Home / AIG Australia Limited / Determination 823599

Determination 823599

Strata insurer's liability for fire reinstatement costs, offset of temporary accommodation and loss of rent payments, temporary protection, and claims preparation costs

FirmAIG Australia Limited
Decided2022-11-04
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded$378,000
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The owners' corporation disputed the insurer's settlement of a fire claim, including withholding of funds to offset temporary accommodation and loss of rent paid to unit owners. AFCA ordered payment of cladding costs, release of withheld funds, and payment of certain professional fees in full, while rejecting claims for further carpet, locksmith, claims preparation, and compensation.

The policy's temporary accommodation and loss of rent benefits are payable to unit owners under a separate benefit, so there is no basis to offset them against the owners corporation's indemnity absent clear agreement.

Issues

Subjects and remedies

related party investmentpay claimpay compensationpay interestreassess claim

Related

All AIG Australia Limited determinations · Find similar determinations

Text of the determination

Determination Case number 823599 Financial firm AIG Australia Limited Determination | Case number: 823599 Page 1 of 20 Case number: 823599 28 October 2022 1 Determination overview 1.1 Complaint This complaint was lodged by the representative/chairperson of the Complainant (OC). While the chairperson has changed, the OC appointed loss/risk management company (LM) to represent it in this complaint. As such, any reference to complainant includes the OC, OC‟s representative(s) and LM. The OC holds a strata title insurance policy with the financial firm (insurer) and lodged a claim for fire damage to the insured premises which occurred on 4 February 2019. The property was evacuated and assessed for safety before residents/tenants could return. The insurer assessed the claim acknowledging that urgent repairs were required before access to the building was allowed. The insurer subsequently determined its liability for the loss caused by the fire and provided settlement to the complainant to authorise their own repair (at their request). Damage to the property varied and some 14 units remained uninhabitable for an extended period. The insurer considers about 7-8 months of the delay was caused by the OC. As such, it withheld $249,000 (paid to, or for the benefit of individual unit owners for loss of rent or temporary accommodation in that time), from the building repair settlement. The complainant disagrees with the insurer‟s settlement of the claim and says the insurer has no basis under the policy to off-set the $$249,000 payment, against settlement for material damage. The complainant also raises concerns regarding the insurer‟s handling of the claim. Is the insurer required to cover additional re instatement? For reasons outlined in section 2.1 of this determination, the insurer:  is required to cover the following costs: > $49,445 for fire affected external cladding > pay the balance owing on reinstatement costs (if it has not already done so) which it estimates at $46,487.90, in its submission to this service of 4 February 2022  is not required to make payment beyond what it has assessed as its liability for the smoke alarm/system, sprinkler system and common area carpet. Can the insurer off-set temporary accommodation & loss of rent payments against reinstatement payment due? No, the insurer cannot off-set one cost against the other as the policy clearly provides reinstatement costs for the insured (OC) and temporary accommodation and/or loss of rent receivable benefit to the insured (Unit/Lot owners) as defined in the policy terms. The insurer is required to release the full amount it withheld from the OC (estimated at $249,574.12. It is also to provide the complainant with all documents which support its calculation/spreadsheet setting out how these amounts were disbursed. Determination | Case number: 823599 Page 2 of 20 Is the insurer liable for additional ‘temporary protection’ benefit payments? Yes, it is fair in the circumstances that the insurer increases the percentage of the costs it has covered to 50% of the full cost of security and concierge fees. The 50% reduction is to account for attendances which relate to repairs to individual unit smoke alarms/systems and other repairs, updates to items or areas of the premises not damaged by the fire or during the firefighting process. The insurer is entitled to limit its obligations to the complainant regarding locksmith fees. Access to the non-damaged units was not required but for the Council order. The costs regarding the non-damaged units arose because of the absence of a master key, not the insured event. Is the insurer liable for any additional claims preparation or professional costs? No. The insurer has already disbursed the maximum policy entitlement for claims preparation to the complainant. Should the insurer pay any compensation or other costs? The insurer is not required to pay compensation as the available information does not support a conclusion that the overall handling of the claim was unsatisfactory. Further, the insurer is not required to contribute to LM‟s fees. However, the insurer is to pay BE and GJ in full and contribute $1,000 to costs incurred for FC. 1.2 Determination This determination is substantially in favour of the complainant. The insurer is to make payments or cover additional costs set out in the provisions of section 2 in this determination. Determination | Case number: 823599 Page 3 of 20 2 Reasons for determination 2.1 Is the insurer required to cover additional reinstatement? Circumstances of the complaint A fire occurred at the insured property on 4 February 2019. The insured property is a 41- storey building, housing about 371 units/apartments. Following the fire, the property was evacuated and assessed for safety. Just over 60 units suffered damage including:  thermal fire damage to the balcony and façade of levels 21 – 27  significant damage from the activated sprinklers and the Metropolitan Fire Brigade (MFB), as well as smoke and heat from the fire to apartments 09 on Levels 21 – 27  significant areas of the building damage to apartments 01, 02, 09 and 10 on levels 18 - 25 (to varying degrees) because of water from the sprinklers and MFB.  smoke damage to some apartments on level 28. After assessing the damage, the insurer accepted the claim. It worked with the OC and other agents to organise:  urgent make-safe to allow access into the building  established a scope of cover/liability for material damage caused by the fire  settlement in form of payments to the OC and/or other trades/service providers, and  provision of temporary accommodation (TA) and loss of rent (LOR) payments to unit owners. As of 31 January 2020, 14 units remained uninhabitable with their repairs being completed in or around August 2020. This complaint relates to the insurer‟s assessment of its liability including for some building damage, cost relating to common area carpets, claims