The complainants claimed storm damage to their chimney and roof under a home policy and sought about $99,158 plus compensation for claim handling delays. AFCA required the insurer to increase its settlement for chimney-impact damage, rejected liability for the 2015 repair defects and most of the claimed works, and awarded $1,000 non-financial loss.

The insurer is liable only for storm damage causally linked to the 2020 events, not for alleged defective 2015 workmanship or unrelated defects, and delays beyond about 12 months warranted modest compensation.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 813837 Financial firm Insurance Australia Limited Determination | Case number: 813837 Page 2 of 11 Case number: 813837 27 April 2022 1 Determination overview 1.1 Complaint The complainants hold a Home Building and Contents policy issued by the financial provider (the insurer). On 10 March 2020, the complainants lodged a claim for storm related damage to the chimney and the roof at the insured property. The insurer accepted the claim; however, a dispute continues as to the extent of the insurer’s liability regarding the repairs. In addition, the complainants say the insurer mishandled the claim processing and seek compensation. 1.2 Issues and key findings What is the extent of the insurer’s liability ? The insurer is required to repair damage relating to the fallen chimney cap. The insurer is otherwise entitled to limit its obligations to the complainants as there is insufficient information to show the entire claimed damage is covered under the policy and/or is a result of the insurer authorised repairs completed following the 2015 claim. Is the insurer required to increase its settlement amount? Yes. The insurer is required to increase its settlement offer to include the cost required to repair bedroom damage resulting from the chimney impact. Are the complainants entitled to additional payments? Yes, the complainants are entitled to compensation due to the delays experienced during the time the insurer was determining the extent of its repairs in 2015. 1.3 Determination This Determination is substantially in favour of the insurer. Within 14 days of the complainants accepting this Determination, the insurer is to:  arrange for the commencement of repairs listed under section 2.2 or settle the claim by a way of cash payment in the sum of $33,896.37  pay the complainants $1,000 for non-financial loss compensation. In addition, (if it has not already done so) the insurer is to issue a payment of $15,536 directly to the stonemason HR. Determination | Case number: 813837 Page 3 of 11 2 Reasons for determination 2.1 Were the 2015 repairs defective? Insured property damaged by policy insured events in 2015 and 2020 The complainants hold a listed events home and contents insurance policy with the insurer. The insured property is a heritage listed double storey house. The property is constructed using the pitched slate roof method with a ‘four hip’ design’. There are two chimneys on each rear side of the roof, totalling four chimneys constructed on the entire roof. Below the rear side of the roof, metal skillion roofs have been attached:  near the veranda (‘the upper skillion roof’)  covering the sunroom/laundry (‘the lower skillion roof’) . The insured property sustained damage from two storm events (2015 and 2020) both resulting in an insurance claim. In April 2015, the complainants lodged a claim for rain-water ingress and subsequent damage to the internal areas of the insured property. Section 3 of this Determination contains details of the damage as described by the insurer’s contractor (JM). In March 2020, the complainants lodged another claim with the insurer (‘the claim’) for damage caused by a fallen chimney’s s andstone at the left-hand side of the roof (near the upper skillion roof) and the internal water leaks below the lower skillion roof. Section 3 of this Determination contains details of the damage and defects as described by various experts in their reports. The insurer accepted the complainants’ claim. However, a dispute exists on the workmanship of the repairs authorised by the insurer and completed following the 2015 storm event and the extent of the insurer’s l iability for damage observed following the 2020 storm event. T he complainants have raised concerns regarding the insurer’s management of the claim, the actions of JM and the insurer’s overall scope of liability for the claim. Complainants say 2015 repairs were defective The complainants say the 2015 repairs to the lower skillion roof and the chimney ’s lead flashing were defective and unprofessional which facilitated, and/or exacerbated damage caused by the 2020 storm event. The complainants also say the ceiling above the damaged chimney (that also required lead flashing repairs in 2015) is sagging as a result of those repairs. Insufficient material to show 2015 repairs were defective JM’s report , issued on 30 April 2015, contains the following relevant information relating to the water entry areas and the 2015 claim: Bedroom 2: The lead around the chimney has blown down, subsequently allowing water to enter, Bathroom: There has been no storm damage sustained to the roof, with water more than likely entering around the flashing, Rear Metal Skillion: Wind driven rain has been pushed up under the lead flashing & has dripped off the ends of the metal roof sheets where they were not correctly weathered. The water stain on the wall is located below a small box gutter that when exposed to large volumes of water overflows inside the home. Determination | Case number: 813837 Page 4 of 11 As mentioned above, it is not in dispute the insurer accepted the 2015 claim and authorised