Home / Suncorp Group / Determination 817561

Determination 817561

Claim denial for damage to backyard, pavers and shed slab allegedly caused by flood/storm/accident from neighbouring development drainage

FirmSuncorp Group
Decided2022-01-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$29,973
SourceAFCA PDF

Summary

The complainant claimed for backyard and shed damage caused by water from a neighbouring development. AFCA found the damage occurred gradually from poor site drainage, not a flood, storm or accident event, and the insurer was entitled to decline the claim.

The policy covers only single insured events such as flood, storm or accident; the damage occurred over time through inadequate drainage, which is excluded as gradual deterioration.

Issues

Subjects and remedies

home or building damagerelated party investmentno remedy

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 817561 Financial firm AAI Limited Determination | Case number: 817561 Page 1 of 11 Case number: 817561 25 January 2022 1 Determination overview 1.1 Complaint The complainant holds a Home and Contents policy with the financial firm (insurer). On 28 April 2021 the complainant lodged a claim with the insurer for damage sustained to his property because of storm and because of development work behind his property. The insurer denied the claim saying damage resulted over time from inadequate drainage in the development behind the property, which the policy does not cover. The complainant disagrees with the insurer’s decision and seeks a review. The case manager provided the parties with a preliminary assessment on the issues in dispute. The preliminary assessment was in favour of the insurer. The insurer accepted the preliminary assessment, but it was not accepted by the complainant . In the circumstances, the complaint has been referred to me for determination . 1.2 Issues and key findings Is the insurer entitled to decline the complainant’s claim? The insurer is entitled to decline the complainant’s claim because the available information does not establish, on the balance of probabilities, the damage was caused by flood as defined, by any storm event or by any accident event. The available information establishes the damage was caused over a long period by the surface water coming from the development site because of poor site drainage and poor water management on the site. As this cause of damage is not covered by the policy the insurer is entitled to decline the claim. Why is the outcome fair? The insurer is entitled to rely on the policy terms and its expert opinion. Based on the available material the insurer is entitled to decline the claim. In those circumstances it would not be fair to require the insurer to pay the claim. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to decline the claim and need take no further action in relation to the claim or the complaint save to pay to the complainant the $1,000 offered as a goodwill gesture (if not paid already). Determination | Case number: 817561 Page 2 of 11 2 Reasons for determination I have decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). I have considered all the material submitted by the parties, both before and after the preliminary assessment. I am satisfied that the documentation I have relied on has been provided to both parties. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. Further submissions and material provided after preliminary assessment After the preliminary assessment was rejected, further submissions were made, and some new material was received. Where relevant this will be referred to in this determination. 2.1 Is the insurer entitled to decline the complainant’s claim? Parties’ submissions and material considered On 17 December 2020 the complainant lodged a claim because his pergola was damaged in a storm that day. He also referred to the development behind his property and that his backyard was flooded. This claim was settled in February 2021. In April 2021 the complainant lodged another claim for damage to his propert y specifically claiming ongoing flooding was occurring in his backyard caused by the development behind his property. Relying on expert reports the insurer declined the claim as it says the claimed damage had been occurring since development of the neighbouring site from 2019. As the claimed damage was not caused by a single insured event but by inadequate draining which over time has caused the movement/claimed damage it says it is not required to accept the claim. It offered $1,000 goodwill considering the complainant’s personal circumstances and tenure with the insurer. The insurer says it is entitled to rely on its expert opinion (which is unchallenged by the complainant) and the policy terms which provide no cover for damage which is not caused by a single insured event but is caused over time by gradual deterioration. The insurer does not dispute: > there is movement and cracking damage at the insured property > the damage is caused by the drainage issue in the neighbouring site causing ongoing excessive water flow to the insured property > the complainant is not at fault for the damage. The complainant says: > a concrete retaining wall and a trench behind his boundary which directed water to a drain was removed by developers when the development began > as a result, water came into his property and caused damage Determination | Case number: 817561 Page 3 of 11 > if there is recovery potential from the developers the insurer should act in good faith and accept the claim and then recover from the developers > his neighbours’ claims were accepted > while the insurer accepted the earlier storm claim it provided inadequate make safe and investigation of the damage in the backyard at that time The insurer acknowledges the complainant had a storm event and another earlier claim in December 2020. It says it settled the complainant for the accepted damages under that claim. It says the damage the subject of this claim and complaint were not present at the time of the earlier claim and