Home / IAG / Determination 810526

Determination 810526

Storm damage claim partly declined; settlement amount and non-financial loss disputed

FirmIAG
Decided2022-08-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$18,981
Non-financial loss$3,000
Amount claimed$51,343
SourceAFCA PDF

Summary

Complainants claimed storm-related water damage to their home and sought cash settlement of $51,343 plus compensation. AFCA found most damage was caused by waterproofing failure and maintenance, but increased the cash settlement to $18,980.62 for contingencies and awarded $3,000 non-financial loss and $2,640 professional costs.

Complainants bore onus to show storm caused the damage; insurer's expert reports were more persuasive than the complainants' expert, so policy limits applied, though a contingency was allowed for accepted repairs.

Issues

Subjects and remedies

home or building damagenatural disasterthird party authoritypay claimpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 810526 Financial firm Insurance Australia Limited Case number: 810526 19 August 2022 Determination | Case number: 810526 Page 2 of 8 1 Determination overview 1.1 Complaint The complainants held a Home and Contents policy with the financial firm (insurer) and lodged a claim for storm related damage following a storm on or about 11 February 2021. The insurer, following investigation of the claim, accepted liability for part of the damage and ultimately offered to cash settle the claim for $17,184.50. The complainants rejected the offer and say all the damage arose because of the insured event. They seek a cash settlement of the claim for $51,343. The complainants also say the insurer has discriminated against them and seek compensation for the emotional distress associated with the claim and the impact on the family. 1.2 Issues and key findings Is the insurer entitled to limit its liability for the damage claimed? Yes. The insurer is entitled to limit its liability for the damage claimed in accordance with the terms and conditions of the policy as set out in section 2.1 of this determination. Is the insurer required to increase its offer of settlement? Yes. The insurer is required to increase its offer of settlement to $18,980.62 to allow for contingencies. Are the complainants entitled to compensation for non-financial loss and professional costs? Yes. The complainants are entitled to compensation of $3,000.00 for non-financial loss and $2,640.00 for professional costs incurred Why is the outcome fair? The panel has considered all the available information and the outcome reflects the damage covered under the terms of the policy while also allowing compensation for the claims handing and professional costs incurred 1.3 Determination This determination is substantially in favour of the insurer. Within 14 days of the complainants’ acceptance of this determination the insurer is to pay the complainants $18,980.62 in settlement of the claim for storm related damage. In addition, the insurer is to pay the complainants compensation of:  $3,000.00 for non-financial loss in accordance with AFCA Rule D3.3.  $2,640.00 contribution to professional costs incurred in accordance with AFCA rule D3.5.1 Determination | Case number: 810526 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer entitled to limit its liability in accordance with the terms of the policy? Yes. The insurer is entitled to limit its liability in accordance with the terms and conditions of the policy for the damage claimed. Complainants have onus to establish claim falls with terms of the policy It is established insurance law that an insured person has the initial onus to establish, on the balance of probabilities, (that is more likely than not), that the loss or damage claimed falls within the terms and conditions of the policy. This is commonly called establishing a prima facie claim. The complainants’ policy is an insured events policy that provides cover for a series of defined events including storm, subject to specific and general exclusions. The policy also includes optional cover for accidental damage which had been taken out by the complainants. While accidental damage includes damage caused to the home unintentionally, it does not cover damage that is otherwise covered under a listed event and is also subject to specific and general exclusions. The complainants’ claim is that the property suffered water damage during a severe storm event on or about 11 February 2021. The onus is therefore on the complainants to establish that the damage claimed is storm damage. No dispute that property suffered storm related damage Following investigation of the claim the insurer has accepted liability for the following damage:  Garage - cost of removing and replacing damaged ceiling and cornices and removing and replacing damaged wall lining between garage and living area, including painting, removal company’s cost and disposal of waste.  Entry foyer – cost of removing and replacing damaged floating floor and moving and reinstating and painting skirtings.  First floor balcony – cost to remove, replace and repaint ceilings of balcony that have been water damaged The insurer has offered the complainants $15,184.50 based on the costs of repairs as quoted. The insurer offered the complainants a further $2,000 to resolve the matter but as the offer was rejected, the insurer has now withdrawn this offer. Dispute as to extent of insured damage In the complainants’ latest submission, the complainants have relied upon a building inspection report conducted by (BS) dated 14 July 2022. The complainants seek the cost of rectification works as set out by BS of $31,287.54 plus the costs for works already approved by the insurer, being:  the entrance floating floor and skirting boards  repairs to the balcony internal roofing  removal of all contents in garage to be stored in a storage unit  a 30% contingency on the costs of works assessed by BS Determination | Case number: 810526 Page 4 of 8 In addition, the complainants seek $2,000 plus GST for legal fees, the cost of the report for BS of $2,640 and $5,000 compensation for non-financial loss. The insurer has rejected the complainants’ response and maintains that it is entitled to rely upon the expert reports obtained to maintain its offer. Insurer’s