Home / Hollard / Determination 818779
Determination 818779
Claim declined for water damage to rental property kitchen
Summary
The complainant claimed about $12,000 for water damage to a rental property kitchen, alleging the insurer's delay forced repairs. AFCA found the pipe probably broke before the policy commenced, the repairs were made without consent, and the insurer was entitled to decline the claim.
The policy excludes events outside the period of insurance and gradual damage, and the insured must not repair damaged property without the insurer's consent, which prejudiced the insurer's assessment.
Issues
- Claim denial primary · not upheld“the insurer is entitled to decline the claim as damage probably arose from a broken pipe occurring before the policy commenced and repairs were made without consent”
- Delay secondary · not upheld“I do not accept the available information shows unnecessary delay by the insurer.”
Subjects and remedies
small businessno remedy
Related
Text of the determination
Determination
Case number 818779
Financial firm The Hollard Insurance Company Pty Ltd
Determination | Case number: 818779 Page 1 of 9
Case number: 818779 9 December 2021
1 Determination overview
1.1 Complaint
The complainant is represented. For the sake of brevity and convenience, references to the
complainant in this determination include references to the complainant’s representative.
The complainant holds a Landlord Accidental Damage policy with the financial firm (the
insurer). In January 2021, the complainant lodged a claim with the insurer for the cost of
repairs to his rental property because of water damage. He claimed a broken pipe caused
water to escape from the kitchen sink, causing damage to the kitchen cabinetry and
floor. He also says due to the insurer’s delay, he had to commence repairs to prevent
further damage and to protect his rental income.
The insurer submits the complainant’s contractors said the damage occurred before the
policy commenced. It also says as the repairs were completed without its consent it was
prejudiced from assessing the cause of damage and the extent of damage.
The case analyst provided the parties with a preliminary assessment on the issues in dispute.
The preliminary assessment was in favour of the insurer.
As the complainant does not accept the preliminary assessment, the complaint has been
referred to me for determination .
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
Based on the available material, the insurer did not unnecessarily delay, and the damage was
probably caused gradually and arose from an event (broken pipe) which occurred before the
policy commenced. As these causes of damage are excluded from cover, the insurer is
entitled to decline the claim.
Further, the policy terms are clear and unambiguous. The insured must not repair the
damaged property without consent. The property was repaired without the insurer’s consent
and before the insurer could establish when the pipe broke and if all the claimed damage was
caused by the leaking pipe. In the circumstances the insurer has been prejudiced and is
entitled to decline the claim.
Why is the outcome fair?
The outcome is fair because the available information does not establish the insurer
unnecessarily delayed its claims response. The policy terms are clear and unambiguous. The
insurer was entitled to assess both as to whether the pipe broke before the policy
commenced and whether all the claimed damage was caused by the leaking pipe. As the
complainant repaired the claimed damage without the insurer’s consent and before the
insurer assessed the claim, the insurer’s assessment of the cause of damage and exte nt of
damage is prejudiced, and it would not be fair to require the insurer to pay the claim in these
circumstances particularly when the available information establishes the pipe probably broke
before the policy commenced.
Determination | Case number: 818779 Page 2 of 9
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action in relation to the claim or the complaint.
Determination | Case number: 818779 Page 3 of 9
2 Reasons for determination
I have decided this complaint based on what is fair in all the circumstances, having regard to
legal principles, applicable industry codes or guidance, good industry practice and previous
relevant determinations of AFCA or predecessor schemes (which are not binding). I have
considered all the material submitted by the parties, both before and after the preliminary
assessment. I am satisfied that the documentation I have relied on has been provided to both
parties.
The parties have raised numerous issues in their submissions to AFCA. However,
commentary in this determination is restricted to those issues considered relevant to the
outcome.
After the preliminary assessment was rejected, the complainant made a further submission
and provided no new material. Where relevant, the further submission will be referred to in
the determination.
2.1 Is the insurer entitled to decline the claim?
Parties’ submissions and material considered
The complainant must establish on the balance of probabilities he has suffered a loss caused
by an event to which the policy responds. This is known as a prima facie or valid claim.
In the context of this claim, the complainant must establish accidental damage to the insured
property and that all the claimed damage was caused by the leaking pipe.
