Text of the determination
Determination
Case number 818778
Financial firm Westpac General Insurance Limited
Determination | Case number: 818778 Page 1 of 12
Case number: 818778 6 April 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm (insurer).
On 31 October 2020, the complainant lodged a claim for storm damage to his property. The
insurer assessed and accepted liability for the damage.
The complainant raised concerns regarding the quality of repairs completed by the insurer ’ s
builder AJG. The insurer appointed (MK) to re-assess the repairs. Based on MK’s
assessment the insurer offered a cash settlement of $33,000 to complete the repairs.
The complainant rejected the offer and provided a quote of $247,474.11 for repairs. The
complainant also wants the insurer to pay for a hygienist report on completion of repairs plus
compensation for professional costs and poor claims handling.
1.2 Issues and key findings
Is the insurer required to increase the cash settlement for the repairs?
Yes. The panel determines the insurer pays the complainant $46,896 being $39,080 for the
outstanding repairs including a 20% allowance for contingencies of $7,816.
Should a mould report be obtained on completion of repairs?
Yes. The panel is satisfied it is fair the insurer pays the complainant $5,000 to cover, the
costs of a hygienist report and any remediation works required.
Is the complainant entitled to additional temporary accommodation?
Yes. The panel is satisfied the insurer should pay an additional $5,000 for temporary
accommodation while repairs are taking place.
Is the complainant entitled to non-financial loss and professional costs?
Yes. The complainant has experienced an unusual degree of inconvenience. The insurer
must pay the complainant compensation of $2,500 for non-financial loss. The insurer should
contribute $560 to the complainant’s professional costs incurred in obtaining reports from DJ.
1.3 Determination
This determination is substantially in favour of the complainant.
Within 21 days of the complainant’s acceptance of the determination, the insurer must pay
the complainant $56,896 in settlement of the storm damage claim including any claim for
mould damage and temporary accommodation.
The insurer is to also pay the complainant $2,500 compensation for non-financial loss and
$560 contribution to professional costs incurred.
Determination | Case number: 818778 Page 2 of 12
2 Reasons for determination
2.1 Is the insurer required to increase the cash settlement offer
for the repairs?
Yes. The panel is satisfied the insurer should the complainant $46,896 being $38,900 for the
outstanding repairs with a 20% allowance for contingencies of $7,816.
Policy provides cover for storm related damage
The complainant’s home and contents policy provides cover for a series of listed events
including storm, subject to the conditions and exclusions set out in the policy.
There is no dispute that the complainant’s property suffered significant damage arising from a
storm event in October 2020. Under the policy, the insurer provides a lifetime guarantee of
the workmanship of any claim-related repairs carried out by its preferred repairs and
undertakes to fix any defects caused by poor workmanship.
There was a breakdown in the relationship between the complainant and AJG which resulted
in the insurer removing AJG from the claim on 12 May 2021 after the complainant had
obtained a report from DJ.
The complainant says that the standard of work was poor. The insurer engaged MK to assess
and prepare a SOW in respect of the repairs undertaken by AJG. MK confirmed the defective
repairs although considered some of items were not defective including:
Downlights in the pool room
Cracks to the wall lining in the ensuite and set joint in main bathroom
Rainwater dripping from fascia
Benchtop laminate
Kitchen sink
Inverted peak throughout ceiling
Outdoor table- wear and tear
Damage to pool table
MK provided an estimate of $14,000 to complete repairs to work undertaken by AJG and
$33,000 for completing all repairs (including roof repairs).
The complainant rejected this offer and obtained reports from SRS, FMPAC and DJ.
The first report obtained was DJ dated 6 May 2021. DJ was critical of the painting repairs,
lighting, internal door clearances, sliding door edges, door handles, latches and locks and
plasterboard sheeting .
The insurer offered $33,000 based on the assessment of MK while the complainant seeks
$247,747.11 based on the quote from FMPAC.
No dispute roof repairs require rectification
The parties agree there were issues with the roof repairs.
