Home / Allianz Australia / Determination 824692

Determination 824692

Claim progression and cash settlement withdrawal following escape of water

FirmAllianz Australia
Decided2022-05-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$2,500
Amount claimed$22,227
SourceAFCA PDF

Summary

A home insurer accepted a water escape claim but withdrew a cash settlement offer of $22,227.05 made in error by its assessor, and held off repairs pending soil drying. AFCA ordered the claim progressed without delay under a prescribed scope of works and awarded $2,500 non-financial loss.

Given the time elapsed within the expert drying period and the impact on the complainant's health, it is fair to progress the claim now, and the insurer's poor customer service justifies non-financial loss compensation.

Issues

Subjects and remedies

elderly or capacityhealth or medicalhome or building damagethird party authoritypay non financial lossprovide documentsreassess claim

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 82 4692 Financial firm Allianz Australia Insurance Limited (Allianz) Determination | Case number: 824692 Page 2 of 7 Case number: 821584 28 April 2022 1 Determination overview 1.1 Complaint This complainant lodged a claim under her home and contents insurance policy held with the financial firm (insurer) for damage to the insured property caused by an escape of liquid. The insurer accepted the claim. However, the insurer says repairs to the property should not commence before the soil below the building has fully dried. Otherwise, the insurer says, further damage may occur to the property as the soil continues to dry. The complainant says that, via its assessor (SE), the insurer offered her $22,227.05 as a cash settlem ent for her claim. The complainant would like to immediately accept this offer, albeit she is aware there may be further damage and repair costs once the foundation soils completely dry. The complainant says she is content to take this risk. The complainant is an older person with several health issues. She says she is stressed, depressed, frustrated and upset about the entire claims process and just wants her claim settled as soon as possible so that she can have her home repaired and move on. 1.2 Issues and key findings Should the insurer progress the complainant’s claim as soon as possible? Yes. Given the exchanged material, and the circumstances involved in this particular complaint, the insurer must progress this matter and meet the complainant’s claim under the terms and conditions of the policy, and in accordance with the provisions of this determination, without delay. Should the insurer pay non-financial loss compensation? Yes, the insurer should pay $2,500 in non-financial loss compensation to the complainant. Why is the outcome fair? Whilst the insurer’s decision to continue to wait has some merit, the passage of time and the circumstances involved in this particular complaint dictate that, at this time, it is fair and reasonable for the insurer to progress the complainant’s claim as soon as possible. The award of non-financial loss compensation is fair because the complainant has experienced an unusual degree of physical inconvenience, time taken to resolve the situation and interference with her expectation of enjoyment or peace of mind. 1.3 Determination This determination is substantially in favour of the complainant. The insurer must progress the complainant’s claim in accordance with the terms and conditions of the policy and the provisions of this determination, as soon as possible. Determination | Case number: 824692 Page 3 of 7 Further, the insurer should pay $2,500 in non-financial loss compensation to the complainant. 2 Reasons for determination 2.1 Should the insurer progress the complainants claim? No dispute damage has occurred that is covered by the policy The following issues are not in dispute:  On 24 November 2020, the complainant contacted the insurer to lodge a claim for cracking damage at her home resulting from a burst pipe which occurred on around 1 October 2020  The complainant paid for the burst pipe to be repaired on around 19 November 2020  After inspecting the premises, the insurer’s loss assessor SE appointed a building consultant and engineer (AA) to provide an engineering report in relation to the cracking damage ( AA’s f irst report dated 18 December 2020)  AA said that the cracking damage was a direct result of differential footing movement caused by escape of water from a ruptured water pipe beneath the laundry area of the building  Later investigations led to the conclusion that a very substantial amount of water had escaped into the soil beneath the premises. In fact, it was estimated that more than 225,000 litres of water had escaped the burst pipe  The insurer accepted the complainant’s claim in accordance with the terms and conditions of the policy. AA’s first report In its first report AA recommended, amongst other things, that the foundation soils beneath the dwelling should be left to dry and to stabilise for a minimum period of 12 months prior to any repairs being undertaken. Subsequently, this period was increased to 18 to 24 months. Meanwhile, the complainant provided an initial quotation for repairs from building group (LB) to ascertain the quantum of the loss already sustained. The quotation totalled $22,114.25. The complainant subsequently provided further quotations and requested to be cash settled for the costs associated with underpinning of her premises and internal repairs. The insurer, through SE, offered to pay the complainant $22,227.05 to repair the damage arising from the leak. The complainant accepted this offer and signed and returned an electronic funds transfer form to SE. However, the insurer said that the cash settlement offer was made in error by SE. The cash settlement offer was then withdrawn by the insurer. The insurer said that repairs to the premises were unable to be undertaken until an engineer confirmed the soil had dried adequately to prevent further damage. AA’s second report AA inspected the property again in September 2021, about nine months after its first inspection. Determination | Case number: 824692 Page 4 of 7 In its second report dated 22 September 2021, AA noted the following:  internal and external damage throughout the dwelling remain relatively unchanged  the top surface of the foundation soils has dried significantly since 7 December 2020  a floor level survey shows further settlement along the western and eastern edges of the dwelling, which indicates drying of the foundation soils. AA’s engineer concluded that, although the top surface of the foundation soils had dried significantly, the soils below the surface would take a longer time to dry and stabilise. As the soils continue to dry, the dwelling will continue to settle, which may result in additional damage. The insurer then maintained its view that damage to the property will not stabilise