Determination 816704

Claim declined for escape of liquid damage to insured building; insurer declined complete indemnity

FirmSuncorp Group
Decided2022-06-06
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant lodged a landlord insurance claim after a burst water pipe caused building damage, and the insurer declined the claim citing ground movement, drainage and pre-inception damage. AFCA found a valid claim and that the insurer must cover 50% of repair costs excluding the roof, with reimbursement of expert report costs up to $5,000.

The burst pipe escape of liquid is an insured event and the insurer's exclusions do not fully defeat the claim, as the burst pipe was the major contributing cause, while the roof damage is excluded as inadequate construction.

Issues

Subjects and remedies

home or building damagethird party authoritypay claimprovide documentsreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 816704 Financial firm AAI Limited Determination | Case number: 816704 Page 2 of 14 Case number: 816704 31 May 2022 1 Determination overview 1.1 Complaint The complainant holds a landlord insurance policy (policy) with the financial firm (insurer), which was incepted on 28 August 2013. On 11 January 2019, the complainant lodged a claim for damage to the insured home said to be because of a burst pipe found under the home. The insurer has declined the claim. The insurer says the damage to the insured building is the result of various contributing factors over an extended period of time. These factors include ongoing ground movement due to highly reactive clay soils, inadequate drainage and inadequate footings of the home building which are excluded under the policy. Further, that the damage has been occurring since before inception of the policy and therefore the insurer is not obliged to cover the complainant for the loss claimed. 1.2 Issues and key findings What does the policy cover? The policy covers the insured property against loss or damage caused by one or more of the listed insured events specified in the product disclosure statement (PDS). Has the complainant established a valid claim? Yes. The complainant has shown a burst water pipe was found under the home and which, on the balance of probabilities, has caused and/or contributed to damage at the insured property. This falls within cover available under the l isted insured event „Escape of liquid‟, and therefore a valid claim has been established under the policy. Is the insurer ’s assessment of its liability under the claim fair ? No. The insurer‟s decision to decline complete indemnity for the loss and damage claimed is not fair in the circumstances. Although, the insurer is not obliged to cover all the loss or damage, it is fair in the circumstances that it covers 50% of the cost of repairs (not including the cost to repair the roof), in line with its obligations under the policy. 1.3 Determination This determination is in favour of the complainant. The panel determines that within 14 days of the complainant accepting this determination, the insurer is to:  arrange for a suitably qualified independent consultant to attend the insured property and provide a scope of works and actionable quote for repairs limited to the damage caused by the burst pipe event and associated works needed to repair such damage  within seven days of receiving the above quote, arrange payment of 50% of the quote to the complainant. This payment is to be increased by 15% to allow for contingencies  subject to being provided with reasonable supporting information, reimburse the complainant for expenses she has incurred in arranging expert reports in support of her position under the claim (up to a maximum of $5,000). Determination | Case number: 816704 Page 3 of 14 2 Reasons for determination The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). The panel has considered all the material submitted by the parties and is satisfied that the documentation it has relied on has been provided to both parties. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. 2.1 What does the policy cover? The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more of the listed insured events, including „Escape of liquid‟. C over under these benefits is subject to the conditions, limitations and exclusions specified in the PDS. The insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, the panel accepts the insurer is entitled to rely on the policy provisions to assess its liability under the claim. 2.2 Has the complainant established a valid claim? Yes. Based on the available information, the panel is satisfied that the complainant has shown an insured event (escape of liquid from a burst pipe) did take place and which has caused and/or contributed to damage to the insured building. Complainant has onus to prove claim falls within terms of the policy. It is established law that the insured has the onus to establish, on balance (that is, more likely than not), that the loss falls within the terms of the policy. Only if a valid claim is shown to exist, will the onus shift to the insurer to show, on balance, it is entitled to decline the claim in line with the policy provisions. There is no dispute the tenant of the insured property found a burst water pipe under the insured building. Further, that the parties to this complaint accept the leak had been present for a long period of time resulting in the introduction of a large amount of water to the foundation sub-soils. The tenant arranged for plumber „JH‟ to attend and repair the leaking pipe. Shortly after this event, the tenant began noticing movement and cracking damage to the insured building, for which the complainant has lodged a claim under