Text of the determination
Determination
Case number 824497
Financial firm The Hollard Insurance Company Pty Ltd
Determination | Case number: 824497 Page 1 of 10
Case number: 824497 28 October 2022
1 Determination overview
1.1 Complaint
The complainants held a Home and Contents policy with the financial firm (insurer) and
lodged a claim on 17 May 2017 for damage to their home during Cyclone Debbie in April
2017. The insurer accepted the claim and authorised repairs.
Issues arose with the quality of the repairs in May and June 2019 and in January 2020 after
the property sustained further damage during a storm. The complaint was subject of an AFCA
determination 712274. The determination required the insurer to appoint an engineer to
assess the damage, prepare a scope of works (SOW) and remediate the faulty repairs and all
mould contamination.
While further repairs were completed, the complainants say the insurer has failed to rectify
the faulty workmanship and seeks:
additional payment for their contents items
replacement of the kitchen stored in the garage
cash settlement for the rectification of faulty repairs including roof replacement, repairs to
the doors and walls, replacement of the solar system and mould remediation.
1.2 Issues and key findings
Are the complainants entitled to additional payments for damage to contents?
No. The complaints have already been cash settled for the contents sum insured of $90,000.
The contents include the kitchen that was stored in the garage. The insurer has no liability
beyond the sum insured for contents damage.
Is the insurer liable to cover the cost to rectify the faulty workmanship?
Yes. The available information confirms there are ongoing issues with the repairs. It is fair
that the insurer appoints an independent structural engineer to assess the ongoing damage
and prepare a relevant SOW. This can then be used to cash settle the claim as set out in
section 2.2 of this determination.
Is the insurer liable for additional mould remediation works?
Yes. It is fair the insurer arranges a further assessment of the mould contamination and
prepare a SOW for the mould remediation. The insurer can cash settle the mould remediation
as set out in section 2.3 of this determination.
Is any non-financial compensation warranted?
Yes. The complainants have suffered an unusual degree of physical inconvenience and time
taken to resolve the situation. It is fair the insurer pays compensation of $5,400 for non-
financial loss.
Determination | Case number: 824497 Page 2 of 10
Why is the outcome fair?
The outcome is fair as it is clear there are ongoing issues with the repairs and the
complainants have lost faith in the insurer’s ability to complete the repairs and mould
remediation. While the insurer has paid the contents sum in full it is fair to pay the
complainants $5,400 non-financial loss compensation due to the poor claims management.
1.3 Determination
This determination is partially in favour of the complainants. Within 21 days of the
complainants ’ acceptance of this determination the insurer is to:
appoint an independent structural engineer to assess the damage to the property and
prepare a SOW to complete the repairs.
on receipt of the independent engineers SOW arrange for two independent builders to
provide actionable quotes to complete the repairs. The insurer can then cash settle the
complainants for the higher quote plus a 15% uplift to cover contingencies
arrange an assessment of the mould contamination and SOW and quote for the mould
remediation. The insurer can then cash settle the mould remediation based on the quote
obtained plus a 15% uplift to cover contingencies.
if not already done, it should finalise the payment of $17,066.61 for the internal kitchen
pay the complainants $5,400 compensation for non-financial loss under AFCA rule D3.3
Determination | Case number: 824497 Page 3 of 10
2 Reasons for determination
2.1 Are the complainants entitled to additional payments for
damage to contents?
No. The complaints have already been cash settled for the contents sum insured of $90,000.
The contents include the kitchen that was stored in the garage. The insurer has no liability
beyond the sum insured for contents damage.
Insurer says it had already covered the cost for contents under the policy
The contents sum insured under the terms of the policy was $90,000. The insurer previously
settled the complainants $51,883.05 for the following items:
blind replacement - $1,553.75
contents cash settlement (one bed plus storage shelf) - $870
contents cash settlement (mattress, base, MK4 mattress, delivery) - $4,698
contents cash settlement (lounge two drawer des, dining set, delivery) - $1,662
contents cash settlement (dressing table, tallboy x 2, bedside table) - $4,395
contents cash settlement - $20,357.88
Harvey Norman invoice - $3,689
contents cash settlement - $14,657.42.
The insurer emailed the complainants on 15 March 2021 to advise it had covered:
contents partial payment
carpet quote
relocation of contents
contents cleaning
restoration costs
Harvey Norman.
The insurer made a final additional payment of $38,116.95 which covered the remaining sum
insured listed on the policy.
