Text of the determination
Determination
Case number 825239
Financial firm Insurance Australia Limited
Determination | Case number: 730453 Page 2 of 8
Case number: 825239 8 June 2022
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents insurance policy (policy) with the
financial firm (insurer). On 20 August 2020, a claim was lodged for damage to the insured
building said to be due to escape of liquid from an underground water storage tank.
The insurer initially declined the claim. However, on further review by the insurer, the decision
was reversed, and liability for the claim was accepted on 24 March 2021. The insurer has
offered to cash settle the claim for approximately $113,184.03 based on a quote from building
consultants ‘J’.
The complainant has rejected this offer and is seeking a significantly higher settlement based
on a repair quote from his preferred building consultant ‘B’ in the amount of $518,690. The
complainant is seeking compensation for his claims experience.
1.2 Issues and key findings
Is the insurer’s claim settlement offer fair in the circumstances ?
No. The insurer has not adequately assessed the full extent of it ’ s liability under the claim.
This is because the proposed cash settlement is not actionable and, on balance, does not
account for all the repairs to be accepted under the claim.
Is the complainant entitled to compensation for service issues and delays?
Yes. The insurer is to pay the complainant $3,500 in non-financial loss compensation in line
with the AFCA Rules (Rules).
Why is the outcome fair?
The outcome is fair because although the available information shows not all the damage to
the insured property relates to the claimed event, the insurer’s quote is not actionable or a fair
representation of all the possible event related damage. Similarly, the quote from B seems
excessive and, on balance, includes works not covered under the policy.
Given the complainant ’s poor experience under the claim, it is fair that the insurer be required
to pay the complainant non-financial loss compensation.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is to comply with the items outlined in this determination under the heading
Mechanism to settle the claim provided in section 2.1 of this determination. The insurer is to
pay the complainant $3,500 for non-financial compensation.
Determination | Case number: 730453 Page 3 of 8
2 Reasons for determination
2.1 Is the insurer’s claim settlement offer fair ?
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including ‘Water and oil leaks’. Cover under these benefits is subject to
the conditions, limitations and exclusions specified in the product disclosure statement (PDS).
The insurer provided the complainant with the relevant policy documentation including the
PDS and certificate of insurance (COI). Therefore, the panel accepts the insurer is entitled to
rely on the policy provisions to assess its liability under the claim.
No dispute the complainant has established a valid claim under the policy
In the first instance, the complainant bears the onus to establish a valid claim. That is,
damage was caused by an event covered under the terms of the policy.
It is not in dispute a leak from the water tank caused damage to the property. As such, the
complainant has established a valid claim. The onus therefore shifts to the insurer to show it
may deny or reduce it ’ s liability by way of a policy exclusion or condition.
Insurer accepted the claim but limited its liability
The insurer initially denied the claim based on a report from its appointed engineering
consultant ‘M’. However, on being provided with persuasive information from the complainant
challenging M’s findings, the insurer acknowledged the report from M was not accurate.
The insurer reversed its decision to decline the claim and is seeking to cash settle the
complainant for the cost to repair damage it has assessed to be covered under the policy.
The insurer relies on a scope of works prepared by its appointed engineer ‘ C ’ and a repair
quote from consultants J.
The insurer acknowledges the repair quote from J is not actionable as its trades are not
prepared to complete the work. Further, that the quote from J is an estimation of the probable
cost of repairs based on a desktop assessment, given the complainant denied J access to the
insured property to complete a more accurate cost of repairs.
Experts disagree on the scope/cause of damage
The parties each engaged experts to assess the cause and extent of the damage. These
reports conflict on some points. In chronological order the reports are summarised as follows:
Insurer’s E ngineer M’s Report 28-10-2020
M inspected the property which it estimated was constructed circa 1890. It noted cracking
throughout the property and says the complainant informed it some of the cracking was
evident at the time of purchase, but it had become much worse in a short period of time since
then. The possibility of water escaping the water tank was raised during the attendance.
M concluded the tank had not leaked sufficiently to affect the property in any significant way,
and all damage throughout the property was most likely to have been caused by long term
ongoing seasonal movement brought about by a combination of the northern exposure, no
Determination | Case number: 730453 Page 4 of 8
provision for pathways at several locations along the northern elevation and significant water
uptake of nearby trees.
