Home / AIG Australia Limited / Determination 816449

Determination 816449

Insurer's assessment of hail storm claim liability and final settlement amount

FirmAIG Australia Limited
Decided2022-08-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$304,931
SourceAFCA PDF

Summary

The complainants disputed the insurer's assessment of hail storm damage to their home and contents and rejected its final settlement offer of $274,931.11. AFCA decided the insurer's assessment and final offer were fair and that no further compensation for non-financial loss was payable.

The insured must prove on the balance of probabilities that the claimed loss falls within the policy, and the insurer is not liable for damage not caused by the hail event or for damage arising from the insured's failure to complete authorised roof works.

Issues

Subjects and remedies

elderly or capacityhealth or medicalhome or building damagenatural disasterno remedy

Related

All AIG Australia Limited determinations · Find similar determinations

Text of the determination

Determination Case number 816449 Financial firm AIG Australia Limited Case number: 816449 8 August 2022 1 Determination overview 1.1 Complaint The complainants hold a home building and contents insurance policy (policy) with the financial firm (insurer). A claim was lodged for significant damage caused to the insured property by a hail storm event on or about 19 January 2020. The insurer has accepted the claim. However, the complainants remain dissatisfied with the insurer‟s assessment of its liability under the claim . The complainants have rejected the insurer‟s final claim settlement offer of $274,931.11. The insurer has already issued two cash settlement payments ($99,004.05 and $188,514.55) under the claim. The complainants put forward a counter offer of $304,931.11 on 18 January 2022. The complainants are also dissatisfied with the insurer ‟ s handling of the claim. 1.2 Issues and key findings Is the insurer entitled to limit its liability under the claim? Yes. The insurer ‟ s final cash settlement offer is fair in the circumstances. The available information does not establish all the damage claimed is due to the hail event. Rather, there is damage which existed before the storm or relates to a failure to complete repairs by the complainants, which is not covered under the policy. Are the complainants entitled to further compensation for non-financial loss? No. The insurer‟s overall management o f the claim has been reasonable with genuine efforts made to bring the claim to conclusion. There have occurred delays over the life of the claim, however, both parties have contributed to the delays as well as circumstances outside their control. The insu rer‟s offer to pay $1,500 in compensation (included within its final settlement offer of $274,931.11) for non-financial loss is reasonable in the circumstances. Why is the outcome fair? The decision is fair because the available information shows, on balance, the insurer‟s assessment of the extent of damage and required scope of works to repair the hail storm damage is fair in the circumstances. Not all the damage claimed has been shown to be due to the hail event . The insurer‟s offer of compensation for non -financial loss is fair for its contribution to the delays experienced under the claim. 1.3 Determination This Determination is in favour of the insurer. The insurer is not required to increase its final claim settlement offer to be paid to the complainants under the claim. The insurer is not required to increase its offer to pay the complainants non-financial loss compensation under the claim. Determination | Case number: 816449 Page 2 of 9 2 Reasons for determination Due to the nature of and complexities involved in this complaint, it has been referred to a panel for determination. The panel comprises an Ombudsman, a member with considerable industry experience and a member with significant experience as a consumer representative. This determination follows consideration of all the information exchanged and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and previous AFCA decisions where applicable. For the purposes of this determination, commentary is restricted to only those issues considered relevant. 2.1 Is the insurer entitled to limit its liability under the claim? Yes. The insurer ‟ s proposed final cash settlement is fair in all the circumstances. The available information shows that not all the damage was caused by the claimed event. The panel is satisfied the insurer is entitled to rely on the terms and conditions of the policy to limit its liability under the claim. The policy is an accidental damage contract of insurance The policy covers the insured property against accidental loss or damage to the insured building and contents. