Home / Suncorp Group / Determination 817909

Determination 817909

Insurer's limitation of liability for water damage claim to bedroom wall and wardrobe, rejecting full bathroom renovation cost

FirmSuncorp Group
Decided2022-03-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$3,550
Non-financial loss—
Amount claimed$28,500
SourceAFCA PDF

Summary

The complainant claimed $28,500 for full bathroom renovation after a water leak from a pipe. AFCA found the insurer could limit liability, but increased its offer from $3,925 to $8,550 less the $5,000 excess, with no interest.

The complainant did not establish that the leak required a complete bathroom strip out and renovation, so the insurer may limit its liability, with a fair allowance for limited bathroom damage.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 817909 Financial firm AAI Limited Determination | Case number: 817909 Page 1 of 7 Case number: 817909 11 March 2022 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy (policy) with the financial firm (insurer). On 24 February 2020, a claim was lodged for water damage to the insured property said to have occurred on 2 January 2020. The claim is subject to a $5,000 policy excess. The insurer originally declined the claim. After a complaint was lodged with AFCA in April 2020, the insurer accepted the claim. However, the insurer then sought to decline the claim on the basis the complainant has failed to establish the proximate cause for damage. AFCA determination 757430 dated 25 June 2021, found the insurer was not entitled to decline the claim but that it could withhold payment until such time that the complainant provides reasonable evidence establishing the loss claimed. The complainant has brought this new complaint to AFCA and says the insurer has failed to follow the findings of the previous determination (757430). The complainant says she has provided the requested information establishing an entitlement to the full cost of repairs in the amount of $28,500 but the insurer has declined to cover her loss. 1.2 Issues and key findings Is the insurer entitled to limit its liability under the claim? Yes. The complainant has not established that the damage caused by the leaking pipe required a complete strip out and renovation of the bathroom. However, it is fair in the circumstances that the insurer should increase its offer from $3,925 to $8,550 less the applicable $5,000 excess. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is entitled to limit its liability under the claim. However, the insurer is to increase the final claim settlement amount to $8,550 less the applicable policy excess of $5,000. Determination | Case number: 817909 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer entitled to limit its liability under the claim? Yes. The available information does not establish the bathroom required a complete strip out and renovation because of the leaking pipe event giving rise to the claim. The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more the listed insured events, including Escape of liquid. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The insurer has accepted a valid claim exists The complainant lodged a complaint with AFCA on 15 April 2020, with respect to the insurer’s decision to decline the claim. On 13 May 2020, the insurer wrote to the complainant accepting she had established a valid claim under the policy, this letter states in part: Having reviewed the full circumstances of the matter, and referring your request to [Insurer’s] management, in the interest of resolvin g the complaint and in recognition of your tenure with the group, [Insurer] accepts that an incident covered by your policy has occurred. It is also not in dispute that the complainant had commenced repairs and the strip out of the bathroom before she lodged the claim. Under AFCA determination 757340, it was found that the insurer could withhold settlement under the claim until such time the complainant provided reasonable information in support of her claim for $28,500. Complainant provided additional information After AFCA determination 757340, the complainant sent the insurer a report/letter from her preferred consultants ‘AZ’ on 8 July 2021. The complainant says this information supports her position that the entire bathroom required strip out and renovation because of the leaking water pipe event. The complainant seeks the claimed $28,500 for the cost to renovate the complete bathroom. Relevant information from this AZ report has been provided in section 3 of this determination. AZ report does not establish all the expenses claimed were due to the leak I am not satisfied the report/letter from AZ is sufficient to show the bathroom in question was damaged to such an extent by the leak that it was necessary to strip out and renovate the complete bathroom. There is no dispute a leaking pipe was located within the bathroom and that this had caused damage to the bedroom wall and wardrobe next to the bathroom in question. AZ’s recent information clarifies that the leaking pipe was located in between the walls to this bedroom and the bathroom, directly behind the shower recess. Determination | Case number: 817909 Page 3 of 7 The insurer assessed the cost to repair this damage at $3,925, which falls below the applicable policy excess. The expert evidence explains that there was more damage to the bedroom wall and wardrobe because of the different materials used in their construction. This was different to the materials used in the bathroom side which will have been villa board, this being a water-resistant product. Given this, it is reasonable to accept the level or extent of damage to the bathroom side will have been significantly less than the bedroom side. Pictures provided show that the damage/rotting of the lower sections of the timber framework and floor in the shower is consistent with damage that occurs over an extended period of time. The information provided by the complainant does not address this and simply comments that all the damage is from the more recent water leak, which I do not find persuasive. The insurer was deprived of an opportunity to arrange an assessment of the bathroom to determine the cause and extent of damage consistent with the leak as the complainant initiated the repairs, including the repairs to the leaking pipe and total strip out of the bathroom, before lodging the claim. I accept this has prejudiced the insurer ability to investigate the claim and assess its liability in line with the policy. Insurer can limit its liability under the claim in line with this