Home / Allianz Australia / Determination 823525

Determination 823525

Pool damage from insurer's authorised repairer; claim management and complaint handling

FirmAllianz Australia
Decided2022-08-01
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$23,300
Non-financial loss$3,500
Amount claimed—
SourceAFCA PDF

Summary

The complainant's pool was damaged by metal debris from roof repairs carried out by the insurer's authorised repairer PB, and the insurer handled the pool damage claim and complaint unreasonably. AFCA found the insurer liable, ordered a $19,800 cash settlement for pool resurfacing, cover for shade sail cleaning, previously agreed items, and $3,500 non-financial loss compensation.

Under the General Insurance Code of Practice, an insurer that directly authorises a repairer accepts responsibility for the quality of that repairer's work, and the rust damage was on balance caused by the roof repairs.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 823525 Financial firm Allianz Australia General Insurance Limited Determination | Case number: 713109 Page 1 of 6 Case number: 823525 29 July 2022 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy (policy) with the financial firm (insurer). In April 2020, the insured property suffered hail damage for which a claim was lodged under the policy. The insurer accepted the claim and authorised repairs to consultants ‘PB’. After some delays, PB completed the claim related repairs in or around May to June 2021. On 14 June 2021, the complainant contacted PB advising there was damage to the swimming pool which she believed relates to PB’s repairs to the roof. PB does not accept liability for the damage to the pool. However, as a gesture of goodwill, PB offered to arrange for an attempt to remove the stains by way of a chemical clean. On 2 July 2021, the complainant contacted the insurer regarding the damage to the pool caused by PB. The complainant wanted the insurer to arrange the required specialist assessment of the pool and associated recommended rectification works to restore the pool to its original condition. The insurer denied liability and said the offer of $1,000 as a gesture of good will by PB was reasonable in the circumstance. 1.2 Issues and key findings Is the insurer liable for the claimed damage to the pool? Yes. The available information shows, on the balance of probabilities, that PB’s repairs to the insured building caused metal to enter the pool. This caused resultant damage and staining to the pool gel liner . There is no persuasive information to establish the complainant’s actions have prejudiced the insurer in terms of attending to the damage/mitigating the loss within a reasonable period of time. Is the complainant entitled to compensation? Yes. The insurer ’s management of the complaint regarding the pool damage, both before and after the matter was referred to AFCA, has been unreasonable. The insurer is to pay the complainant $3,500 in non-financial loss compensation. 1.3 Determination This determination is substantially in favour of the complainant. Within 14 days of receiving notice of the complainant accepts this determination, the insurer must pay the complainant a total of $19,800 for repairs to the swimming pool. The insurer is also to pay the complainant $3,500 for non-financial loss compensation. The insurer, as per its offer of acceptance made during the claim, is to also arrange payment to the complainant for electricity costs, reinstatement of damaged turf ($1,500) and cleaning costs ($2,000), if it has not already done so. Determination | Case number: 713109 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer liable for the damage to the pool? Yes. On balance, the information shows the insure r’s appointed repairers (PB) damaged the swimming pool. The insurer is responsible for damage caused by its authorised repairer Based on the chronology of events provided by the insurer, the repairs to the roof were completed by PB on around June 2021. The complainant contacted PB on 14 June 2021 saying the repairs damaged the swimming pool area. The complainant advised that repair debris (left over nuts, bolts and steel fragments) had fallen into and around the pool including the shade sail covering the pool. Further, that this has now caused rust staining and discoloration. In support the complainant provided:  a copy of a quote/report issued by consultants ‘CT’ dated 31 July 2021  many supporting images of the pool showing discoloration from the rust as well as fading damage sustained after PB’s attempted chemical clean in September 2021  an image of the shade cover  a video showing a dirty pool pump filter. The General Insurance Code of Practice states that when an insurance company selects and directly authorises a repairer, it accepts responsibility for the quality of their work. On balance, swimming pool damage is a result of roof repairs It is not in dispute extensive rust discoloration is present across the pool lining of the pool. I acknowledge PB’s position that it does not accept liability for the damage. However, PB was unable to confirm or deny whether its repairs had caused metal shavings/shards to enter the pool. There is no material to show pre-existing rust discoloration to the swimming pool. There is information to show:  PB did compete repairs to the metal roof,  these repairs were in reasonably close proximity to the pool, and  there is extensive metal staining to the pool lining as well as evidence of rust staining within the pool clearing apparatus. This is confirmed by both pool specialists (CB and PW) appointed by the parties. PW, who was appointed by the insurer, provided a report dated 1 September 2021 saying the pool surface allowed the metal debris to embed itself into the fibreglass, leaving rust marks behind. There is no information to show the damage to the pool was pre-existing. The complainant maintains it was not. Given this, and the above factors, I am satisfied the rust discoloration is a result of PB’s repairs. Insufficient material to show insurer prevented from mitigating loss There is no dispute the pool in its present condition cannot have the staining successfully removed and will require a complete resurfacing. Determination | Case number: 713109 Page 3 of 6 The insurer says its ability to mitigate the loss has been prejudiced by the complainant ’s refusal to allow PB to attempt repairs (chemical cleaning process) to the pool after its inspection completed on 25 June 2021. The complainant refutes this allegation and says she never prevented the insurer or PB access to the pool. She was requesting that a pool specialist be appointed to properly assess the pool as opposed to an unqualified representative from the building consultants (PB). In support, the insurer relies on a report issued by PW dated 1 September 2021 and email correspondence with PB on 4 November 2021. I note the PW report says: Large amount