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The insurer provided the complainants with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, the panel accepts the insurer is entitled to rely on the policy provisions to assess its liability under the claim. Complainants have initial onus to establish claim falls within terms of policy It is established insurance law that an insured has the initial onus to prove, on the balance of probabilities (that is more likely than not), the loss or damage claimed falls within the terms of the policy. This is commonly called a prima facie claim. The parties accept a significant storm/hail event has damaged the insured propert y, resulting in the complainants lodging the claim. The insurer accepts the complainants have a valid claim for storm damage to the insured property. However, the insurer says not all the damage claimed is covered under the policy. Complainants have decli ned the insurer’s claim settlement offer s The insurer does not dispute the insured property (building and contents) has suffered damage because of the storm/hail event in January 2020. The insurer has paid the complainants the below amounts under the claim: Payment issued on 24 July 2020 in the amount of $99,004.05 for:  $5,097.73 repairs to pergola and alfresco  $7,994.50 make safe works to pergola and alfresco  $4,086.50 tarpaulin expenses  $5,000.00 insulation replacement  $76,825.32 roof replacement. Determination | Case number: 816449 Page 3 of 9 After further negotiations and assessments over around 12 months, the insurer made a further payment to the complainants in the amount of $188,514.44. On 14 July 2021, the insurer made an offer of a further payment of $218,059.57 to the complainant, which included: Building  $125,810.32 balance of building repairs  $12,749.00 make safe tarpaulin expenses up to 31 October 2020  $12,749.00 further contingency allowance for insured health issues (Dec 2020) Contents and Temporary Accommodation  50% of amount claimed for 12 months rental which is equivalent ($27,891.05) to 12 weeks in furnished Airbnb  $5,940 furniture packing and storing (contents do not need to go off site)  $5,000 contingency allowance  $7,920 for remaining contents items (not including table) The insurer has based its liability under the claim on two actionable quotes for repairs accepted under the claim from consultants „J‟ and „M‟ . These quotes are in the amounts of $133,834.04 and $158,505.74. The complainants rejected this offer. On 13 October 2021, the insurer through its internal dispute resolution review, increased the final claim settlement offer to $235,431.11 including $1,500 in compensation for non-financial loss. This offer was made in the effort to achieve a resolution. The complainants declined the offer and put forward a list of damaged areas/items they believe the insurer was liable for in addition to the previous cash settlement offers it had made, these being:  furniture to send to Italy for repairs  lease house expenses  repairs in the kitchen  repairs in the master bedroom  repairs in the study  pergola tiles  laser lite for the alfresco and pergola  electrical works  plastering and painting works  curtains  windows. Having reviewed the complainants‟ response, the insurer maintained the position that its assessment of the damage to be covered under the claim was reasonable. Further, that the complainants had not provided compelling information in support of the expectations of a higher settlement. However, in a final attempt to resolve this matter, on 21 December 2021, the insurer offered to increase its final claim settlement by a further $39,500 to a total of $274,931.11. This is said to include $10,000 for repairs to the Italian furniture, $12,000 towards electrical works and $17,5 00 towards repairs to brickworks. This is despite the insurer‟s view that these amounts are not justified, however, the offer is made in the interest of reaching a resolution. The complainants have rejected the offer and put forward a counter offer of $304,941.11 as an amount they would accept as full and final settlement of their claim. Determination | Case number: 816449 Page 4 of 9 The insurer’s assessment of its liability is reasonable The panel has considered all the information provided by the parties as well as the entitlements, obligations and limitations under the policy. The various concerns raised by the complainants regarding the insurer‟s assessment of its liability under the cl aim have been considered under the below sub-headings: CONTENTS COVER Storage and temporary accommodation The complainants are seeking temporary accommodation costs for 12 months as well as cover for packing up the house and relocating all contents to a temporary residence or storage. The panel notes the complainants have from the outset of the claim expressed concerns about the removal and storage of their contents. The insurer‟s building experts M and J have confirmed that the property would only be uninhabitable for a period estimated at four to six weeks. The consultants have made allowances for this in their scopes of work and quotes. The insurer has offered to cover 12 weeks temporary