Home / Suncorp Group / Determination 814118

Determination 814118

Claim declined under ground movement exclusion

FirmSuncorp Group
Decided2022-06-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$4,532
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Homeowners had a building claim for cracking and settlement declined under the ground movement exclusion, arguing leaking sewer and stormwater pipes caused the damage. AFCA found the claim valid, ordered the insurer to accept and settle most of the damage (excluding the garage ceiling and bathroom screws) with a 20% cash uplift, and to reimburse $4,532.32 of expert report costs with interest.

The leaks were the proximate cause of most of the damage, and the insurer did not establish that the ground movement exclusion applied.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interest

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 814118 Financial firm AAI Limited Determination | Case number: 814118 Page 1 of 15 Case number: 814118 15 June 2022 1 Determination overview 1.1 Complaint The complainants have home building and contents insurance with the financial firm (insurer). The policy covers specified insured events, including escape of liquid. The complainants lodged a claim in February 2021 for movement and cracking damage to their home from leaking pipes. The insurer accepts leaks were identified and there is cracking damage but declined the claim saying the proximate cause of damage was ground movement which is excluded by the policy. The complainants dispute this and seek cover for the damage. 1.2 Issues and key findings Is the insurer entitled to decline the claim? No. The insurer is not entitled to decline the claim as the complainants have established a valid claim and, on the balance of probabilities, an excluded cause has not been established as the proximate cause of damage. How should the claim be settled? The insurer is required to accept and settle the claim as set out in part 2.2 of this determination. Why is the outcome fair? The outcome is fair because, considering all the available information, the panel is satisfied a claim covered by the terms of the policy has been established. 1.3 Determination This determination is mostly in favour of the complainants. Should the complainants accept this determination the claim and the complaint are to be settled as set out in part 2.2 of this determination. Determination | Case number: 814118 Page 2 of 15 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? No. The insurer is not entitled to decline the claim as the complainants have established a valid claim and an excluded cause has not been established as the proximate cause of damage. Complainants must establish a valid claim It is accepted insurance law that the complainants carry the initial onus to establish a loss covered by the terms and conditions of the policy. The complainants are required to show, on the balance of probabilities, they suffered a loss caused by a risk insured against under the policy. This is known as a valid claim. The policy provides cover for damage caused by leaks from fixed pipes and sewerage systems. This includes leaks which are ongoing if the complainants could not reasonably be expected to be aware of the leaks. There is no suggestion the complainants were aware of the leaks until about the time they made the claim. Once the complainants establish a valid claim, the insurer is liable for the loss unless it shows an exclusion or condition applies. In the context of this claim and complaint, the complainants must establish on the balance of probabilities the claimed damage was caused by the leaking pipes. For the insurer to deny the claim it must establish on the balance of probabilities the claimed damage was caused by long-term ground movement due to seasonal and environmental factors. Extracts from the relevant policy terms are set out in supporting section 3.2 of this determination. Sewer and stormwater leaks found Both parties rely on expert opinion. Extracts from the reports are set out in supporting section 3.3 of this determination. The complainants noticed cracking damage in early 2021 and sought advice from the underpinner (LS) about subsidence at the front of the home. LS noted unusual moisture and recommended an urgent plumbing inspection to check for leaks. The complainants’ plumber (AP) found the ensuite toilet branch drain was broken underneath the house footings. He said there was substantial moisture in the soil. CCTV inspection also showed the junction connecting the laundry waste to the main drain was broken underneath the back decking, adjacent to the laundry window. Following these findings, the complainants made a claim in February 2021 for cracking and movement damage to the property due to the identified leaks. The insurer arranged for a plumber (SP) to conduct leak detection testing. SP confirmed the broken bend to the ensuite toilet towards the front of the home and a cracked bathroom junction, gully junction and bend downstream from the kitchen at the rear of the home. SP said