Determination 810508

Partial claim denial for subfloor, bathroom and bedroom damage; cash settlement of leak damage and temporary accommodation

FirmQBE
Decided2022-06-07
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$4,000
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for kitchen and subfloor water damage from a burst hot water pipe and related ground movement. AFCA found the leak damaged parts of the kitchen, dining and lounge but much of the wider damage pre-dated the policy, and ordered cash settlement of the leak damage, temporary accommodation, and $4,000 non-financial loss compensation.

Loss from water escaping from a fixed pipe is covered, but exclusions for ground movement, structural defects and pre-existing damage apply to the disputed damage, which was largely pre-existing, while leak-caused damage must be fairly cash settled.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay compensationpay interestpay non financial loss

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 810508 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 810508 Page 2 of 25 Case number: 810508 6 June 2022 1 Determination overview 1.1 Complaint The complainant and the co-insured hold a home and contents policy with the financial firm (insurer). The policy includes cover for accidental loss or damage to building and contents. For the sake of brevity and convenience, references to the complainant in this determination include references to the co-insured. In late April 2021, the complainant noticed damage to the timber flooring in the kitchen and lodged a claim for the damage. The complainant says the damage was caused by a burst kitchen pipe which leaked under the home in the previous month. The complainant also claimed further damage was caused by storm water damage from rainfalls in March 2021 and the insurer’s delay in finding the source of the leak The insurer repaired the leak, assessed the damage and partially accepted the claim. The insurer offered to pay $41,668.40 made up as follows:  building repairs - $29,788.17  contingency allowance (15%) - $4,468.23  temporary accommodation - $6,412.00 (28 days X $229/day)  non-financial loss compensation - $1,000 The insurer says the damage which is in dispute did not result from the leaking pipe. Rather, it says that damage was present prior to the policy commencement and is due to factors which are excluded under the policy. The complainant disputes the insurer’s settlement offer. He says th e disputed damage resulted from the leaking pipe. The complainant wants the insurer to repair all the claim related damage. 1.2 Issues and key findings Is the insurer’s settlement offer fair and reasonable? No. While some of the claimed damage probably occurred before the policy commenced, the insurer’s settlement offer does not include all the damage caused by the leak. A fair outcome is for the claim to be cash settled in the manner set out in the paragraph “cash settlement mechanism described”. The insurer is also required to pay temporary accommodation for the repair duration. This part of the claim is to be settled in the manner set out in the paragraph “insurer required to pay temporary accommodation”. Is the insurer required to increase its non-financial loss compensation offer? Yes. The insurer is required to pay $4,000 in non-financial loss compensation. Why is the outcome fair? The insurer is entitled to settle the claim based on its policy terms and expert opinion. As the panel accepts the available information establishes much of the claimed damage was caused Determination | Case number: 810508 Page 3 of 25 before the policy commenced, it would not be fair for the insurer to pay all the claimed damage. As the claim is to be cash settled, it is fair the insurer makes adequate provision for contingencies and variations which may occur once repairs commence. 1.3 Determination This determination is partially in favour of the complainant. Should the complainant accept this determination then within seven days of notification of acceptance the insurer is to resolve the claim in the manner set out in the paragraphs “cash settlement mechanism described” and “insurer required to pay temporary accommodation.” The insurer is also to pay the complainant $4,000 non-financial loss compensation. Determination | Case number: 810508 Page 4 of 25 2 Reasons for determination 2.1 Is the insurer’s offer fair and reasonable? Circumstances surrounding the claim The complainant’s policy is a home and contents policy. The policy commenced on 1 February 2021. The policy covers accidental loss or damage to both building and contents. The policy also covers damage caused by storm and by water escaping from a fixed pipe. The policy defines accidental as “unintended and unexpected”. The policy is subject to exclusions. Extracts from the policy are set out in supporting section 3.2 of this determination. The complainant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. On 29 April 2021, the complainant lodged a claim with the insurer after he noticed damage to the timber flooring in the kitchen. In mid-April he said he noticed a lack of hot water pressure. The insurer appointed a builder to undertake the make safe works in the kitchen. The insurer appointed two builders (AB and AJ) to attend the property and assess the damage. The builders noticed damage to the floorboards around the kitchen. In early May 2021, AB undertook a leak detection test and found a leaking hot water pipe in the subfloor (under the kitchen) which caused damage. The complainant was told to turn off the hot water service except when using hot water. The claim was accepted, and the insurer arranged repair quotes. The insurer arranged another builder (CS) to undertake the repairs. CS formed a contract which included a scope of work for repairs to the kitchen and lounge area. On 24 May 2021, the complainant signed the contract for CS to undertake the repairs at the property. Prior to CS starting the repairs, CS attended the property to ensure the scope of works was accurate. During this assessment, CS noticed additional damage to the areas in the house which were not part of its original scope of work. CS provided numerous photographs of the resultant damage and the subfloor including the water escaping from the hot water pipe. Plumber described multiple factors contributing to the moisture in the subfloor CS appointed a plumber (EC) to undertake a leak detection test. The leak in the kitchen was repaired by the insurer which it says it was not obliged to do under the policy terms. EC also undertook a leak detection test in the bathroom where it found no leaking pipes. However, thermal flood testing was conducted and showed water escaping from the shower screen to the floor through the tiled wall dividing the bathroom and entry leading to the conclusion there was a failed membrane. Determination | Case number: 810508 Page 5 of 25 EC noticed the floor waste in the bathroom was not connected to