Summary
The complainant's landlord insurance claim for tenant damage and decontamination was accepted, but the insurer's repairs were incomplete and it made assessment errors. AFCA ordered the insurer to rectify the work, pay loss of rent, costs, expert report fees and non-financial loss.
The insurer made avoidable errors in assessing and repairing the property, so it must correct them outside the sum insured limit and compensate consequential loss.
Issues
- Repairs or contractors primary · upheld
“The insurer must rectify the repairs and not cash settle the claim; decontamination work was incomplete and experts' reports flawed.”
- Administrative error secondary · upheld
“The insurer failed to properly inventory items removed from the property, leading to missing fixtures.”
- Poor claim handling secondary · upheld
“The insurer made avoidable errors during the assessment and repair process leading to incomplete work and additional loss.”
- Delay secondary · upheld
“A claim process taking over 900 days; the length of the claim is excessive.”
Subjects and remedies
health or medicalhome or building damagepay compensationpay interestpay non financial lossprovide documentsrepair or rectify
Text of the determination
Determination
Case number 815885
Financial firm Terri Scheer Insurance Pty Ltd
Case number: 815885 21 March 2022
Determination | Case number: 815885 Page 2 of 8
1 Determination overview
1.1 Complaint
The complainant held a landlord insurance policy with the financial firm (insurer) and lodged a
claim on 4 July 2019 for rental arrears and repair work to her property.
The insurer accepted the claim, has repaired some of the damage, and offered to settle its
remaining liability with a cash payment up to the sum insured value of the policy.
The complainan t rejects the insurer’s position as she says the insurer has mishandled the
claim leading to extensive delay and poor-quality work by its trades. The complainant says
the insurer must repair the property to its pre-damage state and compensate her for the claim
experience and lost rental opportunity.
1.2 Issues and key findings
Is insurer’s proposed settlement fair ?
No. The Panel is of the view that this is not an appropriate matter to cash settle. The insurer
is to rectify the work already carried out. The insurer is also to pay for loss of rental.
The insurer is to undertake the requirements as set out in section 2 of this determination
Is complainant entitled to compensation for non-financial loss?
Yes. The insurer must compensate the complainant for avoidable non-financial loss.
Is complainant entitled to costs incurred?
Yes. The insurer must pay the complainant for reports and legal costs as set out in section 2.
Why is the outcome fair?
The outcome is fair in all the circumstances because the insurer made avoidable errors
during the assessment and repair process leading to incomplete work and additional loss to
the complainant.
The complainant is entitled to compensation for this, as well as non-financial loss
compensation.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is to undertake the requirements as set out in section 2 of this determination.
Determination | Case number: 815885 Page 3 of 8
2 Reasons for determination
2.1 Is the insurer’s proposed settlement fair ?
Policy covers insured events subject to exclusions
The insurance policy covering the property is an insured events policy. This means the
insurer covers the cost of repairs when one of the listed events causes damage to the
property, up to the limits in the policy. Relevant to this complaint, “ tenant damage ” is one of
the listed events.
There is no dispute the tenant has caused damage to the property. The insurer has accepted
there is a valid claim and begun repair work.
The dispute is over the insurer’s decision to pay out its remaining liability up to the sum
insured rather than complete the repairs. The complainant says this decision is not fair, nor
does it properly compensate her for her loss.
Insurer has settled the complainant to the policy limit
The loss the complainant is claiming from the insurer is:
decontamination work which has failed or was incomplete
items removed from the property during decontamination but then lost
damage to ceilings and paintwork in the property caused by the insurer’s trades
ongoing loss of rental opportunity stemming from the delay in settling the claim.
The panel notes some of these may fall into damage caused by the insured event, and some
are the result of errors made by the insurer. To determine which these are, the panel
reviewed what work the insurer performed, and whether any error was made when
completing that work.
The insurer has engaged trades to complete decontamination work and repair the damage to
the property. The insurer supplied repair quotes showing the amounts paid to those trad es, as
well as the value paid to the complainant as a cash settlement up to the policy sum insured.
The panel is not satisfied the complainant is entitled to a higher pay out because of the
insured event, being tenant damage. The policy is clear the limit it pays for damage caused
by this is the sum insured value of the policy.
The complainant has obtained quotes cheaper for the same work comparted with the
insurers, but this does not mean the insurer’s quotes are excessive. The panel notes the
information from the complainant has not shown the lower price was available to the insurer
at the time it proceeded with repair work. The insurer can rely on what it has paid when it
settles the insured event claim.
However, this does not fully resolve the complaint as a number of issues are not the result of
the insured event. They are the result of errors made by the insurer, which is not something
limited by the policy sum insured.
Complainant has shown remediation work is incomplete
The panel has not accepted the complainant’s assertion the insurer’s trade did not do any
decontamination work. The readings before and after the remedial work have shown a
substantial drop in the level of contamination. This said, it is clear the decontamination efforts
Determination | Case number: 815885 Page 4 of 8
have not brought all areas of the house below the levels recommended by government safety
guidelines.