accommodation (or $27,891.05). The panel is not satisfied the complainants have provided persuasive information in support of their opinion that all contents need to be relocated or that 12 months of temporary accommodation is warranted. Rather, on balance, the panel accepts the insurer‟s off er covering 12 weeks temporary accommodation and allowance for contents to be moved around within the home, is fair and reasonable in the circumstances. Italian Furniture The complainants say the Italian furniture items cannot be repaired in Australia and will need to be sent to Italy for repairs. There is reference to the costs associated with this being around $30,680.16 as the items must be freighted to Italy. The panel notes the insurer‟s appointed consultants had initially said the repairs to this ty pe of furniture cannot be achieved in Australia. However, the insurer has since located a specialist in Australia „TM‟, that has provided a quote to repair the furniture for $10,000. The panel notes this quote is based on a desktop assessment as the complainants have not allowed TM access to the furniture. The insurer says allowing TM to repair the furniture is the more cost-effective option as well as can be achieved in more timely manner. The panel acknowledges the complainants‟ lack of confidence in this option. However, the complainants have not provided any compelling information to show TM cannot complete the repairs. Without persuasive information to the contrary, the panel is of the opinion it would be unfair to require the insurer to cover the higher expense of sending the furniture to Italy. This is especially since the complainants have failed to allow TM to complete a physical assessment of the furniture. Therefore, the panel is satisfied the insurer‟s allowance of $10,000 in its final claim settlement offer for this damage is reasonable in the circumstances. Curtains The complainants are seeking payment of $35,372.66 for the cost to replace all the silk curtains at the insured property. The insurer has offered to pay the complainants $17,940.78 to replace the water damaged curtains. The insurer accepts all the curtains match, however, Determination | Case number: 816449 Page 5 of 9 says it is not required under the policy to cover undamaged items to ensure a uniform appearance. The insurer relies on the information from consultants „ R ‟ and „ A ‟ in this regard. The complainants do not accept R‟s quote on the curtains and say the new c urtains will not match the undamaged curtains, so they want all curtains replaced for uniformity. The panel has reviewed the policy and notes it limits cover to damaged items and does not extend to cover undamaged items to achieve a uniform appearance. In relation to the curtains, the panel is satisfied with the insurer‟s response and amount offered towards the cost to replace the damaged curtains ($17,940.78) fulfils its obligations under the policy. BUILDING COVER Additional damage due to not getting roof replacement within reasonable timeframe The panel notes the insurer cash settled the complainants for the cost of a roof replacement in July 2020. The insurer has repeatedly advised it will not be accepting liability for any additional damage to the home due to a failure by the complainants to authorise the roof replacement. This includes any ongoing tarpaulin hire expenses. The insurer says any further damage and the associated expenses arise from the complainants‟ failure to complete the works. The panel acknowledges the complainants have also repeatedly advised that they would not be authorising the works until such time they were able to relocate given the nature of the works and health of elderly parent living with them. There is no dispute there have been instances of further water ingress and associated damage over the two years the roof has remained under a tarpaulin. The panel finds the information from the insurer to be more persuasive and reasonable. The panel accepts it fulfilled its obligation under the policy regarding the damage to the roof by paying the complainants (complainants‟ own preference) for the cost of a roof replacement. It was the complainants‟ obligation to then arrange for the works to completed in a timely fashion and to mitigate any further loss or damage. The complainants have failed to fulfil this obligation over an extended period of time. The panel accepts the insurer‟s position that it is not liable for the additional damage or ongoing tarpaulin hire costs. These expenses rest with the complainants and arise from their decision not to arrange the required repairs within a reasonable timeframe, despite receiving a cash settlement for the works at their preference. Repairs SOW in master bedroom, kitchen, study The complainant s have disputed the insurer‟s assessment of its liability with respect to the SOW in the master bedroom, kitchen and study. They say the insurer‟s consultants have not allowed for works such as dismantling/removal of cupboards, shelves