Complainants say they are entitled to a further contents cover
The complainants say the insurer allocated some of their contents sum insured to restoration
and cleaning. In the listed amounts it states, ‘contents cleaning’. The complainant s have not
elaborated on why the items should not have been cleaned. There is also no clarification on
which contents items these were.
Based on the policy terms and conditions, the insurer is to determine whether the contents
items should be replaced or restored.
The complainants listed various contents items they are seeking coverage for, outlining
contents not replaced by the insurer and items disposed but not replaced. They say due to
the insurer’s negligence and faulty workmanship; the insurer should be covering additional
contents items.
The complainants also claim the costs of replacing a kitchen that was stored in the garage.
The kitchen was valued at $34,901. They say this should be included in the building sum
insured as it could have been used to replace/ repair the damaged kitchen.
Determination | Case number: 824497 Page 4 of 10
Insurer is entitled to rely on the policy terms and conditions to limit its liability
The policy outlines, on page 8, the definition of contents and refers to the limits that apply
overall and for certain contents. There are fixed amounts for certain items and the certificate
of insurance outlines the sum insured. As noted above, the sum insured of the contents is
$90,000. The complainants have, at no time, disputed the sum insured for contents.
There is no evidence that the additional items claimed were damaged in a separate insured
event or during the repair process. As for the kitchen stored in the garage this was disposed
of because it was water damaged and mould affected. The policy provides as follows:
Contents (in the home you live in):
Contents means any hous ehold goods or pers onal
belongings, us ually kept in y our home, that you own or are legally
res ponsible for. If your building is al so
ins ured by y our policy we will c onsider building mat erials on sit e
due t o be inst alled wit hin t he ins ured building [inc luding it ems
suc h as c upboards or sink s] as c ont ents.
The kitchen was stored on site in the garage. It is not clear if it was to be installed in the
home. The insurer has correctly classified the kitchen as a content within the terms of the
policy.
The policy is clear. The maximum amount payable under the policy for contents is the sum
insured. The onus is on the complainants to ensure the policy limits suit their needs and the
insurer is not liable for a policyholder’s underinsurance.
It is fair the insurer is entitled to rely on the policy terms and conditions to limit its liability for
the loss and damage to contents to $90,000.
2.2 Is the insurer liable to cover the cost rectify the faulty
workmanship?
Yes. The available information confirms there are ongoing issues with the repairs. It is fair
that the insurer appoints an independent structural engineer to assess the ongoing damage
and prepare a relevant scope of works (SOW). This can then be used to cash settle the claim
as set out in section 2.2 of this determination.
Complainants say the insurer should cover all faulty work in their home
The complainants listed issues they say are a direct result of the insurer’s faulty
workmanship, these are:
the cornices were not sanded down correctly
the walls are water damaged, and have noticeable bows in them
the walls were also not painted correctly
the ceiling heights were below 2.4 meters and not done in accordance to Australian
Standards
the downpipes were never replaced, and gutters are blocked
some doors need replacing due to swelling from water damage
some windows are cracked and require replacing
the solar system was repaired and replaced, but does not work
Determination | Case number: 824497 Page 5 of 10
the home requires re-painting once the issues with the ceiling, cornices, doors and walls
are rectified.
The complainants submitted a builder’s report and quote from EWB. This quote mentions the
roof trusses have sagged due to high volumes of water resulting in the ceiling height being
below the recommended height under the building code.
EWB also advised the roof was designed to have roof tiles and the current roof is iron. There
appears to be no evidence of additional fastenings being installed to the trusses and walls to
ensure the iron roof will be not be compromised in high winds.
Insurer’ s building assessment indicates structural engineer needed to settle
SOW
The insurer appointed building company AB to assess the damage on 9 August 2022. AB
noted similar issues with the roof and ceiling as did EWB. AB noted:
AB had not been supplied with the SOW completed by the original builder nor any
supporting engineer reports, invoices, or building certification documentation.
the ceiling height throughout the property is under 2.4m. This has likely been caused by
the original builder installing battens to the trusses which has lowered the ceiling height. It
may be possible to obtain a performance solution by a building certifier/engineer to
achieve a suitable outcome for the lower ceiling height.
the painted wall linings have poor adhesion which may be due to lack of primer before
painting wall linings.
the tiled roof had been replaced with a metal roof. AB was unsure if the tie downs to the
property are suitable for a metal roof to be installed. This may have been inspected by the
appointed engineer or certifier however we have not been provided these documents.
the complainants want the ceiling replaced to a 2.4m ceiling height.
the complainant says the wall framing is not straight and believes the walls have moved
following the water ingress from their leaking roof.
the complainants say the driveway has cracked due to trades driving their vehicles on it.
