Delayed property A mortgage discharge and settlement; bank's communication and incorrect payout figures; losses from missed settlement of property B

FirmANZ
Decided2022-07-05
ProductCredit · Home loan
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,500
Amount claimed$70,000
SourceAFCA PDF

Summary

The complainants sought $70,000 after a delayed settlement of their property sale and a missed settlement on their purchase of another property. AFCA found the bank contributed to delay in discharging its mortgage and awarded $1,500 non-financial loss, but rejected liability for the property B losses as the bank was not on notice.

The bank was not aware of the property B contract or its essential settlement term, so the resulting losses were too remote from its conduct regarding property A.

Issues

Subjects and remedies

related party investmentpay non financial loss

Related

All ANZ determinations · Find similar determinations

Text of the determination

Determination Case number 811996 Financial firm Australia and New Zealand Banking Group Limited Determination | Case number: 811996 Page 2 of 8 Case number: 811996 28 June 2022 1 Determination overview 1.1 Complaint The complainants owned property 12B Drive (property A). Property A had a secured residential mortgage (mortgage) over the property to secure loans with the financial firm (bank). On 5 September 2020, the complainants entered into a contract of sale to sell property A for $880,000, with settlement scheduled on 3 November 2020. On 21 July 2020 the complainants entered into a contract of sale to purchase property 16L Street (property B) for $840,000. The settlement for property B was scheduled on the same day as property A. The settlement funds of property A were to be used to settle property B. The complainants had already paid a 10% deposit for the purchase of property B. On 14 October 2020, the complainants contacted the bank to notify it of the sale of property A and arrange a discharge of the mortgage (discharge) to ensure settlement. The settlement of property A and property B was delayed for two days. The complainants say:  the bank delayed settlement of property A and therefore property B failed to settle on 3 November 2020  if settlement for property A had been effected, the proceeds of sale would have been available for the complainants to complete the purchase of property B  the vendor proceeded to terminate the contract of sale of property B  they agreed to pay the vendor of property B $35,000 to settle, and  the bank’s delay was responsible for the loss associated with the delayed settlement of property B. The complainants seek $70,000 in compensation, which comprises of:  $35,000 paid to the vendor of property B, and  $35,000 in legal fees. On 24 December 2021, AFCA’s case analyst issued a recommendation partially in the complainant’s favour. A copy is attached to this determination. The complainants rejected the recommendation for the reasons set out in section 2.2. below. 1.2 Issues and key findings Were the findings in the recommendation correct? I have considered all the information submitted by the parties, including the further submissions the complainants have provided after the recommendation was issued. The findings in the recommendation are correct and are adopted in this determination . Do the complainants’ further submissions change the outcome? The complainant s’ further submission s do not change the outcome. The available information shows the bank was not involved in or was provided with any notice or direct instructions about the pending settlement of property B, or that it was important that the settlement for Determination | Case number: 811996 Page 3 of 8 property A proceed to settlement in a timely manner so the settlement for property B was not delayed. Why is the outcome fair? The complainants’ circumstances are unfortunate, and I understand they have suffered stress and inconvenience regarding the issues with the settlements of the properties. I consider much of their stress and inconvenience is due to the issues they experienced with the seller of property B who exercised his right to terminate the contract as they did not settle on the specified date in the contract. However, the bank had no knowledge of the terms of the contract for the purchase of property B and was not on notice of the ‘essential term’ in the contract, or that the settlement of property B was required to urgently take place on 3 November 2020. I consider the bank contributed to the delayed settlement of property A and non-financial loss compensation should be awarded in that regard. However, as the bank was not involved in or on notice of the settlement of property B, it is unfair to hold it responsible for the subsequent losses the complainants incurred from that settlement. The losses they claim are too remote from the bank’s conduct in relation to property A. 1.3 Determination This determination is partially in favour of the complainants. I agree with the case analyst’s reasons for the recommendation and the recommended outcome. If the complainants accept the determination within 30 days, then within a further 14 days the bank should compensate the complainants $1,500 for their non-financial loss associated with the delayed settlement for property A. If the complainants do not accept this determination the bank is not required to take the steps set out above or take any further action in relation to this determination. Determination | Case number: 811996 Page 4 of 8 2 Reasons for determination 2.1 Were the findings in the recommendation correct? The recommendation was correct I am satisfied that the recommendation contains an accurate summary of the complaint, the issues to be determined, any applicable paragraphs of the rules and any relevant law. The findings in the recommendation were correct and are adopted in this determination. A