Summary

The complainant claimed storm and mould damage to her home and sought full indemnity. AFCA found the insurer's building offer of $103,884.44 and a 50% share of mould remediation fair, excluding pre-existing damage, and ordered temporary accommodation extension, $1,500 non-financial loss and up to $5,000 professional costs.

Under the policy's insured events cover and exclusions for gradual deterioration, atmospheric conditions, mould and lack of maintenance, the storm was the proximate cause only of part of the damage, so the loss was apportioned.

Issues

Subjects and remedies

health or medicalhome or building damagenatural disasterloan or hardship variationpay claimpay interestpay non financial lossprovide documents

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 826106 Financial firm Insurance Australia Limited Determination | Case number: 826106 Page 1 of 15 Case number: 826106 24 May 2022 1 Determination overview 1.1 Complaint The complainant lodged a claim on 17 May 2021 under her home insurance policy with the financial firm (insurer) for damage to her property, including mould because of a storm on 24 March 2021. The insurer accepted liability for the storm related damage including some mould damage but declined cover pre-existing damage caused by maintenance issues, atmospheric conditions and gradual deterioration. The complainant disagrees with the insurer’s decision and seeks full indemnity from the policy. The complainant is represented by (DJ). For simplicity, the panel will refer to the complainant and DJ as the ‘complainant’. 1.2 Issues and key findings Is the insurer’s offer for the building damage fair ? Yes. The panel is satisfied the insurer’s offer of $103,884 to settle the claim for storm related damage to the building is fair in the circumstances and reasonably reflects the scope of works for damage caused by the storm event in March 2021. Is the insurer liable for the mould remediation? Yes. The panel accepts the pre-existing mould issues have compounded due to the increased moisture and lack of ventilation following the storm event. For the reasons set out in section 2.2 of this determination the panel considers is fair the insurer contributes $38,652 to the mould remediation costs. Is the insurer required to extend the temporary accommodation? Yes. The insurer must extend the temporary accommodation for another six (6) months from the date of the complainant’s acceptance of this determination. Is the insurer’s settlement for contents damage fair? Yes. The panel does not accept the insurer breached its duty of utmost good faith. The insurer considered the contents a total loss and paid the contents sum insured of $96,169.00. Is the complainant entitled for non-financial loss compensation? Yes. In addition to waiving the $1,000 excess the insurer must pay the complainant $1,500 compensation for non-financial loss. Is the complainant entitled for professional costs? Yes . The insurer if it has not already done so should contribute up to $5,000 to the complaints cost of obtaining the mould assessment report from CRT subject to the complainant providing Determination | Case number: 826106 Page 2 of 15 the relevant invoice. The panel does not consider the representative’s submis sions or reports from SWE or H were reasonably required or assisted the c omplainant establish her claim. 1.3 Determination This determination is partially in favour of the complainant. The insurer is required to pay the complainant:  $103,884.44 for the building repairs  $38,652 for the mould remediation  extend the temporary accommodation for six (6) months from the date of this determination  $1,500 for non-financial loss  professional cost of up to $5,000 for the mould assessment report and scope of works from CRT subject to provision of the relevant invoice The insurer must pay interest on the settlement sum of $103,884.44 and $38,652 in accordance with section 57 of the Insurance Contacts Act 1984 (Cth) ( ‘The Act’) from 27 January 2022 until the date of payment. Determination | Case number: 826106 Page 3 of 15 2 Reasons for determination 2.1 Is the insurer’s offer for the building damage fair ? Yes. The panel is satisfied the insurer’s offer of $103,884 to settle the claim for storm related damage to the building is fair in the circumstances and reasonably reflects the scope of works for damage caused by the storm event in March 2021. Complainant has the onus to establish claim falls within terms of policy It is established insurance law that an insured has the initial onus to establish on the balance of probabilities (that is more likely than not) a claim that falls within the terms of the policy. This is commonly called a prima facie claim. The complainant’s policy is an insured events policy that provides cover for several insured events including storm damage, subject to conditions and exclusions. The complainant lodged the claim with the insurer on 17 May 2021 and says that during a storm on about 24 March 2021 stormwater entered through the skylight causing damage to several rooms and causing mould throughout the building. The insurer partially accepted