Underinsurance clause applied to fire damage claim for hotel building; valuation and cost of repairs disputed; business interruption payment disputed
Text of the determination
Determination
Case number 822164
Financial firm Lloyd's Australia Limited
Determination | Case number: 822164 Page 1 of 10
Case number: 822164 22 August 2022
1 Determination overview
1.1 Complaint
The complainant is a business that runs a hotel. It held a business insurance policy with the
financial firm (the insurer). It lodged a claim after the hotel was damaged by fire.
The buildings were insured for $1,000,000, but the insurer valued them at $2,806,006. If this
valuation is correct, the policy’s underinsurance clause means the insurer only has to pay
about 44% of the cost of repairs . The complainant disputes the insurer’s valuation.
The complainant says the cost of repairs was $467,823.20, and the insurer should pay this
amount in full. The insurer says the cost of repairs was $175,570; 44% of this is $77,250.80.
The insurer offered to settle the claim for building damage by paying $200,000. The
complainant rejected this offer.
The insurer says it paid the complainant $24,567 for business interruption. The complainant
says the insurer should pay $80,000 for business interruption.
1.2 Issues and key findings
What was the value of the insured buildings?
The value of the insured buildings was $1,749,284. Applying the underinsurance clause, the
portion of the claim the insurer is required to pay is 71.46%.
What was the cost of repairs?
The cost of repairs subject to the underinsurance clause totalled $340,909.90. The insurer
must pay 71.46% of this amount, which is $243,614.21.
The costs not subject to the underinsurance clause (professional fees, demolition, stock, and
contents) totalled $69,663.30. The insurer must pay this amount in full.
The insurer’s total liability for damage to the building, stock, and contents is $313,277 .51.
Has the insurer paid enough for business interruption?
The information provided to AFCA is insufficient to determine whether the complainant
incurred business interruption costs exceeding $24,567. Therefore, the panel cannot
determine whether the insurer is required to pay more for business interruption.
1.3 Determination
This determination is mostly in favour of the insurer.
The insurer must pay $313,277.51 (ex GST) for building repairs, stock, and contents. The
insurer is entitled to deduct the excess of $2,500, and any amounts it has already paid. The
insurer must pay interest on the outstanding amount, at the rate determined under section 57
of the Insurance Contracts Act 1984 (Cth), from 6 August 2021.
Determination | Case number: 822164 Page 2 of 10
2 Reasons for determination
2.1 What was the value of the insured buildings?
Claim subject to underinsurance clause
The terms of the policy are set out in the policy schedule and the product disclosure
statement. Relevant sections of the policy are quoted in section 3.2 of this determination.
Section 1 of the policy covers fire damage to buildings. Claims under this section are subject
to the following underinsurance clause:
Your claim will be reduced if the Sum Insured is less than 80% of the insured
property’s value… We will only pay that proportion of Your claim that the Sum
Insured bears to 80% of the insured property’s value…
The policy schedule shows the buildings were insured under section 1 for $1,000,000. This
means underinsurance clause will apply if the value of the buildings exceeded $1,250,000.
Value is cost of rebuilding, excluding professional fees and demolition
Under the policy, the ‘value’ of a property is ‘w hat it would cost you now to build your
buildings in their original style and materials ’.
The policy schedule lists a sum insured of $1,000,000 for buildings, and a separate sum
insured of $280,000 for ‘removal of debris’.
The product disclosure statement describes how to determine the value of a building. It then
says the insurer will also pay for professional fees, demolition, and removing debris. There is
also a separate benefit for landscaping.
Under the policy, the ‘value’ of a building does not include the costs of professional fees,
demolition, removing debris, or landscaping.
Parties provided different valuations
The complainant lodged the claim on 19 May 2020.
The insurer appointed a quantity surveyor (RLB), who prepared a report dated 30 July 2020
on the insured property’s replacement cost. The report said the replacement cost was
$4,171,200, including professional fees and demolition. In a letter dated 18 June 2021, RLB
said the replacement cost, excluding ‘demolition, consultant fees, authority fees, contingency
and general sales tax’ was $2,806,006.
The complainant appointed a builder (EV), who provided quotes to rebuild the insured
buildings ‘ from the ground up, as built when originally constructed ’. EV’s quote of 31 July
2020 was to rebuild the hotel for $1,149,240 (ex GST). EV’s quote of 27 September 2020 was
to rebuild the annex building for $212,820 (ex GST). Both quotes excluded professional fees
and demolition. The two quotes totalled $1,362,060.