preparation costs and professional fees. The complainant says the insurer has not acted in line with the policy terms and sections 13 & 14 of the Insurance Contracts Act 1984 (the Act). It also says the insurer has incorrectly withheld payment for building reinstatement, to off-set costs it incurred in providing extended TA and LOR payment to 14 unit/lot owners from 31 January 2020. The complainant says the insurer should cover all costs relating to repair works completed (mainly to the alarms system) so the emergency orders could be lifted. It says these works relate to the fire (or is a consequence of the incident), needed to be done for the fire damage to be repaired and the costs incurred in meeting these orders meant the insurer could mitigate against additional costs. The complainant also says the insurer should cover the full costs for locksmith and security guards‟ services on the basis that access, and security were needed by the insurer to effectively assess and process the claim. Additionally, the complainant says the access;  was needed to retrieve unit/lot owner‟s content and th is would have been required in any case for the removal and storage of contents under the policy  the locksmith and security costs fall under the policy‟s temporary protection benefit  therefore, all costs should be covered. Further, the complainant is seeking indemnity for professional costs incurred because of the Council appointing a forensic engineer at the OC‟s cost. The complainant also says the services provided by the body corporate management company, for which the OC utilised the Determination | Case number: 823599 Page 4 of 20 $50,000 claims management payment the insurer made to it , does not constitute „claims management‟ therefore , this sum should be made available for LM‟s cost s. LM is of the view that its services more appropriately fits the definition of claims management. Policy cover is subject to conditions The strata policy is held by the OC and provides indemnity/ benefits, some of which are for the OC and others to individual lot/unit owners. The terms of cover are set out in the policy schedule and product disclosure statement (PDS). Cover provided for the insured building is pursuant to section 1 of the policy. The terms include: 1. The Indemnity We will pay You up to the Sum Insured specified in the Schedule for Building(s) and Common Contents, for accidental loss or damage to the Building(s) or Common Contents which occurs during the Period of Insurance. We will not pay You under Section 1 of the Policy in respect of any of the matters set out in the Exclusions or the General Exclusions. You must comply with the Special Conditions in Section 1 and the General Conditions. (emphasis added) There is no dispute the insured property suffered fire damage which is covered under the above section. The insurer accepted and processed settlement to the OC, for the cost of repairs to fire damaged areas of the building, as the OC elected to have its builder (LU) complete the works. The insurer also made payment for replacement of affected carpet under the policy cover for common contents. However, a dispute remains about the in surer‟s liability under this section of the policy. Policy covers reinstatement of damaged property only Page 24 of the PDS contains clauses relating to the basis of settlement for claims under section 1 of the policy. Clause 6.1 says the amount payable is calculated based on: …the cost of Reinstatement of the Property Insured damaged at the time of its Reinstatement subject to the following provisions and subject also to the terms, conditions and limit(s) or sub-limit(s) of liability of the Policy: Reinstatement is defined in the policy to mean: > … > where property is damaged, the repair of the damage and the restoration of the damaged portion of the property to a condition substantially the same as but not better or more extensive than its condition when new. The policy also covers extra costs of reinstatement as outlined in clause 4.8 of section 1 in the PDS. 4.8 Extra Costs of Re-instatement Applicable to Buildings insured by the Policy lost or damaged as a result of an Incident covered under Section 1 of the Policy. The Policy extends to include the extra cost of reinstatement including demolition or dismantling necessarily incurred to comply with the requirements of any Act of Parliament Determination | Case number: 823599 Page 5 of 20 or Regulation or any By-Law or Regulation of any Municipal or other Statutory Authority, subject to the following provisions and subject also to the terms, conditions, limit(s) or sub limit(s) and exclusions of the Policy: > the work of reinstatement … must be commenced and carried out within 12 months, failing which We will not be liable to make any payment beyond the amount which would have been payable under the Policy if this provision has not been incorporated herein; > the amount recoverable will not include the additional cost incurred in complying with any such Act, Regulation, By-Law or requirement with which You were required to comply with prior to the damage happening; Having carefully considered the definition of reinstatement and the terms for extra costs of reinstatement, the panel is satisfied they operate such that:  the insurer is required to reinstate damaged property only, to the same condition prior to the claimed incident, but not better than when it was new  the insurer is required to cover extra costs where the reinstatement (of damaged property) requires compliance with > a) any Act of Parliament or regulation made under it; or > b) any by-law or regulation of any municipal or other statutory authority operative at the time of reinstatement and the complainant incurs additional costs to meet the compliance requirements.  H owever, the extra cost of reinstatement does not apply to “the additional cost incurred in complying with any such Act, Regulation, By-Law or requirement with which You were required to comply with prior to the damage happening”. This provision is clearly limited to extra costs because of incident damage, not costs to meet compliance requirements which were already in place prior to the claimed incident. The complainant was issued with several emergency orders The relevant City/Municipal Council issued the following emergency orders under the Building Act 1993 (the Building Act) requiring the complainant to complete specified works before re- occupation of the premises:  Order 1: following an inspection on 4 February 2019 requiring a minimum 48-hour evacuation. The order cites danger to life or property arising out of the condition of the building due to fire and its adverse impact on essential safety measures (such as smoke systems, smoke detection and occupant warning systems) to various levels of the building  Order 2: on 6 February 2019 that the building‟s smoke detection and alarm system is brought into compliance with minimum standard requirement s. It specifies that “building‟s smoke detection and alarm system has been identified as being” dilapidated and had not been maintained in accordance with requirements of the building regulations. The complainant was given 14 days to replace all smoke alarms in all units, and all smoke detectors in common areas as well as ductwork and other enclosed or concealed areas.  