copy of the recommendation is attached to this decision. The complainants rejected the recommendation The complainants rejected the recommendation and say that:  it was the bank that solely caused the delay of the settlement of property A as it failed to respond to their requests for further information about the discharge  the online Property Exchange (PEXA) platform notes they have now provided to AFCA show their conveyancer recorded a proposed simultaneous settlement on 16 October 2020 to support their claim that the bank was on notice of the settlement for property B  the bank should therefore be responsible for the financial loss they incurred for the failed settlement of property B. 2.2 Do the complainants’ further submissions change the outcome? I do not consider any of the issues raised by the complainants change the outcome of this complaint for the reasons set out below. However, I have addressed the specific concerns raised by the complainants in their further submissions which relate to their claim that the bank is responsible for the losses they incurred due to the failed settlement of property B. The available information shows the bank was not involved in or was provided with any notice or direct instructions about the pending settlement of property B, or that it was important that the settlement for property A proceed to settlement in a timely manner so the settlement for property B was not delayed. The bank contributed to the delayed settlement of property A The complainants say that the bank was solely responsible for the delayed settlement of property A and they say:  even though they did not complete the discharge correctly, the bank delayed responding to them to fix up the inaccuracies  the bank’s responses were confusing and did not assist them in completing the discharge  the bank breached its obligations under the Banking Code of Practice (code), which required it to communicate with them in a timely and responsive manner. I have reviewed the discharge completed by the complainants which states the settlement for property A was scheduled to take place on 3 November 2020. Further, it says they have sold property A and will be closing all loans with the bank. The discharge was submitted to the bank on 17 October 2020. The bank responded on the same day asking for clarification about the loans to be repaid as the loan included in the discharge had already been repaid and closed. It provided Determination | Case number: 811996 Page 5 of 8 clarification about which loans were still secured by the property and asked for instructions on the disbursement of settlement funds. After the complainants responded to the bank, there was some confusion around the bank providing a response to their queries about the discharge. The complainants say they made multiple calls to the bank, which were ignored. The bank agrees it failed to call the complainants as it had undertaken to do at this time, and this contributed to the confusion around the completion of the discharge. It also acknowledged that its conduct in relation to the settlement of property A did not meet appropriate and reasonable service standards. The settlement did not take place until 5 November 2020, two days after the scheduled date for settlement in the discharge. Again, the bank acknowledges its failures in communication with the complainants has contributed to the delayed settlement of property A. The bank also contributed to the delayed settlement by providing incorrect payout figures as set out in the recommendation. Due to the bank’s error in this respect, the settlement was delayed for two days. However, I consider the settlement was also impacted by the complainants providing an amended discharge on the day prior to settlement. I agree with the recommendation in that the bank contributed to the delayed settlement of property A, and this caused the complainants stress and inconvenience. There is no information to show any direct financial loss related to the delayed settlement of property A. The bank was not appropriately notified of the simultaneous settlement for property B The complainants say the bank should have been aware that the settlement for property B was due to take place on the same day as property A, and therefore this settlement was also delayed for two days. Further, they say the impact of the delay was so onerous as to have caused the sellers of property B to exercise their right to terminate the contract, resulting in financial loss to the complainants. The complainants refer to the PEXA notes and specifically an entry made by their conveyancer on 16 October 2020, which refers to a simultaneous settlement as follows: 16/10/2020 16:27 AEST [Conveyancer] has created linked destination line item PEXA[number] for simultaneous settlement The complainants say this entry put the bank on notice of the simultaneous settlement for the scheduled settlement date. However, they also confirm that their conveyancer advised them that they were under no obligation to discuss the settlement of property B with the bank. I have reviewed information provided by the complainants which includes an email from their conveyancer dated 5 October 2021. She confirms that the bank was not a party to the purchase of property B as the complainants had advised they had sufficient funds from the sale proceeds to complete the purchase without the assistance of a lender. Further, that they never provided the conveyancer with authorisation to discuss the purchase with the bank. I have also reviewed a legal advice provided by the complainants which explains that the sellers of property B were entitled to terminate the contract if the buyers (complainants) breached an ‘ Essential Term ’ (essential term) which was defined to include a clause which required settlement to occur between 9.00am and 4.00pm on the settlement date. The available