determination For the reasons discussed above, I accept it is fair in all the circumstances, that the insurer be permitted to limit its liability under the claim. I am not satisfied the complainant has been able to show that the said leaking pipe event caused damage to all areas of the bathroom or that it was necessary to authorise the complete strip out and renovation of the entire bathroom. I am not satisfied however that it is fair for the insurer to limit its liability under the claim to the bedroom wall and wardrobe alone. I accept given the location of the leaking pipe, which sat in between the bedroom and bathroom walls, that it is reasonable to accept it will have also caused some damage on the side of the bathroom as well. As stated above, I do not accept the damage to the timber frame in the area of the leak was consistent with being the result of this recent water leaking event. Rather, on balance, it seems to be due to long term moisture exposure which as indicated by the assessor seems consistent with a leaking shower base. The information from AZ and photos of the bathroom show there may have been damage to the tiled shower wall, loosening of floor tiles and some degree of damage to the flooring near the leaking pipe behind the shower. Therefore, without persuasive information in support of the complainant authorising the complete bathroom renovation and in the interest of bringing this matter to conclusion, I determine it is fair in the circumstances that the insurer is to cover 30% of AZ’s repairs invoice less the applicable policy excess of $5,000. This means the insurer is to pay the $3,5550 which is $8,550 less the policy excess of $5,000. AS the complainant failed and delayed providing reasonable information in support of her claim, it is fair that no interest is paid on the settlement amount. Determination | Case number: 817909 Page 4 of 7 Why is the outcome fair? The available information does not establish the insured event caused such significant and wide spread damage within the bathroom that it was necessary to completely strip it out and fully renovate the bathroom. However, it is fair in all the circumstances to accept that a certain limited degree of damage will have also occurred to the bathroom side of the wall and floor where the leak was found. So, although it would be unfair to require the insurer to cover the cost of the full bathroom renovation, it is fair to permit some allowance for damage to the bathroom because of the water leak event. Determination | Case number: 817909 Page 5 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant policy provisions How to establish your loss When your home or contents are damaged Allowing us, a repairer or an expert appointed by us, to look at what is damaged is usually all that is needed to prove your loss. Sometimes though we might ask you to produce a copy of the most recent plans and drawings for your home, photographs of your home or other evidence that supports the extent of the loss you have suffered. For valuable and badly damaged items, we may ask you to provide proof of ownership and value. To process the claim, you must  allow us to inspect the damaged home and/or contents;  allow us to arrange for experts to assess the damaged home and/or contents and to quote on repair or replacement;  provide us with a quote for repair or replacement if we ask for this. If you choose to use our recommended repairers (when available), there is no need to obtain your own quotes;  when requested, provide us with all proofs of ownership and value, information, co-operation Determination | Case number: 817909 Page 6 of 7  and assistance in relation to a claim (including giving evidence in court) as we may reasonably require;  allow us, or a person nominated by us, to recover, salvage or take possession of your home  and/or contents. When we ask, you must send any items to us, or cooperate in our collection or retrieval of such items; … What you must not do  do not dispose of any damaged parts or items of your home or contents without our consent;  do not carry out or authorise repairs without our consent unless you cannot contact us and need to make emergency repairs to protect your home or contents;  do not wash or clean or remove debris from any area damaged by fire without our consent unless you need to do this to prevent further loss;  do not admit liability or responsibility to anyone else unless we agree;  do not negotiate, pay or settle a claim with anyone else unless we agree;  do not accept payment from someone who admits fault for loss or damage to your home or contents. Refer them to us instead. … 3.3 Relevant expert evidence Record Key points AZ Report/Letter  Confirms AZ carried out the complete works at the insured property as provided in invoice 1426 dat ed 6 March 2020  AZ sub - contracted M to carry out the plumbing works  After removing the build in robe and severely mould infected bedroom wall, it was clear and visibly evident that there was a burst pipe in the wall  The burst pipe was located in between the bedroom and bathroom wall directly behind the shower  Due to movement and rotten wall it was found that the bottom plate was completely rotten  Noted loose tiles and damaged water membrane  Given the extent of structural damage caused by the water leak, it was beyond rep air and required entire bathroom renovation. Determination | Case number: 817909 Page 7 of 7 Record Key points FF Asse ssor Email 14 October 2021 FF Asse ssor Report 26 August 2021 The bathroom wall would be made of villa board which is a water - resistant product so would not be affected by the water leak. The plaster board/gip rock wall and laminated or chip board built in robe in the bedroom are not the same material and would be af fected easily by water and moister. This would be the reason there would be no damage to the bathroom wall, but damage would be present on the bedroom wall. This is a very common occurrence on water claims as a bathroom is built to be water resistant due t o its use. Please also note that the bat hroom was stripped out prior to claim lodgement so we could not confirm if there was any damage to the bathroom, we also couldn’t confirm the cause of the water damage and we accepted the result and damage to the bed room as good faith as it would be consistent with the claimed pipe leak.  Plumber’s invoic e is for works done after the leak was detected and bathroom had been stripped out  The report does not inform of what was leaking or what leak det ection tests were completed.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.