the claim for building damage and following additional information from a hygienist accepted mould damage to the property that was as a direct result from the claimed event. The complainant denies any pre-existing maintenance issues with the building and denies any pre-existing mould. The dispute relates to the extent the damage and mould is due to the storm or is pre-existing damage. Reports indicate pre-existing maintenance issues contributed to building damage. The insurer says it is not responsible for the roof damage but accepts liability for the internal damage caused by water ingress. The complainant says she had regularly maintained the roof with leaks last repaired in 2019. She denies that maintenance issues contributed to the damage. The insurer ’s builder (RB) attended the property on 24 May 2021 and says the complainant advised the following:  water entered in a few rooms during the storm event  some of the staining has occurred previously and the insured was going to have this repaired herself  over the past 12 months mould growth has been a bit of an issue  she did have a dehumidifier, but it has recently broken  since the storm event the area has not been able to dry out  mould growth to doors, architraves and ceilings has gone out of control  the complainant has tried to keep up with the cleaning, but it is now too much  during the winter months there is no sunlight that enters the property. Since the house is so cold windows and doors do not get opened  the house internals have not been painted for approximately 15-20 years. RB says water ingress has occurred through the roof which has evidence of gradual deterioration, noting the maintenance related issues such as build-up of debris, cracked bedding and tiles and collapsed gutters pulling away. RB considered the resultant internal Determination | Case number: 826106 Page 4 of 15 damage to the property is the direct result of rainwater ingress from storm activity in March 2021. The insurer engaged an independent building consultant (ISC) who attended the property on 15 September 2021. ISC concluded:  the proximate causes of water ingress to the family room are was a slipped roof tile, allowing water to enter and inadequate roof tile coverage to the replaced valley gutter, permitting wind driven rainfall to enter.  there were previous issues with valley gutter, which are unknown as it has been replaced prior to inspection.  the proximate cause of water ingress to the ground floor bathroom is a broken roof tile located beside to skylight opening.  the proximate causes of water ingress to the laundry are inadequate roof pitch for usage of concrete tiles (as per current standards), prone to permitting wind driven rainfall to enter the tiles and missing sections of sarking allowing water that enters the tiles to enter the internal area.  the proximate causes of water ingress to the dining room are openings with the sarking on shallow pitched roof which is allowing water that enters the roof tiles (from the spreader pipe and shallow pitch) to enter the internal area.  the proximate cause of water ingress to the hallway is partially detached pointing to the ridge capping tiles, allowing water to enter.  the proximate cause of water ingress to the Water Closet is leaves/debris around the skylight, causing blockage and overtopping  the proximate cause of water ingress to bed 1 and study is wind driven rainfall entering the change of pitch junction. The complainant provided an inspection report and scope of works from BIH. The report provides a quote for repairs of $425,627.57. The building repair scope is for a total home renovation, on the basis that the property is not in compliance with the current relevant building codes and standards and needs to be renovated to comply with the current standard, it also includes damaged items and various upgrades that are not insured event related. The panel is satisfied the reports establish the building has significant pre-existing damage and maintenance issues The complainant’s argument s do not advance her position The complainant says the property needs to be brought up to compliance with current building standards and codes. The panel is not persuaded that the need for the property to be bro ught up to compliance with current building standards and codes is the insurer’s responsibility. The complainant says the insurer did not identify any pre-existing damage and maintenance issues when she made a claim for storm damage in 2019. The insurer says the 2019 claim was for water ingress into the upper-level bathroom ceiling and its assessment and repairs was limited to the area of the damage. However, it drew the complainant’s attention to some maintenance issues, which the complainant says she has rectified. The panel notes there is no evidence of maintenance work completed by the complainant after this date and prior to the storm. The complainant says Section 46 of the Act prevents the insurer from denying or limiting liability by reference to pre-existing damage or defects. Section 46 of the Act does not apply Determination | Case number: 826106 Page 5 of 15 in this