The complainant’s builder DJ found the installation of roof tiles and associated work has not
been carried out in accordance with AS 2050:2018 Installation of Roof Tiles. DJ identified
issues with cracked tiles, colour matching, incomplete bedding and pipping and fixing
incomplete.
Determination | Case number: 818778 Page 3 of 12
A second report provided by SRS a roofing specialist, dated 10 May 2021, confirmed the poor
workmanship with broken tiles, bedding not straight on the ridge capping above the antenna,
gutter lines and valley irons. SRS does not suggest the roof required replacement.
The building inspection report from MK dated 21 June 2021 also identified defects in the roof
repairs. The panel notes the reports from all three builders confirm similar issues with the roof
repairs. The panel accepts the roof repairs are defective. A more detailed summary of the
findings of DJ and MK is contained in section 3 of this determination.
The complainant provided a further report from FMPAC dated 15 November 2021. FMPAC
reported similar issues with the roof repairs but quoted to replace the roof ($51,524.57) rather
that rectify the faulty roof repairs. Details of FMPAC’s report are set out in section 3 of this
determination.
While the report from FMPAC is detailed it does not, in the panels view, adequately explain
why the roof needs to be replaced rather than repaired. The panel is not satisfied the report
from FMPAC justifies the total replacement of the roof.
The panel notes the AJG ’s scope of works involved significant repairs to the roof including
removing and replacing the damaged concrete tiles for approximately 428 square metres of
the roof. The panel is persuaded by the reports from MK, SRS and DJ that while the initial
repairs were defective, rectification work can be completed to restore the roof to its pre-
damaged condition.
The panel notes however that in the SOW from AJG, a sum of $600.00 was allowed for a roof
audit following repairs. The panel considers this should be added to any cash settlement.
No dispute interior work requires rectification
There is no dispute that some of the internal repairs were defective. The reports from DJ, MK
and FMPAC are largely consistent in identifying the internal repairs required.
DJ identified issues with the standard of painting, installation of doors, the installation and
jointing of plasterboard ceiling sheeting and cracking in cornices. DJ also found the
plasterboard wall linings have detached from frame, issues with the kitchen cupboards and
the ceiling cornice and sections of the insulation were poorly installed / laid with mismatched
insulation installed. FMPAC identified similar issues as well as suspected water damaged
light fittings (safety issue).
MK identified the following works required rectification:
laundry door and architraves require sanding and repainting
remove crinkled paint to the internal wall corner and closet
plaster repair internal corners and paint walls to match existing
paint underside of shelving to the laundry closet.
Kitchen- cornice to above bulkhead out of alignment and requires replacement and re -
painting
prepare and re -paint ceilings and wall lining.
Dining/Family room - remove paint from downlight gimbles if possible, if not replace
downlight
prepare and re -paint walls and ceilings.
En-suite - remove and replace silicone sealant above tiled walls
prepare and re -paint door and architraves to W/C
sand, seal and paint the entire En-suite.
Dining/Family room/lounge- prepare walls, ceiling, skirting boards and architraves for paint
Determination | Case number: 818778 Page 4 of 12
seal and paint the walls, ceiling, skirting boards and architraves to match existing.
Pool Room - seal and paint the skirting boards, architraves, ceiling and wall linings to
match existing.
The insurer says the quote from FMPAC is excessive and should not include items that do
not need full replacement. The quote has included items which are not part of the claim in the
accepted works – such as, a full kitchen replacement.
It is not unusual for there to be significant discrepancies in the amounts quoted by different
builders for undertaking the same works. There can also be variations when items are not
strictly ‘like for like’. The fact the FMPAC have quoted significantly higher amounts for the
rectification works than MK does not of itself establish either to be more accurate or
comprehensive.
However, having carefully reviewed the available information, the panel is not satisfied
FMPAC’s quote accurately reflects the reasonable cost of completing the repairs. When
comparing with the initial SOW from AJG, the panel is satisfied the quote from FMPAC
includes items which were not a part of the damage or SOW.