Order 3: also, on 6 February 2019 for access to relevant expert to: > address/test water/fire damage, electricals and provide hygienist clearance, > remove perishables and contents of water damage apartments between levels 21-28, > install containment on common corridors on levels 22-28, > remove water damaged lining, and > appoint a “ registered building practitioner in the category of Civil Engineer to inspect and provide recommendation on the fire damaged façade and structure ” .  Order -Lift: on 12 February 2019 to within 2 days, alter all three elevators to function appropriately upon activation of the general fire alarm. Determination | Case number: 823599 Page 6 of 20 Fire did not damage or affect all items/areas covered by the orders The complainant says the insurer should cover all costs incurred to comply with the emergency orders listed above. Particularly, the works required to comply with order 2. The insurer says it is not required to cover costs relating to items which were not affected by the fire, smoke or firefighting efforts by the MFB. Its position is mainly that the evidence shows some of these items (wholly or in part) were not damaged by the fire and/or were non- compliant prior to the fire incident. For ease of reference, the disputed items are considered under the headings in italics, below. Smoke alarm/system and fire sprinklers The insurer has limited indemnity for works required for the OC to be compliant with the above orders to replacement/reinstatement of only fire/smoke affected smoke alarms (estimated at 10% of the total costs given the number of units affected) and the cost of testing the sprinkler system ($1800). It says it is not required to cover the cost of replacement/repairs of all smoke alarms or making the fire sprinkler system complaint. It also says:  all smoke alarms/smoke detection systems were required to be replaced under the relevant emergency order at a cost of around $145,770. This included replacements for units which were not damaged by the fire or in the process of the fire being put-out.  issues with the fire sprinkler system were unrelated to the fire and due to defects. As such it is only required to cover the cost of testing the system, not the total cost of repairs being claimed which is $48,335 (the complainant says this amount is $50,135)  other than order 1, the remaining Council orders followed the identification of issues with the fire alarm and overall system which relate to inadequate maintenance or compliance with standards that were applicable pri or to the fire incident claimed. The Council‟s expert BA identified smoke detectors which were over 10 years expired and others which were incompatible with the overall fire system due to changes made by individual lot/unit owners  the policy cover only extends to damage caused by accident during the period of cover, not any pre-exiting or maintenance related issues. The complainant disagrees with the insurer. It says the policy provides cover f or „temporary protection‟ for the costs reasonably and necessarily insured for “temporary protection or safety …pending repairs, following loss or damage” as a result of a covered incident, and:  the emergency orders (EO) were issued because of the fire  all the units required smoke detector replacement for the EO to be lifted  the fire affected a total of 60 units (or 16% of all 371 units) across 16 of the 34 levels of the building, however, all levels were affected by evacuation and subsequent works  the costs of testing and certification is unrelated to the extent of damage. This should also apply to other costs which are unrelated to direct damage (from fire, smoke or water)  the insurer would not have been able to progress with the claim and mitigate costs (including in relation to temporary/emergency accommodation and/or loss of rent receivable), had prompt steps not been taken to comply with the EO.  the insurer‟s assessor acknowledged the need for the smoke detectors to be changed and accepted this needed to occur for the claim to proceed. As such, the complainant incurred the costs; the insurer should not be able to renege from this position based on the legal principle of estoppel as the insurer encouraged the OC to go ahead with works needed to lift the EO, did not provide the OC with adequate guidance or direction about the costs and that it would not be covered in full.  it has records showing the sprinkler system‟s pre -incident maintenance Determination | Case number: 823599 Page 7 of 20 The panel has considered the building forensic and fire engine er‟s (BE) report which was commissioned by the Council. It notes BE‟s report:  raises concerns about the reliability of the sprinkler system  says its review of the building‟s Fire Engineering Report (FER) and programming requirements found that the Fire Indicator Panel and Emergency Safety Measure systems showed “requirements in the FER that ap pear to not have been compliant with or properly commissioned or maintained”  includes that the emergency safety measures (ESM) had not been properly maintained (or was maintained using poor practices) and was in a state of disrepair likely due to the FER requirements not being followed or implemented. The panel agrees with the insurer‟s assessment of its liability for costs incurred by the OC to replace the fire alarms and test the sprinkler system. It has taken the following into account when reaching this conclusion:  while the orders were not issued until after the incident, there is no dispute the complainant was required to comply with fire safety measures, including ensuring the proper functioning of its fire alarm and sprinkler systems, prior to the claimed incident  the fact that the Council found existing issues due to the occurrence of the fire, does not of itself mean the insurer is liable for the costs of the OC complying with obligations which either it or the unit/lot owners had prior to the fire.  the complainant has not provided evidence which may show the fire alarm/detection system (other than that damaged because of the fire or the fire service efforts to put out the fire) was compliant prior to the fire occurring or evidence which would contradict the Council‟s finding relating to issues with the system.  while the complainant says the sprinkler-system was maintained, there is no evidence to contradict the issues with the system which were identified by the Council‟s expert and amount to defects, not just maintenance.  