the head loss from the sewer system was in excess of 20L per minute. SP also identified Determination | Case number: 814118 Page 3 of 15 a leak in the base of the toilet riser in the ensuite which leaked beyond the flow rate of 20L per minute. Additionally, SP found a cracked base in the stormwater bend behind the garage on the other side of the house, with head loss of approximately 3 litres per minute under test conditions. There is no dispute there is damage to the home including cracked walls and tiles, dropping of the ensuite floor and subsidence to paths. There is also no dispute that leaks have been identified in the pipes servicing the property. For the policy to provide cover, the complainants must show not only that an insured event occurred, but also that it caused the damage claimed. Proximate cause of the cracking damage must be determined The insurer says the complainants have not established the damage was caused by the sewer and/or stormwater leaks. The insurer says the complainants have not established a valid claim. The insurer also says the proximate cause of the damage is ground movement which is excluded from cover under the policy. To determine whether the insurer is required to accept the claim, the proximate cause of damage needs to be determined. The proximate cause is the dominant, efficient or operative cause of the loss. It is not necessarily the first or last in time or the sole cause. It is a question of fact that depends on the circumstances of each case and requires a common-sense evaluation of the evidence. Insurer’s engineer says damage caused by drying factors including trees The insurer arranged for an engineer to give his opinion. The engineer (IE) inspected and photographed the property in late February 2021. He reviewed the plumbing report and undertook a survey of the perimeter brick course levels. He said the damage to the house has not been caused by leaking pipes. IE noted cracking damage and settlement of floors and paving on the south-eastern side of the home, consistent with differential footing movement. He described and photographed cracking at and near the front porch. IE said the concrete paving around the eastern corner and along the south-eastern side had settled. IE r eviewed the plumber’s report and noted the leaks on a sketch of the level survey he carried out. He says the level survey confirmed the south-eastern and southwestern sides of the home have settled downwards, with settlement more pronounced at the front, where the cracking is more severe. He says pattern of cracking is consistent with the house settling away from the north-western side. He notes the leaks are primarily located in areas where the house settled. But in these circumstances, he would expect the house to heave due to an increase in soil moisture. IE initially considered bore logs from a site 170m away which indicate the foundation soil in the vicinity is a highly reactive clay soil type, which will expand significantly if its moisture content increases, and shrink significantly if its moisture content reduces. IE said the settlement was caused by shrinkage of the reactive clay foundation beneath the house. IE said this was due to seasonal and environmental factors including below average Determination | Case number: 814118 Page 4 of 15 rainfall in 2018 and 2019 (although there was above average rainfall in 2020) and moisture demands from nearby trees. IE said the house footings would be in the zone of influence of the trees and the cracking and settlement was consistent with drying caused by their moisture demands. IE later acknowledged the fill report and soil samples taken at the time of construction indicate the clay in the fill is not as reactive as commonly found in the area, but maintained the settlement was caused by shrinkage of the clay foundation due to reducing soil moisture content from seasonal and environmental factors. IE said the damage was not caused by the leaking pipes as the house has predominantly settled in these areas, where heaving would be expected due to the increase in soil moisture. While the stormwater leak was in an elevated area IE said this was unlikely to leak significant amounts of water, especially during periods of below average rainfall. IE acknowledged the leaks at the rear may cause subsidence in the fill used to level the site but considered the footings would most likely be founded in the natural clay soil, and the settlement was not consistent with subsidence in fill. Council’s engineer disputes impact of trees on building movement The local council engaged an engineer C to review IE’s findings regarding the impact of trees on the nature strip adjacent to the complainants’ home. C did not inspect the house itself but reviewed IE’s report and the trees on the southern boundary and their potential impact on building movement. C noted the planting was rather sparse with one tree of reasonable size (which does not have an aggressive root system) along with some shrubbery. C noted it is generally considered the height of a tree approximates the