instance. An insurer is entitled to exclude cover for particular events irrespective of when they occur. The exclusion for wear, tear, gradual deterioration or damage caused by atmospheric conditions, mould or lack of maintenance could not be said to be made by reference to the condition of a thing at the time the contract was entered. In any event, the complainant is aware or should have been reasonably aware of the pre- existing damages and maintenance issues at her property. Insurer’s offer for building repair is fair in the circumstances Having reviewed all the information, the panel is satisfied the insur er’s quotes are fair and reasonable. The information available shows the roof was in a poor and deteriorated condition. All expert reports confirmed pre-existing damages to the roof, which required maintenance by the complainant. In the panel’s view, the property has extensive pre-existing damage. The property has evidence of gradual deterioration, noting the maintenance related issues such as build-up of debris, cracked bedding and tiles and collapsed gutters pulling away. The panel accepts the insurer is not liable to replace the roof and other damages not directly related to the claimed storm event of March 2021. RB commented the roof had heavy moss growth that is blocking tile drains from operation. The photographs provided supports this observation. Further, the panel accepts the policy does not cover a betterment of the property. The policy states: we only repair the damaged part(s) of your home. We don’t pay for materials to match the undamaged parts of your home to create a uniform appearance. The insurer has now offered the complainant $103,884.44 which includes $74,570 for the RB quote, $12,000 for supply and installation of all kitchen cabinetry plus a 20% uplift to cover the transfer of risk. In the absence of any reasonable alternative quote and given the detailed findings in the reports from RB and ISC the panel considers the insurer ’ s offer of $103,884.44 fair in all the circumstances. The insurer must pay interest on the settlement sum of $103,884.44 in accordance with section 57 of the Act from 27 January 2022 until the date of payment. 2.2 Is the insurer liable for the mould remediation? Yes. The panel accepts the pre-existing mould issues have compounded due to the increased moisture and lack of ventilation following the storm event. For the reasons set out in section 2.2 of this determination the panel considers is fair the insurer contributes $38,652 to the mould remediation costs. Report indicate mould due to combination of factors RB says the mould presence is due to:  the property being in a high moisture location  worsened due to the wet summer period and the heavy rains in March 2021.  climate and a direct result of water ingress. Determination | Case number: 826106 Page 6 of 15 RB considered the significant mould growth was not related to the claimed event but had been occurring gradually over a long period because of atmospheric conditions. Due to the complainant’s dissatisfaction, the insurer engaged a hygienist (EHO) for further inspection. In summary EHO says the long-term water leakage and increased humidity has led to mould growth throughout the property. Mould growth has occurred within the property for an extended period at low to medium levels, as evident by long term mould growth and paint damage to cabinetry and the bathroom rear door. EHO says due to recent water ingress through the roof into occupiable areas, there has been a significant increase in humidity levels, which in turn has led to a significant increase to surface mould identified throughout the property, to the doors, door frames and window frames. The complainant provided a mould assessment report by SWE. SWE confirmed the evidence of elevated moisture and widespread microbial growth. The site was considered a high risk and requires extensive targeted remediation. SWE did not establish the causes for elevated moisture level and mould growth in its report. SWE recommended the complainant engage a building consultant to assess these causes. BIH did not comment on causes of damage for the scope of works provided. The complainant also provided a report, scope of works and quote from CRT for mould remediation and water damage restoration. CRT considered the location of the building and associated environmental factors may have added to the proliferation of mould within the building. CRT considered this could further compound the effects of moisture and reduced ventilation due to the lack of occupancy and failure to conduct mould remediation. On balance property has extensive pre-existing mould issues When damage has mult iple causes, AFCA considers which was the ‘proximate cause’. The proximate cause is the real, dominant, or effective cause. It is not necessarily the cause that most immediately preceded the damage. The policy excludes loss or damage caused by rust, corrosion, gradual deterioration, depreciation, wear or tear, atmospheric conditions or extreme temperature, mould and loss, damage, injury or death arising from the insured not maintaining the property in good