Home / AIG Australia Limited / Determination 821513

Determination 821513

Partial decline of accidental damage claim for storm-damaged retaining wall

FirmAIG Australia Limited
Decided2022-03-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$54,898
Non-financial loss—
Amount claimed$47,738
SourceAFCA PDF

Summary

The complainant claimed the full replacement cost of a storm-damaged retaining wall, and the insurer offered 20% on the basis that inadequate construction was the proximate cause. AFCA found the storm was the proximate cause, rejected the decline, and ordered payment of the claim with an uplift plus statutory interest.

Under the common-sense proximate cause test, the storm event, including driveway run-off, was the dominant cause of the damage, so the wear-and-tear and faulty construction exclusions did not apply.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All AIG Australia Limited determinations · Find similar determinations

Text of the determination

Determination Case number 821513 Financial firm AIG Australia Limited Determination | Case number: 821513 Page 1 of 11 Case number: 821513 25 March 2022 1 Determination overview 1.1 Complaint The complainant holds an accidental damage home building insurance policy with financial firm (the insurer). He lodged a claim for damage to a retaining wall on his property following a storm event in December 2018. The insurer accepted there was a significant storm event. But relying on engineering opinion, it says while the storm may have contributed to the failure of the retaining wall, the storm is not the proximate cause of the damage or failure of the retaining wall. It says damage to the retaining wall was caused by inadequate construction/design. It offered a 20% contribution ($9,547.52) to the replacement cost of the wall. The complainant disputes this decision and requests the full replacement cost ($47,737.58) be paid because the storm caused all the claimed damage. The case analyst provided the parties with a preliminary assessment on the issues in dispute. The preliminary assessment was mostly in favour of the insurer. The insurer accepted the preliminary assessment, but it was not accepted by the complainant . In the circumstances, the complaint has been referred to me for determination . 1.2 Issues and key findings Is the insurer entitled to partly decline the complainant’s claim? No. The available information establishes on the balance of probabilities the proximate cause of the claimed damage was the storm event. As the available information also establishes the claimed amount addresses the actual damage caused in the storm event the insurer is not entitled to partly d ecline the complainant’s claim. Why is the outcome fair? The available information establishes on the balance of probabilities the proximate cause of the claimed damage was the storm event. In these circumstances it would not be fair if the insurer partly declined the claim. Further, the available information establishes the complainant’s quote addresses the actual damage. In these circumstances it would not be fair to only partly pay the complainant’s claim. Determination | Case number: 821513 Page 2 of 11 1.3 Determination This determination is in favour of the complainant. Should the complainant accept this determination then within seven days of notification of acceptance the insurer is to pay to the complainant: > $54,898.22 (less the policy excess of $500 if the excess is not already paid) > statutory interest on the net settlement amount from 24 February 2021 until settlement of the claim. Otherwise, the insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 821513 Page 3 of 11 2 Reasons for determination I have decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). I have considered all the material submitted by the parties, both before and after the preliminary assessment. I am satisfied that the documentation I have relied on has been provided to both parties. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. New material provided after preliminary assessment After the preliminary assessment was rejected, the complainant provided some new material. Both parties make further submissions. Where relevant, these will be referred to in this determination. 2.1 Is the insurer entitled to partly decline the complainant’s claim? Complainant has established a valid claim The complainant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. The policy provides for cover if the property is accidentally damaged. The insurer does not dispute the property was damaged in the storm on 14 December 2018. The insurer said the storm event likely contributed to the wall failure. I accept the complainant has established a valid claim. Insurer must establish policy exclusions apply Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. The policy terms relied on by the insurer are set out in supporting section 3.2 of this determination. Relying on the policy terms and its engineer’s opinion (F) the insurer says it is entitled to partly decline the claim. It says while the wall failure occurred during the storm event, the proximate cause of the damage was inadequate design and construction of the retaining wall. It says because the wall was inadequately designed/constructed and because of its age the wall could not withstand the storm event. The insurer noted other retaining walls were unaffected by the storm event. It also asserts the retaining wall included various types/ages and it would have been obvious the damaged part of the brick retaining wall required replacement. Extracts from the material relied on by the parties are set out in supporting section 3.3 of this determination. Determination | Case number: 821513 Page 4 of 11 The complainant has not obtained an expert opinion. He challenges