radius of its root zone. As the main tree is 6-7m tall and is situated about 6m from the nearest part of the house, this indicates it was nearing the edge of its zone of influence. C also noted that IE emphasised the soil desiccation at the site, but also notes photographs included in the report showed significant moisture present in the retaining wall, despite IE visiting in summer. C noted this moisture was in the area of the greatest movement and suggests the soil may not be desiccated and is not shrinking through drying. C considered the likelihood of the tree and shrubbery contributing to the building movement to any significant degree was small. C further noted the greatest movement to the house was in the south-eastern corner well away from the influence of the tree, and the southwestern corner (over 25m from the tree) has also moved significantly. Complainants’ engineer agrees trees not a significant contributing factor The complainants obtained an engineer’s opinion as well. TK con ducted a site inspection and desktop review of construction engineering documents and soil profile information. The bore log report identified calcareous soil material at depths between 1700mm and 3000mm below ground across the site. TK said reactive soils with calcareous layers can be subject to a loss of strength upon wetting (during wetter months or because of poor drainage or leaking plumbing) when under a load. TK noted the ‘rebound’ effect of a reactive soil profile containing calcareous layers can be reduced due to this loss of strength within the calcareous layers, so it is not able to recover Determination | Case number: 814118 Page 5 of 15 from shrinkage experienced in the dry part of the year, while areas not affected by moisture ingress may be able to do so, resulting in differential movement across the structure. TK said the b uilding settlement can be attributed to a loss of the soil’s bearing capacity due to significant moisture ingress within the collapsible fill soil layers or calcareous soil layers at the site. Because of the identified leaks, he said founding soils would have experienced an elevated moisture content for some time, potentially many years prior to discovery, resulting in gradual consolidation and settlement. This settlement has manifested in wall cracking and variations in floor levels and raised structural concerns. TK agreed with C that trees were not a significant contributing factor and said the severe plumbing leaks would have negated, if not exceeded any drying impacts from the tree. Engineers disagreed on proximate cause of damage IE reviewed TK and C’s reports. IE also reviewed material from the consulting engineer from April 1992. He maintained the deeper soil horizons had dried out and caused the house to settle. He remained of the view the trees and vegetation along the south-eastern boundary had contributed to the settlement of the house to some degree. IE said they can draw moisture through matric suction from some distance away, particularly maturing trees. TK reviewed this further information and said the effects of the tree did not explain the extent of settlement occurring in other parts of the house. TK also challenged IE’s assumptions and noted 1500mm of compacted fill was placed on the site and the design documentation indicates the footings were founded in this controlled filling material. As for the finding of no heave, TK said hydro compression can cause settlement in filled soil profiles by wetting and hydrostatic pressure over time and would be considered a likely contributing factor, so the overall building settlement was caused by significant moisture ingress from the constant plumbing leaks. It was the collective professional opinion of TK’s engineers that the building movement can be attributed to the settlement/consolidation of the supporting fill material due to substantially increased levels of moisture from the plumbing leaks. IE continued to challenge TK’s opinion pointing out sewer pipes only leak during use and do not constantly leak. IE also says the level surveys indicate the fill settlement is not the primary cause of movement. He continues to assert the pattern of movement and damage in the house is not consistent with leak induced fill settlement but because of the trees. In response, the complainants did not provide any further material from TK but provided some photographs of the moisture he found when digging the trench near the cracked gully at the rear of the house. Settlement from soil drying inconsistent with moisture found at site IE notes the pipes would not be constantly leaking and would not leak at the same rate as in test conditions. The panel accepts this observation. But the panel also accepts the available information establishes the pipes had probably been leaking for some time. Even if they only leaked during use, there is still substantial leaking (20L per minute) on each occasion of use. Determination | Case number: 814118 Page 6 of 15 The panel is satisfied moisture was noted and demonstrated not only by the complainants but by the