EV appointed a quantity surveyor (MB), who prepared an estimate for a ‘Hotel Re -Build (on
original spec) ’ . The estimate totalled $1,659,923 (ex GST), but included a mathematical error,
and should have totalled $1,742,900 (ex GST) . MB’s estimate included demolition,
excavation, and landscaping. When these items are excluded, the estimate totals $1,569,870.
Determination | Case number: 822164 Page 3 of 10
The complainant says EV’s quotes show the property was adequ ately insured and the
underinsurance clause does not apply. However, all valuations showed the value of the
buildings exceeded $1,250,000. This means the underinsurance clause will apply. The effect
of the underinsurance clause will depend on which valuation is used.
Fire-damage area was 14% of total building area
AFCA asked the insurer how much of the insured property was damaged by fire. RLB
provided the following figures:
Item Area (m 2 )
Fire damage to hotel 146
Hotel 892
Annex 162
External works 1,598
Total project area 2,652
RLB estimated the cost of repairing the fire damage at $175,570, and estimated the insured
property’s value at $2,806,006. This means RLB estimated the cost of repairs at 6% of the
cost of replacement.
RLB said the fire-damaged area was 6% of the total property area (146m 2 ÷2,652m 2 ), and this
was consistent with its estimate of the cost of repairs being 6% of cost of replacement.
However, the total property area of 2,652m 2 includes the outdoor area. The total building area
is only 1,054m 2 . The fire-damage area of the hotel was 14% of the total building area
(146m 2 ÷1,054m 2 ).
RLB estimated the cost of replacing the hotel (excluding the annex) at $2,282,007. This
means RLB estimated the cost of repairing the hotel at 8% of the cost of replacing the hotel
($175,570÷$2,282,007), but the fire-damaged area was 16% of the hotel (146m 2 ÷892m 2 ).
The complainant says it is not true that only 146m 2 (16%) of the hotel was damaged by the
fire. This is because about 80% of the building was impacted by smoke and water damage.
EV estimated the cost of repairs (excluding professional fees and demolition) at $381,863.20
and estimated the cost of replacement (excluding professional fees and demolition) at
$1,362,060. This means EV estimated the cost of repairs at 28% of the cost of replacement
($381,863.20÷$1,362,060).
EV’s estimate of the cost of repairs (excluding professional fees and demolition) was 24% of
MB’s estimate of the cost of replacement (excluding professional fees and demolition)
($381,863.20÷$1,569,870).
Value of buildings was $1,749,284
The panel prefers MB’s estimate of the cost of replacement. This is because:
EV’s estimate s are much less detailed than the MB’s or RLB’s. They provide only lump-
sum figures and do not specify the cost of individual items
RLB said the fire damaged 16% of the hotel, but the cost of repairing the fire damage was
only 8% of the cost of rebuilding the hotel.
Determination | Case number: 822164 Page 4 of 10
MB estimated the cost of replacement (excluding demolition, excavation, and landscaping) at
$1,569,870. However, this estimate included a builder’s margin of 5%. RLB’s estimate
included a more realistic builder’s margin of 14%. EV (who repaired the damage) charged a
builder’s margin of 17%. If MB included a builder’s margin of 17%, their estimate would have
been $1,749,284.
The panel concludes the cost of replacing the insured buildings (excluding demolition,
excavation, removing debris, and landscaping) was $1,749,284 (ex GST).
Underinsurance clause reduces insurer’s liability
The value of the insured buildings was $1,749,284. 80% of this is $1,399,427.
Applying the underinsurance clause, the portion of the claim that the insurer is required to pay
is $1,000,000÷$1,399,427, which is 0.7146, or 71.46%.
2.2 What was the cost of repairs?
Cost of repairs was $410,573.20
The complainant appointed EV to repair the hotel. EV estimated the cost of repairs at
$410,573.20.
RLB estimated the cost of repairs at $175,570. This was not an actionable quote; RLB did not
offer to repair the damage for $175,570.
EV repaired the damage. No other builder provided an actionable quote to repair the damage.
Therefore, EV’s evaluation of the cost of repairs should be given considerable weight.
The insurer has not provided information showing EV’s quote included unnecessary work.