the policy wording discussed above li mits the insurer‟s liability to damage from the insured incident. The complainant has not provided evidence that the sprinkler system suffered damage (other than what the insurer has indemnified for) from the fire. The panel has considered the cover for extra cost of reinstatement under the policy. In its view, this does not assist the complainant in the present circumstances as it does not extend to complying with “Regulation, By -Law or requirement with which You were required to comply with prior to the d amage happening” . The available information does not show that the insurer made any specific commitments in relation to specific costs or the extent of costs which would be indemnifiable for this portion of the claim as suggested by the complainant. The pa nel notes the complainant‟s body corporate management company (MG) as acting for or assisting the complainant during this period of the claim process. MG would have had the requisite expertise to advise the OC of its responsibilities, particularly relating to the fire alarms. It would be unfair to attribute any failure to provide adequate advice by MG (and the panel is not saying there was failure), to the insurer. Cladding The complainant is claiming a total of $49,445 for external cladding which was damaged by the fire. There is limited information from both the parties about the cladding. This seems to be because the insurer previously agreed to pay the cost of replacement for damaged cladding Determination | Case number: 823599 Page 8 of 20 (as confirmed in MC‟s letter/report of 4 April 2022 ). According to the report, this amount is based on quantification completed by the complainant‟s builder (LU). In its email to this service of 5 April 2022, the insurer advised it now seeks to rely on the terms of the policy to exclude cover for the cladding. It refers to previous advice from its expert/loss adjuster which included that:  the policy covers costs incurred solely due to the claimed incident on a replacement basis  had the fire not occurred, the OC would have needed to replace the cladding because there was an existing building notice from Cladding Safe Victoria (CSV) requiring it to do so. It says information available to the insurer shows the OC was actively engaged in and had committed to removing the cladding.  where the OC has not promptly acted, the policy entitles the insurer to base settlement on indemnity rather than reinstatement value noting that the indemnity value of the cladding is nil as it was not compliant.  Further, the specific cladding in-situ at the time of the fire cannot be replaced as it was non-compliant  the policy cover for extra costs of re-instatement does not apply as the requirements for works to be completed within 12 months of the event has not been met and the OC was required to replace the cladding prior to the fire. The complainant disagrees with this assessment. The panel has reviewed the information available. It is not satisfied the insurer has adequately shown why it is entitled to decline cover for what it would cost to replace the area of fire damaged cladding. The panel considered the following:  There is no dispute some of the cladding was fire damaged and LU provided an estimate on the proportion of the damaged. The onus is therefore on the insurer to adequately show its entitlement to reduce its liability for this under the policy.  the insurer has not provided any detailed submission or identified information which shows how it reached the conclusion that the requirements for “work of reinstatement … must be commenced and carried out within 12 months” has not been m et.  the insurer has not sufficiently shown how it concluded that its liability, if the extra costs of reinstatement clause did not exist, would be „nil‟. In view of the above, and in the absence of any evidence to the contrary, the panel does not accept the insurer can deny cover for the fire damaged cladding. The insurer is to pay the complainant the assessed cost of replacing the fire damaged cladding estimated at $49,445 and interest in accordance with the section 57 of the Insurance Contracts Act 1984 (the Act) from the date the OC incurred the cost (payment invoice to be provided by the OC to the insurer) until the payment is made following this determination, if it is accepted. Removal of debris (food spoilage) The policy cover extends to „Removal and Storage Costs of Lot/Unit Owner‟s Contents‟ under section 3.1G. The clause specifies that: Where a Lot/Unit becomes uninhabitable or unfit for its intended purpose as a result of an Incident covered under Section 1 of the Policy, We will pay the reasonable and necessary costs incurred in the removal of, storage of and return of Lot/Unit Owner‟s Contents, from the time of loss up until when the Building(s) is deemed habitable. Determination | Case number: 823599 Page 9 of 20 The complainant says the insurer has reneged from its previous agreement to cover the $300 cost of removing food from the building. They say the insurer is required to cover these costs under the above clause. The insurer says clause 3.1G does not extend to food items in question. It says:  the insuring clause is for building and common contents  lot/unit owner‟s contents are defined in the policy to mean “personal effects, furniture, appliances, electronic equipment and carpets, rugs and floating floors and any other items owned by a Lot/Unit Owner”, not food. The panel has reviewed the definition (above) and is of the view that it was not the intention of this provision to cover the cost of removal of food to be discarded. The provision relates to items that are to be removed, stored and returned. The insurer is entitled to deny this aspect of the claim. Common area contents - Carpet There is no dispute carpet in common areas of the building were damaged during the fire and/or by water from the sprinkler or firefighting activity or that the policy responds to damage to common area or its contents. The policy definition for com mon area is “any area at the Situation that is not a Lot/Unit” and common contents means “property in Common Areas at, in or adjacent to the Situation which You own or for which You are legally responsible”. The insurer says it paid $24,893 for its assessed cost of replacing fire or water damaged carpet in the common area which includes some areas of corridors where there was no damage. It says its assessment is reasonable as the policy only covers replacement of damaged property. It says there is no provision in the policy for replacing undamaged items to match the new replaced item. The complainant says the policy covers reinstatement of damaged property to as new. The panel has reviewed the policy. The referenced definition (for reinstatement) includes “ the repair of the damage and the restoration of the damaged portion of the property to a condition substantially the same as but not better or more extensive than its condition when new”. The panel accepts it is clear and unambiguous that:  cover is provided to loss/damage to building and common contents from an incident as defined.  