the policy. Given the above, the panel is satisfied that the complainant has established a valid claim under the policy. The onus rests with the insurer to show an entitlement to decline and/or reduce its liability for the loss or damage claimed in line with the policy provisions or otherwise. Determination | Case number: 816704 Page 4 of 14 2.3 Is the insurer’s assessment of its liability fair ? No. Based on the available information, the panel is not satisfied the insurer‟s decision to decline complete indemnity for the damage to the insured building is fair in the circumstances. The insurer is to contribute/cover the complainant for 50% of the cost of repairs in line with this determination. Circumstances not in dispute under the claim Having considered the available information, the panel is satisfied the following is not in dispute between the parties:  the insured property is approximately 60 years old  the complainant has owned the property for approximately 20 years  the tenant, leasing the property during the period relevant to this claim, has been at the property since around 2011-2012  in late 2018, the tenant heard some hissing sounds from under the property. A plumber was appointed who located a burst water pipe and which was repaired  water had been escaping this burst water pipe for quite some time and introducing a significant amount of water into the building foundation soils  the foundation clay soil profile has been identified as Class H2, which are highly reactive and means they react significantly to introduction of moisture  all consultants appointed to the claim by the insurer and complainant agree that the escape of liquid has caused/contributed to damage to the building. It is the extent of such damage and/or when it may have occurred that remains in contention. Consultants have provided varying opinions on the cause of the damage The complainant says the damage occurred due to an insurable event and relies on reports compiled by her appointed consultants, whilst the insurer relies on the opinions and information provided by its appointed consultants. Relevant extracts from the reports are contained in section 3.2 of this determination. The tenant appointed plumber JH to investigate the hissing sound heard from under the insured home. JH has provided an email dated 15 August 2021, confirming its attendance on 1 August 2018 to repair a burst water pipe under the bathroom towards the rear side of the home. JH says in its opinion, water had been leaking for a very long time. Some months later, the tenant noted cracks appearing in the walls and ceilings of the insured building, which was reported to the complainant. The complainant appointed building consultants „MS‟ to investigate the damage. MS has provided a report and repair quote dated 10 January 2010, MS says the home clearly showed movement and structural issues with internal and external cracking damage in various areas. On inspecting the sub-floor area, MS noted modifications and multiple stumps had been put in place at some stage to address slippage and subsidence. The panel notes this may be consistent with the „Certificate of guarantee‟ dated 2 June 1999, from „SR‟ noted as re - blocking and underpinning experts. MS says the entire sub-floor had deteriorated due to damage through water ingress and with drying out, will further deteriorate around the footings and foundations. MS provides a scope of works and repair quote in the amount of $86,745 - $106,000. Given the above, the complainant lodged the claim and the insurer first appointed consultants „AG‟ to investigate the cause and extent of damage. AG confirmed the presence of internal and external cracking to the insured building. AG arranged for the appointment of leak Determination | Case number: 816704 Page 5 of 14 detection sp ecialists „BA‟, engineers „LE‟, engineers „HN‟ and roofing consultants „TB‟ to inspect and investigate the cause and extent of the damage to the insured building. BA confirmed the presence of the burst water pipe under the home and that it had since been repaired. The vanity waster connection to the main drainage line was found to be too short and was allowing some water to terminate under the home. BA noted some concerns with the stormwater site drainage but that there were no other leaks identified with the home ‟s other plumbing. BA recommended appointment of an engineer to determine what damage is claimable. The insurer appointed engineers LE which attended the property on 21 February 2019 and provided a report dated 15 March 2019. LE noticed evidence of previous repairs/patchwork to some of the cracks on the south and east side elevations. LE also noted creasing of linings at locations of some of the cracks, evidence of previous repairs or painting. LE says it was advised by the complainant that no structural works or repairs to cracks had been completed by her or current tenant. The last time the interior was repainted was by a previous tenant in around 2010. LE concluded the movement damage can be attributed to:  25% natural seasonal expansion and contraction of highly reactive soils  25% to the incorrect discharge from vanity waster connection; and  50% to the escape of liquid from the burst water pipe and stormwater pipework LE says, given the complainant‟s information that no repairs or re-painting had been completed since the previous tenant in around 2010. In its opinion, movement damage had been occurring for a long period of time, evidenced by the previous repair and patching of cracks from before 2010. A report from the insurer‟s ass essor, having reviewed the information from BA and LE, refers to 75% of the damage being claimable whilst 25% of the damage not being