Home / Suncorp Group / Determination 810763

Determination 810763

Escape of liquid claim: extent of liability, cash settlement amount and temporary accommodation

FirmSuncorp Group
Decided2022-02-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$556
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for earthquake-related wall cracking and movement; the insurer accepted an escape of liquid claim but limited liability for plumbing repairs and offered a cash settlement. AFCA found the insurer must increase the cash settlement for temporary accommodation and underpinning, with the claim otherwise largely upheld in the insurer's favour.

The policy excludes the cost of repairing the item from which liquid escaped, so the insurer's liability for plumbing is limited, while cash settlement must be fair and reasonable and the insurer must reassess and underpin as scoped by its engineers.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 810763 Financial firm AAI Limited Determination | Case number: 810763 Page 1 of 12 Case number: 810763 4 February 2022 1 Determination overview 1.1 Complaint The complainant lodged a claim under her home and contents insurance policy with the financial firm (the insurer) for damage to the insured property (wall cracking and movement) caused by an earthquake from three years prior. During the assessment of the claim, the insurer appointed experts found the damage is consistent with an escape of liquid event, not an earthquake. The insurer accepted the complainant’s claim for an escape of liquid event, however it limited its liability to the repairs of the resultant damage. The complainant seeks cover for the cost of repairing the damaged plumbing and additional payment for temporary accommodation. In addition, the complainant says the insurer caused unreasonable delays to the claim processing and seeks compensation. 1.2 Issues and key findings What is the ex tent of the insurer’s liability? The insurer’s liability under the relevant policy is limited to the repair s caused by the escape of liquid event. The insurer is not liable to repair the plumbing issues This is because the policy excludes cover for the cost of repairing the item from which the liquid scaped. Is the cash settlement offered by the insurer fair and reasonable? Based on the available material, the insurer is required to increase its cash settlement offer to include:  the cost required for underpinning of the property’s footings discussed in the engineering report issued by F  10% increase for temporary accommodations costs. Is the complainant entitled to compensation? There is insufficient material to show the insurer mishandled the claim process to which the complainant is owed compensation. 1.3 Determination This Determination is substantially in favour of the insurer. The insurer is to:  increase its cash settlement payment for temporary accommodation by 10%  within 14 business days following the drying out period completion, the insurer is to engage an expert to issue a quote for the cost required to underpin the footing areas of the property identified by engineer F (the underpinning quote) Determination | Case number: 810763 Page 2 of 12  within a further 14 business days from the date of obtaining the underpinning quote the insurer is to issue a payment of the quote by applying a 20% contingency cost  once the pipework is repaired by the complainant, the Insurer will monitor the property every three (3) months to check the progression of the drying out period  once the property is stabilised, the insurer will re-scope the work required again and settle the claim accordingly. The complainant is required to complete the defective plumbing (scoped in C’s quote on 11 November and 17 November 2020). If the complainant fails to repair the required plumbing within eight weeks from the date of this determination, the insurer is to settle the complainant’s claim by applying a 20% contingency cost to the quote issued by its appointed builder C. Determination | Case number: 810763 Page 3 of 12 2 Reasons for determination 2.1 What is the extent of the insurer’s liability? The complainant has the onus to establish a claimable loss When making a claim, an insured party has the onus of establishing they suffered a loss for which their insurance policy provides cover. The insured party must establish this on the balance of probabilities (i.e. that it is more likely than not). If a claimable loss is established, the insurer has the onus of establishing, on the balance of probabilities, the application of any exclusion it relies on to reduce its liability. Subject to exclusions, the policy covers escape of liquid The cover provided by the policy is set out in the product disclosure statement (PDS). Relevant sections of the policy are quoted in section 3.2 of this determination. The policy is an ‘insured events’ policy, meaning it only covers damage caused by specific events. Relevant to this complaint, subject to the conditions and exclusions set, the policy covers the insured event of escape of liquid. Given the insurer partly accepted the complainant’s claim, it follows the complainant has established a valid claim. The insurer seeks however to limit its liability and not pay for the cost to repair the damaged plumbing. That being, the replacement of the broken sewer pipe located under the driveway and carport of the insured property. Accordingly, the insurer has the onus of establishing it is entitled to rely on a policy exclusion to limit its liability for the claim. The insurer is not required to cover the cost for all plumbing repairs The property’s plumbing has been damaged at various locations, is leaking and requires replacement. The relevant expert findings are contained under section 3.3 of this determination. On the exchanged material, the Panel is satisfied the repairs to the claimed damage cannot commence until the property’s plumbing has been repaired and the