Home / Allianz Australia / Determination 810937

Determination 810937

Water damage claim repairs and settlement

FirmAllianz Australia
Decided2022-11-16
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$3,500
Amount claimed$308,643
SourceAFCA PDF

Summary

The complainant made a water damage claim under a home insurance policy, with repairs stalled and mould found in the property. AFCA found the insurer's conduct and the repairs unsatisfactory and ordered a full reassessment, mould assessment, accommodation, and $3,500 non-financial loss.

The insurer had accepted the claim, so it was unfair to deny the complainant the right to have the property properly repaired, and its conduct was unsatisfactory.

Issues

Subjects and remedies

home or building damagepay compensationpay non financial lossprovide documentsrepair or rectify

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Amended determination Case number 810937 Financial firm Allianz Australia Insurance Limited Amended determination | Case number: 810937 Page 1 of 7 Case number: 810937 16 November 2022 1 Determination overview 1.1 Complaint The complainant holds a Home and Contents policy with the financial firm (insurer) and lodged a claim following water damage which occurred at the property on 4 December 2019. The original complaint was in relation to a service complaint but following an agreement between the parties, it is now in relation to the claim and the subsequent decision by the insurer in relation to the claim. The insurer agreed to commence repairs but during the process, further damage was found to the premises from alternative water ingress and a further two claims were lodged at the suggestion of the insurer. The complainant further says that he was required to replace the roof of the premises, which cost $27,179. 1.2 Issues and key findings Insurer to undertake full assessment of property On the information provided to me, on balance, I am satisfied as follows:  the complainant has established claim for damage to the property from the water ingress  the insurer has accepted the claim  the property has been substantially affected by mould  the property has not been satisfactorily repaired  the condition of the property may result in a danger to the complainant and family due to the existence of mould. Resolution of claim The insurer is to appoint an independent builder to provide an up to date assessment of the property including requirement to complete the repairs, carry out mould remediation, and provide an actionable quote and scope of works. This quote is to provide a starting date for the repairs and an estimate of the time period to complete the repairs At the option of the complainant, the matter may be cash settled with an uplift of 20% to cover contingencies and loss of guarantee. The insurer is also to undertake an assessment of any contents which were damaged as the result of the ingress of the water or as the result in the delay to undertake the repairs to the house. Is the complainant entitled to non-financial loss? I am satisfied that the conduct of the insurer has not been satisfactory. In the circumstances, I am satisfied that the insurer is to pay the sum of $3,500 non-financial loss. Amended determination | Case number: 810937 Page 2 of 7 Is the complainant entitled to alternative accommodation? The complainant is entitled to accommodation until the property has been repaired by the insurer, or if the matter has been cash settled for the period which the above assessment anticipates as time for completion of all repairs. Mould remediation The insurer is to carry out a further assessment upon completion of repairs in relation to mould in the premises. If this matter is cash settled, the insurer is to pay the complainant the sum quoted for this assessment together with a 20% uplift. Why is the outcome fair? The conduct of the insurer in this matter has not been satisfactory. The repairs to the property have not been satisfactory and have not been completed in a satisfactory manner. It would be unfair to deny the complainant the right to have his property repaired, given that the insurer has accepted the claim. 1.3 Determination This determination is in favour of the complainant. The insurer is to carry out the following:  arrange an actionable quotation and scope of works together with estimate of time for completion  arrange for accommodation for the complainant until the completion of the repairs  arrange an inspection of the premises by a mould expert at the completion of the repairs and to carry out any further works as required in that report  pay the complainant non-economic loss of $3,500. If this matter is cash settled, which would be at the discretion of the complainant, the insurer is to provide an uplift of 20% on the repairs and mould assessment. Amended determination | Case number: 810937 Page 3 of 7 2 Reasons for determination The insurer has accepted three claims in this matter which are related to ingress of water. The dispute originally arose over the service however, it has been agreed by the parties that this matter can proceed as a determination as to outcome and completion of the insurer’s responsibilities. 2.1 Insurer to undertake the following Summary of facts The complainant lodged a claim on 5 December 2019 as a result of water damage which occurred the day before. The complainant advised that water had flooded from the washing machine and there was damage to the living room, carpets and lino in the kitchen. The insurer appointed a repairer (ORS). ORS arranged for a quotation for the flooring and carpets. When the carpet was lifted to undertake repairs on 6 March 2020, further damage was discovered. The insurer appointed a builder TBS to provide a report and scope of works. TBS suggested that there might be a further leak to the property and a leak test confirmed there was a leak from the shower breach/combo in the bathroom. A second claim was lodged in relation to this damage. TBS provided a scope of works and the complainant agreed for them to proceed with the repairs. Subsequently, TBS advised there had been a partial collapse of the ceiling in the complainant’s bathroom. TBS arranged for a roofing consultant (OW) to examine the roof. OW suggested the collapse was due to overflowing gutter. TBS then advised