The panel largely accepts the findings of MK in regard the additional internal rectification
works required. MK’s findings appear more detailed and consistent with the original scope of
work for the damage. Some additional items should however be added to the assessment.
Insurer should add items to rectification scope of works
MK says that there is a defect to the plasterboard ceiling of the lounge /dining room that was
pre-existing. FMPAC says it was damaged and should be replaced. The panel notes MK has
included replacement of the plasterboard in the quoted repairs and agrees this should be
included in the quote.
The panel considers the insurer should increase the cash settlement to allow for the damage
to the pool table, the outdoor table the kitchen bench top and relocation of the downlights in
the rumpus room.
The pool table was located under a damaged ceiling with limited protection (a drop cloth).
This would not have been adequate to prevent the damage claimed. MK has costed the
repair at $2,400.
The kitchen benchtop was included in the scope of works provided by AJG and accepted by
the insurer. This was costed by MK at $2,400.
Assessment of the damage to the outdoor table outdoor table is difficult. The complainant has
provided a photograph of the damage. The panel accepts it is likely the table was used by the
repairer. In the circumstances the panel considers it fair the insurer allows $500 to replace the
table.
The complainant says the downlights in the rumpus room are not in the correct position. The
insurer maintains the lighting is in the same area as identified in photographs supplied. The
photographs are inconclusive. The panel notes MK has quoted $180.00 to relocate the
downlights. As the ceiling is to be replaced the panel considers it fair the insurer includes the
cost to relocate the downlights as assessed at $180.00
Insurer not liable for external render or bathroom tiles
The complainant had purchased the property only 2 months prior to the event. A copy of his
pre-purchase pest and building report confirms that there were some issues with the property.
Determination | Case number: 818778 Page 5 of 12
This includes the issues with the cracks in the outdoor mortar which the complainant had
suggested were part of the claim.
The insurer appointed NJA, an engineer who provided a report in relation to the cracking on
the perimeter and determined that it was not claim related as there was an absence of joints .
NJA considered the cracking in the shower tiles was consistent with their being no allowance
for movement which was not related to the storm damage. The insurer denied the claim for
cracking to the external render and the bathroom tiles.
The panel is satisfied given the report from NJA and the pre-purchase report that the insurer
is entitled to deny the claim for damage to the external render and bathroom tiles.
Insurer to increase offer of cash settlement
The Panel accepts, given the breakdown in relationship that a cash settlement is appropriate.
The insurer offered $33,000 to settle the rectifications work based on MK’s findings . The
panel considers the insurer should increase the cash settlement as follows:
MK quote $33,000
roof audit $600
pool table $2,400
O/D table $500
kitchen benchtop $2,400
Downlights $180
Total $39,080.
As the cash settlement transfers the risk to the complainant then the panel considers it fair
that a 20% contingency ($7,816) be provided due to the likely significant increase in costs
bringing the total to $46,896.00
2.2 Should a mould report be obtained on completion of
repairs?
Yes. The panel is satisfied given the ongoing water ingress that it is fair the insurer pays the
complainant $5,000 to cover, the costs of a hygienist report and any remediation works
required.
Information provided shows no hygienist report was obtained by the insurer
During the claim, the complainant repeatedly requested the insurer to obtain a hygienist
report.
There is no indication that the insurer engaged a hygienist to provide a report regarding
mould in the property. The insurer relied on the moisture readings completed by AJG as to
whether there was in mould in the property.
The panel notes drying machines were used by AJG in the property prior to repairs
commencing. There were several episodes of water ingress prior to the repairs as the make
safe repairs failed.
Determination | Case number: 818778 Page 6 of 12
Insurer to pay for a hygienist report and remediation works
The panel considers it fair that a hygienist is engaged to investigate if there was mould in the
property. Although there is no evidence of mould, the panel is satisfied given the continued
exposure and leaks due to the make safe failing that it is fair the insurer covers the costs of a
mould assessment and any necessary remediation.
To bring finality to the claim, the panel determines the insurer should pay the complainant
$5,000 to cover the costs of obtaining a hygienist report and any required remediation of the
mould.