information does not show that the bank was informed of the purchase of property B until the day before settlement or provided with a copy of the purchase contract. It was told in a call with the complainants ’ conveyancer on the day prior to the scheduled Determination | Case number: 811996 Page 6 of 8 settlement for property A, that the complainants had purchased property B and that settlement was due to occur on the same day. However, it was not made aware of the critical requirement for settlement to occur on the scheduled date and the consequences for the complainants if it did not. This was a significant term of the contract which the bank should have reasonably been made aware of by the complainants, if they required the bank to ensure that settlement took place on the scheduled date. I do not consider the entry of the PEXA note above was sufficient to alert the bank to the requirement that property B had to settle on the scheduled settlement date as specified above. As stated by the complainants ’ own conveyancer, she did not have the complainants ’ authority to discuss the purchase with the bank, and therefore did not alert the bank to the critical nature of the essential term included in the contract. On the available information, the complainants and their conveyancer did not appropriately notify the bank of the pending settlement of property B. There is no information to show the complainants reasonably informed the bank of the settlement of property B and that it was critical it take place on the same day as the settlement of property A. Therefore, as the bank was not aware of this information, it cannot be held responsible for the losses that the complainants incurred due to the delayed settlement of property B. The bank is not liable for the complainants’ financial loss related to property B For compensation to be awarded for any loss, whether it be for direct or consequential loss, the loss must both have been caused by the breach and not be too remote. That is, it must have been reasonably foreseeable or within the contemplation of the parties at the time the financial product or service was provided. The complainants say that by the bank’s failure to settle property A as scheduled , the settlement for property B was also delayed, and the seller exercised his right to terminate the contract for property B. They were required to obtain legal advice about their rights in this respect but eventually resolved this dispute with the seller by paying an additional $35,000 to obtain the property. However, I consider the bank did not make any error in relation to the delayed settlement of property B as it was not on notice of it or of the special terms included in the purchase contract which required settlement to take place on the scheduled date (3 November 2020). It was not reasonably foreseeable by the bank, that the settlement for property B was required to take place on 3 November 2020, or the seller under that contract could have terminated the sale. Therefore, I do not consider the complainants’ loss was caused by the bank and it should not be required to compensate them for the financial loss they incurred. 2.3 Why is the outcome fair? The outcome is fair in the circumstances The complaina nts’ circumstances are unfortunate, and I understand they have suffered stress and inconvenience regarding the issues with the settlements of the properties. I consider much of their stress and inconvenience is due to the issues they experienced with the seller of property B who exercised his right to terminate the contract as they did not settle on the specified date in the contract. However, the bank had no knowledge of the terms of the Determination | Case number: 811996 Page 7 of 8 contract for the purchase of property B and was not on notice of the essential term in the contract or in fact, any of the contract terms. I consider the bank contributed to the delayed settlement of property A and non-financial loss compensation should be awarded in that regard. However, as the bank was not involved in or on notice of the settlement of property B, it is unfair to hold it responsible for the subsequent losses the complainants incurred from that settlement. The losses they claim are too remote from the bank’s con duct in relation to property A. Determination | Case number: 811996 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted our determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Recommendation Case number 811996 Financial firm Australia and New Zealand Banking Group Limited Case number: 811996 24 December 2021 Recommendation | Case number: 811996 Page 2 of 11 4 Recommendation overview 4.1 Complaint Mr M and Mrs D (the complainants) owned property 12 B Street (property A). Property A had a secured residential mortgage (mortgage) over the property. On, 5 September 2020, the complainants entered into a contract of sale to sell property A for $880,000, with settlement scheduled on 3 November 2020. On 21 July 2021, the complainants entered into a contract of sale to purchase 16 L property (property B) for $840,000. The settlement for property B was scheduled on the same day as property A. The settlement funds of property A were to be used to settle property B. The complainants had already paid a 10% deposit. On 14 October 2020, the complainants contacted the financial firm (bank) to notify it of the sale and arrange a discharge of the mortgage (discharge) to ensure settlement of the contract. The complainants say:  the bank delayed settlement of property A and therefore property B did not settle on 3 November 2020  the vendor proceeded to terminate the contract of sale of property B  they engaged a solicitor and ultimately agreed to pay the vendor of property B $35,000 to settle, and  the bank’s delay is responsible for the losses associated with the missed settlement of property B. The bank accepts it contributed to some of the delays, however it says it is not responsible for the complainants’ total loss. The bank has extended an offer of $34,549 to the complainants. The complainants seek $70,000 in compensation, which comprises of:  the $35,000 paid to the vendor of property B, and  $35,000 in legal fees. 4.2 Issues and key findings Did the bank delay the settlement of property A? The bank was partially responsible for the delay of property A’s settlement . Did the bank’s delay cause the complainant’s loss ? The bank was not involved or on notice of the settlement of property B. Therefore, the bank is not responsible for the associated loss. Why is the outcome fair? As the bank was not on notice or directly involved in the settlement of property B, it would be unfair to hold it responsible for the associated losses the complainants incurred. 