Other than RLB’s estimate, the insurer has not provided information showing the amounts
quoted by EV were unreasonably high. The insurer has not provided information showing why
part or all of EV’s estimate should be rejected.
The panel is satisfied that the cost of repairs (including professional fees, demolition, stock,
and contents) was $410,573.20.
Insurer not liable for delays
From July 2020 to December 2020, EV provided cost summaries showing the cost of repairs
was $410,573.20.
On 16 February 2021, EV sent the complainant an invoice for an additional $57,250. The
invoice said the additional costs were due to delays, as work was placed on hold due to the
complainant’s dispute with the insurer.
The complainant says the insurer should pay $467,823.20, being the original estimated cost
of repairs ($410,573.20), plus the additional costs caused by delays ($57,250).
The complainant was responsible for arranging repairs. The available information does not
show the insurer was responsible for delays in completing repairs. The insurer is not liable for
any increased costs caused by delays.
Determination | Case number: 822164 Page 5 of 10
Insurer’s liability under Section 1 is $313,277.51
EV’s estimate of $410,573.20 included professional fees, demolition, stock, and contents.
Under the policy, these costs are not part of the value of the buildings.
In addition to the value of the buildings, the policy provides cover for professional fees (no
limit), debris removal ($280,000), stock ($20,000), an d ‘all other property’ (property that is not
part of the buildings or stock) ($200,000).
The available information does not show these items were underinsured. Therefore, the
underinsurance clause does not apply to these costs.
The insurer’s liability under Section 1 of the policy can be calculated as follows, based on
EV’s estimate :
Item Cost Insurer’s liability
Professional fees to consultants $6,425 $6,425
Demolition, asbestos & debris removal $22,285 $22,285
Stock $5,774.57 $5,774.57
Cont ents & inventory $35,178.73 $35,178.73
Other $340,909.90 $243 , 614.21 (71.46% of $340,909.90)
TOTAL $410,573.20 $313,277.51
Insurer must pay interest
The insurer’s liability under Section 1 of the policy, including damage to the building, stock,
and contents, is $313,277.51 (ex GST). From this, the insurer is entitled to deduct the excess
of $2,500, and any amounts it has already paid.
The insurer must pay interest on any outstanding amount from 6 August 2021. That is the
date the complainant lodged this AFCA complaint, and is shortly after the insurer offered to
settle the claim for building damage by paying $200,000.
2.3 Has the insurer paid enough for business interruption?
Insufficient information to determine business interruption complaint
Section 2 of the policy provides cover worth up to:
$200,000 for loss of income due to business interruption caused by damage covered
under Section 1 (loss of profit)
$50,000 for extra costs needed to keep the business running after an interruption caused
by damage covered under Section 1 (increased cost of working).
The complainant says it is entitled to $80,000 for business interruption. It has not provided
information showing how this figure was determined.
The insurer says it has paid $24,567 for business interruption. The complainant says the
insurer has only paid $18,621. The insurer must provide records showing it has paid $24,567
for business interruption. If it has paid less than $24,567, it must pay the outstanding amount.
Determination | Case number: 822164 Page 6 of 10
The insurer says its payment was based on a report by the complainant’s claims preparer
which said the complainant incurred a loss of profit of $24,567. The insurer says this report
also said the complainant incurred an increased cost of working of $25,000, but provided no
evidence and no explanation of how this figure was determined. AFCA has not received a
copy of the report.
The complainant says the insurer deducted money from the business interruption settlement
to account for JobKeeper payments. The insurer says its payment made no allowance for
JobKeeper.
The information provided to AFCA is insufficient to determine whether the complainant
incurred business interruption costs exceeding $24,567. Therefore, the panel cannot
determine whether the insurer is required to pay more for business interruption.
Determination | Case number: 822164 Page 7 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with extensive experience in consumer and small business advocacy
a member with extensive experience in insurance.