reinstatement to as new condition relates to damaged portion of the property only. The policy does not have a matching provision and there is no obligation on the insurer to cover undamaged portions of property solely because there would be a mismatch. The panel considered whether the areas covered by the insurer is reasonable in the circumstances. It noted the insurer says the complainant ‟ s builder LU provided measurements for the damaged area “cut back to the nearest sensible point along the corridor, generally before the lift passage on each floor”. While the complainant has raised matching and reinstatement to „ as new ‟ as basis for requiring the insurer to cover additional undamaged common area carpet, the panel does not agree with their interpretation that the policy cover for reinstatement to as new, means all carpet in common area, irrespective of damage, location or reasonable breaks should be covered. On the available information, the insurer has considered reasonable break/s in the common area carpet affected by the fire incident, and extended cover to some undamaged carpet to Determination | Case number: 823599 Page 10 of 20 account for it. The panel accepts the insurer has acted reasonably in the circumstances and that it is not required to cover any additional common area carpet replacement. 2.2 Can the insurer off-set temporary accommodation & loss of rent payments against reinstatement payment due? Policy covers temporary accommodation or loss of rent receivable (TA or LOR) In addition to cover for accidental loss or damage to the building(s) and common contents, additional benefits are provided under section 1 of the policy. The benefits include emergency accommodation, temporary accommodation and/or loss of rent receivable under the following terms: … 3. Additional Benefits Following loss or damage by any cause not excluded, the following Additional Benefits will be paid in addition to the Sum Insured. 3.1. Temporary Accommodation, Loss of Rent Receivable, Reletting Costs, Maintenance Fees and Removal and Storage Costs of Lot Owners Contents. We will pay, in total, for the following benefits 3.1 A-G, up to 15% of the Building Sum Insured. 3.1A Temporary Accommodation Where an owner occupied Lot/Unit is uninhabitable or unfit for its intended purpose or access to the Building is prevented as the result of an Incident covered under Section 1 of the Policy, We will pay to the Lot/Unit Owner, an amount equal to the amount that the Lot/Unit could have been Rented for. We will pay this amount until the Lot/Unit becomes fit for occupation or until access to the Building has been re-established, for maximum period of 48 months. 3.1.B Loss of Rent Receivable Where a Lot/Unit or Common Area that is Rented or would have been Rented (and You can verify this by way of lease or rental agreement), becomes uninhabitable, unfit for its intended purpose or access to the Building is prevented as a result of an Incident covered under Section 1 of the Policy, We will pay an amount equal to the actual rent lost. We will pay this amount until the time the Lot/Unit or Common Area is re-leased, for a maximum period of 48 months. … The panel has carefully reviewed the above wording and accepts it is clear and unambiguous that:  lot/unit owners have an entitlement to TA or LOR (as applicable) for up to 48 months,  where loss or damage which is not from any excluded cause(s) results in,  Lot/Unit becoming “uninhabitable or unfit fo r its intended purpose or access to the Building is prevented as the result of an Incident covered under Section 1 of the Policy” In relation to temporary accommodation, the policy clearly states the benefit will be paid “to the Lot/Unit Owner”. Lot/Unit O wner is specifically defined on page 11 of the PDS to mean: Determination | Case number: 823599 Page 11 of 20 a person, persons or others registered as a proprietor or owner of an estate in a unit in terms of the Strata Titles Act, Community Titles Act or similar legislation applying at Your Situation. While this is not specified in the loss of rent receivable wording, the panel accepts the payment is to/for the lot/unit owners given there is no specification as to whom the payment is to be made to. It is reasonable to conclude that the person/s suffering any loss of rent would generally be the owner, not the OC. There are numerous submissions setting out and explaining payments made in respect of TA or LOR by the insurer, and submissions from the complainant as to why the insurer was not entitled to withhold the funds. Details of what makes up the amount withheld or deducted from the OC‟s entitlement for building damage or common contents claims settlement is summarised in the insurer‟s response to this service of 5 April 2022. Relevantly, the submission shows the insurer paid a total of $218,929 in TA/LOR to 14 units/lot owners for the period from 31 January 2020. Please see section 3 of this determination for details. The insurer says it is presently withholding around $249,000 in payments to the OC to offset the LOR/TA paid to the 14 lot owners. $218,929 of the amount relate to LOR/TA while the remaining is for costs of storage for the lot/unit owner‟s contents. The insurer says it is entitled to off-set its costs. Its reasoning centres around its views:  the OC did not take reasonable precaution to ensure the repair process followed the timeframe forecasted for by its own builder. It says the OC ended up taking 7-8 months to complete processes which ought to have taken 1-2 months,  other repair, compliance works and works relating to cladding which are unrelated to the claimed incident contributed to the delays, and  it should not be responsible for TA/LOR for the delays that occurred due to the above. The complainant disagrees with the insurer‟s decision. It points out that the insurer does not have any basis within the policy terms to off-set costs it paid for temporary accommodation from the material damage claim (repair and associated costs). The complainant‟s submissions on this subject includes its view that the time taken was necessary and not unreasonable given:  the complexities with a property housing over 300 units/lots,  the legislative requirements which the OC must meet when making any decisions and  complex legal issues raised which required expert/professional advice and/or input. Insurer cannot off-set LOR/TA benefits against settlement payable to the OC The policy provides indemnity to “You up to the Sum Insured specified in the Schedule for Building(s) and Common Contents, for accidental loss or damage to the Building(s) or Common Contents which occurs during the Period of Insurance” . „You/Your/Insured‟ is defined in the policy to mean: > in respect of Section 1: the Body Corporate, Corporation, [Complainant], Plan or Company named in the Schedule including, but limited to, the interest therein of Proprietors, Members, Owners or Shareholders which includes the Committee however named. Determination | Case number: 823599 Page 12 of 20 The available information shows indemnity for accidental damage/loss to the building and common contents (other than those which remain in dispute and are discussed separately in this determination) were issued to the OC. As noted above, the TA and LOR benefits are payable to the lot owner as specified in the policy wording. It is not in dispute that the TA/LOR benefits which were paid were to (or for the benefit of) the unit/lot owners, not the OC. The additional benefits for LOR/TA are payable to the lot/unit owners. This is separate and in addition to indemnity provided to the insured/you (the OC) under the policy for building and common