Text of the determination
Determination
Case number 822244
Financial firm AAI Limited
Determination | Case number: 822244 Page 2 of 12
Case number: 822244 15 February 2022
1 Determination overview
1.1 Complaint
The complainant and her husband hold home and contents insurance with the financial firm
(the insurer). On 29 May 2019, the complainant lodged a claim on the policy for damage to
the insured property and contents due to a significant storm event in February 2019.
The insurer settled the contents claim and attended to mould remediation. It later concluded
that there were pre-existing issues with the insured property. It said that, as a result, it could
not warrant building repairs. The insurer also said the recurrence of mould was environmental
and not associated with the storm event. Accordingly, it cash settled the building claim and a
limited amount of further mould remediation for a combined amount of $18,048.03.
The complainant is dissatisfied with the settlement. She denies that there were any pre-
existing issues with the insured property and says that the mould that has reoccurred is
directly related to the storm. She has obtained a quote in the amount of $189,991.75 for the
complete strip out and cleaning of all internal and external wall and ceiling sheeting.
The complainant wants the insurer to either repair and remediate all of the damage and
mould or cash settle her in line with her quote.
1.2 Issues and key findings
Is the insurer required to cover the additional works?
No. The available information does not establish that the further repairs and remediation the
complainant wants covered are required as a result of the storm event.
Is the insurer entitled to cash settle the claim?
Yes. The policy allows the insurer to decide whether it attends to repairs or pays the cost of
the repairs to the complainant. However, the insurer’s cash settlement should have included
an uplift for risk transfer and contingencies. A fair uplift in the circumstances is 15%.
Why is the outcome fair?
The outcome is fair because it is not established that further repairs and remediation are
required due to the storm event. The policy terms entitle the insurer to limit its liability and to
pay a cash settlement. However, it is fair that the insurer pays a further $2,707.20 as an uplift
on the $18,048.03 cash settlement it has paid, to allow for risk transfer and contingencies.
1.3 Determination
This determination is substantially in favour of the insurer.
If the complainant accepts this determination, the insurer is required to pay her within 21 days
of notification of that acceptance $2,707.20 as a cash settlement uplift.
The insurer is not required to take any further action.
Determination | Case number: 822244 Page 3 of 12
2 Reasons for determination
2.1 Is the insurer required to cover the additional works?
No. The available information does not establish that the further repairs and remediation the
complainant wants covered are required as a result of the storm event.
Complainant is insured for damage caused by storm
The complainant and her husband hold a home and contents insurance policy. Relevant
extracts of the policy’s produc t disclosure statement (PDS) are set out in section 3.2 of this
determination.
Subject to its conditions and exclusions, the policy provides cover for loss or damage caused
by the insured events listed in the PDS, one of which is storm.
This means that not all loss and damage is automatically covered. Rather, only loss and
damage caused by an insured event during the period of insurance is covered and this
coverage is subject to the exclusions detailed within the PDS.
The complainant and her husband also purchased the optional cover ‘ accidental damage at
the home’ . However, that cover is not relevant to this dispute.
There is no dispute that the storm in February 2019 caused damage to the insured property
and contents. The insurer accepted the complainant’s claim and has made payments under
the policy.
The issue is whether the extent of claim coverage has been sufficient. The complainant says
the initial mould remediation was unsuccessful and that the cash settlement the insurer paid
her is insufficient to cover all storm-related damage.
Complainant is required to establish additional loss claimed is covered
T he complainant is disputing the insurer’s claim settlement. This means she bears the onus
of proving on the balance of probabilities that the settlement payment is insufficient and that
all of the claimed damage falls within the scope of the policy.
If the complainant can establish this, the onus transfers to the insurer to establish a policy
exclusion applies to enable it to deny the claim. Again, the applicable standard is the balance
of probabilities.
The parties’ experts disagree on the extent of storm related damage
Both parties have provided detailed submissions and a number of expert reports in support of
their respective positions.
The comments of the experts and of the insurer’s assessor are briefly outlined below. A more
detailed summary of key comments within the main expert reports is set out in section 3.3 of
this determination.
The insurer had the property initially assessed on 4 June 2019. The assessor reported:
water had leaked through the roof, most likely due to the sheer volume of rainfall
the complainant said the roof had not previously leaked
there was internal water damage and the beginnings of mould growth
some internal walls had pre-existing marking/damage
Determination | Case number: 822244 Page 4 of 12
mould on the garage walls was due to the storm
mould on external eaves and the garage ceiling was unrelated.