The panel accepts the complainant’s experts have shown there i s still contamination
occurring inside the property after the work done by the insurer’s remediation experts .
Further, the latest response from the insurer’s experts and their offer to perform further
remedial work shows there is doubt the property is clear of contamination.
The panel notes both parties have made comments about the credibility of the other experts.
Ultimately, the information supplied shows there is no current mandate around licensing for
this kind of work. The only suggestion in the government guidelines is the experts hold
relevant qualifications.
Both parties have supplied their reasons for saying each is qualified. The panel accepts, on
balance, both parties ’ experts have relevant expertise and can be considered experts for the
purposes of the determination. The relevant question is whether the property is still
contaminated.
T he panel accepts it is based on the complainant’s evidence which shows readings on the
doors of the property are up to 24 times the limit allowed in the government safety guidelines.
The unsafe readings have been returned on every door sampled, as well as one of the
window sills.
The panel notes the insurer’s contamination expert supplied its process for testing for
contamination. This involves avoiding high touch areas and seeking areas it considers are a
reasonable example of general contamination.
This approach does not meet the guidelines supplied for remediating this kind of
contamination. Page 11 of the government remediation guidelines document clearly states:
If there is information from any source that would indicate a higher rate of
sampling, then those samples should be taken;
Further, the panel considers the method proposed is likely to produce lower results and
potentially lead to precisely the outcome of this claim, a situation where cover came into
question leading to delay, and incomplete decontamination work.
The guideline document does not recommend the method applied by the insurer’s experts. As
a result, the panel considers insurer’s expert report s are flawed as they do not meet the
recommended guideline to remediate the property.
Finally, the panel notes the insurer’s expert says the remediation work may have been less
successful as the remediated areas were not painted following the work. This means
encapsulation is part of the repair process, a part which was never completed by the insurer.
The result is the insurer’s decontamination work is of limited value to the complainant as the
property will need further remediation before the property can serve its purpose as a rental
property.
Insurer to cover the cost of correcting errors made during the claim
The panel accepts the insurer has made errors while assessing the damage and repairing the
property. The property is still contaminated after the insurer repaired it, meaning the
complainant has not received the benefit which was the point of the insurer proceeding with
repair work.
Determination | Case number: 815885 Page 5 of 8
The complainant’s assert s the insurer committed to fully repair the property. The insurer
disputes this. While the specific commitment the insurer made during that call is unknown, the
panel accepts on balance there was an agreement for the insurer to proceed with arranging
repairs.
The complainant has indicated in her correspondence she distrusts the insurer and its trades
based on her experience. The policy is clear the insurer is entitled to decide the method of
settlement which includes repairing the damage or settling the claim as a cash settlement.
The insurer must exercise this discretion fairly.
The panel is of the view that the insurer must rectify the repairs and not cash settle the claim.
The panel considers the insurer had the ability to scope the work and assess whether the
repairs would exceed the sum insured prior to beginning repairs. The panel considers this
would have been a reasonable time to make an informed decision on how to settle the claim,
rather than trying to change positions mid repair in these circumstances.
This is particularly relevant as the insurer’s expert suggests delaying the paint ing of the
property to switch settlement methods may have allowed the contamination to resurface. The
insurer must compensate the complainant for this error.
Further, the insurer needs to take responsibility for failures in the assessing process which led
to fixtures which went missing. The insurer had the opportunity to properly inventory items
removed from the property but does not appear to have done so. The insurer has requested
more co-operation from the complainant to determine what needs to be replaced which the
panel accepts is an admission of the error.
The insurer must also cover the cost of repairing damage to the ceiling around the vents, and
areas which have sagged due to work performed.
This is because the panel accepts this damage most likely occurred because of the work
being performed by the insurer’s trades, rather than co -incidental to it. The panel is not
convinced the damage was unavoidable, which means the insurer must cover the cost of
repairs as part of correcting the errors.
The insurer is not entitled to limit its liability to the sum insured of the policy while covering the
cost of these repairs. For the sake of clarity, the work the panel accepts falls under this is:
remediating the remaining contamination, including the cost of post repair clearance
certificates
repairing the sagging or damaged ceiling plaster due to the duct work and work around the
area of the air conditioner vents
painting any parts of the building which are repaired to return the property to its pre-
damage state, including two coats to contaminated areas which were not painted by the
insurer’s trades
replacing the contaminated or missing fixtures and fittings.
The insurer is to arrange for the repairs and rectification to be carried out.
The panel is of the view that it is fair that the complainant should be entitled to have the
property inspected by her drug contamination expert to confirm that the repairs have been
satisfactorily completed.
The complainant is to arrange the inspection immediately the insurer informs her the repairs
have been completed.