underpinner, by the complainants ’ plumber and by TK which is not consistent with soil drying as stated by IE. The complainants note the moisture in the soil is still significant, with between 200mm and 1500mm (the pipe depth) in the area of the gully leak being extremely wet and pliable. LS also noted the concrete above the more significant ensuite leak had deteriorated from moisture. Panel accepts leaks were the proximate cause of most damage Having carefully considered the available material, the panel is satisfied on the balance of probabilities most of the claimed damage was caused by the stormwater and sewer leaks. This is because the leaks align with the areas of damage and engineers agree the calcareous layers on the site can lose bearing strength on wetting which explains the pattern of settlement. While IE disagrees this is the cause of damage, the panel finds TK and C’s reasoning more persuasive, particularly considering IE ’s views on the impact of vegetation which is inconsistent with the pattern of settlement that has presented. Both TK and C are clear and unambiguous in their opinion which is that the trees and shrubs were not a significant contributing factor to the movement. The panel accepts there were significant leaks and the areas of settlement by and large coincide with these significant leaks. Further the level survey shows movement at the other side of the house, remote from the trees. The panel accepts the eng ineer’s explanation in relation to the absence of heave in the area of the leaks. Further, the preponderance of expert opinion is in favour of the complainants as C and both engineers at TK support the complainants’ position. The panel is satisfied the complainants have established a valid claim. The panel does not consider the application of an exclusion relating to general ground movement, tree roots or climactic conditions has been established as the proximate cause of damage. While C found evidence of soil desiccation in the local area, the available information indicates the site itself is impacted by water from the leaks, and this is the proximate cause of the cracking damage. The panel accepts there is ground movement, but the panel is satisfied the proximate cause of the ground movement was the leaking stormwater and sewer pipes. 2.2 How should the complaint be settled? Insurer required to accept most of the claimed damage As a valid claim has been established for the claimed damage, and on the balance of probabilities the available information does not establish the proximate cause of the damage was an excluded cause, the insurer is required to accept the claim. TK indicated the south-western portion of the garage ceiling and popping screws in the main bathroom were not necessarily related to the overall building movement. The complainants accept the south-western portion of the garage ceiling was not caused by the leaks. Determination | Case number: 814118 Page 7 of 15 The complainants do not accept the popping screws in the main bathroom were not related to the building movement. However, the complainants have not provided any independent expert material in support of this assertion. As the panel has found TK’s opinion otherwise persuasive, the panel accepts TK’s opinion in this regard as w ell. The insurer is not liable to repair the south-western portion of the garage ceiling or the popping screws in the main bathroom. Mechanism for settlement described The scope of works and cost of the repairs for the remaining damage has not been assessed. TK recommended allowing 12 months for drying following repair of the leaks and perimeter paths before scoping the repairs. TK said if movement is ongoing after this period, structural stabilisation may be required. The complainants have provided material from plumbers indicating the leaks have been repaired. Should the complainants accept this determination then within 14 days of notification of acceptance, the insurer is to com plete a full scope of works for repairs (if the drying period is com plete), obtain a quotation for the cost of repairs, and finalise the claim in accordance with the policy terms and conditions. The policy provides if the insurer agrees to pay a claim it will decide if it will repair the damage or pay the complainants what it would cost the insurer to repair the damage. If the insurer elects to cash settle, it must ensure that the settlement amount is reasonable and sufficient for the complainants to complete the necessary work. That is, the amount must be arrived at having regard to all relevant factors. These include risk is passing to the complainants, since they will lose the lifetime guarantee on the work and unknown variations and contingencies may arise once repairs commence. Should the claim be cash settled, the panel is satisfied an uplift of 20% is fair to consider any variations and contingencies which may occur once repairs commence. This also takes into account the increased cost of labour and materials due to the COVID-19 pandemic. If the complainants wish to obtain a scope of works and quotation