Summary

The complainant claimed for property damage from leaking pipes found during underpinning works. The insurer first accepted and offered $35,104.66, then denied the claim as pre-dating the policy and excluded. AFCA upheld the denial but ordered $2,000 non-financial loss for unreasonable claim handling.

Expert evidence established on balance that the damage was caused by long-term differential movement pre-dating the policy inception, which is excluded from cover.

Issues

Subjects and remedies

home or building damagepay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 822357 Financial firm AAI Limited Determination | Case number: 822357 Page 1 of 7 Case number: 822357 25 January 2022 1 Determination overview 1.1 Complaint On 12 September 2020, the complainant lodged a claim under her insurance policy with the financial firm (insurer) for damage to her property, following her discovery of a leaking pipe when she was attending to underpinning repair works at the property. The insurer accepted her claim and offered cash settlement of $35,104.66 (inclusive of $3,400 for accommodation) based on 55% of the insurer’s scope of work (SOW) of $57,644 . The complainant objected to the insurer’s SOW and provided a quotation for $129,310.50. The insurer then reassessed its liability and denied the claim. The insurer says it did so because the proximate cause of damage to the property is excluded under the policy. Furthermore, the insurer says the damage to the property is long-term and pre-dates the policy inception. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The insurer is entitled to rely on the terms and conditions of the policy to decline the claim. I am satisfied that most likely the damage occurred prior to commencement of the policy. Further, the damage arose from differential settlement of the footings, inherent defects, structural faults and long-term settlement that developed over time which is excluded from cover. Has the complainant suffered a loss as a result of the insurer’s error? No. The evidence does not establish the incorrect acceptance of the claim contributed to further damage or loss. Why is the outcome fair? The damage pre-dates the policy commencement date and is excluded. In these circumstances, it is fair for the insurer to rely on the terms and conditions of the policy to refuse the claim. 1.3 Determination This determination is in favour of the insurer. The insurer is required to pay the complainant $2,000 for non-financial loss compensation. The insurer is entitled to decline the claim and is not required to take any further action. Determination | Case number: 822357 Page 2 of 7 2 Reasons for determination I have decided this complaint on its merits, having regard to the relevant law, good industry practice, codes of practice and previous AFCA decisions. I have considered all the materials submitted by the parties. I am satisfied that the documentation I have relied on has been provided to both parties. For the purposes of this determination, I will deal with only that material considered relevant to the final outcome. 2.1 Is the insurer entitled to decline the claim? Yes. The insurer is entitled to decline the claim. I am satisfied that most likely the damage occurred prior to commencement of the policy. Further the damage arose from differential settlement of the footings, inherent defects, structural faults and long-term settlement that developed over time which is excluded from cover. Complainant has initial onus to establish a valid claim The complainant has the onus to establish any loss or damage is covered by the policy. This is known as a valid claim. Once established, the onus turns to the insurer to show:  the policy does not cover the claimed loss or damage, or  it is otherwise entitled to deny the claim. The complainant ’s policy is an insured events policy. This means the policy only responds where one or more of the insured events causes damage to the complainant’s property, subject to any exclusions. Relevant to the complaint, the policy provides cover for escape of liquid, subject to exclusions and conditions. The complainant was undertaking underpinning repair works at her property after observing damage and discovered leaking pipes underneath the property. Following the discovery of the leaking pipes, the complainant lodged a claim for escape of liquid. The insurer accepted liability for the damage that is attributed to the leaking pipes and offered cash settlement based on the insurer builder ’s (ARC) scope of works (SOW). The complainant disagrees with the insurer’s SOW and cash settlement and provided a SOW from her builder. The insurer re-assessed the damage and subsequently denied the claim in its entirety. The property has been subject to movement damage Following lodgement of the claim, the insurer engaged a builder (ARC) to assess and report on damage to the property. ARC says the complainant advised that she purchased the property in January 2019. ARC says it reviewed the real estate photographs from 2019, which show no internal cracking to the property but ARC are of the opinion that the walls and ceiling were patched and painted prior to the complainant purchasing the property. In his report, ARC found:  the complainant already had the property underpinned when she discovered the issue  there was evidence of a history of footing and foundation settlement Determination | Case number: 822357 Page 3 of 7  external brick walls have been re-pointed