3.2 Relevant policy terms
Policy Schedule
FIRE SECTION 1 (page s 1 – 2 )
Buildings: Location: 1 $ 1,000, 000
Stock : Location: 1 $ 20 ,000
All other property : Location: 1 $ 2 00,000
Removal of debris : Location: 1 $ 280,000
Excesses: Standard
Earthquake
$ 2,500 Each & Every Claim
As per policy wording
PROFITS SECTION 2 (page 2)
Determination | Case number: 822164 Page 8 of 10
PROFITS SECTION 2 (page 2)
Part A - LOSS OF INCOME
Insured Income : $ 200 ,000
Indemnity period 12 mont hs
Part B - CLAIM PREPARATION COSTS: $ 25 ,000
Part D - EXTRA COSTS: $ 50 ,000
Excess: Standard $ 2,500 Each & Every Claim
ENDORSEMENTS (pages 4 – 5)
The method of deciding the value will be for:
1. BUILDINGS
(a) What it would cost You now to build Y our Buildings in their original style using modern
currently a vailable materials and building methods
Product Disclosure Statement
DEFINITIONS (pages 6 – 7)
POLICY DEFINITIONS
In this Policy, Certificate of Insurance and in the Schedule some words and phrases have been
given specific meanings:
1. All Other Property means:
Property that You own, that is in Your care or that for which You are legally responsible. It does not
mean any:
(a) Business book, document, record, plan or Electronic Data except for the material on
which they are written or stored. We do cover u nused stationery.
(b) Jewellery, fur, precious metal or stone.
(c) Living creature.
(d) Money, cheque, postal note, Money order, stamp, credit card voucher or negotiable
instrument.
(e) Registered motor vehicle motorcycle motor scooter trailer and any accessory to such
items.
(f) Property that is described under Buildings or Stock other than signs.
(g) Property of any one Employee that is in excess of $2,000 in total.
(h) Structure other than any fixture, fitting or fixed appliance if:
(i) You own the u nit (and that unit is part of a Strata or Group Title) containing the
items and the insurance of those items is not the duty of the Body Corporate.
(ii) You are a tenant and the items belong to You.
(i) Thing that flies or hovers and any accessory to such a thing.
(j) Watercraft and any accessory to a watercraft.
(k) Your property that is not used for nor connected to Your business.
Determination | Case number: 822164 Page 9 of 10
GENERAL CONDITIONS (pages 8 – 9 )
8. Underinsurance
(a) Section 1
Your claim will be reduced if the Sum Insured is less than 80% of the insured property’s value and
that claim is for more than 5% of the Sum Insured. We will only pay that proportion of Your claim
that the Sum Ins ured bears to 80% of the insured property’s value at the start of the period of cover.
The claim will still be subject to any Excess that may apply.
SECTION 1 – FIRE & PERILS (pages 11 – 13)
WHAT IS COVERED
Your Buildings, Stock and All Other Property that are at the Location. They are covered against
accidental damage that is caused by:
1. Fire…
HOW CLAIMS ARE SETTLED
We will at Our option either:
1. Repair or replace Your Buildings, Stock or All Other Property, or
2. Make a cash payment.
The method of deciding the value will be for:
1. Buildings
(a) What it would cost You now to build Your Buildings in their original style and materials.
We will also pay the cost of:
(i) Professional fees, demolition, removing debris, shoring or propping up that are
incurred in rebuilding or repairing the damage; and
(ii) Complying with current building and planning r egulations but We will not pay for
that work for which You received a compliance notice before the loss or damage
took place.
…
2. Stock
The cost of:
(a) Replacing Your Stock less due allowance for depreciation.
(b) Removing debris that is needed to replac e Your Stock.
3. All Other Property
The cost of:
(a) Repairing or replacing All Other Property without deduction for depreciation or wear.
(b) Professional fees, demolition and removal of debris that are needed to replace the
property or repair the damage.
ADDITIONAL BENEFITS
…
5. Landscaping
We will cover landscaping including plants, shrubs and trees at the Location if Your Buildings are
covered by this Section. They are covered against loss or damage caused by fire, lightning,
explosion, earthquak e, volcanic eruption or impact. We will not pay more than $5,000 under this
benefit.
Determination | Case number: 822164 Page 10 of 10
SECTION 2 – PROFITS (pages 14 – 15)
WHAT IS COVERED
Part A Loss of Income
Loss of Income. The loss must result from an interruption to Your business. The interruption must
be caus ed by damage that is covered by Section 1 of this Policy. We must have agreed to pay a
claim for that damage or would have except for the application of an Excess.
Part B Claim Preparation Costs
Those costs that are needed to prepare claims under S ections 1 and 2 of this Policy.
…
Part D Extra Costs
Those extra costs that are needed for the sole purpose of keeping Your business running normally
after an interruption. The interruption must result from damage that is covered by Section 1 of this
Polic y. We must have agreed to pay a claim for that damage or would have except for the
application of an Excess.