Home / IAG / Determination 825890

Determination 825890

Water damage repairs inadequate and further damage unrepaired

FirmIAG
Decided2022-10-10
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$1,496
Non-financial loss$3,000
Amount claimed$178,000
SourceAFCA PDF

Summary

A landlord complained that a 2017 water leak was inadequately repaired, with further damage unrepaired and insurer delays. AFCA found the insurer liable for the additional damage and ordered a desktop assessment of repair costs or cash settlement, plus $3,000 non-financial loss, $5,400 indirect loss and $1,496 expert report costs.

The insurer's 2017 repairs did not cover all damage in the scope of works, and it unreasonably failed to coordinate inspections, so it is liable for the additional damage and resulting losses.

Issues

Subjects and remedies

business interruptionhome or building damagepay claimpay compensationpay non financial lossreassess claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 825890 Financial firm Insurance Australia Limited Determination | Case number: 825890 Page 1 of 7 Case number: 825890 8 September 2022 1 Determination overview 1.1 Complaint The complainant holds a landlord residential insurance policy with the financial firm (insurer). He lodged a claim after a leak caused water damage at the insured premises in 2017. The insurer accepted the claim and completed resultant damage repairs. The complainant says these repairs were inadequate, and there is further water damage from the event which remains unrepaired to date. He says he provided the insurer numerous opportunities to assess and repair this damage, but it failed to do so. The complainant is seeking the cost of repairing this damage, his costs of dealing with the complaint and both his sustained and anticipated loss of rental income. He says the insurer has mishandled the claim and is seeking compensation for his difficult claim experience and lost income opportunities. 1.2 Issues and key findings Is the insurer liable to cover further damage? Yes. The evidence shows the plasterboard lining along the eastern wall was exposed to the leak and should have been replaced. Is the complainant entitled to non-financial loss compensation? Yes. Given the insurer’s handling of the claim and overall delays, I consider an award of $3,000 in non-financial loss compensation is fair. Is the complainant entitled to indirect financial loss compensation? Yes. I consider the insurer’s actions caused the complainant to suffer indirect financial loss. It is fair in all the circumstances for the insurer to pay him $5,400. It is also fair for the insurer to pay the complainant $1,496 for his expert’s report . 1.3 Determination This determination is in favour of the complainant. Within 14 days of this determination being accepted, the insurer must:  complete a desktop assessment of the complainant’s repair quote to assess the fair and reasonable cost of repairs  if it is satisfied the complainant’s quote represents the fair and reasonable cost of repairs, it must settle the complainant accordingly  alternatively, it must obtain a competitive quote within a further 14 days, and either complete repairs or offer settlement based on an actionable quote for the complainant  settle the complainant $1,496 for his expert report fees  settle the complainant $3,000 for non-financial loss compensation, and $5,400 for his indirect financial loss. Determination | Case number: 825890 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer liable to cover further damage? Yes. The evidence shows the plasterboard lining along the eastern wall was exposed to the leak and should have been replaced. The complainant says the insurer did not adequately repair the damage in 2017 The complainant says the insurer agreed to repair the water damage through its preferred expert AG, adopting his expert NH’s scope of works which included replacing 79m2 of plasterboard along the eastern wall up to a height of 1.20m. The complainant further says AG subcontracted the works to TDLJ, who only replaced the plasterboard lining in the walk-in robe (and not the living/dining area or the garage). The complainant says replacing the plasterboard was necessary because the burst pipe within the wall cavity caused a substantial leak. The complainant says he noted a crack between the kitchen joinery and plasterboard lining in November 2018. He says he notified the insurer, and it sealed the crack without opening up the wall lining. The complainant says a further crack in the skirting board was discovered in 2021 from the edge of the kitchen joinery across the whole dining area. He considers the leaking pipe from 2017 flowed inside the wall cavity from the walk-in robe to the kitchen and dining area. The complainant arranged an expert (WC) to inspect the damage. WC’s report dated 17 August 2021 stated:  the crack in the eastern wall is not a ‘normal crack due to ageing’  there are no similar cracks in the other walls (north, south, west)  screws on the steel stud frame showed signs of rust, while there was no rust on screws installed at a higher position within the wall cavity  there is mould behind the plasterboard  it believes the reason for the skirting board crack is previous water damage inside the wall cavity and there might be water stocked somewhere on the left side of the steel frame stud  the mould on the back of