claimable. The complainant was told to address the drainage issues at the property and allow a 12-month drying out period, before to the building repairs could be authorised. The complainant arranged the reco mmended works through plumbers „ RP ‟ at the cost of $ 8,800. The complainant arranged and relies on information from two engineering consultants „SM‟ and „SD‟ she appointed to investigate the cause and extent of damage to the insured home. SM attended on 30 August 2021 confirmed in its report dated 14 September 2021. SM noted the soil profile for the site is extremely variable i.e. highly reactive clay and considered a „Problem site‟. SM says abnormal moisture conditions are likely to result in exaggerated soil movement as the site adjusts to the varying moisture levels. SM formed the view the probable cause of the damage noted to the insured home is:  Plumbing leak (burst water pipe)  Footings that are not suitable to the underlying geological region. SD attended the insured property on 11 January 2022. SM noted the cracking damage to various locations (walls and ceilings) throughout the home and says the damage is consistent with stump differential movement caused by abnormal moisture conditions. In SD‟s opinion this is due to the significant water leak from the burst pipe under the bathroom. The abnormal moisture conditions will have caused expansion of clays causing excessive heave to the strip footings and stumps, resulting in the cracking of wall plaster, ceiling plaster, render to external walls and roof structure. Further, the continued over moisturisation of the foundation soils will have caused a reduction in soil bearing capacity, allowing settlement of the strip footings and stumps causing further differential movement and damage. Determination | Case number: 816704 Page 6 of 14 SD does not believe the natural seasonal movement is responsible for the damage noted to the insured building. No abnormal moisture levels were noted at the time of its inspection or that of SM. The fact the foundation soils are highly reactive does not in itself mean this is responsible for the damage, but it does support a flooding event under the home such as that from the burst pipe, will have a considerable effect on the foundation soils. The footings supporting the building are compliant with the time the home was constructed. Inadequate information to show all damage was present before policy inception The panel acknowledges the in surer‟s position, that in its opinion the damage claimed pre - dates inception of the policy and therefore it is not covered. Also, that it is clear the insured home has been subject to ongoing damage due to seasonal ground movement and inadequate site drainage for a very long time, which is excluded under the policy. The panel is not entirely convinced of this position. The panel believes, given the nature of the foundation soils, it is reasonable to accept the insured building will have experienced a degree of seasonal foundation movement and associated damage (cracks) over the years. The panel accepts this is supported by the fact there exists evidence of previous repairs to cracks as well as evidence of previous works to the foundations having been completed in 1999. The panel notes all the appointed consultants agree on this much i.e. the classification of the site, the nature of the foundation clays and that there exists damage to the walls and ceilings consistent with foundational movement. However, the panel notes there is no information which shows the significant cracking or damage in the past, only minor patching of some cracks. The panel does not accept SD‟s opinion that none of the damage noted to the insured building is consistent with ongoing seasonal foundation movement. The panel finds LE‟s opinion, identification, explanation and distinction of the cracks and damage to the home to be more persuasive. The panel believes it is reasonable to argue that the significant degree of damage to the insured building after the 2018 burst pipe event was not consistent with the ongoing and/or normal extent of building damage which will have been expected to arise from seasonal foundation movement. The panel is of the opinion, in the absence of persuasive evidence to the contrary, that it is reasonable to accept damage to the building after the 2018 burst water pipe event is much more significant compared to any ongoing minor re-occurring cracking damage caused by seasonal foundational movement. On the available information, the panel is of the view the historical repair/patching works were limited to some cracks only and minor in comparison. The panel accepts LE‟s view that the burst pipe event is the more significant and major contributing factor for t he damage subject of the claim. Further, that LE‟s assessment that this insured event is responsible for 50% of the damage to the insured building, is fair and reasonable. The remaining contributing factors being natural seasonal expansion and contraction of highly reactive soils (25%) and the incorrectly installed vanity waste connection (25%). The panel is not satisfied that there is adequate and persuasive information showing the significant damage to the insured building existed prior to the policy inception. As discussed above, there is some information showing previous maintenance works in the form of patching and painting of cracks, but this is minor and relates to cracks that would have appeared many years prior. There is no information showing there occurred any damage (cracks) between 2010 and the insured event giving rise to the claim. Determination | Case number: 816704 Page 7 of 14 The panel believes it would not fair in the circumstances to