Home / IAG / Determination 819789
Determination 819789
Claim declined for flood damage; optional flood cover not taken
Summary
The complainant's business premises were inundated by water in March 2021 and the contents claim was declined because the policy only covers flood with optional cover, which was not taken. AFCA found the damage was caused by flood from watercourses and determined the insurer was entitled to refuse the claim.
Flood was excluded under the policy because the optional flood cover was not selected, and the evidence established the inundation was caused by floodwater escaping watercourses rather than stormwater runoff.
Issues
- Claim denial primary · not upheld“The insurer is entitled to refuse payment of the claim in accordance with the terms and conditions of the policy.”
- Inadequate claim investigation secondary · not upheld“The panel is not persuaded by the complainant's submissions that the inundation was from stormwater runoff; G's report does not assist the complainant.”
Subjects and remedies
business interruptionnatural disasterno remedy
Related
Text of the determination
Determination
Case number 819789
Financial firm Insurance Australia Limited
Determination | Case number: 819789 Page 1 of 6
Case number: 819789 24 November 2021
1 Determination overview
1.1 Complaint
The complainant holds a business insurance policy with the financial firm (the insurer). The
policy held by the complainant excludes cover for damage caused by flood.
On 22 March 2021, the complainant lodged a claim with the insurer after his business
premises were inundated by water causing damage to the contents.
After assessing the circumstances of the loss, it was determined the damage was the result
of floodwater. The policy provides cover for his damage, but only when the optional cover is
taken. In this instance, the complainant did not take out the optional cover. The insurer
declined the claim on that basis as the policy does not respond to the loss.
1.2 Issues and key findings
Is the insurer entitled to refuse payment of the claim?
Yes. The availabl e information establishes the damage to the complainant’s property was due
to inundation from flood. The complainant did not have the optional cover for flood. The
insurer is entitled to rely on the terms and conditions of the policy where the complainant
does not have the optional cover. The insurer is entitled to refuse payment of the claim.
Why is the outcome fair?
The outcome is fair because the insurer has established that it is entitled to rely on the policy
exclusion for flood to refuse payment of the claim.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to refuse payment of the claim in accordance with the terms and
conditions of the policy.
Determination | Case number: 819789 Page 2 of 6
2 Reasons for determination
2.1 Is the insurer entitled to refuse payment of the claim?
Policy does not provide cover for flood
The complainant’s business policy provides cover for loss or damage to the insured property
caused by an incident during the period of insurance.
The cover provided is subject to several exclusions and conditions. In addition, the policy
contains optional flood cover. For the complainant to have cover for flood, he must select this
optional cover.
The certificate of insurance (COI) clearly states that flood is not covered. The information
exchanged shows the complainant was given the option to add the optional cover for flood for
an additional premium. The exchanged material confirms the complainant was aware he did
not have cover for flood.
Flood is defined in the PDS as:
the covering of normally dry land by water that has escaped or been released
from the normal confines of any of the following:
a lake (whether or not it has been altered or modified);
a river (whether or not it has been altered or modified);
a creek (whether or not it has been altered or modified);
another natural watercourse (whether or not it has been altered or modified);
a reservoir;
a canal;
a dam.
Circumstances of the loss
On 22 March 2021, the complainant lodged a claim for damage to contents due to water
inundation. The complainant was not present at the site during the inundation event. The
complainant reviewed CCTV footage and discussed the event with neighbouring property
owners.
The complainant advises water started to pool in the rear carpark around 12.00noon on 19
March 2021 and then flowed south through the alley and into H Street. The complainant says
the kerb inlet put on H Street has limited capacity, which causes run off into the property. The
complainant states the water began to seep through the front door at about 2.30 am on 20
March 2021 and reached a peak depth of between 100-150mm above floor level at about
3.00am. The complainant further states water which inundated the property was clear and
had receded by 10.00am on 20 March 2020.
Information indicates inundation by flood
The insurer provided a report from its hydrologist (AD) dated 9 June 2021, which was
prepared following a site inspection on 31 March 2021.
Determination | Case number: 819789 Page 3 of 6
During its inspection AD noted the property is a commercial enterprise situation near the
eastern edge of the Wauchope Central Business District. AD noted the property is located
approximately 550 metres south of the Hastings River, which flows in an easterly direction at
Wauchope. AD noted the property is located about 2.5 kilometres west of Kings Creek which
flows northward into the Hastings River. AD observed there are a number of unnamed
watercourses and drainage channels that flow from Wauchope towards Kings Creek.
AD noted a narrow alley to the west of the premises provides access from the rear carpark to
H Street. AD observed a stormwater inlet it is located at the carpark end of the alley. There is
a kerb inlet pit located outside the adjacent business.