the plasterboard lining further evidences that the plasterboard lining socketed in the water had not been replaced and the damaged lining has been left in the original place for a few years  the shrinkage of the affected plasterboard lining being damaged by water seepage is therefore highly likely the cause of the overall cracking of the skirting board on the east side wall of the kitchen/living areas. WC stated it is likely there is further damage along the eastern wall, and the whole length of cracked skirting board and plasterboard lining in the living area will need to be replaced. WC recommended to investigate if there is similar damage behind the pantry and kitchen cabinet, and the bedroom/walk in robe adjacent to the living area. Information shows the insurer is liable for the additional damage The insurer says the complainant has not substantiated the need to repair the damage according to his expert NH’s scope of works. However, the information from WC shows there is additional damage. I accept the complainant’s position that this damage is, on balance, due to the original leak rather than Determination | Case number: 825890 Page 3 of 7 new damage. This is because there is no evidence of an alternate leak within the wall cavity, the original leak was repaired, and given the likelihood of this damage occurring was flagged during the insured repairs in 2017. Given the cracks that have developed, and the rust/mould WC discovered during its inspection, I am satisfied the damage has progressively worsened and will continue to do so. The information sh ows, on balance, the insurer’s initial repairs in 2017 did not cover all the damage included in NH’s scope of works. Given the location of the current damage and the persuasive information to show this is due to the 2017 water leak, I do not consider the insurer adequately repaired the damage. This means the insurer is liable for the additional damage claimed. Insurer to repair the damage or provide a fair cash settlement offer The complainant’s initial quote from NH was for $49,852. This is dated 1 Septemb er 2017. He says this is out of date, so he obtained an updated quote from EL based on what he says is the same scope for $127,242.50, which includes replacing 177m2 of plasterboard along the entire eastern wall up to the full height of 2.60m2. The insurer says due to the amount of the quote and the fact the quote does not itemise the rooms the works pertain to, it wants the opportunity to inspect the property and conduct its assessment. The complainant says it is unreasonable for the insurer to insist on assessing the damage after it has passed on multiple opportunities to assess the damage in 2021. He says both quotes include a detailed breakdown of the costs to repair the damaged walls and based on the same floor layout plan. The complainant says he contacted the insurer and offered four opportunities for a joint inspection between August and December 2021 while the property was untena nted. However, he says the insurer failed to attend and failed to adequately respond to why it did not attend. He is no longer willing to provide a further opportunity to inspect the damage as it would disturb his current tenant’s peaceful enjoyment of the premises. I appreciate the insurer says it agreed to inspect/assess the damage in April 2020 and the complainant denied access until August 2021 (when the existing tenancy ended), this still offers no explanation as to why the insurer failed to assess the damage between 18 August 2021 to 6 December 2021 when the premises were made available for a joint inspection. Having reviewed the email correspondence between the complainant and the insurer, I am satisfied the insurer failed on multiple occasions to take up the opportunity to organise an assessment through its own expert. The insurer has not offered an adequate explanation to this in its submissions. While I accept its position that an ongoing tenancy is not a bar to a necessary damage inspection, I consider it unreasonable for the insurer to insist on this for the following reasons:  it failed to effectively coordinate with the complainant and attend the property while it was untenanted over a significant period  it has not given any consideration towards the information put forward by the complainant to establish the nature and extent of damage. The insurer is to determine whether it will repair, or cash settle the required repairs. Determination | Case number: 825890 Page 4 of 7 Given the significant costs quoted by EL and the additional repairs included in its scope of works, I consider it fair in the circumstances for the insurer to be given the opportunity to assess whether the quote is fair and reasonable. However, this must be done via a desktop assessment and if the insurer obtains a competitive quote, this must be based on an actionable quote for the complainant. The insurer is also to assess the fair and reasonable time required for the repairs and assess whether the complainant is entitled for any loss of rent during this period. 