The roof report the insurer received from MC on 26 June 2019 identified that there were
maintenance issues not related to the storm event that would have caused the roof to leak
during heavy rains.
On 17 July 2019, EO, the in surer’s hygienist , confirmed mould remediation work had been
completed. EO also indicated that due to the atmospheric conditions of North Queensland
(where the insured property is located), annual maintenance was required to ensure mould
did not reappear.
The property was reassessed on 6 August 2019. The insurer’s assessor advised the
complainant that:
mould on the soffits and external wall linings and in the garage was purely atmospheric
mould and not related to the storm event
the insurer’s builder, DW, would be unable to warrant internal repairs due to the presence
of pre-existing movement cracks, paint delamination and exposed asbestos
once the insurer received DW’s updated quote, it would be cash settling the claim for
internal building repairs.
The complainant did not agree that external mould was unrelated to the storm in February
2019. She said that no mould had been present before the storm. She was also worried that
EO had not properly remediated the internal mould. After an IDR review, the insurer agreed to
arrange further expert review and appointed EH, hygienist, for that purpose.
In its report dated 3 January 2020, EH confirmed there was visible mould throughout the
ceiling cavity and on external surfaces. However, no viable mould spores were detected in six
out of seven swab samples. The one sample with viable spores was at the minimum
detection limit and within the acceptable limit range. EH said it was not possible to determine
the particular cause of the growth. EH recommended cleaning and sanitising of the ceiling
cavity, underside of the roof, window shutters and external walls.
On 25 March 2020, DW quoted $14,169.65 inclusive of GST for internal repairs.
On 4 June 2020, JA, mould remediator, provided an estimate totalling $3,878.38 inclusive of
GST for:
remediation of external mould and mould in the ceiling cavity
external eaves and visual mould on the carport walls to be wiped down with a mould
inhibitor
ceiling cavity to be chemically treated with a micro mist process
The complainant has provided a mould remediation quote dated 22 January 2021, from BR,
cleaners, for $189,991.75. The quote provides for the complete strip out of the property. BR
estimated the work will take a month.
BR’s quote was based on the report of ML, hygienist, dated 16 October 2020. ML had tested
one ceiling sheet material sample. The sample was found to have a very high level of fungal
(mould) concentration.
The insurer obtained a desktop report dated 31 March 2021 from P, hygienist. P concluded
there is no requirement to strip the property to carry out mould remediation works. This is
because the evidence shows previous remediation was successful and any recurrence of
mould was as a result of atmospheric conditions and the poor condition of the property.
Determination | Case number: 822244 Page 5 of 12
Finally, the complainant has provided a report dated 19 October 2021, from RP, plumber. RP
confirmed he had recently repaired the roof maintenance issues MC had identified.
The complainant has not proven additional loss claimed is covered
Based on the information submitted by the parties, on balance, I am not satisfied that the
complainant has established that the further repairs and remediation she wants covered are
necessary as a result of the storm event.
In reaching my view, I have found the following matters to be particularly persuasive:
the complainant bears the onus of proving on the balance of probabilities that the
additional claimed damage falls within the scope of the policy
neither BR or ML comment on the source of the mould
ML only tested one sample of sheeting material, approximately 20 months after the storm.
ML’s finding of a ve ry high level of mould is relatively consistent with the insurer’s
contention the reoccurring mould is due to local atmospheric conditions, not the storm
regular maintenance has been identified as a requirement in the North Queensland area to
prevent atmospheric mould developing
the insurer’s assessor and a number of its experts have referred to a lack of external
maintenance and pre-existing damage
in July 2019, EO reported there was evidence that mould had previously been painted
over. The insurer had not performed internal repairs at that stage
MC’s findings of maintenance related issues with the roof have been confirmed by RP
those roof issues were not repaired by RP until more than 2.5 years after the storm. The
expert evidence suggests that roof leaks will lead to mould growth.
EO attended to storm related mould remediation in July 2019. EH said in December 2019 that
complete removal of mould and mould spores from porous materials (like parts of the insured
property) is unlikely. EH also said it was not possible to identify the particular cause of a
mould growth. However, EH’s sampling confirmed that EO’s cleaning had been effective . P
has also said that is the case.