contents. Arguably, the insured/beneficiary for the material damage/loss and loss relating to TA/LOR are different. Consequently, the panel does not consider there is a basis within the policy for the insurer to off-set amounts payable or paid to unit/lot owners under a separate policy benefit against indemnity which the policy provides to the OC in relation to building and common contents for the interest of “…Proprietors, Members, Owners or Shareholders which includes the Com mittee…”, not just the owners. OC did not agree to TA/LOR costs being offset against material damage claim The insurer says that it raised, on several occasions, concerns about the time which the OC was taking to commence arrangements with its builders, sign relevant contracts and the impact of cladding issues with the OC in meetings as well as via written correspondence. It also points out that the OC‟s representative acknowledged the delays in some instances. The panel accepts the available information shows the concerns about delays were raised several times in correspondence between the insurer and the complainant/OC‟s representatives. The panel also notes there were several items of correspondence about the delays in the context of TA/LOR being paid, as well as extending a cut-off date which the insurer had initially slated as 29 December 2019, to the end of January 2020. However, the panel has not been able to locate any document which would support a conclusion that the OC agreed to an off-set of costs or of any specific arrangement about how any off-set amount would be established and applied. In fact, an email from the insurer to the OC‟s account manager (IG) dated 13 Jan 2020 , includes specific request from the insurer to the OC for “a signed letter from the OC agreeing to the arrangement before I go ahead and commit funds” to TA/LOR, past 31 January 2020. There is no evidence any letter was signed or provided in response to the request. The fact that the insurer repeatedly raised concerns with the OC and warned the OC of the possibility that it would withhold and off-set TA/LOR costs against the claim payment, is not of itself a sufficient basis to conclude that the insurer can take that action. In view of the above, the panel agrees with the complainant that there is no evidence the OC agreed that it caused delays or that its delays resulted in specific loss which the insurer would be entitled to off-set TA/LOR to unit/lot owners. In the absence of any clear evidence the OC agreed to a claw-back/offset of specific payments the insurer made to the unit owners for TA/LOR, the insurer cannot off-set those costs against payment which is arguably due to a separate insured/beneficiary (being the OC). Determination | Case number: 823599 Page 13 of 20 As the panel does not accept the insurer can off-set the costs in the present circumstances, it does not consider it necessary to discuss the allegations of delays, contributory factors to such delay and whether those factors relate to the claimed incident and loss/damage repairs. The panel also notes that the insurer has suggested that the OC failed to take reasonable precaution or steps to prevent delays. Case law about what constitutes reasonable precautions or reasonable steps show an analysis of whether a party has “courted a danger” , which is an unacceptable risk for the insurer, is required. This is a subjective test, viewed through the eyes of the OC. The complainant ‟ s actions must be viewed from its perspective. It is not a question of what a “reasonable person‟ would do, but wheth er the complainant thought its actions were reasonable in the circumstances. The panel questions whether the complainant ‟ s can be deemed to have courted danger in the circumstances, however, do not consider it necessary to make a finding in this regard given its conclusion (above). The insurer is to pay the complainant the full amount withheld against the material damage claim (estimated at $249,574.12) plus interest in accordance with the section 57 of the Act from the date the OC lost use of this amount (payment to its builder during/following category 3 repairs) until the payment is made following this determination, if it is accepted. 2.3 Is the insurer liable for additional costs under policy’s ‘temporary protection’ benefit? The complainant is seeking indemnity for certain costs incurred immediately following the fire incident on the basis the costs were incurred to protect the insured premises and are therefore covered under the policy benefit for: 4.5 Temporary Protection The costs reasonably and necessarily incurred by You for temporary protection or safety of Your Property Insured pending its repair, following loss or damage as the result of an Incident covered under Section 1 of the Policy. The services and associated costs in question are:  Security and concierge costs totalling $279,928 and $19,689 respectively  locksmith services it required to access all units following the fire total $24,209. Security/ concierge costs The insurer says the security guard costs (other than what was necessary for the reinstatement of fire related damage) is not covered by the policy. It says the OC chairperson was informed of this and concerns were raised to the OC about what the insurer‟s assessor saw as excessive security personnel on-site. The insurer apportioned the costs for security from the overall costs by reference to the number of damaged units which the security would have been required for in order to give unit/lot owners access. It offered the OC $75,000 of the overall cost of just over $279,000. In its re port, MC says this amount is double what was recommended by the insurer‟s builder (AB) who attended the property in the aftermath and conducted make-safe and covers more than the hours of AB‟s attendances during that process. The insurer says the remaining security costs were to prevent entry (including by occupants) into the premises, protection of contents in the units, and for safety considering the order that Determination | Case number: 823599 Page 14 of 20 that smoke alarms of many units (other than those damaged by fire or firefighting) were considered non-complaint, repairs to the smoke detectors and guiding the locksmith through the premises to collect their contents, among other things which the insurer considers are not fire related. The complainant‟s view is that the need for security access was necessitated by the fire in the building, the occupant (whether their units were affected) were required to evacuate due to the fire. Essentially, the complainant says the security would not have been needed but for the fire incident therefore, allowance for security required for the occupants to access the building, should be covered in full under the claim The panel has reviewed the available information. There is no dispute security was needed. The dispute is whether all the security engaged was needed to address issues/property damaged by the fire. The panel is only partially persuaded by the insurer‟s argument in so far as the security costs are concerned for the following reasons:  there is an actual connection between the