subsoils fully dried. Having reviewed the applicable policy, the Panel is satisfied the insurer is entitled to limit its liability. This is because the policy clearly says there is no cover for: the cost of repairing or replacing the item from which the liquid escaped The complainant does not dispute the policy wording, or the findings contained in the leak detection report issued by P. The complainant disagrees with the scope of plumbing repairs the insurer says she is liable for outlined in a quote issued by C on 11 November and 17 November 2020 (the maintenance repairs). Determination | Case number: 810763 Page 4 of 12 In addition, or in the alternative, the complainant also disputes the cost required to complete the maintenance repairs. In particular, she seeks the insurer engaged builder C complete the repairs for the initially quoted price, that being 11 November 2020. For ease of reference, the Panel has considered each item in contention separately. On balance, the scope of works for maintenance repairs is correct The complainant says she should only be responsible to pay for the initial leak, which she says caused damage to sewage and stormwater pipes. In support, the complainant relies on the findings contained in the insurer appointed engineer M’s supplementary report, issued in July 2020 which says: It is therefore my opinion that leakage from the VC pipe in the driveway of the house between IOS4 and the GIO is the proximate cause of damage to all areas of the house (with the exception of the front verandah. It is my opinion that damage to waste and sewer pipes elsewhere at the property is resultant damage from the initial leak in the VC pipes. On the available leak detection report the plumbing repairs required at the insured property are extensive. The details of the report’s findings are contained under section 3.3 of this determination. On the exchanged material, the Panel is satisfied the insurer has correctly limited its liability. This is because:  the insurer has not required the complainant to repair all plumbing issues identified in P’s leak detection report. The maintenance repairs are limited to the replacement of the damaged sewer pipe in the driveway and underneath the carport  M ’s findings described above relate to the sewer pipe in those locations  the engineering findings carried out by F indicate the proximate cause of cracking and movement of the property is a combination of factors including the type of soil on which the property is built (highly reactive), differential footing construction between the original part of the property and the extension, the proximity of a tree and plumbing leaks to the various areas of the house. In addition, the Panel is also satisfied the insurer excluded the removal and the replacement of the concrete driveway and carport paving from the maintenance repairs. These repairs fall under the policy’s cover for exploratory costs. Insufficient material to show complainant prejudiced by C’s quota tion error During claim processing, the insurer arranged for a quote to be issued to the complainant showing the scope of works and the cost required for the maintenance repairs. On 11 November 2020, a builder C, engaged by the insurer issued a quote for $4,482.50. However, the quote was increased on 17 November 2020 to $17,967.40 citing an error in calculation. The complainant seeks C complete the maintenance repairs for the initial quote issued, that being $4,482.50. There is no material to suggest the complainant engaged C upon receipt of the initial quote, that being 11 November 2020. Further, there is also no indication the complainant suffered a loss as a result of C’s error. Determination | Case number: 810763 Page 5 of 12 As a result, the Panel is satisfied th e complainant was not prejudiced by C’s error. In light of this, an indemnification to the complainant is not warranted and C is not required to complete the maintained repairs for the cost of the initial quote. 2.2 Is the cash settlement offered by the insurer fair and reasonable? The policy provides the insurer with discretion as to how to settle a claim The policy entitles the insurer to choose whether to cash settle or complete the repairs. While the policy provides a discretion for the insurer to elect to cash settle a claim, when exercising that discretion, the insurer must act fairly, reasonably and consistent with the principles of utmost good faith. On the exchanged material, the Panel is satisfied the insurer intended to repair the damage, howev er due to the complainant’s hesitancy to complete the maintenance repairs the insurer decided to cash settle the claim pursuant to a builder’s quote issued on 11 November 2020 by C for $110,636.50. The complainant has expressed concerns on the quantum of cash settlement. She indicated a total loss payment is appropriate under the circumstances. Insufficient material to show total loss payment is warranted The complainant says the extent of damage is such that it cannot be repaired and has sought the insurer issue a total loss payment in discharge of its obligations under the policy. In support, the complainant relies on a report issued by a building inspector AB on 21 May 2021 and a letter issued by a builder J on 12 February 2021. Both, the report and the letter, are based on visual observations and indicate the home cannot be successfully repaired or restored to a satisfactory condition. Specifically, AB recommends the following course of action is required: The original or the front portion of the home should be demolished and rebuilt and the rear of the home or the addition could remain as it was not adversely affected by the movement in the original part of the home. On the other hand, J concludes entire property should be replaced: In my opinion, the building cannot be successfully repaired or reinstated to any reasonable condition and should be demolished. Having carefully reviewed the material, the