Once so established, the onus shifts to the insurer to prove on the balance of probabilities
that an exclusion applies if it seeks to deny or limit its liability for the loss.
In the context of this claim the insurer must establish the damage was caused by gradual
deterioration and/or by an event which did not occur within the period of insurance.
The insurer says the complainant’s report indicates damages were ongoing for more than 12
months and as its ability to assess the claim was prejudiced by the complainant’s repairs prior
to its assessment, it was reasonable to rely on the information available from the complainant.
The insurer also argues the material provided by the complainant is indicative of a long-term
issue and not a sudden one-off event.
The insurer says the damages sustained could not be determined because the complainant
repaired the damage without its consent prior to assessment. It also says its ability to assess
the cause of damage was compromised by the repairs.
The complainant claims about $12,000 to repair the water damage. He also claims 4 weeks
loss of rent because of the insurer’s delays. He says:
> the time frame from his builder was only an estimate
> his plumber supports his position
> his plumber is more experienced to determine the time frame of the leak
> repairs to the leak and mould had to be repaired quickly
> he could not have known about the leaking pipe before it was discovered
> repairs were completed because the insurer took too long to make an assessment and
he could not afford to lose rental income.
Determination | Case number: 818779 Page 4 of 9
The insurer does not agree they were unusual delays. It says when the assessor attended the
premises on 9 February 2021 (which was not long after the claim was made) repairs were
already done.
Submissions after preliminary assessment considered
After the preliminary assessment, the complainant conti nued to reiterate the insurer’s inaction
put the complainant in a difficult position. He says had the insurer attended the property
earlier as requested the insurer would have been able to assess the damage. The
complainant says he was open in advising repairs were underway and could not stop. He also
says he was not advised to cease repairs until an assessment took place.
The complainant submits ample photographs and reports were provided to the insurer to
make a desktop assessment and he should not be pr ejudiced by the insurer’s delay.
He also argues when the policy commenced, he was unaware the pipe was leaking, and the
damage was noted and reported on 11 January 2021 which is borderline with 12 months after
the date of the policy inception (17 February 2020).
The policy terms relied on are set out in supporting section 3.2 of this determination.
Both parties rely on reports and photographs. A summary of the material relied on is set out in
supporting section 3.3 of this determination.
Insurer entitled to investigate the claim and did not unnecessarily delay
I accept the leak was repaired when it was found, and mould treated to prevent any further
damage. I accept these repairs were required.
The insurer is entitled to investigate a claim and ascertain whether the policy responds and if
all the claimed damage is caused by the claim event. While I acknowledge the complainant
was keen to undertake repairs as soon as possible to continue with rental income, I am not
satisfied the complainant has established the rest of the repairs were urgent.
I acknowledge the complainant indicated when he claimed he needed to continue with repairs
and required an assessment as soon as possible. The insurer requested information which
was sent on 14 January 2021. The assessor was appointed on 19 January 2021 and attended
on 9 February 2021.
The claim file notes show the complaint was advised of a probable decline on 23 February
2021. Further information from the complainant’s plumber was requested and considered and
the claim was formally declined on 23 March 2021.
I do not accept the available information shows unnecessary delay by the insurer. Further, in
view of the clear policy terms and the complainant’s representation , I do not accept the
insurer was required to advise the complainant to cease repairs. In addition, although the
complainant indicated when he claimed he needed to keep going on with the work, NA’s
report indicates the works had come to a stop.
Insurer entitled to decline the claim
The policy commenced on 17 February 2020. There were routine inspections in March 2020
and September 2020. The tenant moved out in December 2020. The routine inspection
reports include photographs of the kitchen, but they are insufficiently clear to establish
whether the kitchen was damaged or not at the time of the reports.
Determination | Case number: 818779 Page 5 of 9
There is no dispute the waste pipe in the kitchen was broken causing water to run under the
house. The dispute relates to when this occurred and how much damage it caused. I accept
the complainant would not necessarily have known when the pipe broke or that it was broken
when the policy commenced, but this is not determinative of the outcome.
NA’s report is clear and unambiguous. He says the waste pipe had been broken “for some
time 12 months or more”. This means the pipe broke before the policy commenced. I accept
NA has the expertise to provide this opinion.
