Claim declined for escape of liquid damage to insured building; insurer declined complete indemnity
Text of the determination
Determination
Case number 816704
Financial firm AAI Limited
Determination | Case number: 816704 Page 2 of 14
Case number: 816704 31 May 2022
1 Determination overview
1.1 Complaint
The complainant holds a landlord insurance policy (policy) with the financial firm (insurer),
which was incepted on 28 August 2013. On 11 January 2019, the complainant lodged a claim
for damage to the insured home said to be because of a burst pipe found under the home.
The insurer has declined the claim. The insurer says the damage to the insured building is the
result of various contributing factors over an extended period of time. These factors include
ongoing ground movement due to highly reactive clay soils, inadequate drainage and
inadequate footings of the home building which are excluded under the policy.
Further, that the damage has been occurring since before inception of the policy and
therefore the insurer is not obliged to cover the complainant for the loss claimed.
1.2 Issues and key findings
What does the policy cover?
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events specified in the product disclosure statement (PDS).
Has the complainant established a valid claim?
Yes. The complainant has shown a burst water pipe was found under the home and which,
on the balance of probabilities, has caused and/or contributed to damage at the insured
property. This falls within cover available under the l isted insured event „Escape of liquid‟, and
therefore a valid claim has been established under the policy.
Is the insurer ’s assessment of its liability under the claim fair ?
No. The insurer‟s decision to decline complete indemnity for the loss and damage claimed is
not fair in the circumstances. Although, the insurer is not obliged to cover all the loss or
damage, it is fair in the circumstances that it covers 50% of the cost of repairs (not including
the cost to repair the roof), in line with its obligations under the policy.
1.3 Determination
This determination is in favour of the complainant.
The panel determines that within 14 days of the complainant accepting this determination, the
insurer is to:
arrange for a suitably qualified independent consultant to attend the insured property and
provide a scope of works and actionable quote for repairs limited to the damage caused by
the burst pipe event and associated works needed to repair such damage
within seven days of receiving the above quote, arrange payment of 50% of the quote to
the complainant. This payment is to be increased by 15% to allow for contingencies
subject to being provided with reasonable supporting information, reimburse the
complainant for expenses she has incurred in arranging expert reports in support of her
position under the claim (up to a maximum of $5,000).
Determination | Case number: 816704 Page 3 of 14
2 Reasons for determination
The panel has decided this complaint based on what is fair in all the circumstances, having
regard to legal principles, applicable industry codes or guidance, good industry practice and
previous relevant determinations of AFCA or predecessor schemes (which are not binding).
The panel has considered all the material submitted by the parties and is satisfied that the
documentation it has relied on has been provided to both parties.
The parties have raised numerous issues in their submissions to AFCA. However,
commentary in this determination is restricted to those issues considered relevant to the
outcome.
2.1 What does the policy cover?
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more of the
listed insured events, including „Escape of liquid‟. C over under these benefits is subject to the
conditions, limitations and exclusions specified in the PDS.
The insurer provided the complainant with the relevant policy documentation including the
PDS and certificate of insurance (COI). Therefore, the panel accepts the insurer is entitled to
rely on the policy provisions to assess its liability under the claim.
2.2 Has the complainant established a valid claim?
Yes. Based on the available information, the panel is satisfied that the complainant has
shown an insured event (escape of liquid from a burst pipe) did take place and which has
caused and/or contributed to damage to the insured building.
Complainant has onus to prove claim falls within terms of the policy.
It is established law that the insured has the onus to establish, on balance (that is, more likely
than not), that the loss falls within the terms of the policy. Only if a valid claim is shown to
exist, will the onus shift to the insurer to show, on balance, it is entitled to decline the claim in
line with the policy provisions.
There is no dispute the tenant of the insured property found a burst water pipe under the
insured building. Further, that the parties to this complaint accept the leak had been present
for a long period of time resulting in the introduction of a large amount of water to the
foundation sub-soils.
The tenant arranged for plumber „JH‟ to attend and repair the leaking pipe. Shortly after this
event, the tenant began noticing movement and cracking damage to the insured building, for
which the complainant has lodged a claim under the policy.
Given the above, the panel is satisfied that the complainant has established a valid claim
under the policy. The onus rests with the insurer to show an entitlement to decline and/or
reduce its liability for the loss or damage claimed in line with the policy provisions or
otherwise.
Determination | Case number: 816704 Page 4 of 14
2.3 Is the insurer’s assessment of its liability fair ?
No. Based on the available information, the panel is not satisfied the insurer‟s decision to
decline complete indemnity for the damage to the insured building is fair in the circumstances.