The cracks appear to be normal movement cracks and not related to any rectification work
or damages caused by trades.
AB concluded that it could not compile an accurate SOW per the complainant’s request. In its
professional opinion a structural engineer should be appointed to provide a comprehensive
scope of works and to address and non-compliance and/or performance solutions for the
property.
Insurer has failed to rectify faulty workmanship or complete repairs
The insurer has sent its SOW, showing the works it completed in April 2021. The
complainants did not return to the property until July 2021.
The complaints notified the insurer of issues with the repairs and faulty workmanship. There
appears to be no dispute the insurer requested a builder reinspect the works in December
2021. The complainants had raised concerns with the faulty workmanship. No report was
provided. It is unclear why the insurer did not follow up on this report.
The AFCA complaint was lodged on 9 June 2022. The complainant provided the report from
EWB dated 2 June 2022. The insurer’s claims team contacted the complainants in late June
to advise there were some works it was prepared to rectify. It is unclear how the claims
department were aware of pre-existing issues, when no one attended the home prior to this
email being sent.
Determination | Case number: 824497 Page 6 of 10
The complainants refused to allow the claims team onsite after their poor experience with the
previous builder. The insurer then appointed an independent builder (AB) to attend the home.
The panel notes AB was provided no information about the works previously completed, no
engineering reports nor the report from EWB.
Insurer is to appoint independent structural engineer
The panel is satisfied that the information provided by EWB and AB confirms there are
ongoing issues with the repairs that need to be rectified. It is clear there are issues to the
ceiling and roof.
The panel acknowledges the complaints desire that the claim now be cash settled. This is fair
given the breakdown in the relationship between the parties. It is fair that the cost to complete
the repairs be based on a SOW prepared by an independent structural engineer and costed
by an independent builder.
The panel determines that within 21 days of the complainant’s acceptance of this
determination, the insurer appoint an independent structural engineer to attend the property,
assess the damage and prepare a SOW to complete the repairs. The structural engineer is to
be provided full documentation including particulars of the SOW already completed by the
original builder, all relevant engineering and building reports, plus copies of the reports from
EWB and AB.
On receipt of the independent engineers SOW, the insurer is to arrange for two independent
builders to provide actionable quotes to complete the repairs. Given the breakdown in the
relationship between the parties it is fair that the insurer cash settle the complainants for the
higher quote plus a 15% uplift to cover contingencies
Insurer should cash settle kitchen repairs as quoted
The insurer says the complainants have not submitted an itemised quote for the kitchen. It
says without this, it cannot establish whether the quantities and materials were correctly
covered.
The insurer advised it offered $17,066.61 for the internal kitchen and noted the following:
it was prepared to arrange for repairs to the kitchen
the complainants advised they wanted to conduct upgrades and requested a cash
settlement based on the scope of works
the quote provided by the complainants was not itemised and does not provide any details
or explanation whether the quote includes the upgrade.
The complainants say when they search kitchens online, the costs range between $18,000-
$25,000 for a newer, smaller kitchen. The complainants were expecting a higher settlement.
The complainants latest quote from EWB prices the replacement of the kitchen at $23,000. It
is not clear what upgrades this includes.
Although the panel appreciates the complainants’ position, the insurer is only obligated to
settle the complainants the amount the insurer would have to pay to reinstate the kitchen. The
complainants have asked to cash settle the kitchen repairs, so they can complete some
upgrades. In the circumstances it is fair that the insurer cash settles the repairs for what it
would have cost to repair the kitchen.
If the insurer has not made the payment of $17,066.61 for the internal kitchen, it is to do so
within 21 days of this determination being accepted.
Determination | Case number: 824497 Page 7 of 10
Other matters
The complainants also raised concerns during calls and emails with AFCA regarding the
damage to the laundry and pet accommodation. Regrettably, AFCA does not have enough
information to confirm:
in what way these issues were not addressed by the insurer
whether the complainants were able to find accommodation for their pet where the insurer
could not
whether the payment/repairs to the laundry were complete.
If the insurer has any payment outstanding for the laundry repairs, it is to finalise this with the
complainants within seven business days. Otherwise, no further action is required.
2.3 Is the insurer entitled cover additional mould remediation
works?