F’s opinion saying the storm event was significant causing the wall to collapse and: > the wall collapsed within hours of the storm > the wall is sound. It was in place for 40 years and withstood the test of time > current design and constructions methods may be different to when the wall was built > the failed wall is a wing to the main wall and was not a retaining wall (like the rest of the eastern retaining wall) but built to redirect water running down the hill towards his property to divert water away from the house and garden. The storm event was the proximate cause of the damage to the wall I have carefully considered the F’s report and photographs. I accept F has the expertise to provide opinion. However, I do not accept F’s conclusion that the storm is not th e proximate cause (or the dominant or effective or operative cause) of the damage to the retaining wall. Firstly, there is no dispute the event on 14 December 2018 was a significant storm event with flash flooding. Not only was there 46mm of rain but newspaper reports describe intense rainfall. Secondly, noting the intense rain, I am not persuaded the insurer has taken sufficient cognizance of the effect of the storm run-off from the neighbour’s driveway. F says stormwater run-off from the driveway substantially contributed to the volume of the water which inundated the eastern side of the property during the rain event. The driveway is located immediately uphill from the failed retaining wall. The photographs show a very steep fall towards the insured property. Debris from the wall blocked the drain which caused a build- up of water. The extent of the water deluge is supported by F’s photograph 14 which shows floodwaters reached 190mm. Due to the nature of the storm event and the probability of a significant deluge of rainwater run-off from the neighbour’s driveway to the retaining wall, I am satisfied on the balance of probabilities the storm event was the proximate cause of the damage. Although F noted no damage to a timber fence at the end of the neighbour ’s driveway, this does not derogate from my conclusion as F inspected the timber fence over three months after the storm event. Thirdly, the insurer argues the age of the wall is unknown. Based on the available information I accept the wall was at least 40 years old. This is because the complainant and his family have lived at the house and the adjoining property throughout that time. He makes that positive assertion which is not contradicted by any objective evidence from the insurer. Fourthly, having considered the available photographs and the position of the wall I do not accept it was obvious the wall required replacement. Fifthly, while the brick retaining wall may have been constructed later than the house I do not consider anything turns on this. The house was built in 1867. Extensions were added to the rear of the house. It is probable the brick retaining wall was added at the same time as the extensions. I do accept this indicates the brick wall was replaced because it was inadequate. F makes several observations which F says indicates the wall was inadequate in design and construction. While F is qualified to make these observations, for the reasons stated above, I do not accept F’s conclusion. After the preliminary view the insurer reiterated F’s opinion and said the wall was not doing the job it was designed or constructed to do and the storm event was “the final straw” and not the proximate cause of the loss. I do not agree. Determination | Case number: 821513 Page 5 of 11 Having considered the available information and for the reasons sta ted while I accept F’s observations about the construction of the wall I do not consider the insurer or F have taken sufficient account of the nature of the event on the day and the effect of the storm run-off from the neighbour’s driveway. Because of this I am satisfied the proximate cause of the damage is the storm event The insurer argues the policy exclusion relied on does not refer to a time/standard against which any defect or design flaw should be measured. I do not agree. Both commercial intention and fairness requires the policy term to be assessed against the standards available at the time of the wall’s construction. Based on the available material and for the reasons stated I am satisfied the proximate cause of the claimed damage was the storm event. On this basis, the insurer is not entitled to rely on the policy exclusions and is not entitled to decline the claim. Material provided about quantum after the preliminary view considered The insurer challenged whether the complainant’s quote addre sses damage caused in the storm. It was prepared to contribute 20% to the quoted amount. This amount ($9,547.52) was calculated on the basis that only a third of the brick retaining wall had collapsed during the storm event. It says the remaining part of the brick retaining wall which had not collapsed during the storm needed to be replaced because of wear and tear. F’s photographs show the failed retaining wall is located at the southern end of the eastern retaining wall and is limited to a short section (about 3m) of the return wall. F prepared a Scope of Works (SOW) and allowed to demolish, remove and dispose of the damaged retaining wall section as marked in Appendix B of the SOW and allowed for 3m². F reported he allowed for a 3m long by 1.30m-1.55m high wall including associated footing and surface drainage details as per Appendix B. A site plan shows the subject retaining wall to be replaced. While F provided a comprehensive SOW, he did not provide any costings. In February 2019, the complainant obtained a quotation from A to supply and install the new brick wall for $43,397.80 plus GST. This included the description in the schedule of works of “Demolition of