The insurer is to contribute/cover the complainant for 50% of the cost of repairs in line with
this determination.
Circumstances not in dispute under the claim
Having considered the available information, the panel is satisfied the following is not in
dispute between the parties:
the insured property is approximately 60 years old
the complainant has owned the property for approximately 20 years
the tenant, leasing the property during the period relevant to this claim, has been at the
property since around 2011-2012
in late 2018, the tenant heard some hissing sounds from under the property. A plumber
was appointed who located a burst water pipe and which was repaired
water had been escaping this burst water pipe for quite some time and introducing a
significant amount of water into the building foundation soils
the foundation clay soil profile has been identified as Class H2, which are highly reactive
and means they react significantly to introduction of moisture
all consultants appointed to the claim by the insurer and complainant agree that the
escape of liquid has caused/contributed to damage to the building. It is the extent of such
damage and/or when it may have occurred that remains in contention.
Consultants have provided varying opinions on the cause of the damage
The complainant says the damage occurred due to an insurable event and relies on reports
compiled by her appointed consultants, whilst the insurer relies on the opinions and
information provided by its appointed consultants. Relevant extracts from the reports are
contained in section 3.2 of this determination.
The tenant appointed plumber JH to investigate the hissing sound heard from under the
insured home. JH has provided an email dated 15 August 2021, confirming its attendance on
1 August 2018 to repair a burst water pipe under the bathroom towards the rear side of the
home. JH says in its opinion, water had been leaking for a very long time.
Some months later, the tenant noted cracks appearing in the walls and ceilings of the insured
building, which was reported to the complainant. The complainant appointed building
consultants „MS‟ to investigate the damage. MS has provided a report and repair quote dated
10 January 2010, MS says the home clearly showed movement and structural issues with
internal and external cracking damage in various areas.
On inspecting the sub-floor area, MS noted modifications and multiple stumps had been put
in place at some stage to address slippage and subsidence. The panel notes this may be
consistent with the „Certificate of guarantee‟ dated 2 June 1999, from „SR‟ noted as re -
blocking and underpinning experts. MS says the entire sub-floor had deteriorated due to
damage through water ingress and with drying out, will further deteriorate around the footings
and foundations. MS provides a scope of works and repair quote in the amount of $86,745 -
$106,000.
Given the above, the complainant lodged the claim and the insurer first appointed consultants
„AG‟ to investigate the cause and extent of damage. AG confirmed the presence of internal
and external cracking to the insured building. AG arranged for the appointment of leak
Determination | Case number: 816704 Page 5 of 14
detection sp ecialists „BA‟, engineers „LE‟, engineers „HN‟ and roofing consultants „TB‟ to
inspect and investigate the cause and extent of the damage to the insured building.
BA confirmed the presence of the burst water pipe under the home and that it had since been
repaired. The vanity waster connection to the main drainage line was found to be too short
and was allowing some water to terminate under the home. BA noted some concerns with the
stormwater site drainage but that there were no other leaks identified with the home ‟s other
plumbing. BA recommended appointment of an engineer to determine what damage is
claimable.
The insurer appointed engineers LE which attended the property on 21 February 2019 and
provided a report dated 15 March 2019. LE noticed evidence of previous repairs/patchwork to
some of the cracks on the south and east side elevations. LE also noted creasing of linings at
locations of some of the cracks, evidence of previous repairs or painting.
LE says it was advised by the complainant that no structural works or repairs to cracks had
been completed by her or current tenant. The last time the interior was repainted was by a
previous tenant in around 2010. LE concluded the movement damage can be attributed to:
25% natural seasonal expansion and contraction of highly reactive soils
25% to the incorrect discharge from vanity waster connection; and
50% to the escape of liquid from the burst water pipe and stormwater pipework
LE says, given the complainant‟s information that no repairs or re-painting had been
completed since the previous tenant in around 2010. In its opinion, movement damage had
been occurring for a long period of time, evidenced by the previous repair and patching of
cracks from before 2010.
A report from the insurer‟s ass essor, having reviewed the information from BA and LE, refers
to 75% of the damage being claimable whilst 25% of the damage not being claimable. The
complainant was told to address the drainage issues at the property and allow a 12-month
drying out period, before to the building repairs could be authorised. The complainant
arranged the reco mmended works through plumbers „ RP ‟ at the cost of $ 8,800.
