Home / Suncorp Group / Determination 816433
Determination 816433
Water damage to home after repairs by insurer's builder; insurer liability and delay
Summary
The complainant said faulty 2016 repair works by the insurer's builder caused ongoing water damage to her home, and sought repairs and compensation. AFCA found the insurer liable, ordered repair of the downstairs ceilings, a cash settlement for balcony sealing, and $2,500 for non-financial loss.
The independent assessor's report attributed the water entry to lack of flashing or sealant installed during the insurer's builder's 2016 repairs, which was the dominant cause, and the insurer's delay and slow document provision warranted non-financial loss compensation.
Issues
- Claim denial primary · upheld
“The insurer is liable for the water damage and repairs to the house; insurer declined rectification relying on ground movement and maintenance.”
- Delay secondary · upheld
“it should have acted more quickly to address the concerns; slow to engage an independent expert until October 2021.”
- Poor communication secondary · upheld
“The insurer did not respond promptly to the complainant's request for documents; documents provided 16 July 2021.”
- Repairs or contractors secondary · upheld
“the cause of the damage was BB's works, which included removing and replacing the wall.”
Subjects and remedies
financial hardshiphealth or medicalhome or building damagenatural disasterpay compensationpay non financial lossreassess claimrepair or rectify
Text of the determination
Determination
Case number 816433
Financial firm AAI Limited
Determination | Case number: 816433 Page 1 of 7
Case number: 816433 1 August 2022
1 Determination overview
1.1 Complaint
The complainant had home building insurance cover issued by the financial firm (insurer). In
March 2016 a tree fell on the house during a storm, causing damage. The insurer accepted
the claim and engaged a builder to undertake the repair works. In October 2020 the
complainant contacted the insurer about water damage to the house, and says it was caused
by faulty works by the insurer’s builder in 2016. The insurer says it is not liable for the water
damage as it was caused by ground movement and lack of maintenance to the house. The
complainant wants the insurer to repair the damage and pay compensation due to the length
of time the damage has been unresolved and the stress and inconvenience this has caused.
1.2 Issues and key findings
Is the insurer liable for the water damage and repairs to the house?
Yes. The insurer is liable for the water damage and repairs to the house.
Is the insurer liable for non-financial loss?
Yes. The insurer has caused stress and inconvenience to the complainant, and must pay her
$2,500 for non-financial loss.
Why is the outcome fair?
The outcome is fair in all the circumstances because:
the insurer should repair the damage to the house as the independent report says that the
damage was caused by the insurer’s builder’s repair works
even if there was ground movement or maintenance issues, the proximate cause of the
damage was the insurer’s previous repair work
the insurer should undertake the repairs to the downstairs ceilings, rather than cash settle
the claim as it would be more difficult for the complainant to arrange the repairs
the insurer should cash settle the works to the balcony as there is some pre-existing
damage and it would not be fair to require the insurer to repair this.
As the insurer has delayed in addressing the issue caused by its builder, and in providing
requested information to the complainant, it should pay the complainant compensation for
non-financial loss.
1.3 Determination
This determination is in favour of the complainant. If the complainant accepts the
determination the insurer must:
Carry out the repairs to the two downstairs plasterboard ceilings, including electrical works
Cash settle the complainant for the cost of sealing the wall on the balcony level as set out
in section 2.1, and
Pay $2,500 for non-financial loss.
Determination | Case number: 816433 Page 2 of 7
Determination | Case number: 816433 Page 3 of 7
2 Reasons for determination
2.1 Is the insurer liable for the water damage and repairs to the
house?
Yes. The insurer is liable for the water damage and repairs to the house.
Insurer repaired damage after storm in 2016
After a tree fell on the house during a storm in 2016 the insurer accepted the claim and
completed repairs using a builder, BB. Works were carried out to fix the house roof, asbestos
cement sheet external wall cladding, timber balcony balustrade, metal weatherboard external
wall cladding, wall frame, fascia beam, posts, front door and leadlight and window glass. The
complainant contacted the insurer to complain that the replaced balcony balustrade leaching
sap later in 2016. BB inspected and repaired this damage.