that there was mould in the property and was unsafe to continue to work until the mould had been rectified. A third claim was lodged for the overflowing gutter. The insurer says this claim has subsequently been closed and the costs met under the two- previous legal lodged claims. On 3 July 2021 OPS confirmed the presence of mould meant that temporary accommodation was required. The insurer accepted this cost of accommodation. A consultant (SE) was appointed to manage the claim. SE obtained a scope of works from its building consultancy division (SBCD) together with a mould report from (P). Subsequently, TBS obtained a quotation for repairs in the sum of $66,810.60. The complainant accepted this scope of works. On 18 March 2021, SE advised the bathroom ceiling had been replaced but more mould had been found. Subsequently after a site meeting with the complainant, TBS and OPS it was arranged for repairs to commence on 31 May 2021 and accommodation was arranged for the complainant. Amended determination | Case number: 810937 Page 4 of 7 TBS removed the kitchen cabinetry and found further mould. TBS then arranged for a cleaning and inspection group EHO and further testing by (CIRTS). Based on the reports, it was recommended that full mould remediation of the entire house was to be recommended. The insurer agreed to accept the cost of mould remediation. Subsequently, SE advised that the glue in the living room concrete slab contained asbestos material which needed to be removed to enable the mould remediation to take place. Subsequently on 6 July 2021, the complainant was provided with an action plan regarding the next steps. The complainant agreed to this plan. Subsequently to reduce the chance of regrowth of mould, it was arranged to provide a report on ventilation and potential cause of mould and also arrange for a further leak test by SBCD. SBCD confirmed that the asbestos had been removed and that the mould remediation could commence. The insurer has made an offer to settle this matter by paying the sum of $200,744.23 with a 15% contingency. Subsequently, the complainant says that the condition of the premises has deteriorated in the last six months. The complainant has paid for repairs to the roof, as the insurer stated these were not covered under the claim. The complainant has provided a breakdown of the cost to restore the premises as follows: Restoration Cost (Based upon Allianz Insurance figures) 200,744.23 + 7% Inflation 14,052.10 214,796.33 + 25% Contingency (Building and material Costs etc) 53,699.08 268,495.41 + Roofing Repairs 24,948.00 293,443.41 + Insulation 4,400.00 297,843.41 + Non-Financial Costs 10,800.00 TOTAL 308,643.41 This estimate does not include cost of any contents that requires repair or replacement. Insurer to undertake further assessment I accept that the insurer has accepted the claims in this matter. I have set out below the relevant provisions of the Product Disclosure Statement (PDS). The insurer is to obtain an actionable quotation for completion of repairs to the property. This is to include a scope of works to complete the repairs including an up to date mould remediation plan. Amended determination | Case number: 810937 Page 5 of 7 The scope of works is also to provide an estimate on time required to complete the repairs and the date the builder is able to commence, considering delays that may be brought about by difficulties in obtaining materials and delays likely due to lack of trades. The assessment is also to provide an estimate of the cost of mould remediation and a final mould assessment at the completion of the repairs. In the circumstances, I am satisfied that the breakdown in the relationship between the insurer and the complainant means that it may not be possible for the matter to be completed by the insurer. At the option of the complainant and considering that the insurer has previously offered an uplift, the complainant is entitled to accept a cash settlement for the amount obtained in this quotation together with an uplift of 20% to cover contingencies and loss of guarantee. The insurer is also to undertake an assessment of any contents which were damaged as the result of the ingress of the water or as the result in the delay to undertake the repairs to the house. If the complainant chooses to take a cash settlement the contents maybe cash settled also. However they will not attract an uplift. This should be in relation to all matters contained in the scope of works and quotation for repairs. Rental The insurer is to provide rental assistance to the complainant based upon the date for the completion of these repairs. If the complainant chooses to cash settle the matter, then the insurer is to pay this rental sum as part of the lumpsum settlement, however this sum does not attract the 20% uplift. Non-economic loss AFCA can award up to $5,400 in relation to non-financial loss where there has been an unusual amount of:  physical inconvenience  time take to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. In assessing whether to award compensation for non-financial loss, AFCA expects complainants to:  moderately robust  bear the normal degree of inconvenience experienced when a problem occurs and  take reasonable steps to minimise the inconvenience suffered. In the current circumstances, I am satisfied that the complainant has been physically inconvenienced in pursuing the insurer and has had interference with the expectation of enjoyment or peace of mind. This matter has been particularly difficult for the complainant. The continual failure to obtain an up to date assessment has provided the complainant with enormous amount of difficulties. The insurer is to pay the sum of $3,500 non-financial loss. Amended determination | Case number: 810937 Page 6 of 7 Why is the outcome fair? The conduct of the insurer in this matter has not been satisfactory. The repairs to the property have not been satisfactory and have not been completed in a satisfactory manner. The complainant has been placed under considerable pressure and the time delays are not acceptable. It would be unfair to deny the complainant the right to have his property repaired, given that the insurer has accepted the claim. Amended determination | Case number: 810937 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.