of rust stains in deep end of pool. Suspect from swarf and metal filings. Due to the pool surface and the nature of metal stains, the metal embeds itself into the fibreglass and become almost impossible to remove. The longer they are in the pool the harder they are to remove. From what I have been told these stains have been present for 4 months. If this had been actioned within a couple of weeks of it happening the rust stains may have lifted or subsided to barely noticeable. We can attempt a stain treatment but there is no guarantee it will work, it may only remove the surface stains, it will not remove the metal embedded in the gelcoat. It will only come back again in the future. In my professional opinion and from experience I do not believe stains will come off if treated. Suspect may need a Fibre Glasser to resurface pool, I note in its correspondence dated 4 November 2021, PB says: As per the specialist recommendation from their attendance, if the technician was allowed access when we initially requested the rust stains may have lifted or been removed, as this was not able to be completed due to unauthorised accessed we cannot confirm this could of (sic) occurred as we weren’t given the opportunity however from the specialist remarks the rust may have been removed. I am not persuaded it has been shown that the complainant’s initial refusal to allow t he insurer to arrange for a chemical clean of the pool clean impacted the insurer’s ability to mitigate the damage. This is because PW’s report does not confirm such a process would have rectified the situation. Rather, only that it may have lifted the stains or cause them to subside to being barely noticeable. Further, on balance, the success of such an attempt to clean the stains was conditional upon the treatment being completed within a couple of weeks of the rust stains appearing. The available information shows the stains were noticed and then reported to PB on 14 June 2021. It was not until 27 July 2021 that PB put the recommendation for the chemical cleaning option to the complainant. This was about six weeks after the staining appeared and well beyond the stated ‘few weeks’ by PW. Given this, even if the chemical cleaning had gone ahead on or after 27 July 2021, it is unlikely the treatment would have been successful given it was outside the two-week period described by PW. Determination | Case number: 713109 Page 4 of 6 The insurer is liable for fibre glass resurfacing costs Given the above, it is fair in all the circumstances that the insurer be required to cover the complainant for the cost to resurface the pool. I have not been provided with any other quote/costing for these weeks other than the quote from the complainant’s consultant CB dated 31 July 2021. This quote is in the amount of $16,500.00 The insurer should cash settle the complainant $19,800.00 based on C B’ s quote along with a 20% contingency. This is to allow for contingencies, the time elapsed since the quote was issued and the transfer of risk to arrange the repairs being passed on to the complainant. Insufficient material to show damage to the shade cover Having reviewed the available material, I am not satisfied there is sufficient information to show the shade sail has been damaged by PB’s repairs. None of the consultants appointed to the claim have confirmed any such damage exists to the shade sail. However, it is not unreasonable to accept the shade sail will have been exposed to some metal fragments/shards. Given this, although I am not of the opinion the insurer is liable to cover the cost to replace the sail shard, I determine the insurer is to cover the complainant for the cost to have shad sail professionally cleaned. Therefore, subject to being provided with a quote for the professional cleaning of the shade sail by the complainant, the insurer is pay the complainant for these works within seven days or receiving the quote. The insurer to pay the complainant for losses previously agreed between the parties The available information shows the insurer agreed to pay the complainant for increased electricity expenses relating to the removal of solar panels to repair the roof. The insurer also agreed to cover the complainant for costs relating to turf replacement and pool cleaner. The insurer is to arrange payment for these items within seven days or receiving notice of the complainant’s acceptance of this determination, unless it has already done so. The complainant seeks the insurer reimburse the costs required for swimming pool water maintenance:  $715 for the chlorinator replacement  $374 being the of chemicals required to maintain the swimming pool to date  $720 being the cost of chemicals required to maintain the swimming pool until it can be fixed. I am not satisfied it would be fair to require the insurer to reimburse the complainant for costs she is claiming towards maintaining the pool over this period. These are expenses the complainant is responsible for regardless of whether a claim existed or not. 2.2 Is the complainant entitled to compensation? AFCA may award up to $5,400 non-financial loss compensation AFCA’s Rules provide that we may award up to $5,400 for non -financial loss compensation for stress and inconvenience caused if the insurer has not handled a claim in a reasonable manner. AFCA takes a conservative approach when considering awarding this compensation. Determination | Case number: 713109 Page 5 of 6 The complainant says she has suffered significant stress and inconvenience The complainant raised the issue of damage to the swimming pool area in June 2021. She says the additional stress of following up with the insurer regarding the swimming pool damage contributed to her experiencing stress and having significant challenges. During the complaint, the insurer agreed to arrange for a swimming pool expert to assess the swimming pool damage and provide comment on a repair method. Despite the agreement, the insurer failed to arrange the re-assessment of the swimming pool. There is clear and repeated information supporting the complainant’s concerns relating to the insurer’s poor communication over the period relevant to this complaint. I note this is also consistent in terms of the communication from the complaint over the course of the AFCA complaint. There have been repeated failures to meet timelines as well as honour commitments made both to the complainant and AFCA representatives. The overall management of the claim and associated complaint has been unreasonable. Further, I accept these caused the complainant to suffer an unusual degree of inconvenience and interference that would not be considered minor. Accordingly, for these reasons and consistent with AFCA approach as provided in the Rules, I determine the insurer is to pay the complainant $3,500 in non-financial loss compensation. Determination | Case number: 713109 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.