allow the insurer to decline complete liability for the now present significant damage, which on balance has been shown to be result of the burst water pipe and has not been present since inception of the policy. Insurer to cover 50% of the cost to repair building damage under the claim The panel, as considered above, accepts there exists information supporting the fact the insured site is likely to have a history of re-occurring minor cracking damage which from time to time has required patching or maintenance over the years. However, this does not mean, nor would it be fair to say this excludes the insured building from cover for damage that can be attributed to an insured event in line with the policy provisions. There may well exist evidence of previous repairs to some cracks and it may be true that the complainant and her tenant have not had to arrange such repairs in the previous 10 years because no new cracks appeared until January 2019. The panel notes the complainant has provided much information relating to maintenance works and repairs arranged at the insured property over these years. The complainant has also provided a property condition report dated 24 August 2011. The panel notes this report shows that the walls and ceilings were recorded as being in good condition. There is no evidence of there being any cracking damage and this report is a year later to 2010, which the year LE and the insurer refer to in support of their position the damage predates policy inception. The panel notes LE and the insurer are prepared to accept and highlight t he fact the tenant and complainant say they have not had to complete any repairs to the walls and ceilings at the insured property, with the last time internal painting took place was 2010. However, LE and the insurer then seem to ignore and not accept the tenant and complainant advising there was no cracking damage to the property until after the insured event at the end of 2018. The available information shows the tenant will have occupied the insured property since around 2011-2012 and has not in this time raised concerns regarding movement damage to the insured building until January 2019. Other requests for maintenance had been made and arranged by the complainant. The panel also notes, it is an interesting coincidence that a home which has stood on this reactive foundation clay site for 60 years, only presented with such significant movement damage after a burst water pipe event and not any time prior. The panel accepts it would not be fair to require the insurer to cover all the cost of repairs for the cracking damage to the various areas around the insured building. This is because LE‟s persuasive information shows there are a few contributing factors for the damage. This information supports the major contributing factor (50%) for the damage as the burst pipe event (50%). The panel determines it is fair in the circumstances, that the insurer be required to cover and contribute 50% of the repair costs under the complainant‟s claim. Insurer not required to cover the damage to the roof The complainant suggests that the condition of the roof and roof structure has arisen out of the escape of liquid insured event. Consultants‟ TB provided a report dated 18 May 2021 after having inspected the insured home‟s roof. TB noted some minor water i ngress issues into the roof structure from above (tiles) but says this is not the cause for the damage to the roof structure. TB recommended a suitably qualified consultant be appointed to determine the cause for the roof sagging. Determination | Case number: 816704 Page 8 of 14 HN, engineering consultants, attended the insured property on 25 May 2021 to inspect the roof and provide a report dated 2 June 2021. HN found the cause for the roof damage was inadequate construction method. HN noted the central ridge beam has not been provided with the required fish plate, causing it to become overstressed and fail over time. HN says the sagging is not due to foundation movement rather it the splitting observed to the central ridge beam which is typical of problems that occur because of inadequate construction. Given the policy does not cover inadequate construction and in the absence of evidence to the contrary, the panel is satisfied the condition of the roof structure has not been caused by any insured event including the burst pipe event and associated ground movement. Accordingly, the panel determines the insurer is not required to cover or contribute towards the cost to repair the roof under the claim. Section 46 of the Act has no application in the circumstances The parties have raised section 46 of the Insurance Contracts Act 1984 (Act), and whether this is enlivened in the circumstances. Under section 46, an insurer cannot rely on a policy exclusion which applies by reference to a defect in an item, if at the time the policy was entered into:  the insured person was not aware of the defect, and  a reasonable person in their circumstances could not be expected to have been aware of the defect. Section 46 prevents an insurer from relying on an exclusion clause that refers to the condition of a thing before the contract was entered into, if the complainant (or a reasonable person) was not aware of the defect or condition which wholly or partly caused the damage claimed for. However, Section 46 of the Act does not apply to an exclusion of an event which makes no reference to when the event occurs. Only exclusions which refer to a condition existing before entry into the contract of insurance, are affected by Section 46. In this complaint the insurer says a valid claim does not exist because the damage claimed is not caused by an insured event. Also, the