repair and condition. The available information shows that the cause of water ingress into the property was due to the poor and deteriorated condition of the roof. The information indicates the external mould to the property was due to the property being surrounded by vegetation, trees, animals and creeks, which has caused mould growth for an extended period. The internal mould growth was exacerbated by the claimed storm event. On balance the panel accepts there was extensive pre-existing mould, but this has been significantly affected by the storm event in March 2021 and failure to conduct any mould remediation following the event. It is fair the insurer contributes to the mould remediation Both parties’ have provided quotes for the mould remediation. The insurer obtained a quote and SOW from SR on 13/8/2021. The quote was $135,697.97. It recommended a total loss for the contents. The quote was for the inventory, double bag and dispose of non-restorable contents and a HEPA vacuum and clean and deodorise of contents Determination | Case number: 826106 Page 7 of 15 in plant. However, as the insurer has elected to cash settle the complainant for her contents, this is largely not relevant. The complainants quote from CRT is for $97,304.00. The building quote from BIH also refers to a quote for decontamination from GB of $88,459. The insurer has indicated it is prepared to work with the quote from CRT and says its liability for the mould damage is 20 percent due to the mould damage being present for a period before the claimed storm event in March 2021. The panel considers the quote from CRT is a fair assessment of the damage, but it includes works such as stripping out of walls and ceilings which is included in the SOW from RB. The panel accepts some duplication in the work to repair the internal damage and the mould remediation. It is fair that the quote from CRT be reduced by $20,000 to $77,304.00. This will account duplication of costs claimed for the removal of the walls and ceilings already included in the RB quote. The balance of the mould remediation should be split. The panel considers it fair in the circumstances that the insurer contributes $38,652.00 being 50% of the balance of the cost of the mould remediation ($77,304.00) based on the quote from CRT. The insurer must pay interest on the $38,652 in accordance with section 57 of the Act from 27 January 2022 until the date of payment. 2.3 Is the insurer required to extend the temporary accommodation? Yes. The insurer must extend the temporary accommodation for another six (6) months from the date of the complainant’s acceptance of this determination. Policy provides alternative accommodation The policy provides the insurer will pay reasonable costs of temporary accommodation when an insured event damages the building and the insurer agree, it will pay for the reasonable temporary accommodation costs for the time it will take to repair or rebuild the building to a liveable condition. No dispute property is uninhabitable There is no dispute that until the mould remediation is completed the building is uninhabitable. Concern was raised by CRT that the elevated results for airborne mould spores indicate that there may be a source of dampness and/or source of water ingress within the structure that is facilitating the mould. The complainant in an email suggests that the insulation remains at the property. This was also raised by EHO Group many months earlier. However, the complainant refused to allow a hygienist to re-attend and it is uncertain as to this possible cause of water ingress. Insurer to extend alternative accommodation The insurer has relocated the complainant to temporary accommodation since 26 May 2021. The SOW to remediate the current damage is extensive with the building likely to need significant stripping out. No information is available, or quote provided to determine how long repairs will take. In the absence of such information the panel considers it fair to allow up to six months to complete the remediation. Determination | Case number: 826106 Page 8 of 15 The panel considers it fair that the insurer extends the temporary accommodation for up to six (6) month while the property undergoes repairs. The insurer is not liable for temporary accommodation beyond six (6) months from the date of this determination as it is not liable for the entire damage and repairs. 