The insurer accepts this report is not an accurate assessment of the cause and extent of
damage and no longer relies on this report in support of its position under the claim.
Complainant’s b uilding inspector CM Report 12-11-2020
The complainant engaged a building inspector to assess the property inside and out. The
author engaged an expert to conduct soil sample testing and provided a point by point
analysis of M’s report disagreeing with much of its content.
CM concluded the damage was caused by a large volume of water escaping the water tank
and not due to general seasonal movement.
With respect to providing a scope or repairs and associated costs, CM noted the difficulty with
this particular circumstance is the unknown. Clearly the dwelling has heaved and settled
because of the free water under the building. CM says there will have to be ongoing soil tests
to ensure satisfactory soil moisture content before an evaluation for scope of repairs can be
completed.
On review of this report, the insurer accepted the claim and engaged its expert C to further
investigate the damage.
Insurer’s e ngineer C’s reports 24-4-2021 and 18-8-2021
C provided a report and scope of work. The report noted several items believed to be
maintenance issues or otherwise unrelated to the claimed event, but agreed water escaping
the tank had caused significant claimable damage.
C noted the property was 120 years old and misalignment was to be expected and identified
certain points for underpinning based on the flooring level survey. Given this, underpinning
would also not likely realign the northern wall where the water tank was located, and where
most of claimable damage was considered to be.
It also recommended a suitably experienced and qualified underpinning contractor attend the
site to provide a technical assessment and detailed quote but cautioned misalignment of floor
levels remote from the northern side were considered pre-existing and not as a result of the
claimed event.
Following several questions being raised about underpinning, the complainant agreed to the
resulting scope of work. However, a dispute arose around the cost of repairs due to materials,
labour and repair methods differing significantly.
Insurer’s b uilder J 3-9-2021
The insurer’s builder J estim ated the cost of repair at $82,539.02. The following disclaimer is
written on the quote:
THE FOLLOWING SCOPE IS BASED UPON ENGINEERING SCOPE PROVIDED BY CFT
BUILDING CONSULTANTS & ENGINEERS. THE FOLLOW ING SCOPE WOULD BE
SUBJECT TO VARIATIONS BASED UPON SITE CHECK MEASURE. PLEASE NOTE DUE
TO THE PRE-EXISTING DETERIORATING CONDITION OF THE PREMISES FROM AGE
WEAR AND TEAR, WE ARE UNABLE TO WARRANT REPAIRS AND RECOMMEND CASH
SETTLEMENT.
Determination | Case number: 730453 Page 5 of 8
J did not attend the property to confirm costings and repair methodology. The insurer
subsequently agreed the quote was not actionable and significant variations would likely be
required. As such, the panel accepts this quote is not an accurate representation of costs
required to reinstate the property to its pre-incident condition.
J also provided a separate underpinning quote for $31,416.00.
Complainant’s b uilder B 23-6-2021
The complainant provided an independent and actionable quote from builder B in the amount
of $518,690.00. The insurer rejected the quote saying it was unnecessarily high. It referred
the matter to an internal technical assessor who recommended a cash settlement more in line
with J’s quote. The panel notes the sum insured for the property is $476,000.00.
Complainant’s u nderpinning specialist ‘ U ’ 11-12-2021
C recommended an underpinning specialist attend the property for a cost accurate quote. The
insur er’s builder J provided a quote which was not based on an actual attendance. As such,
the complainant engaged independent specialist U to provide a full scope and actionable
quote in the amount of $85,305.00 including GST.
The panel notes U’s scope mentions using its own unique and patented method. It also
appears to be intended to realign all areas of the property, not just those affected by the
claimed event and which would exceed cover available under the policy. U has not provided a
detailed scope of repairs identifying what works and in what areas such works will be
completed.
On review of the above quotes, the panel accepts three things:
the quotes essentially follow the same scope of work except for the underpinning
t he insurer’s quote is not actionable and therefore not an accurate reflection of the cost of
repair
t he complainant’s quote appears excessive in terms of its costings.
Insurer entitled to cash settle the claim and limit its liability
The panel accepts the policy allows the insurer to decide how a claim is settled, including
settling the claim by way of a cash settlement.