expert reports attribute damage to failu re of water proofing and lack of maintenance The insurer obtained a report from (HBI) who attended the complainants’ property on 19 February 2021. HBI considered the cause of damage to the garage ceiling and external walls was directly due to the failure of the waterproofing to the tile deck on the first-floor balcony above the garage. It considered the damage to the front door of the complainants’ property was due to lack of maintenance. Photographs supplied with that report indicate mould on the tiles of the deck above the garage. A copy of the plumber’s report to HBI dated 18 March 2021 confirms that on inspection of the manhole to the upstairs balcony there was water entering the cavity. A flood test conducted by the plumber confirmed water penetrated straight through the balcony into the roof space. The plumber considered the waterproof membrane was failing allowing water to penetrate the upper balcony floor, the balcony had insufficient fall and has design faults from its original construction and that this would be the primary cause of water penetrating the upper level causing damage to the garage ceiling. The insurer also obtained a report from building consultants and engineers CFT, dated 12 July 2021. The report is detailed and includes CFT’s obs ervations of the balcony/deck, garage and ceiling cavity. CFT concluded as follows:  there was water damage to the plasterboard ceiling lining within the garage consistent with water ingress because of the storm event via the defective waterproof balcony floor  no other damage was attributable to any one single storm event but most likely the damage was because of maintenance and defective building work including: > lack of fall to the external balcony/deck floor allowing ponding of water on the floor surface and subsequent ingress to the interior of the residence > several penetrations on the balcony/deck with ineffective seals allowing water ingress to the interior of the residence > deteriorated grout surrounding the floor tiles of the balcony/deck contributing to water ingress to the interior of the residence > staining of the exterior render of the residence from degrading balcony/deck sub straight minor building movement > other than the damage to the plasterboard ceiling lining, the damage identified to the property had been occurring over an extended period and was not the result of any one insured event. In a supplementary report dated 29 July 2021 CFD confirmed that the two-cylinder posts on the verandah do not require removal as part of the agreed repairs to the plasterboard ceiling. CFD found the columns were displaying gradual wear due to continued weather exposure which was a maintenance issue. CFD rejected the compla inants’ claim that the building consultant had created a hole in the cylinder posts. CFD noted the photo of the alleged damage displayed a threaded hole that is consistent with other threaded hooks located in the head shrouds of the column. Determination | Case number: 810526 Page 5 of 8 The insurer also provided a report from a restorer (RX). Whilst RX does not comment on the cause of the damage, RX found:  the floating floor in the entrance/hallway has started to move and was non-salvageable  there was a large spot of mould present near the air conditioner located on the balcony  the garage gyprock ceiling is no longer level and had signs of mould on the gyprock. RX recommended the ceiling be removed and replaced once the leak was rectified. Complainants expert says damage consistent with storm event The complainants have disputed the comments and findings in the various expert reports provided by the insurer. The provided their own expert opinion from BS on 14 July 2022 following an inspection of the property on 8 July 2022. BS comments with respect to the observed damage are in the main consistent with the reports from the insurer. BS observed water leaking into the void between the garage ceiling and the bottom of the balcony causing damage and deterioration to the building but did not consider the damage was caused by the total failure of the waterproof membrane. BS noted there were no signs of any water ingress or associated deterioration below the balcony area proper including at the suspected weak points. BS did not consider the lack of outward fall to the balcony was contributing to the leaking, given there was no evidence that water was leaking through the low area identified on the balcony. Contrary to other reports BS considered the efflorescence on the balcony area an indication that the waterproof membrane was functioning. BS considered that there was a gap between the floor and skirting tile, most likely due to building movement and the possibility that the waterproof upturn may have been damaged because of such movement resulting in a potential point of water entry. As he had not inspected the premises prior to the storm event. He could not determine that this was the cause of the leak. BS concluded, based on his observation and photographs provided that the deterioration was not due to a long-term pre-existing leak but was more consistent with the short-term exposure and was unable to dismiss the storm event as the cause of damage. CFT in a report dated 4 August 2022 agrees with BS that a waterproof membrane should have been installed on the balcony during construction. CFT notes that evidence of high moisture content nearly 17 months after the event suggests this was an ongoing issue and not related to a one-off event. While BS says there is no evidence of total failure of the waterproof membrane, for there to be an ingress of water you do not require a total failure of the waterproof membrane. Insurers reports more persuasive The panel has considered the various reports. To succeed with the claim the onus is on the complainants to establish that most likely the damage arose because of the storm. Only when the complainants have established this does the onus shift to the insurer to establish the application of an exclusion. The panel is persuaded by the reports of the plumber dated 18 March 2021 and CFD that most likely a failing of the waterproof membrane on the balcony floor has caused the water ingress and damage to the garage ceiling. While the complainants’ expert BS disputes this, BS is unable to say that the storm was the cause of the damage and in fact identifies a possible failure, although not total failure, of the waterproof membrane as being a cause of damage due to building movement. Determination | Case number: 810526 Page 6 of 8 The panel is also persuaded that the presence of mould and efflorescence was not caused by the storm. The photographs provided with the HDI report following its inspection of the property in February 2021 indicate the damage had been present for some time and most likely existed prior to the storm. In the panel’s view most likely, the damage had been occurring over an extended period and existed prior to the storm. 