and carpeting in the areas where walls and ceilings are to be repaired. The insurer maintains that these works are not necessary to complete the repairs to the damaged areas within these rooms. The insurer notes that the SOW accepted under the claim allow for re-painting of cabinets or covering of the carpet, but there is no need for these items to be removed to allow for the damage to be repaired. The panel notes, in addition to the above, there is also the aspect of some additional water ingress damage for which it is satisfied the insurer is not liable in the circumstances (relating to failure to replace the roof). Further, the panel is not satisfied the complainants have shown, Determination | Case number: 816449 Page 6 of 9 on balance, that there is a requirement to dismantle and/or remove cabinets and carpets to complete the repairs authorised under the claim. The panel notes, for the most part, claimed repair costs or opinions provided about repairs are provided on the complainants‟ company letterhead. There is no information to show this company is qualified or licenced to complete building repairs. Without persuasive information to the contrary, the panel accepts it is reasonable for the insurer to rely on the suitably qualified and licenced building consultants to assess its liability in this respect. Accordingly, the panel is not satisfied it has been shown that the insurer is required to increase its cash settlement offer relating to the building damage repairs in the above noted areas of the home. Laser lite for pergola alfresco The complainants are seeking $4,725.00 towards the cost of installing laser lite roof panelling to the alfresco and pergola which were damaged in the storm. The insurer says its assessment of this damage and associated allowance for cover in line with J‟s quote fulfils its obligations under the policy. The available information shows the insurer has allowed for $5,586.55 in settlement offer towards this damage. This includes the amounts $3,811.25, $242.00, $272.25, $90.75 plus GST and a 15% uplift for contingencies. The panel is satisfied this offer exceeds the amount sought by the complainants and fulfils the insurer‟s obligations under the claim . Electrical works The complainants say the offer they have received from the insurer is not sufficient to cover all the electrical works needed. The complainants have provided a quote for electrical works including rewiring all switches, smoke detectors, exhaust fans, heaters, outdoor lights and AC units at $16,170.00. The panel notes this quote, similar to other quotes, is on the complainants‟ company letterhead, with no information showing this company is li censed to complete these works. They have not provided any evidence of a licenced electrician having assessed and quoted these works. The insurer says its consultants note all items as requiring “Inspect, test and approve for use” before they can be approved and certified as fit for purpose by suitably qualified professionals. The insurer says no such testing has been completed by the complainants and/or it has not been provided with any such information from the complainants. The insurer had allowed $544.50 under its SOW for this testing. However, in an effort to bring this to a resolution, the insurer has allowed $12,000 for the electrical works in its latest claim settlement offer. The panel is not satisfied, in the absence of persuasive qualified information, that the complainants have shown there exists a need to rewire all switches, smoke detectors, exhaust fans, heaters, outdoor lights and AC units at $16,170.00. The panel accepts the insurer‟s offer of $12,000 in an effort to resolve this aspect of the complaint is reasonable in the circumstances. Brickwork The complainants are seeking $17,500 for damage to brickworks from hail impact. The insurer, despite having quotes for $15,500, accepted and has included in its final claim settlement offer payment of $17,500 towards damage to the brickwork. Determination | Case number: 816449 Page 7 of 9 Given the above, the panel is sati sfied the insurer‟s settlement offer for the damaged brickwork is fair and fulfils its policy obligations. Windows The complainants‟ information refers to two different amounts, $16,350.00 and $17,016.51, as what they are expecting as settlement under the claim for damage to windows. The insurer says not all the damage to the windows is consistent with hail damage. Rather, much of the damage is clearly due to wood rot, wear and tear which is not covered under the policy. The panel has reviewed the available information, in particular photos provided by the consultants, and accepts these show evidence of damage consistent with long term wood rot, wear and tear to the window frames. The panel accepts there is some, although, limited damage to the windows due to hail impact. Without persuasive information to the contrary, the panel accepts the insurer‟s assessment of its liability in this regard as well as