Panel is not persuaded by AB and J’s recommendations. The reason for this is because their findings are based on opinion and are not supported by fact. As a result, the Panel does not consider the complainant is entitled to a total loss payment under the policy. This is because there is insufficient material to show:  the insured property’s structural in tegrity has been compromised  the cost of the repairs will exceed the policy’s insured value. Determination | Case number: 810763 Page 6 of 12 In light of this, the insurer is not required to issue a total loss payment in settlement of the claim. On the available material, C’s quote is reasonable In the absence of any information to the contrary, the Panel is persuaded that the structural integrity of the property has not been compromised and repairs are appropriate. The precise scope of works requires stabilisation of the ground. In their reports, both engineers M and F appear to agree a period of two years is a sufficient drying time for the soil to return to its normal moisture conditions. C’s quote issued on 11 November 2020 estimates repair cost of $110,636.56. Having carefull y reviewed the exchanged material the Panel is satisfied C’s quote is not a final a quotation, it is provisional in that the extent of damage may change as the ground stabilises. In its initial submission to this service , the insurer accepts C’s quote is likely inadequate, and that provision needs to be made for the contingency of further damage occurring. Following the receipt of F’s report, the insurer indicated parts of the payments included in the cash settlement to the complainant may not form part of the event related damage:  entry area – diagonal and horizontal wall cracking to this area, crack width less than 5 mm. Separation between flooring and skirting  bedroom 1 – cracking above door and at corners  bedroom 2 – cracking around chimney and adjacent to window. Crack width ranges between 5-10 mm  driveway – cracking to the driveway pavement, predominantly towards the western/north- western side of the driveway. Given the insurer settled the above in the form of a cash settlement, the Panel considers the insurer accepted liability for the same and as such further consideration by the Panel on this aspect is not required. In consideration of the drying out period, it is fair and reasonable the insurer re-assess the internal damage (cracking and movement) following a two-year drying our period. However, in the instance where the complainant fails to arrange for the maintenance repairs to be finalised within eight weeks (from the date of the of this determination) the Panel finds it reasonable for the insurer to finalise the cash settlement for the internal repairs pursuant to C’s quote by applying a 20% contingency cost, being an amount of $22,127.31 In addition, the insurer is liable to cash settle the complainant for the underpinning of the pro perty’s footings to some areas, as described in the most recent scope of works issued by F on 29 October 2021. The insurer is required to engage an expert to issue a quote for the underpinning following the drying out period. The complainant is not entitled to 52 weeks of temporary accommodation The complainant says the property in its current condition is not suitable for occupancy. As a result, the complainant seeks the insurer issue a payment of the maximum policy cover relating to temporary accommodation, being 52 weeks. On the exchanged material, the Panel is satisfied the insured property can be occupied during the drying out period. Determination | Case number: 810763 Page 7 of 12 On the available expert findings, the required repairs will take approximately six weeks. In settlement of its liability under the policy for temporary accommodation the insurer issued a payment of $5,558.16 to the complainant. Taking into consideration the likely increase in rental properties in the next two years when the repairs can commence, the Panel considers the insurer should issue an additional 10% ($555.81) for temporary accommodation. 2.3 2.4 Is Complainant entitled to compensation for non- financial loss? There are no service issues warranting an award for non-financial loss. The complainant says the in surer’s claim processing caused her stress and unreasonable delays. In particular, the complainant says the insurer failed to comply with the Insurance Code of Practice and to operate in good faith evidence by:  poor handling of the overall clam  poor communication  refusing to accept she is only responsible to repair the initial leak  delaying the settlement of the claim by 20 months. On the exchanged material, the following is a relevant timeline: Date Record 23 January 2020 Claim lodged 30 January 2020 Insurer arranged M to assess the damage 9 February 2020 Re - assessment of the damage 21 May 2020 Leak det ection testing carried out by P 31 July 2020 Supplement ary report issued by M 7 September 2020 Building coordinator specialist report review concluded the plumbing at the insured property requires repairs, following which the insured property needs to undergo a two - year drying out period for repairs to the damage to commence 23 October 2020 Scope of works repaired 11 November 2020 Quotes for maintenance related works and repairs to damage issued . Following this period, the parties were unable to reach an agreement on how to proceed and a complaint was received by this service on 24 June 2021. Having reviewed the available contemporaneous notes provided by the insurer, the Panel is satisfied the insurer actively worked on the complaint’s claim. The notes do not establish failure by the insurer to communicate with the complainant within reasonable timeframes or that there were any other service quality issues warranting compensation. Determination | Case number: 810763 Page 8 of 12 Having said this there were difficulties in progressing the claim. There were some delays between the reports due to the complexity of the claim, including it was initially considered as an earthquake claim. Overall, the Panel considers non-financial loss compensation is not warranted. Determination | Case number: 810763 Page 9 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience as a [field of expertise]. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 810763 Page 10 of 12 3.2 Relevant policy terms Product Disclosure Statement Escape of liquid (pages 36 – 37 ) We cover Loss or damage caused by liquid leaking, overflow ing or bursting from any of the following: …  any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage systems (not forming part of a shower cubicle wall, floor or base); … Exploratory costs If we provide cover under this insured event, we will also pay the reasonable costs of:  locating, at the insured address, the source of the escaped liquid; and  repairing and restoring the damage to your home and cont ents caused by our exploratory work (but we do not cover the repair or replacement of the item from which the liquid escaped). We will also pay up to $1,000 extra to match or c omplement undamaged materials in the same room, hallway, stairs or passageway where the damage occurred (see pages 97 to 99). We do not cover wear, tear or loss or damage caused by liquid leaking, splashing, dripping or overflowing over a period of time if a reasonable person would have been aware of this condition; …  the cost of repairing or replacing the item from which the liquid escaped; 3.3 Relevant expert findings Record Key points Financial firm’s engineer ( M ) Caus ation Report 28 February 2020 Insured property is approximat ely 96 years old, a single storey house with an extension in the rear. The original house has concrete strip footings, extension has a concrete slab.  The damage has not been caused by an earthquake  The cracking to the nort h ea st corner has been caused by the front yard tree roots (moisture drawn down)  Cracking to th e internal areas of the property has been caused by water ingress into the subsoils of the property (escape of liquid). Determination | Case number: 810763 Page 11 of 12 Record Key points Financial firm’s plumber ( P ) Leak investigation Report 18 May 2020 A large gap exists between an extension built in 1988 and the main house. The complainant disclosed there were two sewerage flooding events at the property some years ago when street sewers backed up and into the prope rty.  The water supply pipe: – possible leakage detected, further testing required  Bath cap and lining: - testing shows leakage, complaint advised bath never in use  Bathroom floor trap drain: - CCTV indicated break on the junction to main drain  Main bat hroom toilet: - further CCTV testing required to find the exact location of the break  Sewer line : - identified multiple locations that leak (most joints broken with tree root intrusions)  Storm water downpipe : - discharges to the ground (May not be impacting the damage).  Downpipe and the stormwater line that service them discharge water into the rear garden. Financial firm’s engineer ( M ) Supplement ary Report 31 July 2020 In view of P’s findings regarding the downpipe at the front veran da, opinion re the cause of cracking reviewed and consider it was cause by leakage from the original stormwater pipe that was connected to the downpipe, with the small tree exac erbating the damage.  The report issued by P confirms leaks in the sewer and wa ste drainage, being the proximate cause of damage, with the exception of the front veranda.  Leakage originally occurred in the vitreous china (VC) sewer pipes between IOS4 and the government inspection opening, the leakage has subsequently encouraged adjac ent root growth into the pipes which exacerbated leakage from the pipes Financial firm’s engineer (F ) Engineering investigation Report 1 29 October 2021 Damage to the property was caused by ongoing long - term variations in the moisture content of the reactive foundation soils due to a combination of:  Preferential drying of the subfloor soils towards the middle of the house  Seasonal changes in soil moisture contents  Tree root drying of foundation soils caused by nearby trees and vegetation (exacerbate d in some areas by the leak due to intensified root growt h)  Variations in the permeability of the ground surfaces/paving around the perimeter of the house.  Different footing construction material to original hous e vs extension  Leaks to the various areas o f the house Complainant’s asse ssor ( A B)  Home built on reactive soils  given the extent of movement and cracking home is unsafe Determination | Case number: 810763 Page 12 of 12 Record Key points Report 21 May 2021  the original part of the home should be demolished and rebuild. Complainant’s builder ( J ) Building site inspection 12 February 2021  some section of the wall have cracks up to 25mm wide and 45mm wide at the intersection of the rear addition  the building is severely leaning and becoming detached from the main dwelling  the building can not be suc cessfully repaired or reinstated to any reasonable condition and should be demolished  the current condition of the house may well be deemed unsafe to occupy 3.4 No material provided to show earthquake damage At claim lodgement, the complainant sought cover for earthquake damage. The complaint did not provide any mater ial in support to this service, or any indication she disputes the insurer’s finding re escape of liquid being the cause of damage. Therefore, there is no basis for the Panel to explore and/or consider earthquake damage. 3.5 Total loss payment quantum The complainant has raised concerns regarding the quantum which would apply if the property was deemed a total loss. The Panel did not consider this aspect of the complainant because a total loss payment is not the appropriate policy indemnification under the subject claim.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.