The complainant arranged and relies on information from two engineering consultants „SM‟
and „SD‟ she appointed to investigate the cause and extent of damage to the insured home.
SM attended on 30 August 2021 confirmed in its report dated 14 September 2021. SM noted
the soil profile for the site is extremely variable i.e. highly reactive clay and considered a
„Problem site‟.
SM says abnormal moisture conditions are likely to result in exaggerated soil movement as
the site adjusts to the varying moisture levels. SM formed the view the probable cause of the
damage noted to the insured home is:
Plumbing leak (burst water pipe)
Footings that are not suitable to the underlying geological region.
SD attended the insured property on 11 January 2022. SM noted the cracking damage to
various locations (walls and ceilings) throughout the home and says the damage is consistent
with stump differential movement caused by abnormal moisture conditions. In SD‟s opinion
this is due to the significant water leak from the burst pipe under the bathroom.
The abnormal moisture conditions will have caused expansion of clays causing excessive
heave to the strip footings and stumps, resulting in the cracking of wall plaster, ceiling plaster,
render to external walls and roof structure. Further, the continued over moisturisation of the
foundation soils will have caused a reduction in soil bearing capacity, allowing settlement of
the strip footings and stumps causing further differential movement and damage.
Determination | Case number: 816704 Page 6 of 14
SD does not believe the natural seasonal movement is responsible for the damage noted to
the insured building. No abnormal moisture levels were noted at the time of its inspection or
that of SM. The fact the foundation soils are highly reactive does not in itself mean this is
responsible for the damage, but it does support a flooding event under the home such as that
from the burst pipe, will have a considerable effect on the foundation soils. The footings
supporting the building are compliant with the time the home was constructed.
Inadequate information to show all damage was present before policy inception
The panel acknowledges the in surer‟s position, that in its opinion the damage claimed pre -
dates inception of the policy and therefore it is not covered. Also, that it is clear the insured
home has been subject to ongoing damage due to seasonal ground movement and
inadequate site drainage for a very long time, which is excluded under the policy.
The panel is not entirely convinced of this position. The panel believes, given the nature of
the foundation soils, it is reasonable to accept the insured building will have experienced a
degree of seasonal foundation movement and associated damage (cracks) over the years.
The panel accepts this is supported by the fact there exists evidence of previous repairs to
cracks as well as evidence of previous works to the foundations having been completed in
1999.
The panel notes all the appointed consultants agree on this much i.e. the classification of the
site, the nature of the foundation clays and that there exists damage to the walls and ceilings
consistent with foundational movement. However, the panel notes there is no information
which shows the significant cracking or damage in the past, only minor patching of some
cracks. The panel does not accept SD‟s opinion that none of the damage noted to the insured
building is consistent with ongoing seasonal foundation movement.
The panel finds LE‟s opinion, identification, explanation and distinction of the cracks and
damage to the home to be more persuasive. The panel believes it is reasonable to argue that
the significant degree of damage to the insured building after the 2018 burst pipe event was
not consistent with the ongoing and/or normal extent of building damage which will have been
expected to arise from seasonal foundation movement.
The panel is of the opinion, in the absence of persuasive evidence to the contrary, that it is
reasonable to accept damage to the building after the 2018 burst water pipe event is much
more significant compared to any ongoing minor re-occurring cracking damage caused by
seasonal foundational movement. On the available information, the panel is of the view the
historical repair/patching works were limited to some cracks only and minor in comparison.
The panel accepts LE‟s view that the burst pipe event is the more significant and major
contributing factor for t he damage subject of the claim. Further, that LE‟s assessment that this
insured event is responsible for 50% of the damage to the insured building, is fair and
reasonable. The remaining contributing factors being natural seasonal expansion and
contraction of highly reactive soils (25%) and the incorrectly installed vanity waste connection
(25%).
The panel is not satisfied that there is adequate and persuasive information showing the
significant damage to the insured building existed prior to the policy inception. As discussed
above, there is some information showing previous maintenance works in the form of
patching and painting of cracks, but this is minor and relates to cracks that would have
appeared many years prior. There is no information showing there occurred any damage
(cracks) between 2010 and the insured event giving rise to the claim.
Determination | Case number: 816704 Page 7 of 14
The panel believes it would not fair in the circumstances to allow the insurer to decline
complete liability for the now present significant damage, which on balance has been shown
to be result of the burst water pipe and has not been present since inception of the policy.