4.3 Recommendation The recommendation is partially in favour of the complainants. Recommendation | Case number: 811996 Page 3 of 11 AFCA endorses the bank’s offer of $34,549 to the complainants as this amount is higher than what AFCA would award in normal circumstances. Recommendation | Case number: 811996 Page 4 of 11 5 Reasons for recommendation 5.1 Did the bank delay the settlement of property A? The bank was partially responsible for the delay of property A’s settlement . The complainant s’ initial discharge advice was incomplete On 17 October 2020, the bank received the complainants’ initial discharge advice form (form) which is signed and dated 8 October 2020. The form contained inaccurate information because:  it stated loan 3233 was secured by property A and requested it to be paid out in full upon settlement. However, loan 3233 had already been paid out and closed on 4 February 2019, and  the discharge advice did not contain any instructions in relation to the loans that property A was still securing. Importantly, it is not in dispute that loan 3233 (which the complainants took out to purchase property A) was paid out and closed. On 15 August 2017, the complainants agreed to a loan variation with the bank that sought to include property A to the security cluster of their investment home loans 7722 and 7772. Details of the loans and the security properties are set out in section 3.2 of this recommendation. The loans were still current when the complainants sought to sell property A. As such, the following information should have also been included in the form:  details of all the relevant loans  the complainants’ request on how they would like the bank to distribute the settlement funds. On 17 October 2020, the bank contacted the complainants by email and confirmed:  the loan details on the form were incorrect because loan 3233 was paid off and closed  property A was securing loans 2772 and 7722, and  it required instructions on the disbursement of the settlement funds. Based on the available information , I am satisfied the complainants’ initial inaccurate and incomplete discharge form contributed to the delay of property A’s settlement. The complainants should have known loans 2772 and 7722 were also secured by property A. It is not unreasonable for the bank to expect accurate discharge advice prior to proceeding with the complainants’ settlement request. The bank would have been required to conduct a security assessment to ensure the complainants’ intentions left its position protected. Accordingly, I am satisfied the complainants’ incorrect form delayed the process and the bank’s initial response was appropriate and within a reasonable timeframe. The bank’s subsequent responses were delayed The complainants say the bank did not respond to them in a timely manner and when it did respond, the information provided was unclear. This is what caused the delays. The Code of Banking Practice (CBP) requires financial firms to (among other things):  communicate with customers in a timely and responsible manner, and  act fairly and reasonably towards customers in a consistent and ethical manner. These obligations are set out in Part C, section 3 of the CBP. Recommendation | Case number: 811996 Page 5 of 11 AFCA has obtained the following documents from the parties:  email correspondence between the parties  the bank’s contact and system notes  letters sent to the complainants. Upon review, I note the complainants emailed the bank on 20 October 2020 after its response to their initial discharge advice on 17 October 2020 seeking further clarity. It was evident from the complainants’ response that they did not fully understand what was wrong with their discharge. Specifically, the emails show the complainants provided the following response to the bank: What do you mean [property A] is already paid off. What are you trying to say? The bank did not provide the complainants with further clarification about what it required. Rather, the bank’s employee:  sent the same email that was sent on 17 October 2020 without any further information, and  confirmed they would follow up with a call. The bank accepts a follow up call was not made as promised. The email correspondence also shows the complainants made multiple attempts to contact the bank about the issue. Specifically, the complainants sent emails to the bank attempting to resolve the issue on the following dates:  21 October 2020  26 October 2020 The bank’s contact notes also show the complainants made several calls to the bank seeking clarification about what was required so that settlement could proceed. The email correspondence and the bank’s contact notes show:  the bank did not return the complainants’ multiple calls  sent the complainants the same information they already had between the period of 21 October 2020 and 2 November 2020 with no further explanation or clarification. Regardless of whether the complainants should have been aware of their security position prior to completing the discharge or