2.4 Is the insurer’s settlement for contents damage fair ? Yes. the insurer has complied with the terms of the policy. It has offered the total sum insured for contents as the contents are deemed total loss Insurer’s cash settlement for contents damage is fair The total sum insured for the complainant’s contents is $ 96,169. The insurer assessed the contents as total loss, in line with the policy terms, the insurer offers to settle the complainant the total sum of $96,169 insured. The complainant says she has more contents damage and the total sum insured is insufficient. The complainant says the insurer has breached its duty of utmost good faith by failing to remediate the mould. The complainant also says the insurer should have warned her that the contents would be damaged by mould if left in the building. The panel is satisfied that the building was already significantly affected by mould prior to the storm in March 2021. Most likely some of the contents would have already been affected. The insurer acted quickly to assess the building and notified the complainant of its claim decision. While the panel accepts there have been some delays in the communication and resolution of the claim we do not accept those delays sufficient to consider it a breach of utmost good faith. We accept the insurer has acted fairly and reasonably in appointing experts to assess the damage and in determining liability. The policy provides the most the insurer we will pay for loss or damage to contents is the contents sum insured. Accordingly, the panel accepts the insurer’s settlement offer for the contents is fair. The insurer does not have any obligation to pay more than the agreed sum insured. 2.5 Is the complainant entitled for non-financial loss compensation? Yes. In addition to waiving the $1,000 excess the insurer must pay the complainant $1,500 compensation for non-financial loss. AFCA can award compensation for non-financial loss. Under the AFCA Rules, compensation of up to $5,400 can be awarded for non-financial loss where a complainant suffers an unusual degree of physical inconvenience or time taken to resolve a situation or interference with a complainant’s enjoyment of life or peace of mind or delay. AFCA expects a complainant to be moderately robust and will not award compensation for the ordinary degree of inconvenience that comes with making a claim. Complainant suffered inconvenience The complainant says the processing of the claim has caused her an unusual degree of physical inconvenience and stress. Determination | Case number: 826106 Page 9 of 15 The panel notes the insurer relocated the complainant to a temporary accommodation due to the reported impact risk the mould infestation poses to the complainant. The initial assessment by RB of damage scope was not thorough and has likely caused some delay in the claims process. Further the insurer by not conducting any remediation or drying may well have contributed to the loss. This has no doubt caused stress and inconvenience to the complainant. The panel accepts the insurer has taken further steps to engage other experts and has overall assessed the claim correctly and fairly. The insurer has already offered to waive the $1,000 excess applicable to the claim under the policy. In the panels view, in addition to waiving the excess, and in view of the initial stress and inconvenience caused, the insurer should pay the complainant $1,500 compensation for non-financial loss. 2.6 Is the complainant entitled for professional costs? Yes. The insurer, if it h as not already done so, should contribute up to $5,000 to the complainants cost of obtaining the mould assessment report from CRT subject to the complainant providing the relevant invoice. The panel does not consider the representative’s submissions or rep orts from SWE or H were reasonably required or assisted the complainant establish her claim. AFCA’s approach to professional costs Under the AFCA Rules, we may require an insurer to reimburse a complainant for professional costs incurred regarding their claim. However, we will not require an insurer to contribute more than $5,000 to these costs, unless exceptional circumstances apply AFCA provides a service which is free for complainants. It is not usually necessary for them to be represented. We decide whe ther the insurer should contribute to these kinds of claimed costs by considering what is fair in the circumstances, considering the complexity of the complaint and whether the complainant genuinely required expert assistance. The complainant is seeking $5 .400 for claim preparation and assistance for a representative. In addition, the complainant is seeking $5,929 for SWE hygienist report and $2,860 for H ’s damage inspection and costing for build repairs . Insurer to contribute to professional costs of CRT r eport The insurer has acknowledged it was prepared to work with the complainant using the CRT report and quote to reach a resolution of the complaint. The panel found the report of assistance when reaching its decision and given the other quote from SR was not relevant, reasonably required to resolve the matter. In the circumstances the panel considers it fair that the insurer contribute s up to $5,000 to the complainants cost of obtaining the mould assessment report from CRT subject to the complainant providing the relevant invoice. Insurer not required to contribute to professional costs of DJ, SWE or BIH It is noted the complainant appo inted the representative without the agreement of the insurer. In addition, the complainant has not provided a formal or itemised invoice detailing the costs claimed. Determination | Case number: 826106 Page 10 of 15 The panel appreciates this matter became protracted and may have been difficult for the complainant. The assistance from DJ may have given her some comfort. The panel however is not satisfied the submissions