The submissions the complainant’s claim advocate describing his experience in relation to
claims made by others on different policies do not carry much weight. This is because he
does not have relevant expert qualifications.
Accordingly, it seems more likely that the additional mould is not related to the February 2019
storm. Rather, it has developed due to maintenance issues and environmental conditions.
Such causes are not covered by the policy.
2.2 Is the insurer entitled to cash settle the claim?
Yes. The policy allows the insurer to decide whether it attends to repairs or pays the cost of
the repairs to the complainant. However, the insurer’s cash settlement of the building claim
and for the limited further mould remediation should have included an uplift for risk transfer
and contingencies. A fair uplift in the circumstances is 15%.
Policy permits the insurer to cash settlement
The policy provides that the insurer will decide if it will:
repair damage new for old, or
rebuild the insured property new for old, or
pay the insured what it would cost the insurer to repair or rebuild new for old.
Determination | Case number: 822244 Page 6 of 12
The insurer had the discretion under the policy whether to undertake covered repairs or to
pay the complainant (cash settle) what it would cost the insurer to attend to those covered
repairs. The insurer must nevertheless act reasonably in deciding what option to pursue and
in calculating a fair cash settlement amount.
The policy also states:
If undamaged defective parts of your home will not support repairing damage by
an insured incident, we will only pay what it would have cost us to repair the
damage had your home not been defective.
The insurer says it elected to cash settle the complainant because it cannot warrant the works
in question. On the advice of DW and the assessor, the insurer says it cannot warrant repairs
because of:
holes and cracking to the asbestos ceilings
delaminating paint and cracking to asbestos ceilings/walls
flaking paint to asbestos eaves
The complainant says if the insurer will not settle her the reasonable cost of
repairs/remediation per the quote of BR, it should complete the repairs itself.
However, BR’s quote does not concern repair of damage; it solely relates to remediation
works. There is no repair quote to counter that of DW.
There is also no objective evidence the remediation works described by JA would not be
successful. Further, the quote of BR does not confirm the proposed works are necessary due
to storm related mould. As indicated above, on balance, I am not satisfied that the additional
mould is storm related.
In this case, the insurer has exercised its entitlement under the policy by choosing to go down
the cash settlement path. In the absence of any evidence that the insurer has acted
unreasonably in deciding to cash settle or in relying on the quotes of DW and JA to do so,
there is no legitimate basis to overturn that decision.
Insurer should have made an allowance for risk transfer and contingencies
When an insurer cash settles a claim, it transfers to the insured the risk that the cost of
repairs may blow out and/or that additional works not quoted for are ultimately required.
Further, it can be the case that a quote an insurer relies upon in cash settling is not readily
actionable by an insured as a retail customer.
AFCA’s approach is that it fair and appropriate that an insurer looking to cash settle a claim
use reasonable quotes as a starting point but should add an uplift to the quoted figures to
allow for transfer of risk and contingencies.
In cash settling with the complainant, the insurer relied on the quotes of DW and JA, totalling
$18,048.03. However, it did not pay an uplift. In the circumstances of this case an uplift of
15% is fair.
Accordingly, the insurer is to pay the complainant an additional $2,707.20.
Determination | Case number: 822244 Page 7 of 12
2.3 Why is the outcome fair?
The outcome is fair because it is not established that further repairs and remediation are
required due to the storm event. The policy terms entitle the insurer to limit its liability and to
pay a cash settlement. However, it is fair that the insurer pays a further $2,707.20 as an uplift
on the $18,048.03 cash settlement to allow for risk transfer and contingencies.
Determination | Case number: 822244 Page 8 of 12
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. I have reviewed and considered
all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, I have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy terms
PDS page 19
Storm and flood
We cover
Loss and damage caused by storm and flood e.g. rain, wind, hail, storm and damage
caused by flooding from rivers, streets and canals.
We do not cover
…
Determination | Case number: 822244 Page 9 of 12
paint when there is no structural storm damage to other parts of the home
PDS page 49
We do not cover:
Wear, tear, rust or mould Loss or damage caused by wear, tear, rust, fading, gradual
deterioration, mould, rising damp, mildew, action of light, atmospheric or climatic
conditions, corrosion, or rot unless this is covered under:
• insured ev ent 1 (storm and flood)…
Page 63
How we settle home claims
If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will:
repair damage new for old or
rebuild your home new for old or
pay you what it would cost us to repair or rebuild your home new for old.
