Storm/leak water damage claim: scope of works, settlement amount, mould remediation, contents, temporary accommodation and non-financial loss
Text of the determination
Determination
Case number 811424
Financial firm AAI Limited
Determination | Case number: 811424 Page 1 of 13
Case number: 811424 11 May 2022
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insured events policy with the financial firm
(insurer).
In January 2020, the complainant lodged a claim after she noticed mould in the bathroom.
There were leaks found in the bathroom, specifically in the toilet and shower recess. The
insurer says the mould was remediated and repairs were cash settled.
Subsequently, further leaks were detected, and a second claim was lodged in March 2020.
A dispute has arisen as the complainant believes the insurer’s scope of works and settlement
amount is inadequate. The complainant says there is mould toxicity present inside the
property and in the subfloor, which needs to be remediated. The complainant says most of
the contents inside the property are unsalvageable and need to be replaced.
The complainant has been assisted by a representative. Reference to the complainant in this
determination includes references to the complainant and to the representative.
1.2 Issues and key findings
What is the extent of the insurer’s liability ?
The insurer’s current quotation ($64,809.76) and $4,741 for mould remedi ation is not
adequate. The insurer is to settle this component of the claim in the manner set out in section
2.1.
Is the insurer required to remediate the mould?
Yes. The panel is satisfied the insurer is required to attend to the mould inside the property
and in the subfloor, in accordance with the provisions of this determination.
Is the insurer required to replace the contents?
The panel considers the insurer’s prop osal to reassess the contents is reasonable in the
circumstances. If the assessment shows the contents are mould affected due to the
sewerage and toilet leaks, it is reasonable for the insurer to be given an opportunity to restore
the contents. If the contents are not restorable, the insurer is to replace the contents or cash
settle the complainant for the contents that are not restorable.
Is the complainant entitled to further temporary accommodation costs?
Yes. The insurer is to cover ongoing temporary accommodation until the insured property is
repaired and habitable. The specifics are set out in the Determination.
Is the complainant entitled to more non-financial loss?
Yes. The insurer failed to manage the claim appropriately and is required to increase its offer
of non-financial loss compensation to $4,000.
Determination | Case number: 811424 Page 2 of 13
Is the complainant entitled to financial loss?
Yes. The insurer is required to pay $3,581.50, which amounts to the fees incurred by the
complainant for building repairs and mould reporting.
Why is the outcome fair?
This outcome is fair because the available evidence shows the insurer’s scope of work and
settlement amount is inadequate.
It is also fair for the insurer to reassess the contents to determine the policy coverage.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is to meet its obligations to the complainant in accordance with the terms and
conditions of the policy and the provisions of this determination.
Determination | Case number: 811424 Page 3 of 13
2 Reasons for determination
2.1 What is th e extent of the insurer’s liability ?
Complainant reported cracking at the property in 2015
In December 2015, the complainant contacted the insurer after she noticed a gap between
the floor and wood (skirting) in her son’s bedroom. She also noticed cracks to the walls and
flooring and heard a squeaking noise which was ongoing. She believed it was due to hot
weather.
During this conversation, the insurer notified the complainant it was an insured events policy
and a cause like ‘heat’ would not be covered unde r the policy. The insurer asked the
complainant to provide a report to support her claim. The complainant did not provide the
report and a claim was not lodged.
Circumstances surrounding the claim
On 17 January 2020, the complainant lodged a claim after she noticed mould and a
mushroom growing near the bathroom. The insurer appointed RN to undertake a leak
detection test.
RN carried out multiple leak detection tests. During the first visit on 23 January 2020, RN
noticed water damage to the timber architrave of the main bathroom. RN noticed the shower
recess in a poor condition with cracked floor and wall tiles.
RN pressure tested the pipes in the bathroom and flood tested the shower recess, there were
no leaks detected.
RN noticed elevated moisture readings on timber architrave at the bathroom’s entrance . It
reported the damage to the architraves is due to a waterproofing failure from the shower
recess.
On 19 February 2020, RN conducted further testing and found a perished rubber on the
toilet ’s pan collar. RN reported after flood testing the shower for two hours, it observed water
being pushed up between wall and floor tiles next to the shower recess. RN did not notice any
dye water leaking in the subfloor.