investigation so there was nothing to investigate. It argues its reports would still identify if that storm had caused the damage which they did not. It also says if the neighbours’ claim were settled, they were settled under different circumstances. Submissions and material provided after preliminary assessment After the preliminary assessment the complainant amplified his assertion that the insurer did not properly assess the damage in his backyard during the earlier assessment of the storm claim which storm claim was about damage to the pergola. He also clarifies the damage was caused by flood. He says following heavy rain the water escaped from the trench behind his boundary which directed the water course to a water drain which was removed by the developers at the commencement of the project. The insurer says the water ingress would not constitute flood as outlined in the policy and the policy also excludes resultant cracking to paths, driveways, any outdoor surfaces, but covers them if they are washed away by the flood. The insurer reiterates the proximate cause of the water ingress is the inadequate drainage, not flood as defined in the policy. After the preliminary assessment the insurer provided the claim file notes and call recording relating to the earlier storm claim. The complainant says the new material supports his contention that he mentioned the storm damage to the back yard and the severity of the flooding, but the insurer failed to properly make safe and investigate all the damage. Claimed damage not caused by flood as defined in the policy The complainant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Having reviewed the photographs provided and the engineer’s report, I accept there is damage in th e complainant’s backyard as described. This determination deals with the cause of the damage. The policy terms relied on by the parties are set out in supporting section 3.3 this determination. The expert material relied on by the insurer is set out in supporting section 3.2 of this determination. I have also reviewed material provided by the complainant including photographs. The complainant says the damage was caused by flood. He says a concrete retaining wall and a trench behind his boundary which directed water to a drain was removed by developers Determination | Case number: 817561 Page 4 of 11 when the development began. He relies on extracts from the insurer’s policy. The relevant extracts are set out in supporting section 3.2 of this determination. I have reviewed the photographs provided by th e parties and the insurer’s reports. I am not satisfied the damage was caused by flood as defined. I accept a trench was excavated next to the boundary fence to install an underground stormwater pipe as described by the complainant to the insurer’s builder and engineer. I accept water has covered normally dry land because of the developer’s work. I do not accept the water has escaped from the normal confines of either a lake, river, creek, reservoir, canal or dam or other natural watercourse as is required by the policy terms. I am not satisfied the complainant has established a valid flood claim. In any event, even if a valid flood claim was established, the policy does not cover resultant cracking to paths, driveways, or any outdoor surfaces (except if they are washed away by flood). The photographs show cracking damage and movement damage only. Claimed damage not caused by a single storm event I have listened to the call recording made when the complainant claimed for storm damage to his pergola on 17 December 2020. I accept he referred to the development behind his house and that his backyard was flooded as well. Having reviewed the claim file notes, I accept the claim was settled by the insurer in February 2021. Even if I were to accept the storm flooded the backyard, based on the available information, I do not accept the storm event on 17 December 2020 caused the claimed damage. This is because the complainant’s history is that water came into his property at about the same time as the development of the neighbouring site and the development started in 2019. At that time, the accepted history is that not only a trench was excavated next to the northern boundary fence but also the land on the northern side of the insured property was raised. The complainant says he noticed surface water flowing to his property then. The engineer describes the mechanism and the damage and concludes the water run-off from the development was not properly managed for a long period of time which contributed to the dampness within the backyard and the damage to the brick pavers, concrete pavement and shed slab. The engineer refers to the relevant Code and says surface water must be disposed of in a way that avoids damage to other property, but no such provision (such as construction of a drainage system) was seen by the engineer on the development site. I accept the engineer has the relevant expertise to comment on the issues in dispute. There is no other expert evidence to contradict the opinion. Based on the available information I do not accept the claimed damage was caused by a single storm event or by the storm on 17 December 2020. Rather, based on the available information I am satisfied the proximate cause (or the dominant or effective cause) of the claimed damage was the inadequate drainage on the neighbouring site which over a long period of time since 2019 has caused water to ingress into the insured property and cause the claimed damage. I am not satisfied the complainant has established a valid storm claim. The policy terms are clear and unambiguous. To establish a valid claim, the complainant must establish the damage was caused by a single event. The available information establishes the damage occurred over time. Determination | Case number: 817561 Page 5 of 11 Claimed damage not caused by a single accident event The policy provides for accidental damage at the home. If the insurer accepts the claim under this optional cover the incident giving rise to the claim is an insured