the proposed method of repair to the limited hail damage to the windows. The panel determines the insurer is not required to increase its cash settlement offer towards the damage to the windows in the circumstances. Plastering and painting The complainants are seeking $8,579.41 towards further plastering and painting expenses. However, the complainants have not provided any explanation as to how and why they are seeking this additional amount towards plastering and painting. The insurer notes that J‟s SOW includes provision for plastering in the amount $9,050.80 and which forms part of the settlement offer. Also, that there is an allowance for painting at $11,311.08, which also forms part of its settlement offer put to the complainants. The insurer says if these additional amounts towards plastering and painting related to possible additional water ingress damage due to the roof not being replaced, it is not liable for these costs. Without information showing how or why the complainants may be entitled to the claimed $8,579.41, the panel is of the view it would not be fair to require the insurer to cover this. Therefore, the panel is satisfied the insurer‟s assessment of its liability and associated claim settlement offer for plastering and painting works is reasonable. Other matters The panel notes reference to concerns regarding mould and cover for the pergola tiles. Having reviewed the available information, the panel is satisfied that not all the pergola tiles were damaged. Therefore, similar to matters considered above, there is no obligation under the insurer to increase its liability under the policy to include cover for undamaged pergola tiles under the claim. With respect to mould, the panel notes the insure r arranged for consultants „E‟ to inspect the insured property and report was provided in December 2020. This report confirms there was no evidence of or risk of mould contamination within the walls and ceiling cavities. E identified: “ both sections, whilst showing some water staining had no visible mould growth; it can be concluded that mould unlikely exists in the ceiling cavity of the property relating to the claimed event. :” Determination | Case number: 816449 Page 8 of 9 Insurer is entitled to settle the claim in the manner proposed Given the mat ters considered above, the panel is satisfied the insurer‟s assessment of its liability under the claim is fair and consistent with its policy obligations. Further, that the information shows the insurer has made all reasonable efforts to try and bring this matter to conclusion. The panel determines the insurer‟s final claim settlement offer in the amount of $274,931.11 has been shown to be fair and consistent with the policy provisions. The insurer is not required to increase this final claim settlement in the circumstances. 2.2 Are the complainants entitled to compensation for non- financial loss? No, the insurer ‟s overall management of the claim and attempts to bring finality to the matter have been reasonable. There is evidence of delays having been experienced under the claim. However, most of these delays were not the responsibility of the insurer and/or were due to circumstances outside the control of both parties. Compensation for non-financial loss not payable The AFCA Rules (Rule D 3.3) allow for an award of up to $5,000 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. The available information shows that there have been delays experienced under the claim. However, the panel is satisfied not all delays were the fault of the insurer. There were delays in assessing the property due to the unavailability of the complainants, issues with organising re- attendance of the insurer‟s trades/service for similar reasons, complainants being unavailable due to personal/health reasons as well as the impact of COVID-19 on the industry. The available information shows the insurer made reasonable efforts to bring finality to the complainants‟ claim without success. This is not to say the insurer is has not contributed to some of the delays in the claims progress. The insurer acknowledges this and has offered to pay the complainants $1,500 in compensation for non-financial loss as a component of its final cash settlement offer of $274,931.11.. The panel is satisfied, having considered all the information, that the i nsurer‟s offer to pay $1,500 in compensation for non-financial loss is reasonable in the circumstances. Why is the outcome fair? The decision is fair because , on balance, the insurer‟s assessment of the extent of damage and required scope of works to repair the hail damage is fair in the circumstances. Not all the damage claimed has been shown to be due to the hail event. The insurer‟s offer of compensation for non-financial loss is fair for its contribution to the delays experienced under the claim. Determination | Case number: 816449 Page 9 of 9 3 Supporting information 3.1 The AFCA processes AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.