RN carried out a CCTV inspection of the toilet waste pipe and found a damaged section of
the earthenware sewer pipe. The damaged pipe was located around the footing.
RN concluded the following:
bathroom architrave has been damaged due to deteriorated toilet’s pan collar
mould and damp brickwork within the subfloor area of bedroom 1 and bedroom 3 relates to
the leaking sewer pipe.
The insurer says the mould was treated outside the bathroom and it cash settled the
complainant for damage to the architraves.
Because of the leaking sewer pipe, a new claim was lodged. The insurer has offered to pay
the complainant for the following:
building repairs - $64,809.76
mould remediation - $4,741
non-financial loss - $2,000
Determination | Case number: 811424 Page 4 of 13
A dispute has arisen as the complainant believes the insurer’s scope of works and settlement
amount is inadequate. The complainant says there is mould toxicity present inside the
property and in the subfloor, which needs to be remediated under the claim. The complainant
says most of the contents inside the property are unsalvageable and need to be replaced.
The complainant believes the insurer should pay for the temporary accommodation until t he
property becomes liveable.
Parties disagree on scope of works
The insurer has accepted damage to the three bedrooms, hallway near the bathroom,
subfloor damage near the pantry/storage room and lounge room.
The complainant says the subject leaks also caused damage to the bathroom along with
damage to the subfloor including mould toxication.
The complainant has raised several arguments, including commentary on the findings of the
insurer’s engineer . However, the panel considers the complainant is seeking the insurer to
include the following in its building scope of work:
bathroom damage
subfloor timber
mould remediation of the subfloor area and internal property.
Insurer ’s offer for bathroom damage is fair
The complainant says the insurer has not assessed the bathroom damage correctly. She
says, on the balance of probabilities, the bathroom has suffered damage given the leaks
originated from the bathroom and underneath the bathroom causing substantial damage to
the other areas of the property.
The insurer accepted damage to the timber architrave near the bathroom’s door, which was
caused by toilet pan collar leak. The insurer remediated the mould near the bathroom door
and paid $655.49 for the architrave damage.
The insurer has relied on its engineer’s (DK) findings. DK attended the property on 21 July
2020 and did not report any damage in the bathroom.
In its response of 19 October 2021, DK reported there did not appear to be any noticeable
damage to the timber floor structure in the subfloor under the bathroom or hallway. The two
photographs provided by DK show the timber under the bathroom and hallway is dry and not
water affected.
The complainant says DK did not enter the bathroom and hence, did not see any damage in
the bathroom. She believes the builder, or the engineer did not use any tools to undertake a
thorough assessment of the bathroom.
She has provided a report from her builder (RC). RC has not provided any information to
show the bathroom has suffered any damage from the leaks.
The complainant says mould is forming underneath the floor tiles in the bathroom due to the
toilet leak along with staining near the toilet. The complainant has provided a quotation from
another builder (PP) which includes bathroom repairs amounting to $17,323 excluding GST.
Essentially, PP’s scope of work includes demolition and reinstatement of the bathroom.
RN’s leak detection report confirmed there was a small water stain visible at the base of the
toilet’s pan collar. RN also engaged a restorer (RK) who noticed mushroom growth in October
Determination | Case number: 811424 Page 5 of 13
2020, near the bathroom door. RK assessed the subfloor area under the bathroom where it
found water damaged timber.
RN provided a quotation of $3,504.60 for mould remediation as per the restoration report. The
quotation included removal of bathroom door jamb and mould remediation around the area.
The complainant has provided a quotation from PP for identical works which amounted to
$4,741. The insurer has agreed to pay $4,741 for these repairs
The panel notes RN’s scope of work does not include the replacement of the water affected
timber under the bathroom which was observed by RK [this damage will be addressed later in
the Determination].
While there is no dispute the leaks originated from the bathroom, the panel is not satisfied
there is any evidence, including the photographs, to show the leaks caused damage to the
bathroom itself (apart from a small stain mark and the door jamb) in a manner that it requires
replacement. The panel is not satisfied bathroom demolition and reinstatement is required to
rectify the claim related damage.