2.3 Is the complainant entitled to additional temporary
accommodation?
Yes. The panel is satisfied the insurer should pay an additional $5,000 for temporary
accommodation while repairs are taking place.
Repair process will require allowance for temporary accommodation
The FMPAC scope of works allows for 10 days temporary accommodation at $470 per day
totalling accommodation totalling $4,700.
The panel accepts that while most of the rectification work and repairs will involve
patching/painting, there will be a need for temporary accommodation.
Even though the FMPAC quote includes the replacement of the roof, the panel considers the
allowance for temporary accommodation fair. After rounding up the allowance the panel
determines the insurer pays the complainant $5,000 to cover the costs of temporary
accommodation.
2.4 Is the complainant entitled to non-financial loss and
professional costs?
Yes. The complainant has experienced an unusual degree of inconvenience. The insurer
must pay the complainant compensation of $2,500 for non-financial loss. The insurer should
contribute $560 to the complainant’s professional costs incurred in obtaining reports
AFCA’s approach to non -financial loss
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
However, we adopt a conservative approach to the award of compensation for non-financial
loss. We expect complainants to be moderately robust and bear the usual stress and
inconvenience associated with an insurance claim.
Complainant suffered an unusual degree of physical inconvenience
While payment of rectification works addresses some of the concerns the panel considers it
fair that the insurer pays compensation of $2,500 for non-financial loss.
The panel accepts the complainant has experienced an unusual degree of physical
inconvenience and time taken to resolve the situation.
Determination | Case number: 818778 Page 7 of 12
There was a failure of the make safe on several occasions resulting in the need for requiring
air purifiers and, dehumidifiers until the repairs commenced. The parties agree the initial
repairs were not completed satisfactory. The panel further accepts AJG caused further
damage to home and contents.
AFCA’s approach to professional costs
Under the AFCA Rules, we may require an insurer to reimburse a complainant for
professional costs incurred regarding their claim. However, we will not require an insurer to
contribute more than $5,400 to these costs, unless exceptional circumstances apply.
AFCA will consider whether the reports obtained by the complainant advanced his position or
altered the outcome of the insurer’s assessment.
Insurer is required to reimburse the complainant for DJ’s report obtained
The complainant provided invoices for the costs incurred from DJ totalling $560.00 and
FMPAC totalling $3850.00.
The panel accepts the report from DJ assisted in the determination of this complaint. It is fair
in these circumstances that the insurer contributes $560 to the cost DJ’s professional costs.
The panel does not consider the report from FMPAC significantly advanced the complainant ’ s
position. The report included various items the panel did not consider relevant to the claim.
The findings did not assist the panel in reaching its determination. In the circumstances the
panel determines the insurer is not required to contribute to FMPAC’s professional costs.
2.5 Why is the outcome fair?
The outcome is fair as it takes into account the issues with the defective repairs, the
breakdown of the relationship between the parties and the inconvenience caused to the
complainant.
While the cash settlement is significantly lower that the amount claimed by the complainant,
the panel is satisfied that it fairly represents the loss or damage suffered based on the
information provided by the complainant and the insurer.
Determination | Case number: 818778 Page 8 of 12
3 Supporting information
3.1 AFCA processes
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes an ombudsman, a member with significant experience in consumer and small
business advocacy and a member with extensive experience in general insurance.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 818778 Page 9 of 12
3.2 Relevant policy wording
General exclusions – page 15 of the PDS
Your policy does not cover loss or damage from the following situations
Any loss or damage to the extent that it is caused by or arises from:
defects in design, structure, materials, workmanship or construction at the insured site
which you knew about or should have reasonable known about at the time of the loss or
damage
…
Any loss or damage that is predominantly caused by or arises from:
wear and tear, gradual deterioration, or fading
…
earth or soil movement including landslide, subsidence, erosion or heave, unless it is a
direct result of an insured event,
…
Storm – page 26 of the PDS
Covered loss or damage caused by storm, including cyclone, hail, wind, snow or rain.