event. I accept the damage was caused accidentally because the damage occurred without intent. Nonetheless, the complainant has not established a valid accidental damage claim because he must establish the damage was caused by a single event. As set out above, the available information establishes the damage occurred over a long time. Complainant not prejudiced by insurer’s claims management The complainant says the insurer accepted the earlier storm claim but provided inadequate make safe and investigation of the damage in the backyard at that time which prejudiced him. Having listened to the call recording on 17 December 2020, I accept the complainant referred to the development behind his house and that the backyard was flooded. I have reviewed the claim file notes of the storm claim. The focus is on the damage to the pergola and other roof damage and the cost of repairs referrable to the storm damage. Offers were made which were accepted by the complainant. There is no reference in the claim file to the flooding of the backyard or damage caused by the development. In view of the nature of the damage I am not persuaded of the practical nature of a relevant make safe, but I accept the complaints about the damage caused by the developer could have been investigated in the storm claim made in December 2020. Once the clai m was specifically made in April 2021 the insurer’s builder attended in April 2021 and the engineer attended in May 2021. I accept the complainant’s frustration that the issue was not dealt with when he first reported it but in view of the nature of the damage and the expert opinion about the cause of the damage, based on the available information, I am not persuaded the complainant has been prejudiced by the failure of the insurer to investigate the cause of the backyard flooding and ensuing damage in December 2020. This is because the expert opinion establishes the damage had probably already occurred as it had occurred over a long time from 2019 and before the first claim was made in December 2020. Insurer not acting in bad faith re recovery from developers I do not accept the insurer has acted in bad faith by declining the claim in circumstances where there is a potential for recovery from the developers. Based on the available information and the policy terms it is entitled to decline the claim. In those circumstances it is not required to indemnify the complainant and not required to launch a recovery action against the developers. Any remedy against the developer remains with the complainant. Payment of neighbours ’ claim does not assist complainant in his claim The complainant says his neighbours’ claims were accepted. However, this is not determinative of the outcome. The available information does not establish the nature of the neighbours’ claims or the terms of the neighbours’ insurance policie s. Determination | Case number: 817561 Page 6 of 11 Insurer to pay complainant $1,000 offered as a goodwill gesture During the AFCA process, the insurer acknowledged the complainant’s long -standing tenure, multiple policies and his circumstances and offered $1,000 as a gesture of goodwill. In the conciliation the insurer confirmed the goodwill offer stood despite any finding in the preliminary assessment or determination. If the insurer has not done so already it is fair it pays to the complainant the $1,000 offered as a goodwill gesture. Insurer entitled to decline the claim Otherwise, based on the available information and for the reasons stated, the insurer is entitled to decline the claim and need take no further action in relation to the claim or the complaint. 2.2 Why is the outcome fair? The insurer is entitled to rely on the policy terms and its expert opinion. Based on the available material the insurer is entitled to decline the claim. In those circumstances it would not be fair to require the insurer to pay the claim. Determination | Case number: 817561 Page 7 of 11 3 Supporting information 3.1 Process AFCA’s approach to this complaint It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Caselaw and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common-sense approach is taken to determine proximate cause. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. Storm ✓ We cover Loss or damage caused by a storm. Accidental damage at the home We cover When you have home insurance, we cover your home for accidental loss (e.g., losing something) and accidental damage (e.g., breaking or damaging something) at the insured address during the period of insurance. Determination | Case number: 817561 Page 8 of 11 When you have contents insurance, we cover your contents for accidental loss (e.g., losing something) and accidental damage (e.g., breaking or damaging something) at the insured address during the period of insurance. Note : Accidental loss or damage not excluded by your policy is an ‘insured event’ (see the meaning of insured event on page 99). If we accept a claim under this optional cover, the incident giving rise to the claim is an insured event. This means that you may be entitled Accidental loss or damage means loss or damage that occurs without intent. Event or incident means a single event, accident, or occurrence which you did not intend or expect to happen. General exclusions (cont.) You are not covered under any section of this policy for damage, loss, cost, or legal liability that is caused by, arises from, or involves: Ground movement [page 76] erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage, or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events: 􀀀 ‘Storm’ (see page 22); 􀀀 ‘Flood’ (see page 20); 􀀀 ‘Earthquake and Tsunami’ (see page 23); 􀀀 ‘Explosion’ (see pag e 29). Wear, tear, and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as but not limited to: 􀀀 tiles and their adhesive or grouting breaking down; 􀀀 weathering of roof tiles or roof ridge capping; 􀀀 gradual weathering and breakdown of bricks, mortar, or concrete. The complainant also refers to the insured event “Flood” Flood We Cover Loss or damage caused by