at some time in history and aluminium channels have been installed to the south eastern and front elevation windows to cover gaps which have appeared due to footing movement  cracking to the bathroom is consistent with underpinning works to the south eastern elevation  the significant movement to the wall on the left of the front wall is pre-existing which is evident due to caulking to base bricks and an aluminium channel to the window frame to cover the gap between the window frame and brick wall  leak detection completed for the storm water shows blocked areas throughout the property and two dislodgements of sewer pipes. ARC recommended:  the complainant engages a contractor to clear all blocked storm water pipes to enable a new CCTV inspection to be carried out  the insurer engages an engineer for further investigation on the proximate cause of damage. Based on ARC ’s recommendation, the insurer appointed an engineer (GP) to further investigate and report on the structural damage to the property. GP provided a report dated 12 February 2021. During inspection, GP says the complainant advised that she moved into the property two years ago and the property had cracks. She was advised by a local builder (around July/August 2020) to underpin the property. However, during the underpinning works, the builder discovered that there were numerous potential leaks and blockages in the stormwater and sewer system at the property. As a result, the complainant hired a plumber to investigate the plumbing issues. The plumber discovered that there were leakages of the sewer system and advised the complainant to contact her insurer. Subsequent plumbing inspections revealed that the stormwater system had numerous blockages. During its assessment, GP observed damage due to a history of long-term foundational movement of the property. In summary, GP concludes that the property has had a history of sewer leaks occurring due to a previously dislodged sewer pipe on the eastern side of the property over a long time. This has saturated the soils and caused a loss of bearing in the founding soils, causing the foundations to undergo settlement and distortions in the superstructure, bringing about cracking to the brickworks. Further, GP says  the underpins have provided a firmer founding material with a deeper stiff base. However, due to the inadequate installation, the footings have undergone differential settlement along the eastern perimeter which is evident from the settlement observed in the floor plans between the underpins  due to the blockage to the stormwater discharge outlet to the street under the footpath, all the downpipes have been overflowing, discharging onto the founding soils, which has caused heave to the underlying soils in the eastern side. The combined effect of heave towards the eastern side and settlement towards the western side has caused distress to the superstructure of the entire property  movement of the footings due to initial prolonged escape of liquid events along with poor site drainage and inadequately installed underpins have induced additional deflections and associated stresses on the superstructure of the property. Such stresses have transferred Determination | Case number: 822357 Page 4 of 7 up through walls where they have concentrated around structural corners and openings along the line of failure (point of inflections). GP noted that the damage to the property is severe and says the following has contributed to the damage in percentages:  contribution to damage due to escape of liquid = 55%  contribution to damage due to insufficient installation of underpins = 30%  contribution to damage due to maintenance issues = 15%. Damage manifested itself before policy inception The complainant acknowledged that following the purchase of the property in January 2019, she observed some cracks appearing to the external walls of the property and internal plasterboard to the ceiling and walls. GP has reviewed various photographs uploaded in the public domain when the property was listed for sale. In reviewing the photographs, GP highlighted areas of the property that show severe cracks and gaps at the time the photographs were taken. GP says in its opinion, the severe cracks and gaps indicated that most of the structural damage to the property is highly likely to have occurred prior to the complainant purchasing the property. GP says previous movement is highly likely to be due to plumbing issues that were present at the time of purchase, which are the same plumbing issues that have been identified within the more recent plumbing reports. Further, it says it is highly likely that the continued movement and dilapidation of the property has occurred due to the continued effects from the on-going plumbing issues (continued from the time of purchase), poor design and implementation of underpinning works, and to a more minor extent, the on-going maintenance issues (poor perimeter surface drainage). I note the complainant has not provided the pre-purchase inspection report. She says she misplaced the report and has been unable to obtain another copy from the issuer. This does not assist her position. Damage caused before inception due to movement and long-term settlement I accept the leaking pipes may have contributed to the damage. However, in my view it is unlikely the damage occurred during the period of insurance nor were the leaking pipes the proximate cause of the damage. This is because:  the period of