair work is undertaken.
However, the policy does not provide TA cover for tenants. Rather, as outlined above, it
provides cover for LOR following an insured event. The policy also excludes cover for
consequential loss.
In the circumstances, the insurer is not liable for temporary accommodation for tenants.
2.3 Is complainant entitled to non-financial loss compensation?
Yes. The insurer’s offer of an excess waiver for its delay in telling the complainant he had to
lodge a separate claim for the bathroom damage is fair. However, the insurer should have
proactively opened and started to assess a separate claim given the complainant was clearly
continuing to claim for that damage. The insurer acted unreasonably. It is to pay the
complainant $1,000 in compensation.
AFCA rules permit award of non-financial loss compensation
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
Determination | Case number: 827173 Page 8 of 9
Insurer is required to pay non-financial loss compensation
The complainant says he has suffered significant stress and hardship due to the insurer’s
delay and mishandling of his claim.
There were delays in progression of the claim. However, not all of the delays were caused by
the insurer. Further, the claim was complicated by SP’s repair work undertaken before the
claim was lodged.
Nevertheless, as noted above, the insurer should have informed the complainant earlier of its
requirement for a separate claim for the bathroom damage. Its offer to waive the applicable
policy excess is fair and is to apply if it pays that claim.
In addition, the insurer has not acted reasonably in continuing to insist on the complainant
formally lodging a separate claim for that damage before it will finalise its position on it. This
has led to avoidable delay.
I accept t hat the complainant has found the insurer’s conduct stressful and frustrating. The
insurer is to pay him $1,000 in non-financial loss compensation.
2.4 Why is the outcome fair?
The outcome is fair because:
when a cash settlement is being paid, an uplift is appropriate to allow for contingencies
and, in this case, possible increases in price since the claim was partially approved
except potentially in relation to the bathroom damage, the insurer has shown the disputed
damage relating to the ensuite leak is likely excluded
removal of the ensuite shower prejudiced the insurer’s ability to assess the claim
the bathroom damage needs to be separately assessed before the insurer can make a
final decision on that, but the insurer should promptly assess that as a new claim
the insurer should pay non-financial loss due to the effect on the complainant of how it has
handled the claim.
Determination | Case number: 827173 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.