JM to complete the repairs. It is also not in dispute the lower skillion roof is presently showing evidence of faulty workmanship and subsequent rainwater related damage to the internal areas located direc tly below. The General Insurance Code of Practice states that when an insurance company selects and directly authorises a repairer, it is responsible for the quality of workmanship and materials for the repairs completed. However, the report issued by JM shows minimal repairs were carried out post the 2015 claim and the repairs do not appear to be related to the present defects of the lower skillion roof. JM’s details the following completed repairs:  the removal and the replacement of six lineal metres of gutter and associated downpipes located along the rear elevation of the upstairs veranda  reinstatement of the fallen lead flashing associated with the chimney  internal repairs (plastering and painting) to the downstairs sunroom area located below the metal skillion roof, the bedroom two ceiling and the wall associated with the chimney. The complainants say JM removed the lower skillion roof and amongst other things, replaced it with non-compatible material, defective flashing, lowered its pitch and constructed it using overlapped roof sheets. However, there is no indication within JM’s report that repairs involved the replacement or any type of repair to the lower skillion roof. As there is no material to substantiate this aspect of the complainants ’ claim, I am not persuaded the insurer is liable for the replacement of this roof area or the internal water ingress related damage to the areas located below. For clarity, this includes the sun-room ceiling, the two windows, lounge room and dining room walls which are otherwise listed on TJ’s quote. There is also no material to show JM removed the down pipes and diverted them to the lower skillion roof area. JM’s report clearly details the gutter related repairs were completed to the upper skillion roof. There is also insufficient material to show JM’s repairs in 2015 have caused the ceiling in the master bedroom to sag. The complainants have indicated the ceiling sagged from the pressure it was exposed to during the 2015 repairs to a chimney located directly above. On the available material, the 2015 repairs required repairer’s pressure/weight to be placed onto the slate roof around the subject chimney. In the absence of evidence showing the slate roof and the adjacent roof rafters have cracked or sagged, compressing the ceiling below, I am not persuaded the damage (sagged ceiling) is consistent and/or related to the 2015 chimney repairs. Further, the complainants have indicated the chimney brickwork needs to be correctly repointed. Notwithstanding the available expert reports indicate the mortar in the brick work of all chimneys require assessment, there is nothing to show storm damage during either claimed events. There is also no material to show JM attempted to repoint the chimneys in 2015. As a result, I am not satisfied the insurer is liable to repoint the chimneys. For completeness, I have also considered whether the insurer is liable for the repairs to the right- hand side chimneys’ lead flashing that based on KRT’s roof report are a step under the Determination | Case number: 813837 Page 5 of 11 flashing onto the overlapped part of the roof slate. In its report KRT does not indicate if this is causing water ingress. In any event, on the available material, JM repaired the lead flashing to the left-hand side chimney, which KRT says has been correctly completed. As a result, the insurer is not liable to repair the lead flashing to the right-hand side chimneys. Notably, this is also not included in TJ’s quote obtained by the complainants. The complainants also say since the conclusion of the 2015 repairs they had persistent roofing problems. The complainants say during the claim processing in an effort to mitigate their loss they engaged TJ to complete make safe repairs and divert water away from the house due to JM’s faulty workmanship. Amongst other things, the works included striping out the sodden plaster from the walls and replacement of the rotten windows. In support the complainants rely on an undated tax invoice issued by TJ showing the cost of $38,313, for various repairs. As there is insufficient material to show the 2015 repairs were defective I do not consider it is fair and reasonable the insurer is liable for this cost. On balance, the defects are unrelated to any of the storm events and have not been caused by the insurer’s actions. 2.2 What is the extent of the insurer’s liability? The complainants seek extensive repairs The complainants seek for the insurer to attend to the required repairs or cash settle the claim for $99,158.40, pursuant to a quote issued by their builder (TJ) on 22 November 2021. The details of the quote are contained under section 3 of this Determination. Following several variations to its original scope of works (which included additional repairs) the insurer relies on a scope of works issued by H on 19 October 2021 (‘the final SOW’) . The quoted cost is $22,883.10. The insurer says the final SOW represents the extent of its liability for the complainants’ 2020 claim under the policy. The relevant details are contained under section 3 of this Determination. In addition to the final SOW, during the complaint the insurer has agreed to cash settle the complainants for the stonemason’s invoice issued by (HR), being the cost for the chimney caps. The invoice is dated 19 March 2021 and it shows a cost of $15,536. The complainants to decide on claim settlement method As discussed above, the insurer is not liable to repair the defects present on the