Existing Brick Wall (10LM)/Earth works to batter.” The complainant refers to F’s drawings in his report and says the whole wall must be rebuilt. The complainant notes it is very likely building costs, time, and materials, have increased since the time elapsed from the SOW and his quote. After the preliminary view the complainant obtain further material from his contractor (A) who said his quote was to replace only 3m² of the damaged wall. A clarified the quote is not to replace 10m² of the retaining wall but the reference to 10LM in his February 2019 quote is referring to the amount of land soil to be removed from the 3m² of wall. Having considered all the available material both before and after the preliminary assessment, I accept A’s quote was t o replace the damaged part of the wall only, not the entire wall. After the preliminary view A also said it will cost about $55-$65,000 to replace 3m² of wall to the standard of the building code. A wanted to revisit the quote as it was two years old. Neither party provided anything further after the preliminary view about the current cost to repair 3m² of the damaged retaining wall. Determination | Case number: 821513 Page 6 of 11 Insurer to pay the complainant $54,898.22 less policy excess of $500 Having considered the available material I am satisfied that in February 2019 the cost to replace the part of the wall which was damaged in the storm was $47,737.58 including GST. In view of the age of the quote and the special circumstances of the increased cost of labour and materials because of the Covid-19 pandemic I am satisfied it is fair to allow an uplift of 15% ($7,160.64 ) to A’s quote. This results in a total amount payable to the complainant of $54,898.22. From this amount the insurer is entitled to deduct the policy excess of $500 (if the excess is not already paid). Interest to be paid on settlement sum from 24 February 2021 The complainant seeks interest from the date he dodged his claim. The available information shows the following timeline: 14 December 2018 Storm event 20 December 2018 Claim made via broker 11 February 2019 A’s quote 21 February 2019 Broker submitted A’s quote to insurer 26 March 2000 Assessor report 11 April 19 Engineer report and scope of works 21 May 2019 Insurer provided reports to the Broker, noting it was reviewing the claim with the view to declining the claim 18 June 2019 Broker advised the complainant wished to withdraw the claim 20 November 2020 Broker advised the complainant wished to reopen the claim providing additional reasons and disputing F’s conclusions 24 February 21 Claim declined due to faulty design/inadequate construction Having reviewed the available information, I am not satisfied it would be fair to allow interest pursuant to section 57 of the Insurance Contracts Act from the date the claim was made. This is because the complainant withdrew the claim in June 2019. Once the insurer was advised the complainant wished to reopen the claim I am satisfied the time taken to make a claims decision was reasonable. In all the circumstances I am satisfied it is fair statutory interest is paid from the date the claim was first declined (24 February 2021) until settlement of the claim. 2.2 Why is the outcome fair? The available information establishes on the balance of probabilities the proximate cause of the claimed damage was the storm event. In these circumstances it would not be fair if the insurer partly declined the claim. Further, the available information establishes the complainant’s quote addresses the actual damage. In these circumstances it would not be fair to only partly pay the complainant’s claim. Determination | Case number: 821513 Page 7 of 11 3 Supporting information 3.1 Process AFCA’s approach to this complaint It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Caselaw and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common-sense approach is taken to determine proximate cause. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. Section 1 – Your buildings and contents Accidental damage cover What is covered Your Buildings and/or your Contents as set out on your Policy Schedule are covered if they are accidentally destroyed, accidentally lost or accidentally Determination | Case number: 821513 Page 8 of 11 damaged. They are covered only if you own them, or are liable for their destruction, loss or damage. … What we will not pay for We will not pay for your Buildings or Contents which are destroyed, lost or damaged by: …  Rust, corrosion, gradual deterioration, depreciation, wear or tear  A defect in an item, faulty workmanship, structural defects or faulty design 3.3 Extracts from material relied on by the parties Date Action Loss adjuster report (A) 26 March 2019  Herit age listed house owned by complainant for the past 10 years .  Property on a sloped block. Retaining walls on the east elevation.  Severe storm caused widespread damage and flash flooding. That evening complainant ret urned to the house to find a section of single brick retaining wall on the southeast elevation had collapsed.  Inspected property 7 March 2019 with complainant and found a section of the single brick retaining wall had collaps ed.  R ecommend engineer be engaged . Loss adjuster report (A) 17 March 2019  Attach es F’s report and F’s Scope of Works, which sets out the necessary work involved to reinstate the damaged retaining wa ll (compliant with current building regulations), which includes the removal and reinstatement of the adjacent concrete paving slab and weat herboard outhouse . Insurer’s engineer’s (F) Report 11 April 2019  Inspected and photographed property with complainant 27 March 2019 .  Retaining walls of various type/ages support the embankment that runs next to the east of the house.  