until the soil has dried. Accordingly, the insurer submitted that it could not accurately determine the amount of the complainant’s loss until the drying process was complete. Conclusion Given the exchanged material, and the circumstances involved in this particular complaint, the insurer must progress this matter and meet the complainant’s claim under the terms and conditions of the policy, and in accordance with the provisions of this determination, without delay. I am satisfied that the first and second reports from AA are thorough, logical, compelling and supported by helpful photographs. However, my determination (that the insurer must progress this matter and meet the complainant’s claim under the terms and cond itions of the policy without delay) is also based upon, amongst other things, the following considerations:  It has now been more than 18 months since 1 October 2020, being the date the insured event occurred. This is within the 18 to 24 month drying period recommended by the experts  A further period will elapse before the terms and provisions of this determination are completed, during which time the drying process will continue  There is evidence that the premises has further levelled since AA’s second insp ection in September 2021  P rolonging this claims process is adversely affecting the complainant’s health. The comprehensive nature of the reports from AA should form the basis of any scope of works (SOW). In this regard the reports offer a great deal of assistance. As per paragraph 7.4 on page 15 of AA’s second report, w ithin 14 days of the date of this determination the insurer must engage a qualified engineer or other suitably qualified expert to draw up a SOW regarding the necessary repairs to the premises. Then, within a further 14 day period, the insurer is to obtain at least one actionable quote based on the SOW, either by way of a tender process or otherwise. The SOW and the associated quotation(s) must include at least the following works:  Re-level the internal floor as best as practicable by jacking and packing the timber subfloor frame and brick piers below the dwelling  Suitably repair all cracks and separation gaps throughout the interior of the dwelling  As the waterproofing membrane within the wet areas have been compromised, complete refurbishment of the bathrooms as required  Prepare and paint all ceiling and walls that have been damaged  Rake out and repoint all cracks to the external brick walls. Determination | Case number: 824692 Page 5 of 7 I also determine that the insurer must obtain an estimate of the time it would take for the repairs to completed. The insurer should also pay to the complainant the costs of alternate accommodation required during the repair-period, in accordance with the terms and conditions of the policy. Within seven days of its receipt of the SOW and associated quotation(s), the insurer must ask the complainant whether she wants the insurer to manage and conduct the repairs or whether she wants a cash settlement. If the complainant decides she wants a cash settlement the insurer must add a 20% contingency to the total of the settlement sum. This is to factor in the risk of the works passing to the complainant and the likely possibility that variations would be required as repairs progress. 2.2 Should the insurer pay non-financial loss compensation? Yes, the insurer should pay non-financial loss compensation to the complainant in the sum of $2,500. Compensation is awarded conservatively Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Insurer should pay $2,500 in non-financial loss At the complainant’s request, an initial quotation for repairs was obtained from L B to ascertain the quantum of the loss already sustained. The quotation totalled $22,114.25. The complainant subsequently provided a further quotation and requested to be cash settled immediately based on her quotes of $34,000 for underpinning and $15,800 for internal repairs. The insurer, through SE, offered to pay the complainant more than $22,227.05 to repair the damage caused by the water leak. The complainant accepted this offer and signed and returned an electronic funds transfer form to SE. The insurer says that the cash settlement offer was made in error by SE as there had been a miscommunication between its claims team and SE. The offer of a cash settlement was then withdrawn by the insurer. The insurer says that, whilst SE can make recommendations to it, it does not necessarily have to follow such recommendations. Further, in this case, it had advanced good reasons as to why it no longer wished to cash settle the claim at that earlier stage. I am satisfied however that, due to the insurer’s actions , the complainant has suffered an additional level of stress and inconvenience than that which she would have ordinarily Determination | Case number: 824692 Page 6 of 7 experienced. This is because she relied upon the representation made by SE that she would be cash settled with an amount of $22,227.05, which did not eventuate. The insurer has not adequately explained the miscommunication between its claims team and SE to the complainant and it has not apologised for such an error. It is reasonable to conclude that the complainant experienced poor customer service from the insurer in this regard. I also note that the complainant supplied the insurer with her quote for underpinning works . It is not clear whether the insurer explained to the complainant that AA has proposed a different method of repair for levelling the floors of the premises and why this was more appropriate than the underpinning works included in the complainant’s quotation. This caused additional stress and uncertainty for the complainant. Further, I note that the cost of re-levelling the floors does not appear in the scope of works that the insurer was going to cash settle on and, therefore, such a scope of works was not accurate. Given all this, and considering our conservative approach, it is fair in all the circumstances for the insurer to pay $2,500 in non-financial loss. 2.3 Why is the outcome fair? Whilst the insurer’s decision to continue to wait has merit, the period which has elapsed since the date of loss, and the circumstances involved in this particular case, dictate that it is fair and reasonable for the insurer to progress the complainant’s claim as soon as possible. The award of non-financial loss compensation is fair because the complainant has experienced an unusual degree of physical inconvenience, time taken to resolve the situation and interference with her expectation of enjoyment or peace of mind. Determination | Case number: 824692 Page 7 of 7 3 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. Please note that the complainant has been assisted by her daughter (JO) throughout the course of this complaint. Any reference to JO is also to be taken as a reference to the complainant. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.