I am satisfied JL also has the expertise to comment. He considered the photographs provided
and the sinkhole where the water had fallen through to the subfloor eroding the ground. He
also found it reasonable to assume that the water had escaped from the kitchen sink for an
extended period.
In a later and undated repor t, the complainant’s plumber says he cannot determine how long
the leak had occurred and says if it had been leaking for over a year, the damage would be
greater. NA provided his report relyin g on the complainant’s plumber. I am unable to reconcile
the difference in opinion and prefer NA’s contemporaneous report which is supported by JL.
The insurer is entitled to decline the claim if the damage was caused gradually or if the claim
arises from an event which did not occur within the period of insurance.
Based on the available material, I am satisfied it is probable the damage was caused
gradually and arises from an event (broken pipe) which occurred before the policy
commenced.
In any event, the policy terms are clear and unambiguous. The insured must not repair the
damaged property without consent. The property was repaired without the insurer’s consent
and before the insurer could establish when the pipe broke and if all the claimed damage was
caused by the leaking pipe.
Taking all matters into account and based on the available information, I accept the insurer
has been prejudiced and, in all the circumstances, is entitled to decline the claim.
2.2 Why is the outcome fair?
The outcome is fair because the available information does not establish the insurer
unnecessarily delayed its claims response. The policy terms are clear and unambiguous. The
insurer was entitled to assess both as to whether the pipe broke before the policy
commenced and whether all the claimed damage was caused by the leaking pipe. As the
complainant repaired the claimed damage without the insurer’s consent and before the
insurer assessed the claim, the insurer’s assessment of the cause of damage and extent of
damage is prejudiced, and it would not be fair to require the insurer to pay the claim in these
circumstances particularly when the available information establishes the pipe probably br oke
before the policy commenced.
Determination | Case number: 818779 Page 6 of 9
3 Supporting information
3.1 Process
AFCA’s approach to this complaint
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an event to
which the policy responds. This is known as a prima facie or valid claim. Once so established,
the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies
if it seeks to deny or limit its liability for the loss.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence. When we assess complaints, we consider available
documents, the recollections of the parties, and all relevant circumstances. We give more
weight to documents created at the time the events occurred. If there is no relevant
documentation, we will decide what is most likely to have occurred based on the information
provided to us. If there are conflicting recollections and these are evenly weighted, we may
find that a claim cannot be established.
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties and in
the insurer’s Notice of Response. Both the policy document and the Notice have been
exchanged with the complainant.
Section 1 Building and Contents
What is insured
Your Buildings and/or Contents as set out in Your Schedule are insured if they are destroyed,
lost or damaged. They are insured only if You own them or are liable for them.
We will cover Your Buildings and Cont ents for any accidental damage or accidental loss
including that caused by:
…
Erosion, subsidence, landslide or earth movement.
The cover for erosion, subsidence, landslide, or earth movement only applies if the loss or
damage occurs within 72 hours of, and as a direct result of, erosion, subsidence, landslide or
earth movement directly caused by:
• Storm, storm surge, Flood, rainwater, hail, snow, wind, tornado or cyclone;
• Earthquake, subterranean fire, volcanic eruption or tsunami;
• Explosion; or
• Liquid escaping from a fixed pipe or something attached to a pipe, fixed gutter, fixed
tank apparat us or a drain.
We will not cover Your Buildings and Contents for any accidental damage or accidental
loss caused by:
• Rust, corrosion, gradual deterioration, depreciation, wear or tear.
We will not pay Claims arising from:
• Any event that does not occur within the period of insurance.
What You must not do when You make a Claim
Determination | Case number: 818779 Page 7 of 9
You must not do any of the following:
• Repair or replace any damaged property without Our consent.
• Pay, promise to pay , or offer payment, or admit responsibility for a Claim
3.3 Extracts from material relied on by the parties
Date Action
Routine inspection report
17 March 2020
Overall property present ed clean and tidy throughout.
Maintenance actions required in bathroom, lounge
room and shower.
Photographs of kitchen but no comment regarding
kitchen.
Routine inspection report
15 September 2020
Because of pandemic, property manager did not
attend the property to conduct routine inspection .
Tenant took phot ographs and sent them.
No maintenance reported.
Photograph of kitchen.
Complainant’s report (NA)
12 January 21
Claim - Burst Pipe Under Kitchen Sink.