not, the bank should have provided a meaningful response to the complainants’ queries and offered adequate assistance. It was evident from the complainants’ responses that they were confused with what the bank required of them. The bank had an opportunity to clarify its position and discharge requirements to the complainants that it failed to take. In my view, t he bank’s failure to respond to the complainants’ misunderstanding also contributed to the delays with property A’s settlement. Further, I am not satisfied the bank met its obligations under the Code in this regard. The bank provided incorrect payout details The complainants say the bank provided incorrect payout details related to loans 2772 and 7722 regarding the settlement of property A, which also delayed settlement. Recommendation | Case number: 811996 Page 6 of 11 On 4 November 2020, the bank advised the complainants to reduce loan 2772 by $65,543. The complainants made an immediate attempt to deposit the required funds into loan 2772 to keep the full settlement amount of property A. The bank confirmed its error in its response dated 19 June 2021: It appears that subsequent to [Bank’s] email of 4 November 2020 there has been an agreement between yourself and [the bank] which has been encapsulated in the settlement authority. We note that this agreement did not require you to make such a large reduction in the amount owing on loan account 7722. We acknowledge that the communication of what [the bank] required for settlement of [property A] on 4 November 2020 was not clear. In its response to AFCA (dated 4 October 2021), the bank again acknowledged the mistake: The Settlement Authority dated 4 November 2020 confirms account 2772 was to be reduced to $426,297.00, reflecting a reduction of $8,003.69. While we acknowledge this is far less than the $65,543.00 reduction initially advised, it is a reduction none the less. I am satisfied the bank did provide the incorrect payout details to the complainants that delayed the settlement due on 3 November 2020. Settlement of property was being ultimately completed on 5 November 2020. 5.2 Did the ban k’s delay cause the complainant s ’ loss? The bank was not involved or on notice of the settlement of property B. Therefore, it is not responsible for the associated loss. However, the complainants are entitled to compensation for non-financial loss. The bank was not on notice of the settlement of property B The complainant says the failure to settle property A on 3 November 2020 led to the loss of the missed settlement of property B which was also due on 3 November 2020. While I accept the bank contributed to the delay in settlement of property A, it does not mean the bank is liable for the loss incurred because of missing settlement for property B. This is explained in further detail below. On 3 November 2020, the complainants intended to use the settlement funds of property A to secure the purchase of property B on the same day. The complainants acknowledge their conveyancer did not notify the bank of the proposed settlement of property B. They say this is because the settlement or property B did not involve the bank. By not settling property A on 3 November 2020, the complainants missed the settlement of property B, which resulted in:  the vendor of property B initially terminating the contract  the complainants engaging a solicitor and ultimately negotiating new terms to settle property B (specifically, paying the vendor an additional $35,000) The complainants say the bank is directly responsible for their financial loss associated arising from the missed settlement of property B. Recommendation | Case number: 811996 Page 7 of 11 As he bank was not aware of, or directly involved with the settlement of property B, I cannot find the bank is responsible for any loss caused because of the delay with settling property B. This is because it would be unreasonable to hold the bank responsible for a situation it was unaware of. The complainants are entitled to compensation for non-financial loss Under AFCA’s Rules, we can award compensation for non -financial loss to individuals for undue stress and inconvenience caused by an error of the financial firm. The maximum amount we can award for non-financial loss is $5,400 for each claim. However, AFCA takes a conservative approach to awarding compensation for non-financial loss. While the bank acknowledges its error regarding the settlement of property A, it also took steps to correct the error and extended a reasonable offer that would have appropriately compensated the complainant. The complainant did suffer stress an inconvenience regarding the prolonged settlement of property A and are each awarded of $1,000, totalling $2,000. The bank’s offer is better than the outcome AFCA can provide Despite our award for $2,000 non-financial loss compensation, the bank has confirmed it is willing to compensate the complainants for 50% of their total loss which equates to $34,459. This is far better than what AFCA would award in the circumstances, including for non- financial loss. Accordingly, in the circumstances it is more beneficial to the complainants to accept the bank’s offer dated 9 September 2021. The bank has confirmed the offer remains available for them to accept. Therefore, if both parties accept this recommendation, the bank should pay the complainants $34,459 to an account nominated by them. 5.3 Why is the outcome fair? As the bank was not on notice or involved in the settlement of property B, it would be unfair to hold it responsible for the losses associated. The outcome is fair The missed settlement of property B and the vendor’s initial decision to rescind the contract is unfortunate. However, it would be unfair to hold the bank responsible for a situation it was unaware of (specifically, the settlement of property B and the impact a delay of settlement of