pursuant to the scope of works, then they are entitled to do so within 14 days of receipt of the insurer’s scope of works and quote. The parties are encouraged to work together to finalise the claim and the cost of repairs. If the parties are unable to agree, the parties can return to AFCA for a decision about the cost of repairs. Insurer to reimburse complainants’ report costs AFCA Rules provide that the insurer may contribute to professional costs (capped at $5,400) incurred by a complainant during a complaint. When considering whether to require the insurer to make a cost contribution AFCA considers the complexity of the complaint and whether the complainant needed to incur the cost to understand or establish the claim. The complainants provided expert reports from TK which assisted in determining the outcome of this complaint. The panel accepts it was fair for the complainants to obtain these reports to assist in determining the cause of damage and to respond to the reports obtained by the insurer. Determination | Case number: 814118 Page 8 of 15 Pursuant to AFCA Rules, the insurer is required to reimburse the complainants for the costs incurred in obtaining these reports, being:  $2,063.50 confirmed by invoice dated 15 May 2021 for TK’s first report  $2,468.82 confi rmed by invoice dated 20 August 2021 for TK’s supplementary report If the complainants have paid for these reports then the insurer is to pay interest pursuant to section 57 of the Insurance Contracts Act 1984, from the date of payment for the reports until settlement. 2.3 Why is the outcome fair? The outcome is fair because, considering all the available information, and on the balance of probabilities, the panel is satisfied a claim covered by the terms of the policy has been established. Determination | Case number: 814118 Page 9 of 15 3 Supporting information 3.1 The AFCA process This matter was determined by a panel Due to the nature of this dispute, it has been referred to a panel for determination. The panel comprises the ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive experience in the insurance industry. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). AFCA’s approach to this complaint A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to thos e issues considered relevant to the outcome. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. Caselaw and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common-sense approach is taken to determine proximate cause. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 814118 Page 10 of 15 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response. Both the policy document and the Notice have been exchanged with the complainants. What you are covered for - Insured Events (PDS pages 16 and 22) We cover the building for loss or damage at the insured address caused by an insured event during the period of insurance. There are some things we do not cover and thes e are shown in the ‘We do not cover’ section of the following tables on pages 16 to 25 and in the ‘What we do not cover - general exclusions’ on pages 35 to 40. Escape of liquid We cover We do not cover Loss or damage to the building caused by liquid leaking, overflowing or bursting from any of the following: … • any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage systems; … … • wear and tear, or loss or damage by the escape of liquid occurring as a result of a gradual process of leaking, splashing, dripping or overflowing over a period of time when you could reasonably be e xpected to be aware of this condition; • the cost of repairing or replacing the item from which the liquid escaped; … What we do not cover - general exclusions You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events: • ‘Storm’; • ‘Flood’ (but only if you have cover for ins ured event ‘Flood’); • ‘Earthquak e and Tsunami’; • ‘Explosion’. Roots of tree s, shrubs and plants the roots of trees, shrubs or plants, but we will cover damage to your building caused by: • liquid leaking or overflowing from pipes or drains that are blocked or damaged by thes e roots to the extent it is covered under insured event ‘Escape of liquid’; • roots from a fallen tree to the extent it is covered under insured event ‘Impact’. How to establi sh your loss Establish an incident took place Determination | Case number: 814118 Page 11 of 15 When making a claim you must be able to prove that an incident covered by your policy actually took place. If you do not do this, we will not be able to pay your claim. 3.3 Extracts from material relied on by the parties Date Action Construction engineer (SF) report 4 May 1992  Reinforced concrete raft footings continuously trenched to existing ground or piered to 200mm into existing ground level  Site inspection after excavation for the footing beams  Soil bore logs – Fill: clay and sandy clays  Soils on this site have a high potential for vertical movements with changes in moisture content and are of medium - high bearing capacity  Ground water not encountered  Changes in soil moisture may significantly affect the bearing strength  Intention of the footing design is to prevent cracking exceeding the Category of Damage degree as slight Underpinner’s report (LS) Undated  Inspected property in relation to suspected subsidenc e and noticed cracking damage and the concrete path was wet and deteriorated due to constant moisture which is uncommon in a 40° weather week.  