PDS page 66
If undamaged defective parts of your home will not support repairs If undamaged defective
parts of your home will not support repairing damage by an insured incident, we will only
pay what it would have cost us to repair the damage had your home not been defective.
3.3 Relevant expert evidence
Record Key points
M , roofer
Insurer’s report
d ated 26 - 0602019
the front area of the corrugated roof had been recently replaced
during the replacement, fixings were put through the roof s heets
into the valleys without nylon washer s; this would enable wat er to
enter
the lounge room leak was directly below the solar hot wat er
service. M presumed that the penet ration for the water supply
leaked as it has recently be en sealed
the abovementioned maintenance issues meant the roof leaked
during heavy rains, although not during a normal rain event.
Determination | Case number: 822244 Page 10 of 12
Record Key points
EO, hygieni st
Insurer’s r eport
dated 17 - 07 - 2019
a ll cleaning works have been carried out diligently and all visible
moul d has been removed or treated
a s mould is naturally present in the environment it is important to
prevent excessive development by regular cleaning of surfac es to
remove biofilm and suppress mould growth. Mould will grow on
previously clean surfaces given time and conditions conducive to
its development
i t is the responsibility of the property owner to address any
sources of excess moisture or water ingress as this is the main
factor in controlling outbreaks of mould along with the regular
cleaning of surfa ces
in regions prone to extended periods of high humidity such as
Nort h Queensland, mould will develop on any exposed surface
due to the presence of ambient moisture in the air being e nough to
encourage and sustain mould growth
general dirt and debris pres ent on surfaces along with general
wear and tear
‘It appears they have painted over mould in areas around skirting
and architraves in many areas’ .
Determination | Case number: 822244 Page 11 of 12
Record Key points
EH, hygienist
Insurer’s report
dated 03 - 01 - 2020
w ater staining is noticeable in several plac es within the dwelling,
indicating potential roof leaks
t he external property does not appear to be maint ained in a
suitable fashion eg external timber walls have no protective
coating
m ould (staining) contamination is visible:
> Internally on some ceilings and curt ain ra ils
> On the higher parts of the wall in the childrens’ bedroom
> In the ceiling cavity
> Externally on the walls, roof, soffits, doors/door frames and
porch
no viable mould spores were detected in six out of seven swab
samples. The one sample with viable spores was at the minimum
detection limit and wi thin the acceptable limit range
‘ It is not possible to determine the particular cause of the mould
growth in the dwelling. However, the conditions must have been
ideal to grow to these extensive quantities in a rel atively short
period after th e flood event in February 2019’
complete removal of mould and mould spores from porous
materials (like parts of the insured property) is unlikely
cleaning of surfaces will reduce the amount of mould but if
conditions remain sui table, mould will reappear
remediation works:
> inspect the roof for leaks
> clean and sanitise the ceiling cavity, underside of the roof,
window shutters, all external walls (including sanding of
timber materials and replacement of rotten wood)
> retest
> repaint all external areas wit h a protective finish
M , hygienist
Complainant’s report
dated 16 - 10 - 2020
v ery high fungal (mould) concentration on single ceiling sheet
sample
Determination | Case number: 822244 Page 12 of 12
Record Key points
P, hygienist
Insurer’s r eport (desktop)
dated 31 - 03 - 2021
i nterior and exterior asbestos containing ceilings and walls have
been poorly maintained
w eat her data indicates that since the storm event, the
complainant’s suburb has regularly achieved ambient conditions at
and above ideal moisture levels for mould grow th
w ater entry damage is present at various locations
there is no requirement to strip the property in order to carry out
mould remediation works as a consequence of the storm
e vent related internal mould was effectively cleaned off and the
property sanitized by EO
t he reappearanc e of mould growth on external and internal
surfaces some 10 months after being cleaned, is environmental
mould and a normal gradual operational cause, this is not claimed
event related.
RP, plum ber
Complainant’s report
19 - 10 - 2021
some months ago, carried out a roof inspection and some minor
roof repairs
a few screws that had gone through roof sheets and the valley
beneath were removed and the valley penetrations sealed
more recently, installed a different met hod of protection around the
solar hot water system pipework, even though the sealant that had
been used was still in good condition and there were no signs of
water penetration
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.