fire and the residents having to leave the premises  it was reasonable for the complainant to arrange security to provide access to the building in a safe manner. This included access to address fire related damage  The fire service, Council appointed experts as well as the insurer‟s o wn experts were able to attend the premises and progress the claim with the security in place. It would appear this would not have been allowed to occur without the necessary safety or security measures in place. However,  the complainant also engaged the security service provider for purposes including electrical works, alarm and sprinkler system replacements/repairs as well as protection of contents or access to individual lot owners‟ contents. These contents are not covered under the policy. The panel considers it fair that the security and concierge costs be apportioned on a 50/50 basis. This is because some of these costs have clearly been incurred for damage which the panel accepts is not claim related. Regarding locksmith fees, the panel notes the insurer has paid a portion of those fees. The panel agrees with the insurer‟s submission that rather than relating to the insured event, the bulk of the fees relate to the complainant being required to comply with the Council order, where in the absence of a master key, access was required to undamaged units to attend to defective smoke alarms. In the panel‟s view the insurer is entitled to limit its obligations for the locksmith fees, as it has done. 2.4 Is the insurer liable for any additional claims preparation or professional costs? Policy cover for claims preparation costs subject to conditions Additional benefits under the complainant‟s policy include that the insurer will pay up to $50,000 for claims preparation. This is contained in clause 3.11 in the PDS which includes: Determination | Case number: 823599 Page 15 of 20 3.11 Claims Preparation Costs We will pay to You, the costs up to a limit of $50,000 per Incident, reasonably and necessarily incurred with Our written consent, in the preparation of a claim following loss or damage to Property Insured as a result of an Incident covered under Section 1 of the Policy Insurer paid $50,000 to the OC for claims preparation The insurer paid the OC $50,000 representing costs for claims preparation. This was for the benefit of the strata management company which engaged in and assisted the OC with the claim, attended meetings with the insurer and coordinated other activities on behalf of the OC. The insurer says it has met its obligation for claims preparation costs under the policy and is not required to pay any further amount. The complainant suggests the service provided by the management company does not amount to claims preparation as it was mainly to administer loss of rent payments to unit holders on the insurer‟s behalf due to the insurer‟s “own inefficiencies” and more appropriately fits within the policy cover for professional fees. LM (for the OC) also says:  the services carried out by the strata management company is not claims preparation  the insurer remains liable for claims preparation costs the OC has otherwise incurred up to the full policy limit of $50,000 and  this limit should be applied towards costs for services rendered by LM  while the OC did not obtain consent from the insurer for LM‟s cost, section 54(1) of the Act assists in this regard. Available information shows LM was engaged by the OC effective on or around 24 April 2020. Its first report of 4 August 2020 provides that it was approached by the OC for claims preparation of the final aspect of the subject claim particularly, 1.2 The OC requested our assistance due to perceived complexities with the claim including concerns regarding coverage for damage/costs claimed, loss of rent limitations and policy interpretation. Attached is a copy of the signed contract with the [Complainant], Appendix A There is no suggestion the OC sought or obtained „written consent‟ from the insurer for costs relating to LM as required in the wording of section 3.11. The introductory paragraph in LM‟s report and the content shows in addition to reviewing payments due under the claim, LM was providing more of an advisory role to the OC, particularly in relation to:  issues which were in dispute concerning the settlement, and  the insurer‟s position that it would withhold certain amounts from the material damage claim due to the delays (which the insurer considers the OC had caused and the increased costs of temporary accommodation and loss of rent). The panel has considered the available information carefully and is of the view LM‟s costs do not satisfy the policy condition for payment of claims preparation costs. This is because the available information does not show:  they were reasonably and necessarily incurred for preparation of the claim by the OC given the OC had clearly accepted the full policy entitlement for claims preparation in respect of another provider Determination | Case number: 823599 Page 16 of 20  available information shows the strata management company engaged in various aspects of the claim (coordinating, attending meetings, liaising with the insurer etc)  there is no suggestion the insurer consented to paying such costs  LM appears to have mainly been engaged to deal with the complainant ‟ s dispute with the insurer about liability and whether the insurer was entitled to set-off costs against the material damage claim based on alleged delays by the OC. Section 54 of the Act does not assist in relation to claims preparation costs Section 54(1) of the Act provides that where the effect of a contract would (but for this section) entitle an insurer to refuse to pay a claim in whole or in part by reason of some „act‟ (which includes an omission) of the insured or some other person that occurred after the contract of insurance was entered into, the insurer may not refuse to pay the claim by reason only of that act. Rather, the insurer‟s liability in respect of the claim is reduced to the extent the insurer‟s interests were prejudiced because of the act. The complainant‟s po licy provides that the insurer will pay costs up to a limit of $50,000 “per Incident, reasonably and necessarily incurred with Our written consent, in the preparation of a claim”. It is not in dispute that the complainant has incurred costs in relation to LM‟s services or that it did not obtain approval from the insurer in respect of the costs. The panel accepts in these circumstances the relevant post contractual act is the appointment of LM without the written consent of the insurer at the time the appointment was made. However, as the panel accepts the insurer met its policy obligations under this clause by paying the OC $50,000, it is not necessary to consider section 54 further. MG’s fees do not constitute professionals fee under the policy terms The complainant says MG‟s fees were incurred to arrange disbursement of TA and LOR. They suggest this should be reclassified as professional fees rather than claims preparation. The argument is that this reclassification would open the claims preparation cover limit for LM‟s costs. The