insurance commenced on 1 February 2019  the complainant noticed damage to the property following the purchase  there is evidence of previous repairs before the complainant purchased the property  expert reports identified the presence of heaving and the soil to be highly reactive clay soils that have the tendency to swell upon wetting and to shrink upon drying. GP identified this was particularly so if the leaking occurred over a long period of time  the stormwater and sewer pipes were dislodged and discharging over a long time  blocked, broken and dislodged stormwater and sewer pipes causing escape of liquid discharge into the foundation soils were long term in nature  evidence of past leakage through below ground sewer and stormwater pipes, which has contributed to the foundational movement and damage to the property  poor surface drainage and poor footing maintenance contributed towards the foundational movement of the property Determination | Case number: 822357 Page 5 of 7 The expert evidence is reasonably consistent in establishing, on balance, that the more significant cause of the damage claimed is differential movement. The experts accept the differential movement occurred because of a combination of factors including the foundational movement, settling, structural issues, tree roots and the cracked, dislodged stormwater and sewerage pipes. Further, the complainant has not provided any persuasive information to contradict the insurer’s position. In these circumstances, I am satisfied the damage claimed, pre-dates the policy inception. Insurer entitled to deny the claim There is no dispute that there were stormwater and sewer pipe leaks. This was most likely long term. The policy commenced on 1 February 2019 and the available evidence and background history of the insured property, indicate that most likely the damages claimed, pre-date the policy inception. Further, I consider that most likely the damage would not have occurred if not for the ground movement and inadequate installation of underpins, which was exacerbated by the pipe leaks and accelerated the damages. Both expert reports referred to differential movement. ARC noted previous patched and painted repairs to the brickworks before the complainant purchased the property. Both reports noted the complainant noticed the damage following the purchase of the property. While escape of liquid has occurred through the stormwater and sewer pipe, I consider the proximate cause of the damage was differential movement. I am satisfied the pipes were damaged and dislodged because of the differential movement and not the other way. In any event, the damage was caused prior to the period of insurance most likely due to differential movement, settling and structural defects. The insurer is entitled to decline the claim. The complainant has not established a claim within the terms of the policy. Insofar as some of the damage may have occurred in the period of insurance, I consider that, on balance, it is excluded from cover. 2.2 Has the complainant suffered a loss as a result of the insurer’s error? No. The evidence does not establish the incorrect acceptance of the claim contributed to further damage or loss. The incorrect acceptance of the claim did not contribute to further loss The complainant says when she lodged the claim, the insurer advised her not to continue with the repairs until the damage has been assessed. The complainant says as a result of not continuing with the repairs for over one year, the damage has deteriorated. T he complainant has not provided any information to demonstrate how the insurer’s claim advice or incorrect acceptance of the claim contributed to further damage to the property. The complainant has the onus to establish her loss. In the absence of evidence that establishes her loss, the insurer is entitled to deny this aspect of the claim. Determination | Case number: 822357 Page 6 of 7 However, I note that the cost of labour and materials today would not be the same as it was in September 2020 The insurer has handled the claim unreasonably overall On further review, I accept the insurer has handled the claim unreasonably overall by incorrectly accepting the claim, which gave the complainant false hope that the damage claimed is covered under the policy. The insurer has apologised for this and has offered $1,000 in compensation. Complainant entitled to non-financial loss Under the AFCA Rules, compensation of up to $5,400 can be awarded for non-financial loss where a complainant suffers an unusual degree of physical inconvenience or time taken to resolve a situation or interference with a complainant’s enjoyment of life or peace of mind or delay. AFCA expects a complainant to be moderately robust and will not award compensation for the ordinary degree of inconvenience that comes with making a claim. The processing of the claim has caused an unusual degree of physical inconvenience and stress to the complainant. In these circumstances and for the reasons above, it is fair the complainant be awarded $2,000 compensation for non-financial loss. This is not in addition to the insurer’s offer . 2.3 Why is the outcome fair? The information shows, on balance, the damage pre-dates the policy commencement and is excluded. In these circumstances, it is fair for the insurer to refuse the claim. Determination | Case number: 822357 Page 7 of 7 3 Supporting information 3.1 The AFCA processes AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.