2.2 Is the insurer liable to increase its offer of settlement? Yes. The insurer is to increase its offer of settlement to consider potential contingencies that may arise during the completion of the accepted repairs. Insurer to increase offer The insurer has offered the complainants $15,184.50 based largely on the complainants quote to settle the accepted components of the claim. The offer is made up of:  $2,200 for the electricals  $1,025 for the skip bin  $875 for the removalist  $607 for the storage  $2,530 for all paintings  $5,225 plastering as per the complainant’s quote  $2,722.50 floor covering per the complainant’s quote. The panel notes the complainants first quote is from April 2021. The panel accepts repair costs have increased significantly since that time due to various global factors. Whilst the panel accepts the insurer is only liable to cover the cost of accepted repairs, the panel is of the view that the age of the relevant quotes and the current circumstances that it is fair to apply a contingency fee of 25% to the settlement offer. In the circumstances the insurer should increase its settlement offer by $3,796.12 to $18,980.62. 2.3 Are the complainants entitled to compensation for non- financial loss and professional costs? Yes. The complainants are entitled to compensation of $3,000 for non-financial loss due to the unusual degree of physical inconvenience and time taken to resolve the claim. AFCA may award compensation for non-financial loss Under AFCA rule D3.3 AGCA mat award compensation of up to $5,400 where a complainant because of an insurer’s claims handling, suffers an unusual degree of physical inconvenience or time taken to resolve the situation or interference with the complainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to the award of compensation and expects a complainant to be moderately robust and bear a normal degree of inconvenience when a problem occurs and to take reasonable steps to manage the situation. Complainants entitled to compensation for non-financial loss The complainants say the insurer’s represe ntatives and experts:  failed to attend at all, or at the agreed time on multiple occasions Determination | Case number: 810526 Page 7 of 8  failed to communicate their inability to attend appointments in advance  either communicated their inability to attend either late or not at all  continued to send multiple requests for appointment confirmations, after confirmation had already been made  failed to comply with the complainant’s instruction to not have any further trades attend after a certain date. The complainants also say the builder from HBI discriminated against the female complainant due to her age and gender when he attended the property on 19 February 2021. The insurer has acknowledged the service issues while HDI do not deny the language used during the attendance by its tradesman may have been inappropriate. The panel accepts the language used by the tradesman was inappropriate and offensive to the complainants. The panel accepts no ill was intended and the complaint properly investigated. However, it was clearly inappropriate and has caused stress and inconvenience. The panel also accepts the service issues have caused inconvenience. The complainants had to take days off work to meet various people who at times failed to attend or were late and communication was poor, although it seems Covid did create some difficulties with site inspections. The claims handling has caused the complainants an unusual degree of physical inconvenience and loss of enjoyment or piece of mind. The panel considers it fair in the circumstances that the insurer pays the complainants non-financial loss compensation of $3,000.00 Complainants entitled to compensation for professional costs Under AFCA rule D5.1 AFCA can determine an insurer contributes up to $5,000 to the professional costs incurred by a complainant during a complaint. AFCA is a free service and it is not normally necessary for a complainant to incur professional costs during a complaint. The complainants incurred professional costs of the engineer, BS. The report was obtained to assist in the resolution of the complaint. While the panel has preferred reports provided by the insurer, the panel accepts it was reasonable for the complaints to obtain the report, given their concerns over the insurer ’ s conduct of the claim. The panel is satisfied the report has assisted in reaching this determination and consider it fair that the insurer covers the cost of obtaining the report of $2,640.00. Why is the outcome fair? There is no dispute that the complainants had been provided the relevant policy documents. The policy is clear, it covers a series of listed events including storm and accidental damage subject to various conditions and exclusions. While the complainant’s property sustained storm damage, the information exchanged confirms some of the damage claimed was most likely caused by wear, tear, gradual deterioration or lack of maintenance. It is fair that the insurer can rely on the terms and conditions of the policy to limit its liability. There was a clear breakdown in the relationship between the complainants and insurer due to the handling of the claim. This has caused significant stress and inconvenience to the complainants. It is fair in these circumstances that the insurer pays compensation for non- financial loss be paid and contributes to the complainant’s professional costs. Determination | Case number: 810526 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in general insurance We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.