The insurer offered the following as full and final settlement:
J ’s repair quote (excluding underpinning $15,000.00) $48,055.02
plus, quote for underpinning - $24,000.00
plus, Builders Margin 19% - $13,690.45
plus 10% GST - $8,574.55
total amount: - $94,320.02
plus 20% uplift - $18,864.01
full and final offer = $113,184.0
The complainant says the insurer does not take in to consideration the following:
J’s quote is not actionable and will require variations as the work progresses
the remote location of the property means builders will need to travel to the site, have all
materials delivered and possibly obtain accommodation during repairs
a large increase cost of repair due to Covid and other factors.
The panel as noted above, accepts the insurer is entitled to cash settle the complainant and
limit its liability under the claim. This settlement method is preferred where there exists pre-
existing damage that may impact on the insurer’s ability to complete repairs.
Determination | Case number: 730453 Page 6 of 8
The complainant does not dispute there exists damage to the building which pre-existed the
insured event and/or that is consistent with ongoing seasonal movement over the years.
However, the complainant says, and the panel accepts, the insurer’s quote is not a t rue and
accurate reflection what it will cost to repair the damage accepted under the claim.
The panel accepts the opinions from the various consultants, that given the age of and nature
of the damage the necessary underpinning works may result in additional damage and
increase building repair costs.
Mechanism to settle the claim
Having reviewed the available material, the panel is not satisfied the insurers offer sufficiently
discharges its obligations under the claim. However, it is also not satisfied the complainant’s
quotes are reasonable and appear excessive in the circumstances.
The complainant had declined access to the insurer’s consultants to undertake further
assessments so to complete a more accurate scope of works and costing. The complainant
has also faced difficulty in locating and appointing a consultant to assess and provide a quote
for repairs to the damage accepted under the claim.
As such, the panel determines, within 14 days of the complainant accepting this
determination, the insurer is to provide the complainant with details of three independent and
adequately qualified consultants from its panel of repairers.
The complainant is to choose two of these repairers who will attend the insured property to
provide repair quotes based on C’ s scope of works, which has been agreed between the
parties (including necessary underpinning works). The quotes are to include an estimate for
the time for the repairs to be completed:
The insurer, within 21 days of receiving the two quotes, is to then arrange a cash settlement
to the complainant based on and including:
the higher of the two quotes
the travel/accommodation costs, if any, for the trades as well as any required building
permits or other sundry costs
the selected quote is to be increased to include the insurer’s proposed model of 19%
builder’s margin if not already accoun ted for in the quotes, as well as the proposed 20%
uplift to a maximum of the policy sum insured
any additional benefits under the policy such as temporary accommodation for the
expected duration of the repairs based on the estimate from the repairer, if required
the insurer is to reimburse the complainant for expenses he has incurred, if any, in
arranging the consultants’ reports, up to a maximum of $5,000 upon provision of paid
invoices.
2.2 Is the complainant entitled to compensation?
Complainant entitled to compensation for service issues and delays
The AFCA Rules allow for an award of up to $5,400 for non-financial loss compensation
where an insurer’s actions caused the complainant to suffer an unusual degree or extent of
inconvenience, delay or interference. AFCA takes a conservative approach when considering
any award of compensation.
Determination | Case number: 730453 Page 7 of 8
In this instance and considering AFCA’s approach to compensation, the panel accepts the
insurer’s overall management of the claim was not to a level which would reasonably be
expected from a professional organisation for the following reasons:
the insurer initially incorrectly denied the claim requiring the complainant to engage an
independent expert to appeal this decision
t he insurer’s quote was not actionable, nor did it take into consideration the complainant’s
concerns around increased costs for materials and labour, or account for variations.
the matter has been unresolved since lodgement in August 2020, more than 18 months
prior
claim file notes indicate the initial denial took approximately 4 months and the decision was
not overturned for another 4 months, which are considered unreasonable delays in the
circumstances.
Overall, the panel is satisfied the above items would reasonably have caused the complainant
to suffer an undue degree of stress, inconvenience and physical inconvenience. The panel
determines the insurer is to pay the complainant $3,500 in non-financial loss compensation.
Why is the outcome fair?
The outcome is fair because although the available information shows not all the damage to
the insured property relates to the claimed event, the insurer’s quote is not actionable or a fair
representation of all the possible event related damage. Similarly, the quote from B seems
excessive and, on balance, includes works not covered under the claim.
G iven the complainants’ poor experience under the claim, it is fair that the insurer be required
to pay the complainants non-financial loss compensation.
Determination | Case number: 730453 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.