Determination | Case number: 815885 Page 6 of 8
The insurer is to pay the cost of this report within seven days of the complainant having
provided proof of payment.
Complainant is entitled to further loss of rent compensation
The panel is satisfied the complainant has suffered an avoidable loss of rental income
resulting from the errors noted above. The insurer is to pay the complainant compensation for
this.
The insurer has already settled the complainant for lost rental income to the value of
$44,947.92 during the complaint, which is approximately 65 weeks of lost rent. The panel
notes this portion was subject of AFCA complaint 783094, settled by agreement on 4 June
2021. The complainant says this covers her loss of rent up to 27 August 2020.
The panel is not satisfied the previous agreement acts as a barrier to claiming further loss of
rent in these circumstances. It is clear the complainant expected repair of the property in
order to forgo further loss of rent and a deepening of the dispute.
As the decision is to award the compensation based on avoidable errors, it would not be a fair
outcome for the agreement to be pleaded as a barrier. Further, as the insurer’s expert
assessment was shown to be flawed from the beginning, the ongoing loss of rent the
complainant has suffered is due to the insurer’s errors. Accordingly, it must compensate her
for this, and may not limit it based on the policy.
The complainant supplied a copy of the last rental agreement showing the property attracting
$690 per week in rent. 75 weeks have passed since then meaning the rental loss has risen by
a further $51,750. The insurer must cover this.
The complainant is also entitled to compensation while sourcing the information necessary to
settle the claim. The panel accepts a further 4 weeks loss of rent to the value of $2,760 is fair
in the circumstances.
The insurer must also pay compensation for the length of time the repairs will take. This can
be calculated and settled at $690 per week and is to be paid up until 7 days after the
complaint’s expert has confirmed the property is no longer contaminated.
Finally, the insurer may reduce the loss of rent compensation by the costs the complainant
would have incurred in the ordinary course of having a tenant in the property. The
complainant must supply a copy of the rental ledger showing what these costs are. This must
cover the last 12-month period where the property was rented. If the complainant does not
supply this, the insurer may reduce the loss of rent settlement by 10% to reflect this.
2.2 Is complainant entitled to non-financial loss compensation?
Insurer to compensate the complainant for non-financial loss
Under our Rules, AFCA can consider making an award up to $5,400 compensation for non-
financial loss. However, we will only award this type of compensation if a complainant suffers
an unusual degree or extent of physical inconvenience, time taken to resolve the situation or
inte rference with the complainant’s expectation of enjoyment or peace of mind.
The panel is satisfied the complainant is entitled to non-financial loss compensation. For the
reasons noted above, the previous agreement under AFCA complaint 783094 does not stand
as the claim was not reasonably resolved after the agreement.
Determination | Case number: 815885 Page 7 of 8
During the claim the complainant has endured:
a claim process taking over 900 days
difficulties in getting the claim accepted, then for loss of rent beyond the policy limit due to
the insurer’s delays , then a fair resolution of her damage claim
was asked to accept the damage to her home was reasonable in the course of the repairs
was asked to assist the insurer with the missing items the insurer did not properly
inventory
saw the insurer’s trades on the property without reasonable PPE equipment in breach of
their own OH&S standards and other actions which have not treated the property with
respect.
This has caused the complainant an excessive level of effort to prove her claim as well as
interfered with her enjoyment of peace of mind which she says has affected her health. The
length of the claim is also excessive, and while the insurer has followed its expert evidence,
the insurer is responsible for appointing those experts who appear to have done an
inadequate job based on the available evidence.
The panel does not accept any of these things are reasonable in a claim which should have
been settled a long time ago. Accordingly, the insurer is to pay the complainant $5,400 as the
full value AFCA may award for non-financial loss.
2.3 Is complainant entitled to payment of costs incurred?
Insurer to compensate the complainant for legal costs
Under our Rules, AFCA can consider making an award of legal costs.
The panel considers this is an appropriate case to refund legal cost up to a maximum amount
of $5,000.
The complainant is to provide the insurer with a copy of the bill of costs and the insurer is to
refund that amount up to $5,000, within 7 days of receipt.
The panel also accepts that the reports obtained by the complainant from the drug expert has
been important in making this determination. The insurer is to pay for t he drug expert’ report
previously obtained by the complainant.
The insurer is to pay interest on the legal fees and the expert’s report under section 57 of
Insurance Contacts Act 1984 (Cth) (the Act) from the date paid by the complainant until paid.
The complainant is to provide the proof of payment including date paid.
2.4 Why is the outcome fair?
The outcome is fair in all the circumstances because the insurer made avoidable errors
during the assessment and repair process leading to incomplete work and additional loss to
the complainant. The complainant is entitled to compensation for this, as well as non-financial
loss compensation.
Determination | Case number: 815885 Page 8 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience as an insurance consultant.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.