Accordingly, the panel is satisfied the insurer is not required to include bathroom repairs in
the claim settlement apart from paying $4,741 for the door jamb and its mould remediation
and addressing the water stain marks at the base of the toilet pan collar.
Engineer recommended maintenance repairs to be undertaken in the subfloor
DK inspected the subfloor where it noticed timber floor joists and bearers were supported on
the isolated brick piers and foundation walls. It noticed the ground surface in the subfloor to
be damp under the three bedrooms.
DK noticed there was no damp-proof coursing (DPC), ant-capping or similar separation
between timber framing and the supporting piers or blockwork walls. DK noticed there was
poor support in some parts of the floor framing in the subfloor as timber wall plate was used
rather than a bearer/lintel.
DK recommended the following works to be undertaken in the subfloor area:
increasing subfloor ventilation by installing permanent mechanical ventilation system
installation of ant- capping / DPC’s between timber floor f raming and pier/ wall supports
where ‘crushing’ of timber bearers has occurred at wall supports due to long -term moisture
exposure, local remediation be undertaken
suitable bearers / lintels be installed across access holes in the internal subfloor walls to
support floor framing.
The insurer says these repairs are the responsibility of the complainant as they are required
to address the pre-existing issues in the subfloor area. Further, the insurer says these are
considered as improvements to the property and are not required due to the subject leaks.
The panel notes the complainant’s builder (PP) also confirmed there is poor ventilation to the
subfloor area.
Insurer accepts subfloor repairs under the lounge, pantry area and bedroom 2
DK reported the central pier below the pantry/storeroom has settled significantly and a floor
bearer is poorly supported on the internal brick pier under the lounge room.
DK noticed moisture staining to bearer at wall support, which had no separation under the
storeroom. It also noticed moisture staining to timber framework under bedroom 1 and 2. DK
Determination | Case number: 811424 Page 6 of 13
reported this is due to no DPC, ant capping or similar separation between framing and the
supporting piers or sandstone blockwork walls.
DK provided a scope of work (after its first assessment) which mainly included repairs to
hallway, bedroom 1 and bedroom 3. DK reported the settlement of the floor in bedroom 2,
springy floor of lounge room and pantry were not caused by the leaks.
After a further assessment, the insurer accepted damage to the flooring in the bedroom 2 and
subfloor repairs under the lounge and pantry/storeroom area.
The insurer has accepted demolition and replacement of the existing isolated pier and footing
under the pantry/storeroom. The insurer is also covering temporary propping and packing to
the western timber floor bearer under the lounge room.
Insurer proposed scope of work in subfloor is inadequate
The complainant says the current scope of work leaves the timber framework wet,
deteriorated and moisture stained which would potentially further jeopardise the property.
Accordingly, she wants the timber framework in the subfloor impacted by the leaks to be
replaced and ventilation to be installed in the subfloor area.
DK says the areas in bedrooms where timber floor framing has settled differentially compared
to the adjacent wall, it indicates the floor frame has undergone localised settlement at its wall
support. Such localised settlement indicates compression/ crushing of the timber from long-
term moisture uptake through the foundation walls due to a lack of separation like a damp-
proof course or ant-capping.
The panel notes the insurer has accepted subfloor repairs under the pantry/storeroom area
where DK observed moisture staining to the timbers, even though DK reported the staining
under the bedrooms 1 and 2, pantry/storeroom area is due to the absence of separation like
DPC, ant capping, etc.
The insurer has not included the timber damage which was observed by the restorer (RK)
underneath the bathroom. The complainant says this damage is due to the subject leaks. The
insurer has provided a report from DK who says that there was no noticeable damage to this
area. The panel is satisfied this area was not damaged due to the subject leaks. Accordingly,
the insurer is not required to include these works in its coverage under the policy.
The panel notes the complainant’s builders have recommended installing a ventilation
machine to dry out the moisture. The panel considers this to be an improvement to the
property and the insurer is therefore not required to include this in the cover under the policy.
The parties have provided quotations for repairs. The panel is satisfied that the insurer’s
quotation is not actionable, an d the complainant’s quotation from PP includes items that the
insurer is not required to cover, for example, $15,000 for drainage works.