assisted the complaint’s resolution or advanced the complainant’s position . The complaint itself was not particularly complex. The insurer should not be liable for the representative’s costs in these circumstances. The reports provided from SWE and BIH did not materially assist the complainant’s positio n. In the panels view it was not necessary for the complainant to obtain either the reports from SWE or BIH. The insurer is not liable to meet the costs of the reports from SWE or BIH. 2.7 Why is the outcome fair? The outcome is fair as it recognises the extent of the contribution to the loss or damage by the storm event and the pre-existing damage. The complainant’s circumstances are unfortunate, and the panel understands she has suffered a loss. However, the information shows there were other causes of damage to the property that are excluded under the policy and it is fair to apportion that loss. Determination | Case number: 826106 Page 11 of 15 3 Supporting information 3.1 The AFCA processes AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes an ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive experience from the industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Expert reports Record Key points Financial firm’s expert (A) RB Report 24 - 05 - 2021  No storm created opening has been observed.  I nsured advised me of leaking above rear sliding door staining the cornice, also there is track marks to the bathroom wall / ceiling however this room is significantly mould damaged from lack of ventilation, so it was hard to determine where the leak was on the linings. I was also advised of water entering a light in the kitchen Determination | Case number: 826106 Page 12 of 15 which is situated next to a skylight.  Further inspection with the insured she pointed up the upstairs toilet but Due to heavy mould growt h on all linings I cannot find a sourc e of where the leak is.  Upon inspection to the roof it was noted that the roof coverings are showing signs of age related where in tear, tiles were chipped cracked and not sitting correctly in many locations. The ridge and hip capping have rec ently been r epoint ed in the last two years, however, there are still some minor shrink cracks noted during the inspection.  The roof coverings have high amounts of debris and moss growth, the gutters have high amounts of debris and moss growt h and the valleys have hig h amounts debris that will need to be cleared and cleaned to restore performance.  The sarking is deteriorat ed a lot and has lost its purpose throughout the roof space. I found a cracked tile to the location above the sliding door, this was removed and rep laced during make safe. The skylight flashing has heavy amounts of debris caught in it and was allowing water to overflow int o the roof space during the heavy rain event, this would be consistent as to why water was able to get into the light fitting below .  Further to the inspection of the second story I noted the antenna anchors have become loose from the anchor points. These will need to be addressed before the ant enna becomes unstable and impacts roof tiles causing breakages. Financial firm’s expert (B ) EHO Report 8 - 06 - 2021  The house is located in the middle of reserve. Lots of trees and bush are in close proximity of the site. There is also a dam within in walking distance of the property. Externally, the property is showing extensive moss growth in lin e with the nature. There is some sign of leave litter in the guttering, but it is cleaned out on regular basis.  Dining room: plaster ceiling and walls with tiled flooring. Mould coverage identified throughout on porous materials stored, fridge doors, pian o, doorframes and doors.  Bathroom and laundry: fibro and plaster ceiling, fibre cement walls and tiled floor. Heavy mould throughout the rooms. Previous water leakage present through skylight in bathroom. The sink cabinets are highly water damaged and moul d affected, but the damage appears long term. Please note, fibre cement lining may contain asbestos.  Kitchen / break fast room: plaster ceiling and walls, with tiled floor. Heavy mould growt h throughout wooden cabinetry and doors and doorframes. Plaster ce iling is showing signs of water damage and mould growth coming through the top directly below trusses. The cabinetry has been highly damaged and possibly acting as a reservoir of mould spores. The damage is long term.  Lounge: plaster walls and ceiling, wi th carpeted floor. Lots of stored items throughout observed. The carpet is highly impacted with surface mould and bacterial growth. Long term mould damage Determination | Case number: 826106 Page 13 of 15 and new condensation mould growth has been identified. Not e, larger items such as leather sofa, curta ins and piano has also been mould impacted.  First floor master bedroom and ensuite: plaster ceiling, walls and carpet of wooden floors. Carpet is old with some sign of mould at corners. The ceiling is mould impacted with mould strip growth where the trusse s are above. Mould growth (surface condensation) was observed to ensuite walls. All doorframes, doors and window frames are highly impacted.  