exclusion provisions referred to by the insurer apply generally and are not temporal in nature. The exclusion clauses are not directed to defects which pre-existed the commencement of the policy. Accordingly, the panel is satisfied that section 46 does not assist the complainant in these circumstances. The insurer is to settle the claim in line with this determination The panel notes the complainant has provided two quotes for repairs, the first from MS with an estimated cost of repairs of $86,745 to $106,000 (10 January 2019), and the second from consultants „LC‟ dated 24 November 2021 in the amount of $247,350. The panel is not satisfied that either of these quotes are sufficiently detailed as to the scope of works, costing and on balance they include repairs to areas such as the roof, which are not covered under the policy. Further, given the delays caused in bringing this claim to conclusion, it is fair to accept the damage to the insured building will have increased and due to the impact of COVID-19, the cost of materials and labour have also increased. As such, the panel is of the opinion, it is fair to the parties, that a new, current and actionable quote be relied on to settle the claim. Determination | Case number: 816704 Page 9 of 14 The panel determines that within 14 days of the complainant accepting this determination, the insurer is to:  arrange for a suitably qualified independent consultant to attend the insured property and provide a scope of works and actionable quote for repairs limited to the damage caused by the burst pipe event and associated works needed to repair such damage  within seven days of receiving the above quote, arrange payment of 50% of the quote to the complainant. This payment is to in be increased by a further 15% to allow for contingencies  subject to being provided with reasonable information, reimburse the complainant for expenses she has incurred in arranging expert reports in support of her position under the claim (up to a maximum of $5,000). Why is the outcome fair? The outcome is fair in the circumstances because the information provided supports the insured event (burst water pipe) has resulted in significant damage to the insured building. Further, that the extent of this damage is not comparable to what would reasonably be expected to occur because of normal seasonal foundational movement. Therefore, it is fair that the insurer be required to cover the complainant for the damage which has been found to be consistent with the insured event whilst allowing the insurer to limit its liability under the claim and exclude cover for damage shown not be caused by the insured event, which is also fair in the circumstances. Determination | Case number: 816704 Page 10 of 14 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance sector. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy sections Section Exclusions to your cover You are not covered under any section of t hi s policy for damage, loss, cost or legal liability that is caused by, arise s from or involve s : Determination | Case number: 816704 Page 11 of 14 Failing to take care your failure to:  take reasonable care of your property or unit and contents;  take reasonable precautions to prevent loss, damage or legal liability;  keep your property or unit and any contents well maintained and in good condition. For the meaning of „well maint ained and in good condition‟ see the „Glossary of important words and phrases‟ section on page 12;  fix faults and defects as soon as you become aware of them. Ground movement  erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement …. Wear, tear, mould, gradual deterioration and other conditions  wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as, but not limited to: > tiles and their adhesive or grouting breaking down; > weat hering of roof tiles o r roof ridge capping; > gradual weathering and breakdown of bricks, mortar or concrete. 3.3 Supporting information Document Key points Insurer’s building report (AG ) 17.01. 2019  t here is cracking to multiple locations throughout property, some cracking to the external render which has been patched  t he Insured has had a burst pipe loc ated at the rear of the property which has since been replaced with t he mains pressure test passing  i nspected the sewer which the Insured advised was replaced 10 years ago, it was f ound to be PVC and sound  t he vanity waste connection to the main line is too short and allows some of the wate r to terminate under the house  t he storm water was inspected and found to have breaks throughout the earthenware with poor vision in parts. The pipe running along the shed has completely collapsed. Determination | Case number: 816704 Page 12 of 14 Document Key points Insurer’s plumbing leak detection report (BA ) 24.01. 2019  t here is cracking to multiple locations throughout property, some cracking to the external render which has been patched.  there has been a burst pipe located at the rear of the property which has since been replaced with the mains pressure test passing.  i nspected the sewer which the i nsured advised was replaced 10 years ago, it was found to be PVC and sound.  t he vanity waste connection to the main line is too short and allows some of the water to terminate under the house.  