In the interest of finalising this long running dispute the panel is satisfied that the insurer’s
cash settlement for repairs should be based upon the quotation from RG, dated 22 November
2021, in the amount of $68,250 excluding GST. To this amount should be added 15% for
contingencies, making an amount of $86,336.25. The insurer is not required to pay interest on
this amount.
If the insurer has paid for the door jamb in the bathroom, it is entitled to deduct this amount.
Determination | Case number: 811424 Page 7 of 13
2.2 Is the insurer required to remediate the mould?
Insurer’s mould expert says no mould remediation required
During the restorer’s (RK) attendance on 3 and 6 October 2020, RK noticed a mushroom
growing near the bathroom. This is the same place where a mushroom was observed in
January 2020, which was deemed to be due to the toilet leak.
Following this assessment, RK cordoned off this area and the complainant and her family
were moved into temporary accommodation.
During RK’s investigation, elevated moisture readings were detected near the bathroom and
hallway. RK conducted a swab test of the microbial fungal and the results of that swab
returned with the potential to produce mycotoxins.
The insurer appointed a hygienist (MC) to inspect the property and assess the mould spore
concentrations and potential sewerage contamination. On 29 April 2021, MC attended the
property and did not observe mould or water staining in the three bedrooms, kitchen and
living room area.
MC took surface and air samples from inside the property and subfloor. The surface samples
returned at low levels of mould spore concentrations. The internal pr operty’s air samples
came back at normal ecology levels, however, subfloor results were considered as ‘very
high’. It says as subfloor is not a living area, these levels of readings are not unusual.
MC accepts there was low count of Aspergillus/Penicillium in the subfloor which is common.
The surface samples confirmed there were no coliform or E.coli detected at the property.
The indoor humidity was recorded as above the range recommended by the ASHRAE
guidelines. MC concluded there is no indication that sewerage or mould spore concentrations
are present at levels outside of what can be considered ‘Normal’ and no remediation works
are required to address mould spore concentrations or coliform/E.coli levels observed within
the subject area.
Complainant’s expert tests came back as positive for mould
The complainant obtained a hygienist report from AS. AS attended the property on 6 May
2021 and noticed a strong unpleasant odour throughout the property. It noticed mould in one
bedroom, but it was not tested. It took surface samples which returned a reading of elevated
moisture levels in multiple parts of the property.
The samples obtained by AS returned results which showed there was mould species like
Aspergillus/Penicillium present in some parts of the property. AS reports this type of mould
species is toxic and allergic.
AS recommended further testing throughout the property to determine the source and the
extent of contamination.
Insurer has agreed to undertake a further mould investigation
Both mould experts have reported shortcomings on the other’s report. MC says AS did not
collect an outdoor sample for comparison to the indoor air and without the outdoor sample, it
is impossible to know the expected airborne spore concentrations or genus distributions
inside the property. AS says comparing indoor and outdoor air samples is one of multiple
methods to identify mould contamination. This is also confirmed in MC’s report.
Determination | Case number: 811424 Page 8 of 13
Further, MC says the mould noticed by AS in the bedroom was not tested and would unlikely
be due to the sewerage leak because of its location (near the top of the wall). It also says AS
did not inspect the subfloor area which was the only source of moisture.
AS says it did not test the mould because of financial constraints of the complainant.
AS says MC has analysed 25% of the sample instead of 100%, which makes its results
subjective because of the selection of the sample type. Further, it says MC results are not
calculated as per spores/m3 and the uncertainty in that type of measurement is much larger.
AS says MC did not take the moisture reading of the floor surfaces at the property and more
importantly, in the bathroom where the leak was identified.
On 22 June 2021, the insurer’s assessor also noted MC did not take any moisture readings in
the bathroom to alleviate the complainant’s concerns. The panel has carefully reviewed the
claim notes and MC’s reports, there is no information to confirm the reasons why moisture
readings were not taken in the bathroom.
The results clearly show there is mould in the subfloor as shown in MC’s report. The panel
does not accept MC’s report proves there is no mould inside the property because firstly, MC
did not take any moisture reading in or near the bathroom where the mushroom growth was
found. Further, AS results show there is mould (Aspergillus/Penicillium) present in some parts
of the property which was also found by MC in the subfloor.