property A would have on it). Accordingly, it would not be fair to require the bank to compensate the complainant for the losses incurred because of the missed settlement of property B. Recommendation | Case number: 811996 Page 8 of 11 6 Supporting information 6.1 The AFCA process AFCA’s approach is based on fairness AFCA has assessed this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this recommendation to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Approach to Non-financial loss Non-financial loss includes claims for stress or inconvenience caused by an error of the financial firm. The maximum amount we can award for non-financial loss is $5,400 for each claim. We take a conservative approach to awarding compensation for non-financial loss. Compensation for non-financial loss is only provided where the complainant has suffered from an unusual amount of physical inconvenience or the time taken to resolve the situation has been unusually long. We do not award non-financial loss compensation merely because the complainant has suffered some inconvenience and anxiety. We expect complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. Generally, we will only award compensation for non-financial loss suffered by an individual. However, where a complaint is made by a company, we may award compensation for stress Recommendation | Case number: 811996 Page 9 of 11 or inconvenience suffered by the company’s directors if this is appropriate because of their close association with the company. Approach to indirect loss Indirect loss is financial loss which is caused by the financial firm’s conduct but is more distant than direct financial loss. Examples include loss of profit or revenue or additional amounts payable to a third party. Before we decide whether to award compensation for indirect loss, we will consider:  if the financial firm made an error or failed to comply with an obligation to the complainant  if so, what loss the complainant suffered because of the financial firm’s actions  if the loss was reasonably foreseeable to both parties, and  whether the loss is too remote from the error or failure. You will need to provide information that shows the loss and how it was caused. For example, if you are claiming for loss of profit, you will need to provide records showing the profit you usually made but did not make because of the financial firm’s error. Under AFCA’s Rules, the maximum amount we can award for indirect financial loss is $5,000 per claim. 6.2 Loan/Security Details Account number Date Approved Loan Type Maturity/Closed Security ** 7722 30/12/ 2015 Investment Loan 8/12/2045 Investment Property A Property A **2772 30/12/ 2015 Home Loan 21/09/ 2021 Investment Property A Investment Property B Property A **3692 29/12/ 2015 Home Loan 15/04/ 2016 Investment property B Investment Property C Property A **3233 4/28/2017 Home Loan 4/02/2019 Property A 6.3 Chronology Date Key points 15 August 2017  Letters of Variation.  Property A cross securing loans 7722 and 2772. 21 July 2020  The complainants sign a contract of sale to purchase property B. Recommendation | Case number: 811996 Page 10 of 11  Settlement to occur within 105 days from date of contract. 8 October 2020  The complainants sign a discharge advice for property A.  Proposed settlement 3 November 2020 14 October 2020  The bank receives the discharge advice for property A. 17 October 2020  The bank responds with an email to the complainants’ discharg e request: ‘ Acknowledge discharge aut hority. Noted with the release of property loan 233 is to be paid out, however the loan is already closed. Two open loan accounts noted whic h are linked to the property. Loan ending 7722 and 2772. Please confirm which of the open account linked to the releasing property is to be paid out / reduced using the sale proceeds. Based on the confirmation, we will have to raise a request fo r valuation to assess the file.’ 21 October 2021  The complainants respond to the bank via email: ‘ What do you mean Property A is already paid off. What are you trying to say? Cheers (complainant ) . Call me on XXX’ 21 October 2020  The bank responds to the complainants with the same email as 17 October 2020. 26 October 2020  The bank representative responds to the complainant via email that she will call him in the morning to discuss the ‘loan arrangement’ regarding property A. 2 November 2020  The bank receives an amended discharge advice including loan 2772 and 7722.  The bank respond s to the complainant that there are still no instructions regarding the received settlement funds and he remaining loans. 3 November 2020  The complainants reach out to another bank representative seeking assistance with their settlement of Property A. 3 November 2020  The complainant emails the bank representative seeking urgent reply regarding settlement pf Property A. 3 November 2020  The vendor’s solicitor advises the complainant that they intend to terminate the contract of property B. Recommendation | Case number: 811996 Page 11 of 11 4 November 2020  The bank representative emails the complainants acknowledging receipt of the corrected discharge though still has the same instruction – no details regarding the remaining loans.  The representative advises that the complainants will need to reduce the ir remaining loans by $65,543. 4 November 2020  The complainant emails the bank to confirm that he has transferred $63,000 in the remaining loan accounts in accordance with the advice from their previous bank manager.  They also seek confirmation that the a mount is adequate. 4 November 2020  The bank representative responds with an email to confirm they have enough to proceed with an assessment of the complainants’ security position after the release of property A. 5 November 2020  Property A settled. 7 May 2021  Property B settled.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.