The complainants claimed storm damage to a rental property including a collapsed masonry wall, other items, lost rent and claims handling compensation. AFCA found the wall was a retaining wall excluded from cover, but ordered settlement of other items and continued lost rent up to the 12 month limit, plus $750 non-financial loss.

The masonry wall was retaining soil at the time of loss, so the policy's retaining wall storm exclusion applies, while other items and lost rent are payable under the policy and claims handling caused unusual inconvenience.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 819190 Financial firm Insurance Australia Limited Determination | Case number: 819190 Page 1 of 6 Case number: 819190 4 March 2022 1 Determination overview 1.1 Complaint The complainants hold a Landlord Insurance Policy (the policy) with the financial firm (insurer). In or around 3 March 2021, the complainants lodged a claim for storm damage to the insured property. After inspecting the damage, the insurer agreed to partially accept the claim from the resultant damages of the collapsed wall. However, the insurer denied liability for the wall itself. The insurer says it is a retaining wall which is excluded from cover. The complainants dispute this. The complainants are also seeking cover for other items, lost rent and compensation for the insurer’s claims handling . 1.2 Issues and key findings Is the insurer liable for the wall? No. This is because the available information shows it was a retaining wall at the time of loss. What is the insurer’s liability for other items and lost rent? The complainants raised other items they say were missing in the scope of works. These should be addressed in the manner set out in section 2.2. The insurer should continue to pay for lost rent until the claim related damage is repaired or the 12 month limit is reached, whichever is earlier. Should the insurer pay non-financial loss? Yes. There were aspects of the insurer’s claims handling which was unreasonable. The insurer should pay $750 compensation for non-financial loss. 1.3 Determination The determination is partially in favour of the complainants. The insurer should settle the claim for the other items and lost rent in the manner set out in section 2.2. The insurer should also pay the complainants $750 in non-financial loss. Determination | Case number: 819190 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer liable for the disputed damage to the wall? The policy is a defined events policy with cover for specified events There is no dispute a storm event occurred on 2 March 2021. During the event, a masonry wall collapsed and caused resulted damage. A fence located against the retaining wall was also damaged. The insurer accepted the claim as the policy covers damage caused by a storm. However, it specifically excludes loss or damage to retaining walls under this insured event. The insurer says the damaged wall is a retaining wall as it is supporting soil. To support its position, the insurer has referred to the Macquarie Dictionary definition of a retaining wall which says: ‘a wall built to hold back a mass or earth etc’. The complainants do not dispute this definition. However, they say the wall was not a retaining wall. Parties experts disagree on whether wall falls within the policy terms There are two structures in the relevant area. The complainant’s engineer, Q, identified an ‘I beam retaining structure’ behind the collapsed masonry wall. This included vertical I beams founded on concrete footings with reinforcement bars being placed behind the I beams with a welded connection. This beam structure was retaining soil. There was a gap between the two walls. Q observed that this gap appeared to have been backfilled using aggregate capped with topsoil. Due to the general absence of core filling and steel reinforcement, Q said the masonry block wall would not resist any surcharge loading or lateral pressures. Q concluded the masonry block wall is not, and never was, a retaining wall. In determining the cause of failure, Q said: It is our opinion that foundation movements of the fence as a result of founding in weak soils between the front of the I beam retaining structure and the back of the masonry block wall have applied lateral and surcharge loads to the back of the masonry block wall. Application of the lateral and surcharge loads has triggered the failure. Q also said the introduction of water behind the masonry block wall created lateral and hydrostatic pressure to the back of the wall. However, Q concluded this was a minor contributing factor to its collapse. The insurer engaged builder R. R said that due to the excessive amount of rain in such a small amount of time, the weight behind the masonry wall forced it to collapse. R described the wall as a retaining wall. Determination | Case number: 819190 Page 3 of 6 The insurer also engaged a civil engineer and building consultant (D). D concluded the masonry wall failed due to non-compliant and defective construction. This is because it did not have adequate vertical reinforcement to support the lateral loads imposed by the retained ground. D also said the wall was a retaining wall. This is because the gap between the back of the masonry wall and the front of the I beam was backfilled with aggregate capped with topsoil. On