The panel acknowledges the insurer has agreed to undertake further mould investigation.
The panel is satisfied that it is fair that the insurer obtains a mould assessment and an
actionable quotation, for mould remediation.
The insurer is to cash settle the complainant the amount of the quotation, plus a 15% uplift for
contingencies.
2.3 Is the insurer required to replace the contents?
Complainant says all the contents are non-salvageable
The insurer appointed a restorer (CG) to attend the property and assess the contents
damage. On 10 June 2021, CG attended the property and took surface samples from
contents. The contents which were tested in the two bedrooms returned high mould count
reading.
CG reported the previous experts who undertook the testing at the property did not
specifically identify and link the cause of damage to the content items. Accordingly, it says the
mould sampling should be considered conditional.
CG says the impact of the sewer leak in the subfloor and toilet leak in the bathroom would
have remained confined to the subfloor and the bathroom only.
During its assessment, CG says the complainant requested it to list all the content items as
non- salvageable because of her family’s health concerns. CG says due to the onsite pressure
from the complainant, it compiled a list for the insurer.
Based on the list provided by CG, the complainant says every single content item in the
property is damaged and non-salvageable. The complainant has provided photos of clothing,
furniture, etc. which she says show mould on these items.
Determination | Case number: 811424 Page 9 of 13
The insurer has offered to re-attend to reassess the contents. Based on the available
information, the panel is not satisfied there is persuasive evidence to prove the content items
have been damaged by the covered leaks. While the contents may be mould affected, the
panel is not satisfied the information shows all the contents items have been damaged by the
covered leaks and in a manner that they require replacement. The panel notes items like
clothing could be laundered and furniture could be cleaned by the restorers.
The panel considers the insurer’s proposal to reassess the contents is reasonable in the
circumstances. If the assessment shows the contents are mould affected due to the
sewerage and toilet leaks, it is reasonable for the insurer to be given an opportunity to restore
the contents. In the event the contents are not restorable, the insurer is required to replace
the contents or cash settle the complainant for the same.
Restoration and storage of the contents is to be at the insure r’s cost, unless otherwise
directed by the complainant.
2.4 Is the complainant entitled to further temporary
accommodation costs?
Policy covers temporary accommodation
The complainant holds a home and contents policy with the insurer which covers damage
arising from listed events. It includes an additional benefit which covers temporary
accommodation if the insurer agrees the property is uninhabitable because of an insured
event. The benefit is payable in line with the policy limit of 12 months in which the insurer
pays reasonable and necessary costs.
Following the assessment by RK, it cordoned off the bathroom and the insurer had placed the
complainant and her family in temporary accommodation from late October 2020. The insurer
says it had continued to extend the accommodation until 7 January 2022. The complainant
says she is currently living in a rental property and would like the insurer to pay for the
temporary accommodation until the property becomes habitable.
Insurer to pay temporary accommodation costs until property habitable
The following is not in dispute:
the insurer has fulfilled its policy obligation towards temporary accommodation
the insured property remains uninhabitable
the claim has been subject to delays and repairs have not commenced.
What remains in dispute is whether the complainant is entitled to ongoing temporary
accommodation until the repairs are completed.
Having considered the submissions and information provided by both parties, the panel does
not consider it fair the complainant funds for ongoing temporary accommodation for an
accepted claim until the property becomes liveable.
This is because:
the insurer’s assessment of the scope of work was incorrect
the scope of works and cash settlement offered by the insurer is inadequate as previously
established in this Determination
reports show, on balance, the property is mould affected and mould remediation needs to
be undertaken under the claim.
Determination | Case number: 811424 Page 10 of 13
The insurer is required to continue to pay temporary accommodation until the complainant is
cash settled. The insurer is to obtain an estimate for completion of mould remediation works
and pay the complainant for three months of temporary accommodation, in addition to the
estimate for mould repairs.
2.5 Is the complainant entitled to more non-financial loss?
AFCA can award non-financial loss in certain circumstances
The complainant seeks non-financial loss for stress and inconvenience due to the way the
insurer handled the claim.
AFCA will only award compensation for non-financial loss where there has been an unusual
amount of physical inconvenience, time taken to resolve a situation, or interference with the
complainant’s expectation of enjoyment or peace of mind. Compensation is capped at an
award of $5,400.