Emergency accommodation – page 33 of the PDS
If we agree to pay a claim for loss or damage to your building and your home is unliveable,
we will cover the cost of similar alternative accommodation for you and any other insured.
This expense will only be paid if you actually incur costs for emergency accommodation and
only while your home remains unliveable.
How we settle your claim – page 52
Repairing or replacing
When we agree to pay a claim for loss or damage, ordinarily we will agree with you to pay
either:
the reasonable costs of repair, or
…
cash amount. If we agree to pay cash, we’ll pay the amount it would reasonably cost to
repair or replace the property. We’ll also let you know the other options available to settle
your claim.
Determination | Case number: 818778 Page 10 of 12
3.3 Expert Reports
Report Key points
Complainant’s expert ( DJ )
Report
6 - 05 - 2021
Roof and gutter: The installation of roof tiles and associated
nomenclature has not been carried out in accordance with AS
2050:2018 Installation of Roof Tiles .
Standard of painting: are poor and defective; and not comply with
the manufacturer's installation instructions or AS/ NZS 2311 .
Door: the installation of doors is defective .
Ceiling: the installation and jointing of plasterboard sheeting
systems is defective, back - blocking to plasterboard inadequate
and cracking in cornices .
Walls: the plasterboard wall linings have detached from frame,
lining is not secured to frame. possibl y due to water ingress, wall
lining should be appropriately re - secured, patched and painted .
Kitchen: overhead cupboards had been removed to facilitate the
replacement of the bulkhead. apron refitting of the overhead
cupboards the cupboards and the ceiling cornice are not parallel,
doors have been adjusted in attempt to rectify the misalignment .
Insulation: sections of the insulation were poorly installed / laid
with gaps visible in sections, areas have been removed and
poorly replaced, mismatched insulatio n has been installed,
recommendations: engage insulation contractor to assess.
Determination | Case number: 818778 Page 11 of 12
Report Key points
Insurer s expert ( MK )
Report
21 - 06 - 2021
Garage/ Roof space
plaster repairs and re - painting to the ceiling lining
removal of tile debris from roof space
re - install insulation to pre - event condition .
Laundry
laundry door and architraves require sanding and repainting
remove crinkled paint to the internal wall corner and closet
plaster repair internal corners and paint walls to match existing
paint underside of shelving to the l aundry closet .
Kitchen
cornice to above bulkhead out of alignment and requires
replacement and re - painting
prepare and re - paint ceilings and wall lining .
Dining/Family room
remove paint from downlight gimbles if possible, if not replace
downlight
prepare and re - paint walls and ceilings .
En - suite
remove and replace silicone sealant above tiled walls
prepare and re - paint door and architraves to W/C
sand, seal and paint the entire En - suite .
Exterior/ Tiled roof
minor leaks to the guttering require silicone replacement
remove and replace crooked hip tiles
repoint missing and defective pointing
replace approximately 3 broken tiles
install tv antenna correctly and replace damaged tiles
supply and install missing droppers to the gutter to the front entry .
Dining /Family room/lounge
prepare walls, ceiling, skirting boards and architraves for paint
seal and paint the walls, ceiling, skirting boards and architraves to
match existing .
Pool Room
seal and paint the skirting boards, architraves, ceiling and wall
linings to match existing .
Complainant’s expert (FM )
Report
15 - 11 - 2021
Defective areas:
r oof c ladding .
g uttering/ s pouting .
r oof void area .
s uspected water damaged light fittings (safety issue) .
i nsufficient ceilings installed.
d efective plastering and painting .
g enerally there are many major defects noted and documented
including but not limited to roof tile installation, roof tile
manufacturer the (paint finish), plasterboard ceilings and walls
Determination | Case number: 818778 Page 12 of 12
Report Key points
installation including lack of scope coverage in terms of ceiling
areas to be replaced, defective ceiling insulation, painting defects
and unfinished works such as doors and roof tiles, amongst
many other minor items that have been captured in the attached
scope of works.