Believe main sewer pipe damaged and a plumber is to check sewer and stormwater pipes for leaks  If underpinning r equired, then take about 12 mont hs to allow the ground to dry out. Asse ssment report 18 February 21  Noted general movement cracking – full extent to be determined by engineer.  Underpinner advised to investigate leaks and leave the site to settle for a year before fixing  Plumber found leaks in the stormwater and sewer  Hous e generally well maintained.  Described and photographed cracks to tiles on front porch, floor tiles at entrance, lounge and family room, movement around main bedroom, dropping of floor in ensuite, crack in wall near gas heater, minor movement near bathroom and laundry, cracking outside the main bedroom and ensuite, possible sinking of paths on south side of home. Complainant s ’ plumber’s email (AP) 25 February 21  In response to yo ur request regarding the sewer drain, it was found that the ensuite toilet 100mm PVC branch drain is broken underneath the house footings. This is causing substantial moisture int o the soil.  Using the sewer camera, it was evident that the 100mm Determination | Case number: 814118 Page 12 of 15 PVC juncti on that connects the laundry waste to the main drain is broken underneath the back decking adjacent laundry window. Unable to carry out a static test as the drain can’t hold wat er. Insurer’s plumber’ s report (SP) 25 February 21 Photographed and carried out comprehensive testing with specialised leak location equipment and plumbing faults were located.  Storm Water > Head loss from the bend at the rear of the garage of approximately 3L/min. > Sewer > Head loss from entire sewer system of in excess of 20L/Min > Head loss from the sewer pipework between Point A and IP4 of in excess of 20 L/Min > Head loss from the bend downstream from kitchen branch of approximately 4L/min > Head loss from the gully branch of approximat ely 4L/Min > Head loss from t he Bathroom/ IP3 junction of approximately 12L/Min > Head loss from the sewer pipework from IP4 upstream to ensuite of in excess of 20L/Min > Head loss from the ens uite W/C riser of in excess of 20L/Min Insurer’s Engineer (IE) 2 March 21  Inspected and photogra phed property with complainant 23 February 21.  Reviewed plumbing report and undertook a survey of the perimeter brick course levels  Survey indicates building’s south - eastern and southwestern sides have settled downwards and the location of the leaks is m ainly where the house has settled.  Differential settlement more pronounced at the front where the cracking is more severe  Retrieved bore logs from a nearby site showing soil is highly reactive clay  Damage not caused by leaking pipes  Damage consistent with differential footing movement  Settlement caused by shrinkage of reactive clay foundation beneath the hous e due to reducing soil moisture content as a result of seasonal and environmental factors, including the moisture demands of nearby trees, which h ave dominated the environment over the recent years due to the below average rainfall.  Several trees along the house’s south - eastern side and the building’s footings are locat ed within the zone of the desiccating influence of these trees and the cracking Determination | Case number: 814118 Page 13 of 15 and building movement evident is consistent with drying settlement effects caused by their moisture demand.  A leaking pipe beneath the house’s central area may be contributing to the damage by causing a central heave, or at least preventing the house’ cen tre from settling to the same degree as the south - eastern side but the leaking pipes are located external to the house footings and would not contribute to a central heave.  Leaks are primarily located in areas where the house settles. We would expect that a leaking pipe would cause the house to heave due to the increase is soil moisture, which has not occurred. The only leak in an elevated area, the stormwater pipe leak, is unlikely to leak significant amounts of water into the soil to cause footing moveme nt, especially during the recent below average rainfall period.  