In assessing whether to award compensation, we expect complainants to be moderately
robust, bear the normal degree of inconvenience experienced when a problem occurs, and
take reasonable steps to minimise the inconvenience suffered. Where a complainant has
contributed to their loss arising from the financial firm’s conduct, the level of compensation
may be reduced accordingly.
The complainant says extreme claim delays, claims mishandling, and poor attitudes of the
insurer's staff has caused a lot of stress and inconvenience to her and her family. The
complainant says she did not feel heard and her requests were ignored by the insurer. The
complainant says her family suffered multiple health issues due to the claim.
The complainant says on some occasions, the temporary accommodation was extended at
the last moment which caused her and her family anxiety and stress.
The panel notes the insurer amended the scope of works on multiple occasions. Initially, only
bedroom 1 and 3 along with hallway were included in the scope of work. Subsequent
assessments took place after the complainant raised concerns with the scope of work, which
resulted in the scope of work increasing.
In the circumstances, the panel agrees there has been an unusual degree of physical
inconvenience caused by the claims process. Further , the claim’s decisions have resulted in
an unusual amount of time taken to resolve the situation which would have interfered with the
complainant’s expectation of enjoyment or peace of mind.
The panel notes the insurer has offered $2,000 as non-financial loss in recognition of the
complainant’s claims experience. Taking all matters into account, the Panel is satisfied it is
fair the insurer pays the complainant $4,000 for non-financial loss compensation.
2.6 Is the complainant entitled to financial loss?
Complainant is entitled to compensation for some professional costs
Under AFCA’s Rule D.3.2 , AFCA may require an insurer to contribute to professional fees
incurred by the complainant during their dispute. Under our Rule D.4, it sets out the maximum
AFCA can award a complainant for indirect financial loss is $5,400.
The complainant seeks reimbursement for fees incurred in obtaining reports from:
Determination | Case number: 811424 Page 11 of 13
RC - $1,012
PP - $1,419.50, and
AS - $1,150.
The panel is satisfied that the three reports assisted the complainant to prove the extent of
her loss. In the circumstances the insurer should reimburse the complainant the costs of the
three reports.
The insurer is required to pay interest as per Section 57 of the Insurance Contracts Act from
the date of the complainant paid for these reports, until the reimbursement date. The
complainant is to provide proof of payment of these reports.
Complainant is seeking reimbursement for other costs
The complainant says she incurred costs in purchasing furniture which they needed after they
moved in a leased property in July 2021. The complainant says she had to buy the essential
household items such as bedding, desks, washing machine, etc to ensure her family could
live in the leased temporary accommodation.
The panel notes the complainant and the insurer discussed the temporary accommodation
arrangements in July 2021. During these discussions, the complainant confirmed she was
able to find fully furnished properties for around $1,100 per week. The insurer approved the
complainants request of a property at a rent of $1,100 per week.
The panel notes the complainant was not able to procure the first rental property which she
found.
In the circumstances, the panel is not satisfied these costs were necessary. There would
have been an expectation that the property of a similar weekly rental payments would also be
furnished. Accordingly, the insurer is not required to cover these costs.
The complainant says her family members developed sleep disorders which was due to them
staying in different accommodations over the life of the claim. The complainant says the
family members had to consult a doctor and receive treatment for the same. The complainant
says this resulted in them incurring additional medical costs which she is claiming.
While the panel accepts the claim would have caused stress and inconvenience to the
complainant and her family, there is no specific evidence that links the medical evidence with
the actions of the insurer.
Further, the panel considers these costs would be considered as consequential which is
excluded under the policy. Accordingly, the panel is not satisfied the insurer is required to pay
these costs.
2.7 Why is the outcome fair?
This outcome is fair because the available evidence shows the insurer’s scope of work and
settlement amount is inadequate in the circumstances.
It is also fair for the insurer to reassess the contents to determine the policy coverage.
If the parties cannot agree on the application of the provisions of this determination, they may
return to AFCA for further review. This does not mean that the parties can challenge the
determination itself, as the determination is final.
Determination | Case number: 811424 Page 12 of 13
Determination | Case number: 811424 Page 13 of 13
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.