First floor bathroom: plaster ceiling and fibre cement wall sheeting with tiled floors. New ceiling installed in 20 17. Mould identified to doorframes window frames throughout.  First floor bedrooms: plaster ceiling with streaks of mould underneat h trusses, plaster walls, carpet floor on wooden flooring. Old carpet showing signs of bacterial contamination. Mould growth on doorframes and doors mostly and window frames. Curtain blinds and other porous items present throughout  First floor ceiling space: extensive water marks were observed. Access was only at the hatch. Fibre glass insulation was present.  External: High leve ls of leaf litter mould identified throughout.  Dining room: Significantly elevated levels of Aspergillus/Penicillium (Water damage indicat or). With an order of magnitude ≥ 10 times the outdoor average.  Lounge: Significantly elevated levels of Aspergillus/P enicillium (Water damage indicat or). With an order of magnitude ≥ 10 times the outdoor average.  First floor master bedroom and ensuite: Significantly elevated levels of Aspergillus/Penicillium (W ater damage indic ator). With an order of magnitude ≥ 10 times the outdoor average.  First floor ceiling space: Significantly elevated levels of Aspergillus/Penicillium AND Cladosporium (Water damage indicator). With an order of magnitude ≥ 10 times the outdoor average. Financial firm’s expert (B) ISC Report 15 - 09 - 2021  There are varying levels of mould like substances noted throughout the entire house. The following areas relate to the water ingress issues stemming from the roof areas only: ground floor: family room, bathroom, laundry and dining room. 1st floo r: hallway, water closet (W.C.), bedroom 1 and study.  Family room: water ingress has occurred above the sliding door unit. previous attempted repairs not ed.  Bathroom: water ingress has occurred to the perimeter of the skylight. laundry: mould like substan ce noted to the cornic e and wall linings.  Dining room: wat er ingress has occurred to the perimeter of the skylight.  Hallway: water staining evident to the ceiling lining, located beneath the ridge capping tiles.  Water Closet: Water ingress has occurred to the perimeter of the skylight. Determination | Case number: 826106 Page 14 of 15  Bed 1 and study: water affected ceiling/wall linings and cornice noted along the southern elevation.  There is evidence to confirm that the water ingress to the family room, laundry and dining room and have been a recurring issue. C omplainant ’s expert (B) SWE Report 1 - 11 - 2021  The moisture meter was used to initially scan and assess the entire int erior of the Site. In addition, surface and air samples were taken from targeted locations. The observations suggest tha t the following building features are affected by mould growth/moisture:  extensive suspected mould growth and moisture staining was observed to interior walls, doors and ceilings throughout the property, on both the ground and first floor;  of particular concern was suspected mould contamination noted to ground floor bathroom wall, master bedroom (including walk - in wardrobe) ceiling, and doorways and architraves throughout building;  soft furnishings within the property such as rugs and carpe ts, and some curtains, observed to show signs of moisture staining and possible suspect mould growth;  hard furnishings such as wooden cabinets and bookcases also show evidence of suspect mould growt h on exterior surfaces;  personal effects throughout the property such as clothing, books and paintings also show evidence of suspected mould growth/moisture damage; and  infrared imaging, moisture met er readings, and visual observation indicate increased presence of moisture and mould towards the ceiling of the property, especially along the north and west boundaries.  The microbiological surface sampling results, air sampling and visual observation indicate that the property shows evidence of elevated moisture and widespread microbial growth. As such the site i s considered a high ri sk and requires extensive targeted remediation.  Elevated res ults for airborne mould spores indicate that there may be a source of dampness and/or water ingress within the structure facilitating mould growth. Airborne spores of mould at these levels and genera indicate that the mould proliferation may constitute a health risk for general occupancy under the current conditions of the dwelling. Surface sampling for indicative contamination also returned elevated levels of mould. Hence, r emediation of the mould problem is strongly recommended. A scope of work for remediation of property and contents should be prepared by a suitably qualified Building Consultant / Decontamination Specialist with specific input from SWE.  Moisture levels ind ic ate increased moisture toward the ceiling and possibly within roof cavities. To prevent recurrenc e of the mould issues, a Building Consultant (Building) or other qualified party is strongly recommended to assess the house for possible physical causes for elevated moisture levels and mould growth identified. Determination | Case number: 826106 Page 15 of 15