Failed retaining wall is located at the southern end of the eastern retaining wall, and is limited to a short section, approximately 3m long, of return wall.  Height of the failed retaining walls varies from Determination | Case number: 821513 Page 9 of 11 approximately 1.55m high at its eastern end to 1 .3m high at its western end. The failed retaining wall comprises single brick construction. There are trees and ot her vegetation immediately behind the failed retaining wall. There is concrete paving, with a spoon drain and an inlet for stormwater drain se rvicing the eastern side of site, in front of the failed ret aining wall .  Describes and photographs the property and wall .  46mm rain fell 14 December 2018 which is the second highest amount of rain for 2018; 48.3mm recorded on 7 November 2018 .  Noted news article referring to a deluge of rain causing flash flooding in the city and eastern suburbs .  Accepts intense rainfall event on 14 December 2018 .  Noted the driveway next door located immediately uphill from the failed retaining wall and the steep fall tow ards the damaged wall. No barriers or drains to prevent water spilling off the driveway. Timber paling fence acted as barrier substantially reducing volume of stormwat er run - off .  A single rainfall event would not cause failure of an adequately designed and constructed retaining wall.  Failed retaining wall was inadequate in design and construction including . > The wall comprised a single leaf of brickwork, 110mm wide, with no reinforcement. Henc e the wall relies on its own self - weight to resist the overt urn ing moments and lateral pressures imposed upon it by the retained soil, the surcharge loading on top of the retained soil (such as the observed trees and vegetation) and any hydrostatic pressure behind the wall. However, the self - weight of a single leaf br ick wall is grossly inadequate for a retained height of 1.3m to 1.55m. Rudimentary calculations indicate that even in the absence of surc harge loading and hydrostatic pressures a single leaf brick wall only has sufficient mass to retain an approximate 200m m height of soil, which equates to approximat ely three brick courses in height. > no weep holes at the base of the wall, although there does appear to have been weep holes approximately 6 brick courses above ground level. Notwithstanding, this would allow a build - up of hydraulic pressure towards the base of the wall, which would further increase the lateral load on the wall above the load imposed by the retained soil. > evidence that the retaining walls along the eastern side of the house previously comprised brickwork construction throughout, but that the brickwork walls Determination | Case number: 821513 Page 10 of 11 were replaced over time. However, it is not possible to determine why the brickwork wall was replaced, except that it is expected that the previous brick retaining wall were single leaf const ruction similar to the subject failed wall. Evidence that a former brick wall was present includes the following: > There is a brick course at the base of the bluestone retaining wall which suggests that the bluestone wall is a later replacement to the expe cted original brick retaining wall. > The interface of the section of reinforced concrete retaining wall with the bluestone wall at one end and the brickwork wall at the ot her end indicates that it was constructed subsequent to either the bluestone or brick works walls.  Whereas the Event may have precipitated the failure of the subject retaining wall, the Event is not the proximat e cause of the damage or failure of the subject retaining walls.  Damage to the subject retaining wall has been caused by inadequa te construction as discussed above. Insurer’s engineer’s (F) scope of works  Drawing and photographs attached of damaged retaining wall and collapsed section and cracks to the brickwork (and of outhouse which is to be removed and subs equently reinstated).  SOW requires all works to be carried out to reinstate damaged wall to condition equivalent to which existed immediat ely prior to wall failure.  Demolish, remove and appropriately dispose of concrete paving slab as marked in Appendix B drawing. Allow for 14m2.  Demolish, remove and appropriately dispose of damaged retaining wall section as marked in Appendix B drawing. Allow for 3m2.  Supply and install new reinforced concrete block retaining wall with face brick as per Appendix B. Allow for 3m long by 1.30m - 1.55m high wall (height to match adjoining retaining wall heights) including associated footing and surface drainage details as per Appendix B . Complainant’s quotation (AC) 11 February 2019  Demolish existing brick wall (10 LM/Earth works to batter), supply and install new concrete footing, new brick wall, drainage, backfill $43,397.80 plus GST Letter from AC to complainant 31 January 22  Clarified earlier quote This tender is to only repair the damaged wall (3 SQM of wall collapsed retaining wall) as identified in the F scope of works.  Quote is not to replace lOSQM of the retaining wall. Determination | Case number: 821513 Page 11 of 11  Referenc e to lOLM in the quote is referring to the amount of land soil to be removed from the 3SQM of wall, allowing an expansion factor of 1.6.  Not be able to replac e the damaged only section of the wall for $16k .  AC strongly believes it will cost in the vicinity of $55k to $6Sk to replace the 3SQM of wall to the standard of the building code.  AC would li ke to revisit this quote due to it being over 2 years ago. 3.4 Other relevant material considered and relied on  Parties’ submissions /emails and all attachments to all submissions/emails  Expert reports, assessment reports and quotations to repair  Photographs and material from Bureau of Meteorology  Claim file notes  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.