Leaks at the rear of the house may cause subsidence in the fill at the rear that was used to level the site, but the house footings would most likely be founded in the natural clay soil. Furt hermore, the pattern of movement at the rear is not consistent with subsidence in fill. Council’ s engineer’s report (CP) 31 March 2021  Local council reviewed insurer’s engineer’s report and tree planting and described site observations noting area subjec t to severe soil movement even where are not significantly sized trees to influence the soil profile  Greatest movement was to the south - eastern corner which is well away from the main tree  Describes photographs noting significant moisture even in the summe r months which suggest the soil is not desiccated and not shrinking through drying  Building movement not in question but the likelihood of the tree and associated low impact shrubbery contributing to the movement to any significant degree is small. Complainant s ’ engineer’s report (TK) 17 May 21  Reviewed historical aerial photographs and likely soil profiles and inspected property 22 April 21  Reviewed insurer’s plumber’s report noting numerous significant leaks within both the sewer and stormwater pipe networks. Most notably: > A sewer leak in excess of 20L/minute was identified at the rear of the ensuite bathroom (north - east). > Combined sewer leaks in excess of 20L/minute were identified across the rear of the residence.  Soil bore log report identifi ed the presence of highly reactive clay soil  Building movement typical of localised relative settlement of external footings and wall mainly along the south - eastern building perimeter because of the loss of Determination | Case number: 814118 Page 14 of 15 the soil’s bearing capacity due to significant m oisture ingress  Described the building movement and its causes  As a result of the plumbing leaks, founding soils would have experienced an elevat ed moisture content for some time; potentially many years before discovery.  Inundation of the fill and calcar eous soil layers caused gradual consolidation over time and resulted in a somewhat permanent settlement of the house along the south - eastern side.  Agree with C that the trees and shrubs were not a significant contributing factor to the movement observed on site.  Severe plumbing leaks identified within the sewer pipe networks would have negated, if not exceeded, any soil shrinkage / drying effects from the tree.  Based on the brickwork level survey provided in IE’s report, the extent of building settlement a ppeared to be the greatest at the southern external corner of the residence; a location well removed from the soil desiccation ‘range of influence’ of the tree in question.  Extent of damage and ‘movement’ observed on site was of structural concern.  Made c ertain recommendations including to monitor the building movement for a minimum of 12 months before implementing any recommendations.  South - western portion of the garage ceiling, over the rear roller door, was noted to have partially collapsed. This was c onsidered to be of a structural concern but not necessarily related to the overall building movement.  ‘Popping’ screws were observed with the main bathroom area of the residence. This is typical of ceiling delamination but was not necessarily related to th e overall building movement. Insurer’s engineer (IE) Report 28 May 21  Reviewed complainant s ’ reports and maintain opinion that all trees and vegetation along the south - eastern boundary have cont ribut ed to the settlement of the house to some degree.  Provided aerial images whic h show the trees have matured over the last 10 years Insurer’s engineer (IE) Email 28 May 21  Reviewed material from consulting engineer (G) in 1992 noting filling greater than the desirable minimum and may be considered as con trolled fill for the purposes of footing design  Suggests the clay in this fill is not as reactive as normal Adelaide clay soil, though exists of clay suggests some reactive nature.  New report also suggests that this soil was sufficiently Determination | Case number: 814118 Page 15 of 15 compacted and th at should not have any effect on the design of the footings.  Nevertheless, as discussed in our report about the footing construction, the house’s footings, and piers like extend below this fill regardless.  In our opinion, it’s the deeper soil horizons tha t have dried out and caused the house to settle. Complainant s ’ engineer’s (TK) R eport 16 August 21  Reviewed insurer’s report and the local council report and remain of the opinion the trees not a significant contributing factor to the movement as other portions of the house have undergone settlement not just a part of the house near the tree.  Building settlement was consistent along the entire southern perimet er of the residence and correspondent with the locations of identified plumbing leaks.  Collective professional opinion of TK Engineers that the building movement observed on site can be attributed to the settlement / consolidation of the supporting fill material; due to substantially increased levels of moisture from the plumbing leaks. Insurer’s engineer (IE) Report 21 September 21  Reviewed TK report, provided analysis of leak reports, tree inf luence and soil profile and pattern of movement and maintained opinion.  Says the pattern of movement and damage in the house is not consistent with leak induced fill settlement. 3.4 Other relevant material considered and relied on  Parties’ submissions /emails and all attachments to all submissions/emails  Expert reports  Photographs, level surveys, material from time of construction  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.