flood. ‘Flood’ means the covering of normally dry land by water that has escaped or been released from the normal confines of any of the following: Determination | Case number: 817561 Page 9 of 11 (a) a lake (whether or not it has been altered or modified); (b) a river (whether or not it has been altered or modified); (c) a creek (whether or not it has been altered or modified); (d) another natural watercourse (whether or not it has been altered or modified); (e) a reservoir; (f) a canal; (g) a dam. We do not cover loss or damage caused by actions or movements of the sea or storm surge;   loss or damage to retaining walls, sea walls, garden borders and free standing outdoor walls;   resultant cracking to paths, driveways, any outdoor surfaces, but we will cover them if they are washed away by the flood;   loss or damage to a sporting surface or court;   loss or damage to boat jetties, pontoons, mooring poles and their attachments and accessories, including if they are washed away by the flood;   the cost of cleaning mud or debris out of tanks, swimming pools or spas, including replacing or storing the water;   damage to external paintwork of your home, if that is the only building damage caused by the flood;   loss or damage to swimming pools or underground tanks caused by water leaking down the sides, against the sides or getting underneath them;   loss or damage to gates, fences or wall fences that were in a state of disrepair which would have been obvious to a reasonable person before the damage occurred;   loss or damage caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover damage caused by a landslide or subsidence proved to have occurred within 72 hours of, and directly because of, flood and not because of erosion over time, structural fault or design fault;   the cost of cleaning your home or contents at the insured address. Determination | Case number: 817561 Page 10 of 11 3.3 Extracts from material relied on by the parties Date Action Builder asse ssment report 30 April 21  Attended to assess claim 30 April 21  Complainant advised on 18/11/2019 Development Victoria started subdividing the land situated behind the property. Upon digging the trenches for the sewer mains right next to the rear of the property, water ingress occurs during downpour and seeps through t he rear boundary fence and pools in the backyard.  As a result of the water pooling, this has caused damage to the pavers throughout the backyard and cracked the shed’s concrete slab.  Found damage sustained to the concret e and brick pavers in the backyard and the shed’s concret e slab as a result of water ingress from the rear property.  Damage appears consistent with the claimed event as it is evident wat er ingress has occurred and pooled within the rear of the property causing the soil to dampen and cause the damages stated above.  Although the damages sustained to the property’s backyard are consistent with the insured’s claimed event, we recommend engaging an engineer to confirm the cause of damage.  Estimate of repair costs $29,973.24 including GST Engineer (MF) Report 4 June 2021  Inspected and photographed property 28 May 2021.  Development and subdivision of site at nort hern side of the property started about 2 years ago.  A trench was excavated immediately adjac ent to the northern boundary fence t o install an underground stormwat er pipe. Additionally, the lands at northern side of the house were raised as part of this development works.  Complainant started noticing surfac e water flow into his property since these works started approximately 2 year s ago.  Surface water flows from the northern side of the property, travels towards the southeast corner of the property where it mostly discharges into the drain located near the pergola.  Owner videotaped the water pooling immediately behind the northern boundary fence in a rainy day which was presented at the time of the inspection.  After complainant notified developer about the water flow, soil was mounted along the boundary and roll weights placed to control water run - off and the timber boundary fence was replaced by the developer.  Damage described and photographed. Determination | Case number: 817561 Page 11 of 11  Observed damage to the garden bed pavers and concrete pavement at northwest corner of the property is consistent with damage caused by excessive water overflow possibly due to inadequate stormwater drainage system within the northern neighbours’ site.  Pho tographs and videos provided by the owner suggest that the stormwater runoff from the northern sites has not been properly controlled/managed for a long period of time contributing to the observed excessive dampness within the back yard, possibly washing o ut the base and the sub - base of the brick pavers and concrete pavement.  Damage to the concrete slab of shed has occurred due to several long - term contributing factors including long - term concret e shrinkage cracking, long - term consolidation of poorly contac ted fill under slab, normal seasonal effects, and the constant water ingress from the northern site. Damage has most likely been exacerbated by the constant water ingress as a result of poor site drainage and surface water management within the northern si te.  Relevant Code provides surface water must be disposed of in a way that avoids damage to any other property but no provision such as construction of a drainage system was observed within the northern site  Recommend a civil engineer be engaged to design and document the required drainage upgrade works necessary within the northern site to prevent water overflow into the subject property.  This work shall be carried out prior any remedial works within the sub ject property. 3.4 Other relevant material considered and relied on  Parties’ submissions /emails and all attachments to all submissions/emails before and after preliminary assessment  Expert reports  Photographs  Call recording  Claim file notes from 2020 and 2021 claims  Correspondence between the parties

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.