Complainant raised concerns about the repairs
In 2018 the complainant raised further concerns with the insurer about a repaired window and
sliding door not working correctly. Again BB attended to inspect the identified concerns. BB
noted that the overall condition of the house was “poor with minimal maintenance and upkeep
carried out”. BB found issues with the sliding door that it had installed, including that it was
out of alignment, could not be closed, the glass had come away from the rubber, and an entry
door next to the sliding door was jamming. BB advised that it had correctly installed all the
items in 2016. BB also identified that the floor of the lounge room and balcony were slanting
down to the front of the house. This was visually identified, and estimated by BB to be about
10mm on one side and 18mm on the other side of the house.
An engineer’s report (by FM ) had been obtained in September 2016. This said that sinking of
the house was caused by “long term ongoing differential founding soil movements and the
general nature of construction of this style house”. BB referred to this report, and said that :
… as the house seems to be moving in the centre of the lounge sliding door area,
we do not believe the concerns to be warranty related, minor fix works were
carried out to the door so that it is usable, we however recommend the insured
engaged a local professional to provide advice and remediation recommendations
to assist with the movement of the house.
Complainant complained about water damage to the house
In October 2020 the complainant contacted the insurer to complain about water damage to,
and partial collapse of the plaster ceiling of the ground floor bedroom below the balcony. A
plumber was appointed to advise on the cause of the water entry, and in a report in
November 2020 the plumber identified that:
The balcony floor was not waterproofed and did not fall away from the house wall
They could not determine flashing beneath the windows or sliding doors of the balcony and
there was a visible gap of 10-15mm.
The insurer and BB said that the cause of the water damage was not the works carried out by
BB, but was due to ground movement causing the building to move over time, and lack of
maintenance, including lack of, or deterioration of, waterproofing on the balcony. The insurer
Determination | Case number: 816433 Page 4 of 7
said that there had been rainwater entry through gaps under the window and door on the
balcony. The insurer said the engineer FM had identified in 2016 that:
there had been differential footing movement and subsequent damage due to ongoing
long term variations in the moisture content and soil suction of reactive foundation soils,
and
the floor level survey results indicated a general pattern of relative settlement towards one
corner of the house.
Insurer appointed assessor in October 2021
The insurer appointed an assessor, JL, who was independent of the builder BB, to review the
cause and extent of the water damage. JL found that the damage to the house had been
caused by water entry from the balcony due to no flashing or sealant being installed, and this
had caused the downstairs ceiling to collapse. The report concluded:
Resultant damage
Upon inspection of the residence there was found to be damages sustained to the
plasterboard ceilings due to previous trades not installing flashing or sealant.
Building or design faults (contributing to the damage)
There was found to be no building or design faults.
JL recommended a cash settlement in relation to the repairs needed to the balcony, as a
warranty would not be possible.
The insurer then undertook a review of whether the repairs in 2016 met the Australian
building standards at that time. The insurer concluded that the existing building, before the
damage occurred in 2016, was non-compliant with the building standard, and that the
installation of flashing was not the responsibility of the builder who made the repairs to the
house in 2016. The insurer said that even if the flashing had been installed, due to the extent
of settlement of the building, the water would still have entered the house. They concluded
that the builder had installed a balcony door onto a non-compliant balcony floor surface
without the required alteration to prevent the passage of water into the house. Further, that
the balcony door could not be fixed without removing the whole balcony.
The insurer recommended declining the rectification and that a new claim could be lodged for
damage to the ground floor area.
Policy terms
The repairs that the insurer authorised, arranged and paid for in response to the 2016 storm
damage claim are covered by a lifetime guarantee under the policy:
When we repair or rebuild the building, we guarantee the quality of materials and
workmanship of that work for the lifetime of the building.
Determination | Case number: 816433 Page 5 of 7
The cause of the damage is the lack of flashing on balcony door
The water damage to the downstairs ceiling is in dispute. Considering the various reports
available I give more weight to JL’s report . JL was engaged by the insurer to assess the
cause of the damage, independently of the previous reviews undertaken by the builder BB
who completed the initial repairs. JL’s report opined that the cause of the damage was lack of
flashing or sealant being installed by the previous builder, and that there were no building or
design faults. I do not consider it appropriate for the insurer to decline to fix the damage due
to earth movement, or non-compliant building works before the initial claim date. This is
because I consider that the dominant, efficient or operative cause of the ceiling damage is the
lack of flashing on the replaced balcony doors.