panel has considered the complainant‟s submission on what is claims preparation. The panel is not satisfied on the information provided that the complainant ‟ s interpretation of claims preparation costs precludes the services provided by MG. Further, it does not accept that the clause/cover for professional fees apply to MG or LM ‟ s services. This is because the heading of the clause suggests cover for fees incurred necessarily to reinstate or replace a building such as surveyor‟s, engineers‟ costs etc. The panel is not satisfied, on balance, that the cover under this section is intended for the type of service which both MG and LM provided. In these circumstances, the insurer is not required to pay or reimburse fees for either MG or LM under this policy provision. Policy cover for ‘Architects and Professionals’ Fees The terms of cover for architects and professional‟s fees are set out at clause 4.2 of section 1 in the applicable PDS. It provides cover for: Determination | Case number: 823599 Page 17 of 20 The reasonable cost of architects‟, surveyors‟ and consulting engineers‟ fees, including all incidental costs, legal and other fees and clerk of works‟ salaries for estimates, plans, specifications, quantities, tenders and supervision, necessarily incurred in reinstatement of Property Insured, but not costs, fees and salaries for preparing any claims hereunder Council’s expert (BE) report fees The council appointed engineer/surveyors to report on the damage following a fire. The Council has subsequently sought payment of these costs from the complainant. There is no dispute the fire incident prompted and necessitated BE‟s appointment and re lated attendances. The complainant says the insurer has refused payment of the fees on the basis it does not agree with BE‟s report. While the panel is unable to locate a submission, which supports this from the insurer, it considers the report from BE was necessary as the fire claim assessment and related works could not have commenced without it. The insurer has allowed $10,000 contribution to BE‟s fees of $45,674 (exc GST). However, the panel does not accept it can apportion its liability in respect of this fee for the reason already mentioned As such, the insurer is required to reimburse the complainant for BE‟s fees in full upon provision of evidence of payment to BE or the Council by the OC/complainant. Fees for Fire systems testing by FC FC‟s scope was to review the fire system installation setup and ensure pump activation. Given the panel accepts the insurer is entitled to limit its liability for damage and repairs to the alarms and sprinkling systems, it is fair in the circumstances that the insurer also apportions its liability for testing which would not appear to have been limited to the fire damages/impacted area of the system only. The panel considers the insurer‟s allowance of $1000 from a total of $3 ,500, reasonable in the circumstances. The insurer is not required to increase its contribution in this regard Fees independent consultant GJ GJ‟s total fees amount to $68,250. The insurer does not dispute the complainant is entitled to cover for the services GJ provided, however, it has sought to apportion its liability on the basis that the time taken by the OC to complete repairs increased the costs. The complainant dispute this. Given the panel is not satisfied the insurer can off-set costs due to alleged delays, it is not satisfied the insurer can reduce its liability for GJ ‟s fees. The insurer is required to cover the cost in full. Should the insurer pay any compensation or other costs? Non-financial loss Determination | Case number: 823599 Page 18 of 20 Complainant raised concerns about insurer’s conduct The complainant seeks review of the insure r‟s overall claim handling. It says:  the insurer did not provide adequate guidance to the OC  reneged on its position with regards to several items which it had indicated would be covered as well as on amounts offered while they were trying to negotiate a settlement  the insurer has not acted in good faith as required under section 13 of the Act because it did has incorrectly sought to reduce its liability for the claim particularly by withholding payments for material damage which meant the OC had to seek funds elsewhere to complete repairs. AFCA can award compensation for insurer’s conduct in some circumstances Where a complainant raises issues with the insurer‟s handling of a claim/complaint or its conduct, AFCA will consider whether it (the insurer) acted in accordance with its obligation under the Act/Code. AFCA takes any obligation the insurer may have under the Act or Code, as well as accepted/good industry practice into account when considering if a claim has been mis handled or whether the insurer caused unreasonable delays. Where AFCA finds an insurer has not conducted the claim in line with relevant standard, it can award of non-financial loss compensation where appropriate. In this instance, having considered the overall management of the claim, the panel determines the insurer is not required to pay compensation as the available information does not support a conclusion that the overall handling of the claim was unsatisfactory. LM’s fees Under its Rules, AFCA can require an insurer to reimburse a complainant for costs incurred in making a complaint. This may include legal costs, expert report fees, or travel expenses. If a complainant asks the insurer to contribute to these costs, we will consider whether they were reasonable and whether they helped resolve the complaint. AFCA tries to make its service accessible and understandable, without any need for representation. If a complainant chooses to be represented, AFCA will generally require a complainant to pay for these costs. However, we may still require the insurer to contribute to the costs if the complaint raises complex legal issues, or if the complainant could not have reasonably handled the complaint without advice. In the circumstances of this complaint the panel is not satisfied that the insurer should be required to contribute to LM‟s fees. In the panel‟s view, the issues have remained the same throughout the complaint and it has been clear to the parties what they were. Further, the panel does not agree that LM has added to the resolution of this complaint. Finally, the OC had a clear contractual understanding when it engaged LM, that it would be responsible of LM‟s fees. Determination | Case number: 823599 Page 19 of 20 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 823599 Page 20 of 20 3.2 Relevant payment information LOR/ TA Payment from 31 January 2020 Unit # LOR payment after 31 January 2020 TA payment after 31 January 2020 Comment 1909 $16,542.68 At $2363. 24/month 2002 $16,958.37 2009 $21,325. 2102 $16,944 At $2824/month 2109 $16,604 At $2 372 /month 2110 $21,948.89 2202 $18, 176.16 2209 $17,969 At $$2567/mont h 2309 $21,898.40 2310 $16,475.76 At $2353. 68/month 2409 $16,430 2502 - - No claim made to date 2509 $17,656.97 2609 - - Claim to be submitted Sub - t otal $ 84535.44 $ 134393.79 Grand total $ 218929.23

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.