balance, evidence shows the masonry wall is a retaining wall Having carefully reviewed the available information, I accept the masonry wall is a retaining wall. This is because the expert reports clearly indicate the gap between the back of the masonry wall and the front of the beam retaining structure appear to have been backfilled using aggregate capped with topsoil. The presence of the aggregate shows the masonry wall was working with the I beam to retain soil. Otherwise, if the masonry wall was simply meant to be used as a fence or wall, then the backfill of aggregate capped with topsoil would not unnecessary. It is also consistent with the mechanism of failure. In this regard, I prefer the insurer’s expert as it is consistent with the fact it failed followed heavy storms. Both engineers also agree the masonry wall was not designed to be a retaining wall so the pressures that came from the retained soil following a heavy storm would plausibly trigger its collapse. Even if I was to accept Q’s evidence about the cause of failure, this would not assist the complainant. This is because Q also accepts there was lateral and hydrostatic pressure to the back of the wall. It is reasonable to conclude this pressure must have been coming from the soil being retained by both the I beam structure and the masonry wall. Therefore, at the time of the loss, I accept the masonry wall was retaining soil. This makes it a retaining wall under the policy. As the policy excludes damage caused to retaining walls due to a storm, the insurer can deny this aspect of the claim. 2.2 What is the i nsurer’s liability for other items and lost rent? Other items In their submissions, the complainants say they received verbal advice the wooden kitchen floors needed repair and they would receive 50% for the cost of a paling fence. However, these items were not included in the scope of works. They also raised concern about the split system air-conditioner not being included. The insurer has not responded to these items in its submissions to AFCA. According to the complainants, their previous split system was removed by the insurer. If that is the case, then it should be replaced. The policy does exclude storm damage to fences but only if they were not in good condition. No evidence has been led to show it was not in a good condition. If it is a boundary fence, and was damaged by the storm, then the 50% contribution expected is fair. Determination | Case number: 819190 Page 4 of 6 Regarding the wooden kitchen floors, if this was damaged by the storm, then the insurer should cover it. Lost rent The complainants have also claimed for loss of rent. The policy provides a loss of rent benefit if a listed event causes damage and the insurer agrees the tenants cannot live in it. The rent covered is the reasonable time it should take to repair the damage for up to 12 months. The insurer has paid for lost rent until 1 October 2021. Therefore, there is no dispute the policy criteria is met. The insurer has not made any submission regarding loss of rent incurred after this. As the property is not repaired, it is reasonable expect this benefit should be paid until the property is either repaired or the 12 month limit is reached, whichever is earlier. The complainants have raised concern that the 12 month limit will be exceeded. However, I do not accept the insurer is required to pay more than this limit. This is because one of the main reasons the claim has been delayed is due to the dispute about the wall. As the insurer’s position on this was substantiated, it is not fair for the insurer to pay lost rent beyond the 12 month policy limit. The complainants have also sought $100 interest for the delayed rent. However, it is not clear how this amount was calculated. Given this, I consider the delay in paying the lost rent to be more appropriately dealt with under an award for non-financial loss. 2.3 Should the insurer pay non-financial loss? Insurer is to pay the complainant $750 in non-financial loss compensation The complainants are dissatisfied with the extent of time taken to finalise the claim. They have sought compensation in the amount of $4,095 for time spent pursuing the claim and dispute. I am not persuaded the amount of $4,095 is a financial loss. No information has been led to show the complainants lost this income. Given this, it is appropriate to consider the time spent as part of an award for non-financial loss. AFCA ’s Rules allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. I note one of the main reasons for the delays was because of the dispute about the wall. As the insurer’s position on this was substantiated, I do not accept the insurer is at fault for the delays caused by this. There was a delay in paying, and settling, lost rent. I accept the insurer could have managed this aspect of the claim more appropriately. There have also been issues with the scope of works that were not timely addressed and are covered above. I accept these would have caused an unusual degree of inconvenience to the complainants. Given this, and considering our conservative approach, it is fair for the insurer to pay the complainants $750 in non-financial loss compensation. Determination | Case number: 819190 Page 5 of 6 Determination | Case number: 819190 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.