Scope - House Has Had A Tenant For Past 5 Years -
Tenant Has Moved Out On The 23/12/2020.
Insured Has Attended property And N oticed A Strong
Sewer Smell Which He Thought Was Cat Or Mouse
Urine.
Attended Property To Carry Out Some Minor Repairs
before New Tenant Was Engaged.
Plumber Noticed The Smell When He Arrived To
Replace Shower Tap Handles And Found The Smell
To Be Coming From Under Kitchen Base Cupboards.
Plumber did Some Minor Exploratory Works …. To
Find Problem. …. Found Waste Pipe In Kitchen Is
Broken At Joiner. Th is Has Caused All Water That
Was Used In Sink To Be Running Directly Under
Hous e. There Is A Large Sink Hole Directly Under
Kitchen Area.
This Has Been Broken For Some Time 12 Months Or
More
Plumber Has Reported That This Hasn't Been Noticed
Until Tenant Vacated And The Water Under House
Has Started To Dry Out And This Is When The sewer
Smell Became Pres ent.
Large Crack in Laundry Wall Which In My Opinion Has
Been Caused By Saturation Of Water Under House
This Is Defiantly A Claim …
Insured is Under A Ti me Line To Have Property Back
To Rental Market As Soon As Possible And Works
Have Come To A Stop Until The Insurance Company
Can Tell Him What The Out Come Will Be.
Insured Has Paid The Plumber To Replace Pipe.
Note That Mould Was Present Under Kitchen Wh ich
Has Been Treated To Prevent Further Damage. (stet)
Cost of repairs $12,309
Insurer’s builder (JL) Attended to ascertain damage 9 February 21.
Determination | Case number: 818779 Page 8 of 9
12 February 2021 During renovations to the property wat er damage was
found under the cabinet ry in kitchen.
Insured appointed NA to complete repairs due to the
need to relet the property as quickly as possible.
NA said he was appoint ed to do some minor
renovations (painting & tiling) to the property after the
most recent tenant vacated.
Smell noticed, and Plumber said kitchen waste pipe
had disconnected at the join which was allowing waste
water from the sink to escape which has caused
damage to the old kitchen cabinetry and flooring.
Advised this was happening for approximately 12
months in the opini on of plumber.
JL relying on the information given by onsite builders
and their plumber as the cabinetry and flooring had
already been replaced at the time of our inspection.
Given the photographic evidence provided, we find it
reasonable to assume that an escape of water around
the kitchen sink waste for an extended period has
caused the claimed damages.
Cont acted the plumber who advised the cause of the
water escape was the disconnection of the galvanised
to PVC waste pipe coupling. This meant any waste
water from the kitchen sink escaped straight under the
house.
Report limited to the visual evidence available at the
time of inspection and NA’s photographs.
Advised by NA the kitchen cabinetry (and the kitchen
floor and framework) sustained water damage a nd
needed to be fully replaced due the age and the style
of construction.
No photos were provided of the original kitchen, so we
cannot confirm or deny this.
Can confirm from the photos provided that the kitchen
wall framing where the sink is located susta ined water
damages.
Unclear from the photos exactly where the break in the
waste pipe has occurred and if the connection has
released below floor level, has it contributed to any
water damages of the kitchen.
From the photos provided by NA we can see that the
water had been escaping for a prolonged period which
has created a sink hole where the water has fallen
through to the subfloor eroding the ground.
Unsure if maintenance issues have played a part in the
failed connection of the kitchen waste pipes.
Da mage sustained cannot be determined as the area
has been repaired prior to assessment.
Recommend a full report from the attending plumber
with explanations of the phot os taken prior to repairs
Scope of works and estimated cost of repairs
Determination | Case number: 818779 Page 9 of 9
$17,849.47
Complainant’s plumber (CK)
Undated
Sewer drain under house broken off.
The time it has been leaking is hard to determine in my
opinion , but it wouldn't be an extended period going on
how much the house has moved.
If it had been leaking for over a year t he crack at rear
of house (laundry ) would be wider and doors would not
shut on back part of house.
3.4 Other relevant material considered and relied on
Parties’ submissions/emails and all attachments to all submissions/emails .
Parties’ expert reports and inspection reports.
Photographs.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.