t he storm water was inspected a nd found to have breaks throughout the earthenware with poor vision in parts. The pipe running along the shed has completely collapsed Insurer’s engineer ’s report ( LE) 15 - 03 - 2019  the results of the soil test confirm that the soil type is classified as extremely reactive  based on the findings of the site investigation and subs equent laboratory testing, the predicted surface movement for this site is between 60 - 75mm  e vidence of previous repairs and patching to cracks is also further testament to the react ive nature of the soils in the area and movement over the long term  c racking and movement to the entire dwelling can be attributed to the combined effects of nat ural seasonal movement (25% ), incorrect discha rging of water from vanity waste connection (25% ) , and the escape of liquid from the water supply and stormwat er pipework (50%)  the leaks have contributed to localised soil saturation and exacerbated the damage to the dwelling  movement and damage of the dwelling has been occurring for an extended period of time since prior to 2010 (when the interior of the dwelling was last painted)  recommended that plumbing defects be rectified Complainants quote from repairer (RP) 26 - 03 - 2019  RP commenced earth moving works which included concrete cutting in order to gain access to a broken terracotta main.  All cracked terracotta pipework leading to the barrel drain at the rear of the property were replac ed Determination | Case number: 816704 Page 13 of 14 Document Key points Complainant ’s engineer report ( SM ) 14 - 09 - 2021  In accordance with AS 2870 - 2011, the site is classified as a class P , problem site.  In accordance with AS 2870 - 2011, this site is classified as class H 2, highly reactive clay site which may experience very high ground movement from moi sture change s.  The site may be subject to moisture changes due to site conditions more severe than normal site conditions due to: > Presence of trees on the building site or adjacent site. > Failure to provide adequate site drainage. > Failure to detail or construct drainage in accordance with AS2870 - 2011. > The effect of trees too close to a footing.  The underlying geology was found to be very highly reactive.  The clay in this geological region will expand by up to 40% of its volume when in contact with water. While expanding the clay continues to have high bearing capacity and can lift footi ngs and buildings, in a phenomenon referred to as “heave”. At moisture content levels above 50% the soil will lose bearing capacity, and footing subsidence can occur.  the probable cause of the damage to the existing structure is as follows; > plumbing leak. > footings that are not suitable to the underlying geological region Insurer’s p lumber ’ s report (TB ) 18 - 05 - 2021  large cracks to the ceiling in the kitchen, cracks to bedroom walls and cracks to the archway into the living room were pointed out. uneven floors were observed  water ingress into the ceiling cavity was identified with a ceiling inspection  the leaks were small drops and not consistent with the extent of the damages  the roof line has sagged which has caused the tiles to move.  the sagging roof line is more consistent with movement rather than roof leak issues  the leaks identified during inspection are not the cause of the damaged areas  the areas of damage are more consistent with building movement however a suitable person will need to inspect a nd confirm. Determination | Case number: 816704 Page 14 of 14 Document Key points Insurer’s builder’ s report (B A ) 20 - 05 - 2021  the movement and damage to the dwelling can be attributed to the combined effects of natural seasonal expansion and contraction of highly reactive clay founding soils (25%) incorrect discharging of water from vanity waste connection (25% ) and escape of liquid from the water supply and Stormwater pipework (50% ).  b ased on the evidence of several of the cracks having been painted previously, we can confirm that the movement and damage of the dwelling ha ve been occurring for an extended period of time since prior to 2010 (when the interior of the dwelling was last painted). Insurer’s engineer’s report (HN ) 02 - 06 - 2021  a site inspection was carried out at the above property to determine if the sag of the roofline is the result of movement of the foundation material  the sag of the roofline is the res ult of the splitting of the central ridge beam . In our opinion, the splitting of the central ridge beam is typical of problems that can occur because of inadequate construction  the joint in the central ridge beam had not been provided the required fishplate. In our opinion, this inadequate construction/design has resulted in the timber ridge beam becoming overstressed and fa iling over time  the sag of the roof line is the result of splitting of the central ridge beam due to inadequate construction, and not the result of foundation movement. C o mplainant’s engineer report (SD ) 11 - 01 - 2022  the damage to the external brick veneer rendered walls, the damage to t he int ernal wall and ceiling plaster and the damage to the roof structure was caused by the significant water leak from the burst pipe located under the bathroom.  the extent of the damage to the building is consistent with a major floor event in the subfl oor area.  an excessive amount of water had accumulated beneath the floor of the residence, resulting in abnormal moisture conditions in the founding soils that support both the outer strip footings and the stumps Complainant’s engineer’s report ( SD ) 28 - 02 - 2022  there is no evidence of abnormal moisture conditions at the time of the ins pection by SM  if flooding event were to occur beneath the home, the effects would be considerable given the nature of the soil.  the footings supporting the existing building comply to the standards which were relevant at the time of construction.  SDC was already in possession of the report by Structural Melbourne and was not disputing the floor levels as stated in their report.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.