Insurer to cover 50% of the cost to repair building damage under the claim
The panel, as considered above, accepts there exists information supporting the fact the
insured site is likely to have a history of re-occurring minor cracking damage which from time
to time has required patching or maintenance over the years. However, this does not mean,
nor would it be fair to say this excludes the insured building from cover for damage that can
be attributed to an insured event in line with the policy provisions.
There may well exist evidence of previous repairs to some cracks and it may be true that the
complainant and her tenant have not had to arrange such repairs in the previous 10 years
because no new cracks appeared until January 2019. The panel notes the complainant has
provided much information relating to maintenance works and repairs arranged at the insured
property over these years.
The complainant has also provided a property condition report dated 24 August 2011. The
panel notes this report shows that the walls and ceilings were recorded as being in good
condition. There is no evidence of there being any cracking damage and this report is a year
later to 2010, which the year LE and the insurer refer to in support of their position the
damage predates policy inception.
The panel notes LE and the insurer are prepared to accept and highlight t he fact the tenant
and complainant say they have not had to complete any repairs to the walls and ceilings at
the insured property, with the last time internal painting took place was 2010. However, LE
and the insurer then seem to ignore and not accept the tenant and complainant advising there
was no cracking damage to the property until after the insured event at the end of 2018.
The available information shows the tenant will have occupied the insured property since
around 2011-2012 and has not in this time raised concerns regarding movement damage to
the insured building until January 2019. Other requests for maintenance had been made and
arranged by the complainant. The panel also notes, it is an interesting coincidence that a
home which has stood on this reactive foundation clay site for 60 years, only presented with
such significant movement damage after a burst water pipe event and not any time prior.
The panel accepts it would not be fair to require the insurer to cover all the cost of repairs for
the cracking damage to the various areas around the insured building. This is because LE‟s
persuasive information shows there are a few contributing factors for the damage. This
information supports the major contributing factor (50%) for the damage as the burst pipe
event (50%).
The panel determines it is fair in the circumstances, that the insurer be required to cover and
contribute 50% of the repair costs under the complainant‟s claim.
Insurer not required to cover the damage to the roof
The complainant suggests that the condition of the roof and roof structure has arisen out of
the escape of liquid insured event.
Consultants‟ TB provided a report dated 18 May 2021 after having inspected the insured
home‟s roof. TB noted some minor water i ngress issues into the roof structure from above
(tiles) but says this is not the cause for the damage to the roof structure. TB recommended a
suitably qualified consultant be appointed to determine the cause for the roof sagging.
Determination | Case number: 816704 Page 8 of 14
HN, engineering consultants, attended the insured property on 25 May 2021 to inspect the
roof and provide a report dated 2 June 2021. HN found the cause for the roof damage was
inadequate construction method. HN noted the central ridge beam has not been provided with
the required fish plate, causing it to become overstressed and fail over time. HN says the
sagging is not due to foundation movement rather it the splitting observed to the central ridge
beam which is typical of problems that occur because of inadequate construction.
Given the policy does not cover inadequate construction and in the absence of evidence to
the contrary, the panel is satisfied the condition of the roof structure has not been caused by
any insured event including the burst pipe event and associated ground movement.
Accordingly, the panel determines the insurer is not required to cover or contribute towards
the cost to repair the roof under the claim.
Section 46 of the Act has no application in the circumstances
The parties have raised section 46 of the Insurance Contracts Act 1984 (Act), and whether
this is enlivened in the circumstances.
Under section 46, an insurer cannot rely on a policy exclusion which applies by reference to a
defect in an item, if at the time the policy was entered into:
the insured person was not aware of the defect, and
a reasonable person in their circumstances could not be expected to have been aware of
the defect.
Section 46 prevents an insurer from relying on an exclusion clause that refers to the condition
of a thing before the contract was entered into, if the complainant (or a reasonable person)
was not aware of the defect or condition which wholly or partly caused the damage claimed
for.
However, Section 46 of the Act does not apply to an exclusion of an event which makes no
reference to when the event occurs. Only exclusions which refer to a condition existing before
entry into the contract of insurance, are affected by Section 46.
In this complaint the insurer says a valid claim does not exist because the damage claimed is
not caused by an insured event. Also, the exclusion provisions referred to by the insurer apply
generally and are not temporal in nature. The exclusion clauses are not directed to defects
which pre-existed the commencement of the policy.
Accordingly, the panel is satisfied that section 46 does not assist the complainant in these
circumstances.
The insurer is to settle the claim in line with this determination
The panel notes the complainant has provided two quotes for repairs, the first from MS with
an estimated cost of repairs of $86,745 to $106,000 (10 January 2019), and the second from
consultants „LC‟ dated 24 November 2021 in the amount of $247,350.