Yes. It is fair the insurer arranges a further assessment of the mould contamination and
prepares a SOW for the mould remediation. The insurer can then cash settle the mould
remediation based on the quote obtained plus a 15% uplift to cover contingencies.
Female complainant is now unwell from the mould
The complainants say the female complainant contracted an illness from the mould in the
walls. Based on the submissions, the complainants say the mould would not be an issue had
the insurer appropriately addressed the roof/ceiling and wall repairs.
The complainants have not submitted any medical records to confirm the illness experienced
by the female complainant is from mould contamination, nor any recommendation by any
experts to have the complainants live elsewhere due to the mould.
The panel acknowledges the comments made by EWB addressing the mould. However, there
are no images or details (such as invasive investigations) confirming how EWB concluded the
mould is within the walls and is also causing the health issues.
The insurer verbally advised the mould remediation works would continue
The insurer says the remediation works would continue to take place by its restorer (S). It is
unclear whether the insurer had communicated this to the complainants while the restorer
was being organised (during this complaint process).
Insurer is to cash settle mould remediation
The last mould remediation report from IEC is dated 24 March 2021. This is before the
complainant returned to the property or the repairs were completed.
The insurer had an opportunity to address the complainants’ various concerns surrounding
mould when it appointed an assessor back in December 2021. The panel is not satisfied the
insurer has adequately addressed the concerns surrounding the mould remediation.
The panel considers it fair that the insurer appoints an appropriately qualified mould
remediation specialist firm to conduct a further assessment of the mould. If further mould
remediation is required, the remediation specialist is to prepare a SOW and actionable quote
Determination | Case number: 824497 Page 8 of 10
for the mould remediation. The insurer is can then cash settle the claim for mould remediation
based on the scope of works and quotation plus a 15% uplift to cover contingencies.
2.4 Is any non-financial compensation warranted?
Yes. The complainants have suffered an unusual degree of physical inconvenience and time
taken to resolve the situation. It is fair the insurer pays compensation of $5,400 for non-
financial loss.
AFCA awards non-financial loss compensation on a conservative basis
Under the AFCA Rules, up to $5,400 can be awarded to a complainant for non-financial loss
compensation where a complainant experiences an unusual degree of physical
inconvenience or time taken to resolve a situation.
AFCA takes a conservative approach to the award of compensation and expects a
complainant to be moderately robust in dealing with the inconvenience occasioned by an
insured event.
The insurer is to pay $5,400 in non-financial loss compensation
The complainants submitted several emails requesting the December 2021 report. The
insurer had no explanation as to why this report was not submitted.
The panel accepts this would cause severe distress to the complainants because they let
another person in their home to conduct an assessment and report on the defects. The
complainants have had to wait on the report and the insurer made no attempts to assist them
in obtaining their own reports.
The complainants mentioned, once their items were cleaned by the insurer (such as the
memorabilia and the TV’s), nothing was set up or re -installed when they returned home. The
panel considers this would be frustrating for the complainants because they assumed the
insurer cleaned and replaced all items. The complainants also emailed the insurer to have
these items set up, but says they were ignored. The insurer has not responded to these
allegations.
The insurer has not expedited the complaint or made attempts to assist in addressing all their
concerns in a timely manner. The insurer had ample time to re-organise a builder and/or an
engineer during the earlier stages of this complaint’s process, however, only appointed
someone after several months had passed.
The panel also notes the report itself was limited as the insurer had not provided all relevant
information to AB. For the insurer to not engage an engineer earlier has shown poor claims
handling.
The panel considers this stress and inconvenience warrants the maximum cap AFCA can
award, being $5,400.
The panel also considers it fair the insurer reimburses the complainants for any
reports/quotes obtained. The maximum which can be awarded under the AFCA approach is
$5,000. The complainants are to provide invoices for these reports/quotes to the insurer.
The insurer should pay these amounts to the complainants within 21 days of the insurer
receiving the invoices from the complainants.
Determination | Case number: 824497 Page 9 of 10
2.5 Why is the outcome fair?
The outcome is fair as it is clear there are ongoing issues with the repairs and the
complainants have lost faith in the insurer’s ability to complete the repairs and mould
remediation. While the insurer has paid the contents sum in full it is fair to pay the
complainants $5,400 non-financial loss compensation due to the poor claims management.
Determination | Case number: 824497 Page 10 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes an ombudsman, a member with significant experience in consumer and small
business advocacy and a member with extensive experience in insurance.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.