It is also apparent from the insurer’s report of 12 November 2021 that BB “installed an
aluminium sliding door frame onto a non-compliant balcony floor surface without the required
alteration to prevent the passage of surface water into the wall cavity below” (emphasis
added.
I acknowledge the complainant’s concerns that, in declining the claim, the insurer gives
weight to the opinion of the engineer FM about ground movement in 2016, without any expert
opinion about the actual effect of ground movement on the entry of water to the house. When
considering the insurer’s view against the view of JL which found that the water entry was due
to a “poorly sealed wall”, I give more weight to JL. This m eans that the cause of the damage
was BB’s works, which included removing and replacing the wall.
Insurer is to repair the ceilings and cash settle the balcony repairs
The insurer is to:
Carry out the repairs to the two downstairs plasterboard ceilings, including electrical works,
and
Cash settle the complainant for the cost of sealing the wall on the balcony level.
The insurer is to repair the damage to the two downstairs ceilings as the independent report
says that the damage was caused by the insurer’s builder’s repair works.
The insurer is also to:
Arrange for an actionable quote for the repair works to the balcony to seal the wall (an
actionable quote means that the author of the quote is willing and able to perform the work
for the quoted amount)
The actionable quote is to have added to it a contingency of 20% given the relatively
remote location of the house, to compensate for the disadvantages of a cash settlement.
A cash settlement for the balcony work is required for the following reasons:
The property has a mix of pre-existing damage noted on the JL report and inadequate
works carried out by BB. Therefore, it would be impractical for the insurer to carry out the
repairs without repairing the pre-existing damage
The insurer’s repairer would not be able to warrant the repairs because of the pre -existing
damage the insurer is not liable for.
The insurer’s repair work to the ceilings will be covered by a warranty . However, the insurer is
not necessarily liable for any future claims caused by any ground movement or maintenance
issues. The insurer may be able to limit any future liability due to exclusions in the policy for
liability caused by various factors, including ground movement and building defects
Determination | Case number: 816433 Page 6 of 7
2.2 Is the insurer liable for non-financial loss?
Compensation is awarded conservatively
Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial
loss where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their expectation of
enjoyment or peace of mind.
We take a conservative approach to compensation for non-financial loss. It is not awarded
when a person suffers the normal degree of inconvenience when a problem occurs.
The insurer is to pay compensation for non-financial loss
Since the insurer made repairs to the complainant’s house in 2016 after her initial claim, the
complainant has made numerous complaints about the quality of the repairs. While the
insurer has addressed these in different ways, it should have acted more quickly to address
the concerns. Repeatedly using the same builder which carried out the repairs to assess its
own workmanship was not a suitably independent approach to assessing the quality of the
repairs. The insurer was slow to engage an independent expert, and only did so in October
2021. The insurer also did not respond promptly to the complainant’s request for documents
in relation to the claim. The request was lodged with the insurer on 11 May 2021, again on 30
June 2021, and the documents were only provided to the complainant on 16 July 2021, after
the complainant lodged a complaint with AFCA.
I have also considered the complainant’s position. The complainant has been living in a
house that is in a damaged state due to the water damage, and experiences financial
hardship and health issues. I accept that these circumstances mean that it must have been
difficult for her to manage the ongoing claim and interactions with the insurer. I accept that
her dealings with the insurer over the years since the initial claim have caused her stress and
inconvenience. I also acknowledge that the insurer has commissioned reports to confirm the
cause of the damage and that there are other factors affecting the condition of the house. I
consider an award of $2,500 is appropriate in the circumstances.
2.3 Why is the outcome fair?
The outcome is fair in all the circumstances because:
the insurer should repair the damage to the house as the independent report says that the
damage was caused by the insurer’s builder’s repair works
even if there was ground movement or maintenance issues, the proximate cause of the
damage was the insurer’s previous repair work
the insurer should undertake the repairs to the downstairs ceilings, rather than cash settle
the claim as it would be more difficult for the complainant to arrange the repairs
the insurer should cash settle the works to the balcony as there is some pre-existing
damage and it would not be fair to require the insurer to repair this.
As the insurer has delayed in addressing the issue caused by its builder, and in providing
requested information to the complainant, it should pay the complainant compensation for
non-financial loss.
Determination | Case number: 816433 Page 7 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.