The panel is not satisfied that either of these quotes are sufficiently detailed as to the scope
of works, costing and on balance they include repairs to areas such as the roof, which are not
covered under the policy.
Further, given the delays caused in bringing this claim to conclusion, it is fair to accept the
damage to the insured building will have increased and due to the impact of COVID-19, the
cost of materials and labour have also increased. As such, the panel is of the opinion, it is fair
to the parties, that a new, current and actionable quote be relied on to settle the claim.
Determination | Case number: 816704 Page 9 of 14
The panel determines that within 14 days of the complainant accepting this determination, the
insurer is to:
arrange for a suitably qualified independent consultant to attend the insured property and
provide a scope of works and actionable quote for repairs limited to the damage caused by
the burst pipe event and associated works needed to repair such damage
within seven days of receiving the above quote, arrange payment of 50% of the quote to
the complainant. This payment is to in be increased by a further 15% to allow for
contingencies
subject to being provided with reasonable information, reimburse the complainant for
expenses she has incurred in arranging expert reports in support of her position under the
claim (up to a maximum of $5,000).
Why is the outcome fair?
The outcome is fair in the circumstances because the information provided supports the
insured event (burst water pipe) has resulted in significant damage to the insured building.
Further, that the extent of this damage is not comparable to what would reasonably be
expected to occur because of normal seasonal foundational movement.
Therefore, it is fair that the insurer be required to cover the complainant for the damage which
has been found to be consistent with the insured event whilst allowing the insurer to limit its
liability under the claim and exclude cover for damage shown not be caused by the insured
event, which is also fair in the circumstances.
Determination | Case number: 816704 Page 10 of 14
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance sector.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy sections
Section
Exclusions to your cover You are not covered under any section of t hi s policy for
damage, loss, cost or legal liability that is caused by, arise s
from or involve s :
Determination | Case number: 816704 Page 11 of 14
Failing to take care
your failure to:
take reasonable care of your property or unit and contents;
take reasonable precautions to prevent loss, damage or legal
liability;
keep your property or unit and any contents well maintained and in
good condition. For the meaning of „well maint ained and in good
condition‟ see the „Glossary of important words and phrases‟
section on page 12;
fix faults and defects as soon as you become aware of them.
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide,
collapse, shrinkage or any other earth movement ….
Wear, tear, mould, gradual deterioration and other conditions
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot,
action of light, atmospheric or climatic conditions or gradual
deterioration such as, but not limited to:
> tiles and their adhesive or grouting breaking down;
> weat hering of roof tiles o r roof ridge capping;
> gradual weathering and breakdown of bricks, mortar or concrete.
3.3 Supporting information
Document Key points
Insurer’s building report
(AG )
17.01. 2019
t here is cracking to multiple locations throughout property, some
cracking to the external render which has been patched
t he Insured has had a burst pipe loc ated at the rear of the property
which has since been replaced with t he mains pressure test
passing
i nspected the sewer which the Insured advised was replaced 10
years ago, it was f ound to be PVC and sound
t he vanity waste connection to the main line is too short and
allows some of the wate r to terminate under the house
t he storm water was inspected and found to have breaks
throughout the earthenware with poor vision in parts. The pipe
running along the shed has completely collapsed.
Determination | Case number: 816704 Page 12 of 14
Document Key points
Insurer’s plumbing leak
detection report
(BA )
24.01. 2019
t here is cracking to multiple locations throughout property, some
cracking to the external render which has been patched.
there has been a burst pipe located at the rear of the property
which has since been replaced with the mains pressure test
passing.
i nspected the sewer which the i nsured advised was replaced 10
years ago, it was found to be PVC and sound.
t he vanity waste connection to the main line is too short and
allows some of the water to terminate under the house.
t he storm water was inspected a nd found to have breaks
throughout the earthenware with poor vision in parts. The pipe
running along the shed has completely collapsed
Insurer’s engineer ’s report
( LE)
15 - 03 - 2019
the results of the soil test confirm that the soil type is classified as
extremely reactive
based on the findings of the site investigation and subs equent
laboratory testing, the predicted surface movement for this site is
between 60 - 75mm
e vidence of previous repairs and patching to cracks is also further
testament to the react ive nature of the soils in the area and
movement over the long term
c racking and movement to the entire dwelling can be attributed to
the combined effects of nat ural seasonal movement (25% ),
incorrect discha rging of water from vanity waste connection
(25% ) , and the escape of liquid from the water supply and
stormwat er pipework (50%)
the leaks have contributed to localised soil saturation and
exacerbated the damage to the dwelling
movement and damage of the dwelling has been occurring for an
extended period of time since prior to 2010 (when the interior of
the dwelling was last painted)
recommended that plumbing defects be rectified
Complainants quote from
repairer (RP)
26 - 03 - 2019
RP commenced earth moving works which included concrete
cutting in order to gain access to a broken terracotta main.