AD noted the property is located near a low point in H Street which has a gutter elevation of
about 6.6m AHD (Australian Height Datum). AD noted the terrain rises to the north, east and
west of the property. The terrain to the south of H Street slopes gradually down into an
unnamed watercourse which drains towards Kings Creek. AD noted the unnamed
watercourse drains this local catchment in an easterly direction toward the North Coast
Railway. AD noted the railway embankment has a crest elevation of about 7.9m AHD at the
point at which it crosses the unnamed watercourse. AD noted the flow carried by the
unnamed watercourse is discharged to the east of the railway embankment via a box culvert.
During inspection, AD observed debris lines at several locations around the property. AD
submits these debris lines are representative of high water level at the property during the
event. AD was able to use these debris lines to verify the peak flood depths. AD inspected the
stormwater inlet pits in the rear carpark and outside number 5 H Street. AD observed a
relatively small burst of rainfall occurred during the inspection which resulted in some ponding
of stormwater in the street gutter in front of the property.
AD observed the height of the footpath at the front of the business was measured to be
approximately 200mm above the street gutter level. AD noted the floor level of the property is
raised 300 mm above the footpath.
AD reviewed the rainfall data relevant to the inundation. AD noted a period of intense rainfall
commenced at about 9.00am on Friday 19 March 2021, resulting in about 240 to 250 mm of
rainfall being recorded in the middle and upper catchments of the Hastings River over the
following 12 hours i.e at the Wauchope gauges. AD commented that this corresponds to a
storm with a magnitude similar to a 1% Annual Exceedance Probability (AEP), that is, a storm
with an average recurrence interval of about 100 years.
AD further commented that this period of intense rainfall was followed by a two-hour period of
no rainfall and then a further 40 mm of intermittent rainfall was recorded between 11.30pm
and 8.30 am on Saturday 20 March 2021.
AD reported that the heavy local rainfall would have led to significant stormwater run-off in the
area of the property at that time. AD states this would have led to pooling of stormwater in the
rear carpark which was reported by the complainant to commenced on 19 March 2021 and
which subsequently flowed along the alley into H Street.
AD reports the pooling of runoff in the rear carpark would not have entered the property via
the rear carpark would not have entered the property via the rear door to the carpark because
there is a step-up from the carpark to the floor level of between 100mm and 200mm. AD
noted there is also a concrete bund inside the rear door with height of 100 to 200mm above
the floor level which has presumably been installed to prevent the inflow of stormwater and/or
floodwaters.
Determination | Case number: 819789 Page 4 of 6
AD reports the inundation of the premises occurred via the front door and did not commence
until about 2.30 on 20 March 2021. AD noted this occurred about 5.5 hours after the end of
the intense rainfall in the local area which indicates stormwater runoff was not the cause of
the inundation.
AD reviewed the internal CCTV footage, which confirms the inundation of the property
occurred in the early hours of Saturday 20 March 20201. The footage shows water starting to
seep through the front entrance at about 2.30am and reached its peak depth at about 3.00am
AD concluded the inundation across the ground floor of the property was caused by flows
escaping the confines of watercourses, namely the Hastings River and other connected
watercourses.
Complainant’s submissions do not assist
The complainant provided a report from a hydrologist G in support of his view the inundation
was caused by stormwater. It is noted G’s report is for a neighbouring property and not that of
the complainant ’s property .
G’s report does not include any notes or information regarding the rainfall data. Further, G did
not use any river level gauge data for the Hastings River. The report provided by G does not
provide any analysis of the data which is critical in determining the cause of the inundation.
On this basis, the panel is satisfied the report provided by G does not assist the complainant.
Insurer entitled to refuse the claim
The information provided shows the inundation into the property was caused by water
escaping the confines of watercourses, namely the Hastings River. In addition, the panel is
not persuaded by the complainant’s submissions that the inundation was from stor mwater
runoff.
Based on the information exchanged, the complainant did not have cover for the
circumstances of the loss, being cover for damage caused by flood.
Therefore, the insurer is entitled to refuse payment of the claim.
2.2 Why is the outcome fair?
Based on the available information, the outcome is fair as the insurer has established that it is
entitled to rely on the policy exclusion for loss or damage caused by flood.
Determination | Case number: 819789 Page 5 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in general insurance
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 819789 Page 6 of 6
3.2 Rainwater that mixes with flood water is flood
The courts have established that once rainwater mixes with flood water, it is all considered
flood water. Where rainwater mixes with flood water and causes damage, a flood exclusion
will usually apply to defeat the claim.
Accordingly, when deciding complaints, consideration has been given to whether there was
any rainwater runoff damage before the flood water arrived at the insured property.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.