2.2 Is the complainant entitled to non-financial loss compensation? Yes. Given the insurer’s handl ing of the claim and overall delays, I consider an award of $3,000 in non-financial loss compensation is fair. Compensation may be awarded in certain circumstances Under our Rules, AFCA may award compensation for non-financial loss where there has been an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with a complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation and expects a complainant to bear a normal degree of inconvenience during a claim or when a problem occurs. The complainant is unhappy with the insurer’s handling of the claim The complainant makes several allegations against the insurer, including that it provided wrong and unprofessional advice to him. He says it required him to demolish an external brick wall to locate the pipe, when the much cheaper and more practical alternative was to break a hole in the gyprock wall lining internally. The insurer says it was the complainant ’s responsibility to repair the leaking pipe and it does not accept it provided wrong or inappropriate advice. The complainant also says after he repaired the leaking pipe, the insurer advised the pipe was still leaking. He says he had to arrange a further inspection with multiple parties at the property to investigate, only to find it was no longer leaking. He says this caused unnecessary time and financial loss. The complainant also says the insurer mistakenly interpreted his temporary sealing of the wall lining to mean he had already completed the repairs. He says this delayed the repairs for 72 days. He also says the insurer did not initially discover the mould at the property, which ignored the health and safety of the tenants. The complainant says he spent more than a hundred hours dealing with the claim. He says the insurer caused unreasonable delay and disruption, meaning the repairs were delayed. He provided a detailed timeline of the claim and a significant amount of correspondence. The complainant is entitled to non-financial loss compensation Based on the information provided, I am satisfied there are numerous delays on the claim. I consider there were instances where the insurer mishandled the claim, including its failure to Determination | Case number: 825890 Page 5 of 7 adequately respond to the complainant’s requests for inspections of the property and adequately manage the rectification of repairs. I cannot be satisfied the insurer provided wrong or inappropriate advice. However, I am satisfied its actions led to an unreasonable amount of time taken to resolve the situation and an interference with the complainant’s expectation of enjoyment or peace of mind. The insurer previously offered $1,000 as non-financial loss compensation. While AFCA takes a conservative approach to assessing compensation, I consider $3,000 more appropriate considering the degree of inconvenience caused to the complainant. 2.3 Is the complainant entitled to indirect financial loss compensation? Yes. I consider the insurer’s actions caused the complainant to suffer indirect financial loss. It is fair in all the circumstances for the insurer to pay him $5,400. It is also fair for the insurer to pay the complainant $1,496 for his expert’s report. The complainant has suffered additional indirect financial loss The insurer says the policy excludes cover for indirect loss. However, AFCA can award indirect financial loss compensation for additional loss suffered when an insurer mishandles a claim. The complainant says he did not claim loss of rent in 2017 as the policy did not cover loss of rent under this policy. He says he is claiming for the period 18 August 2021 to 6 December 2021 when the insurer ignored his requests for a joint site inspection at the property. He says without the insurer’s consent, he was not allowed to instruct his contractor to replace the affected wall lining, meaning he could not advertise the property for lease. He says this caused him to suffer loss of rent. He says this amounts to $7,928.73. The complainant says he is claiming $36,869.33 for his time dealing with the claim, additional cost for rental compensation, electricity and water charges, property manager visits and administration costs incurred. The insurer says it is prepared to review loss of rent for the period the property was uninhabitable. It also is willing to accept any compensation the complainant paid to the tenant, upon receipt of the rental ledger confirming the amount paid. It says it is not liable for any delays caused by the complainant’s agent. I am satisfied the complainant has provided information to show he incurred losses due to the insurer’s actions. This is because I consider the initial repairs were not adequate to repair the damage and the insurer has delayed the claim since the complainant raised concerns. These losses include loss of rent and compensation paid to the tenant. Given this, I am satisfied the complainant is entitled to recover the maximum $5,400 as compensation for his indirect financial loss. Under the AFCA rules, we cannot award anything further. Complainant entitled to expert report cost Under Rule D.5, AFCA may decide a financial firm is to contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000 unless exceptional circumstances apply. Determination | Case number: 825890 Page 6 of 7 The complainant’s expert W C charged $1,496 for its investigations/report. This was of material assistance to AFCA in preparing this determination. It is fair for the insurer to reimburse this cost to the complainant. Determination | Case number: 825890 Page 7 of 7 3 Supporting information 3.1 The AFCA Process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.