All cracked terracotta pipework leading to the barrel drain at the
rear of the property were replac ed
Determination | Case number: 816704 Page 13 of 14
Document Key points
Complainant ’s engineer
report ( SM )
14 - 09 - 2021
In accordance with AS 2870 - 2011, the site is classified as a class
P , problem site.
In accordance with AS 2870 - 2011, this site is classified as class
H 2, highly reactive clay site which may experience very high
ground movement from moi sture change s.
The site may be subject to moisture changes due to site
conditions more severe than normal site conditions due to:
> Presence of trees on the building site or adjacent site.
> Failure to provide adequate site drainage.
> Failure to detail or construct drainage in accordance with
AS2870 - 2011.
> The effect of trees too close to a footing.
The underlying geology was found to be very highly reactive.
The clay in this geological region will expand by up to 40% of its
volume when in contact with water. While expanding the clay
continues to have high bearing capacity and can lift footi ngs and
buildings, in a phenomenon referred to as “heave”. At moisture
content levels above 50% the soil will lose bearing capacity, and
footing subsidence can occur.
the probable cause of the damage to the existing structure is as
follows;
> plumbing leak.
> footings that are not suitable to the underlying geological region
Insurer’s p lumber ’ s report
(TB )
18 - 05 - 2021
large cracks to the ceiling in the kitchen, cracks to bedroom walls
and cracks to the archway into the living room were pointed out.
uneven floors were observed
water ingress into the ceiling cavity was identified with a ceiling
inspection
the leaks were small drops and not consistent with the extent of
the damages
the roof line has sagged which has caused the tiles to move.
the sagging roof line is more consistent with movement rather
than roof leak issues
the leaks identified during inspection are not the cause of the
damaged areas
the areas of damage are more consistent with building movement
however a suitable person will need to inspect a nd confirm.
Determination | Case number: 816704 Page 14 of 14
Document Key points
Insurer’s builder’ s report
(B A )
20 - 05 - 2021
the movement and damage to the dwelling can be attributed to the
combined effects of natural seasonal expansion and contraction of
highly reactive clay founding soils (25%) incorrect discharging of
water from vanity waste connection (25% ) and escape of liquid
from the water supply and Stormwater pipework (50% ).
b ased on the evidence of several of the cracks having been
painted previously, we can confirm that the movement and
damage of the dwelling ha ve been occurring for an extended
period of time since prior to 2010 (when the interior of the dwelling
was last painted).
Insurer’s engineer’s report
(HN )
02 - 06 - 2021
a site inspection was carried out at the above property to
determine if the sag of the roofline is the result of movement of the
foundation material
the sag of the roofline is the res ult of the splitting of the central
ridge beam . In our opinion, the splitting of the central ridge beam
is typical of problems that can occur because of inadequate
construction
the joint in the central ridge beam had not been provided the
required fishplate. In our opinion, this inadequate
construction/design has resulted in the timber ridge beam
becoming overstressed and fa iling over time
the sag of the roof line is the result of splitting of the central ridge
beam due to inadequate construction, and not the result of
foundation movement.
C o mplainant’s engineer
report (SD )
11 - 01 - 2022
the damage to the external brick veneer rendered walls, the
damage to t he int ernal wall and ceiling plaster and the damage to
the roof structure was caused by the significant water leak from
the burst pipe located under the bathroom.
the extent of the damage to the building is consistent with a major
floor event in the subfl oor area.
an excessive amount of water had accumulated beneath the floor
of the residence, resulting in abnormal moisture conditions in the
founding soils that support both the outer strip footings and the
stumps
Complainant’s engineer’s
report ( SD )
28 - 02 - 2022
there is no evidence of abnormal moisture conditions at the time
of the ins pection by SM
if flooding event were to occur beneath the home, the effects
would be considerable given the nature of the soil.
the footings supporting the existing building comply to the
standards which were relevant at the time of construction.
SDC was already in possession of the report by Structural
Melbourne and was not disputing the floor levels as stated in their
report.