lower skillion roof and the master bedroom ceiling. Having reviewed the available material, I am satisfied the insurer is required to increase its final SOW to include damage resulting from the fallen chimney cap. KRT’s report clearly shows the fallen chimney cap caused impact related damage to the surrounding slates (approximately 30-40) and the surrounding gutter. The remaining expert reports indicate the impact from the fallen chimney may have also caused damage to the cornices in one of the bedrooms. In fact, this damage forms part of the insurer’s liability in a scope of works issued by H in May 2021 , for the total cost of $1,092. In the absence of material suggesting otherwise, I am satisfied the insurer is liable for the bedroom damage. Determination | Case number: 813837 Page 6 of 11 The final SOW issued by H includes the repairs to the gutter and the roof slates. However, the replacement of the damaged roof slates is quoted at $1,000, ‘until a specialised quote is obtained’. Given the circumstances of this claim and this complaint, I am satisfied it is fair for the complainants to choose the method of settlement. In the instance where the complainants decide to proceed with the insurer’s authorised repairer H, the insurer is required to include the bedroom related damage to its final SOW. In the instance where the complainants decide to accept a cash settlement the insurer is required to settle the claim in the following way:  the insurer is to increase its offer by $5,500 to cover the cost required to replace the damaged roof slates. The only available quote for the removal of the slates is contained in TJ’s quote for the cost of $6,500. The cost of $5,500 repres ents the difference between TJ’s quote of $6,500 (being the only available quote) and the $1,000 cost allowed for in the final SOW issued by H  the insurer is also required to include the cost required to repair the bedroom damage, quoted at $1,092 in H’s e arlier quote  the insurer is to apply a 15% contingency cost to the total claim settlement payment of $29,475.10, that being the sum of $4,421.27. T he final SOW includes the supply and replacement of ‘two chimney caps’. For completeness, I have also conside red whether the insurer’s final SOW should be increased to cover the cost required to replace all four chimney caps. On the available information, it appears the stonemason’s tax invoice relates to the supply of four chimney caps. Notwithstanding the insurer agreed to settle the entire tax invoice, in the absence of material confirming the 2020 storm damaged all four chimney caps, the insurer is not liable for the works relating to the replacement of the right-hand side chimneys. The complainants to lodge a separate claim for hail damage to the upper skillion roof During the claim, it has become evident the upper skillion roof shows evidence of hail related damage. The complainants’ policy covers hail damage. In this instance, given the lack of detail, I am unable to consider whether the insurer is liable for this damage. If the complainants believe the damage occurred during the period of insurance and wish to lodge a claim, the insurer is required to assess it. 2.3 Are complainants entitled to additional payments? Complainants seek non-financial loss for stress experienced during the claim processing. The complainants say there were unnecessary delays caused by the insurer who:  assessed and re-assessed the claim and the 2015 faulty workmanship  failed to refer to customer relations in a timely manner  installed scaffolding in the driveway area precluding access to the back-yard and access to the driveway by an ill family member. Determination | Case number: 813837 Page 7 of 11 The complainants also say the delays in claim processing resulted in the loss of the benefit of being able to use their fireplaces for the past two winters, adding to the cost of living in running heaters and air conditioners. In support (amongst other things), the complainants rely on a letter issued by a psychologist, the letter indicates the complainant experienced high levels of stress during the claim processing. Compensation paid in some circumstances The AFCA Rules allow for an award of up to $5,400 for non-financial loss compensation, if the insurer caused the complainants to suffer an unusual degree or extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. I accept the COVID restrictions impacted the processing of the complainants’ claim. However, I am not satisfied all delays were COVID restriction related. This is particularly so as the available claim file notes and various scope of works clearly show the insurer delayed the claim processing while determining the extent of repairs post 2015. I am satisfied the insurer is entitled to assess claims that are brought before it, however I also consider this process should not extent to over 12 months. This is particularly so when there is evidence of mould at the property. Accordingly, the insurer is to compensate the complainants for non-financial loss in the sum of $1,000. This is in addition to the $1,000 (excess waived) already issued by the insurer. Determination | Case number: 813837 Page 8 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 813837 Page 9 of 11 3.2 The relevant details of the damage post 2015 claim Record Key points Financial firm’s expert ( JM ) Assessment report 30 April 2015 The insured had cleaned up the small amount of water prior to our inspection and there was no evidence of any resulting damage . The insured reported:  a small water strain in the ceiling area  a stain in the ceiling area and a wall near the window located underneat h the metal skillion roof at the rear of the home. 3.3 The relevant details of the damage post 2020 claim Record Key points Financial firm’s expert ( H ) Chimney make safe 15 July 2020 The insured advised that a chimney capping had dislodged and caused damage to the left side guttering and roofing. Resultant damage:  dislodged chimney capping to the left side chimney  damage to the colorbond guttering and slate roofing tile  cracking to the right side chimney capping  cracking to the cornice of the upper bedroom ceiling wall around the dislodged chimney capping. In addition, hail damage observed to the lead ridge capping of the upp er slate roo f . Financial firm’s expert ( RG ) Roof report to determine the cause of water ingress under the lower skillion roof 21 July 2020  Rear lower skillion roof is under pitch which could cause major ingress of water during heavy rain  the area where the leak is present (under the lower skillion roof) is located where the barge meets the box gutter on the gable end of adjoining building. The barge needs to be wider with stop ends installed to divert water onto the roof area  multiple roof penetrations, lapped sheets and poor quality flashing to the lower skillion roof  damage to the slates around the damaged chimney (fallen cap)  hail damage to the lead ridge capping o f the roof to the main house. Financial firm’s expert ( KRT ) Roof report 31 February 2021  T he lower skillion roof is under pitched (not installed with a required fall)  corrosion caused by incompatible lead flashing used on zinc roof material in the construction of the lower skillion roof  poor quality flashing  lapped sheets (one part zinc sheet is installed over the top of the original lower skillion roof)  a defective gutter system made in the roof junction between the main roof and the lower skillion roof  the mortar in the chimneys’ brick work requires assess ment by a builder or bricklayer  upper skillion roof shows evidence of hail dints and tree branc hes scraping paint. Determination | Case number: 813837 Page 10 of 11  Financial firm’s expert ( H ) Re - inspection report 5 March 2021  the probable cause of damage to the lower - level lounge room wall of the chimney is from rain - water entering the chimney opening as there is no weat hering cap to prevent water ingress  damage to the plasterboard celling cornice to the rear ent ry and hall to side entry: the rear entry plasterboard roofing has ingress of water int o the ceiling cavity dues to the low pitch of the lower skillion roof and the sheeting is custom orb  the upper children’s bedroom has a separation crack bet ween the timber corner and wall, likely from the general movement or from the impact of the chimney cap on the other side of the chimney lower side of chimney’s brick  the master bedroom metal press ceiling has sagged – there is no water marking or related storm damage evidence. Probable cause of damage is relate d to the age of the house. Complainant’s expert ( JBI ) Building inspection report 23 August 2021  The ceiling under the lower skillion roof is showing signs of mould and water damage  the bathroom wall (located under the junction between an external wall and the lower skillion roof) showed high mo isture reading. JBI says likely from the flashing above not being installed correctly and non - compatible mat erial being used  lower skillion roof i s under pitch – inconsistent fall  a window located below the lower skillion roof is water damaged. JBI sugges ted this is due to the lower skillion roof and flashing being installed in a substandard manor  the gutter system made out of lead flashing located in the roof cavity under the roof linings between the main roof in the lower skillion roof is defective as it creates an area when water can pool  likely electrolysis (corrosion) due to incompatible mat erials being used in the construction of the lower skillion roof  roof sheeting in the lower skillion roof is installed higher than the guttering allowing water to flow past the guttering  cracked flas hing in the lower skillion roof. 3.4 The insurer’s scope of works Record Key points Financial firm’s expert ( H ) Scope of works 18 May 2021  Scaffolding to the rear verandah  r emove and replace the upper skillion roof  i nstallation of transition flas hing from slate to colorbond roofing  r epairs to bedroom 2 incl: sealing of the separation crack, painting of the ceiling and the wall. Financial firm’s expert ( H ) Scope of works 18 May 2021  S upply and replacement of the chimney capping x 2  supply and replace the damaged slate roof tiles  scaffolding for the repair to the slate roofing and chimney (left had side) Determination | Case number: 813837 Page 11 of 11  gutter repairs  crane hire and traffic management for the chimney cap replacements  home warranty insurance. 3.5 TJ’s quote Record Key points Complainants’ expert ( TJ ) Quote 22 November 2021  Repair and paint lounge room walls, dining room walls, bedroom 2 upstairs , the master bedroom ceiling, sunroom ceiling and cornic e  replace the sunroom windows x 2  replace and make to code the lower skillion roof  replace the upper skillion roof  remove and replace the main roof slates  remove, replace and paint the left hand side top gutter  furniture handling and scaffold hire. 3.6 Insurer not required to assess for non-compliance On the available material, on balance, the lower skillion roof defects may have been present at the time of JM’s assessment in 2015. I have considered whether JM was required to assess the lower skillion roof and report the defects to the complainants. JM was under no obligation to carry out further assessments. This is particularly so as there was no storm created opening on the roof and the reported internal water ingress related damage was minimal.