any drainage which resulted in water draining straight to the subfloor. EC also found the floor tiles were flowing away from the floor waste. There is no dispute about the membrane failure and shower screen leaking. Photographs under the house show water had escaped to the subfloor from the failed membrane near the bathroom entry. Annotated photographs say stormwater is trapped to the lowest point of the subfloor and cannot escape the subfloor. Annotated photographs also say there is storm water entry to the subfloor through weep holes, water trap to the footpath, wood rot in the subfloor, mould in subfloor dirt and timber flooring. EC inspected the subfloor. He found mould in the dirt and the underside timber floor through about 80% of the house. He found this was consistent with multiple water issues which had occurred over time. EC agreed the particle flooring in the kitchen was damaged consistent with the burst pipe which would have “assisted to levels of moisture to the subfloor” but with minimal impact. EC said the water which escaped from the main bathroom through the floor waste combined with the failed membrane caused damage to the hallway entry of the bathroom and contributed to moisture to the subfloor. This also elevated moisture in the adjoining bedroom. EC reported weep holes to the high elevation of the house were found flush and lower than the landscape allowing stormwater to flow into the subfloor during storms. EC found no subfloor drainage to allow water to egress. Also, the subfloor perimeter is higher, and the stormwater cannot escape. EC provided an aerial image of the house indicating the flow of stormwater through the weep holes at the side of the house (the side near the pool and garage) and circled the lowest elevation of the subfloor which he says allowed stormwater to be trapped causing moisture to transfer inside. EC’s site plan describes the high levels of m oisture in the bedroom from water flowing from the bathroom floor waste and the flow of water from the shower to the hallway. As for the dining and lounge rooms, he notes the damaged floor skirtings and doors from the stormwater moisture. EC described the subfloor as a moisture trap causing mould to grow on the dirt and timber which has transferred the high levels of moisture inside causing skirtings and doors to swell. EC found extensive wood rot to bearers and joists mostly around the bathroom. One bearer was propped which he said appears temporary. Because of the extent of wood rot, he recommended a structural engineer be appointed. Engineer and builder say the leak only caused localised damage The complainant also claimed further damage was caused by storm water damage from rainfalls in March 2021 and the insurer’s delay in finding the source of the leak. The insurer arranged for a builder (JE) and engineer (PS) to provide an opinion. A summary of the expert opinion is set out in supporting section 3.3 of this determination. PS inspected and photographed the property on 18 June 2021 and concluded the following:  damage to the kitchen floor was caused by the hot water leak. Determination | Case number: 810508 Page 6 of 25  water damaged timber framing under the kitchen was to be replaced but before that is done the brick piers and timber supports are to be realigned.  his inspection showed a pattern of ground movement caused by surface water entering the subfloor and ponding over time (annotated photographs of vents explain).  movement and subsequent subsidence was not caused by a single event but over time.  floorboard damage in other parts of the house is due to ground movement, lack of foundations and age (an annotated photograph says no visible footing under brick piers).  damage to the subfloor, floor and bathroom is due to age, lack of property foundation, poor maintenance, and long-term soil movement. JE also inspected and photographed the property on 18 June 2021 and concluded:  damage to the kitchen cupboards joinery and damage to the flooring in the kitchen and family room was due to the burst pipe and pre-existing extremely high levels of moisture in the subfloor area.  detachment of the skirting boards in the living room (which backs on to the kitchen) is due to the burst pipe.  damage to the floors in dining, lounge and hallway is due to pre-existing high levels of moisture to the subfloor.  damage to the master bedroom and small bedroom next to the bathroom is due to pre- existing high levels of moisture in the subfloor. JE provided an extract from the1990 building code and several photographs including:  how some of the brick vents and a manhole are located at ground level allowing water to enter and a gap between the paving and external brick work also allows water to enter.  one which was annotated to show the ground under the subfloor is graded to trap water at the base of the brick wall where it ponds and soaks into the foundations.  floor framing and underside of the flooring showed mould (most of the house is like this).  an illegal timber strut. Parties disagree on the cause and extent of damage Based on these reports, the insurer accepted the damage to the kitchen cupboards and joinery, the skirting board in the living room as well as the solid flooring in the kitchen and living room was ca used by water damage from the burst water pipe. Relying on policy exclusions, the insurer said the damage to the subfloor, footings, bathroom, master bedroom, ensuite, hallway were excluded because of breaches of the building code and that this claimed damage was due to long-term soil movement which pre-existed the commencement of the policy on 1 February 2021. It says the subfloor damage is clearly long- term as evidenced by mould and rot. It says water has been ponding under the house for many years and identifies how water has entered the house. The insurer said the water damage to the bathroom floor and wall tiles was also pre-existing and unrelated to the leak in the kitchen. These parts of the claim were therefore declined. The insurer agreed to cover some repairs and prepared a scope of works. Initially it offered to settle the claim by paying $38,880.12. Subsequently, it increased the offer to $41,668.40. Parties’ submissions and material considered The complainant has made many lengthy submissions and provided commentary on the complainant’s expert reports. He says all damage to the kitchen, family, dining, living room, Determination | Case number: 810508 Page 7 of 25 bathroom and master bedroom was caused by the burst hot water pipe, since the pipe was located between the kitchen and dining room's shared wall. Initially he indicated he would provide two reports: one from him and his wife who are both engineers and the other from an independent engineer. No independent engineer report was provided. The complainant made many submissions but essentially, he argues the damage occurred after the policy commenced and:  because the leak was not repaired quickly enough significant water flowed under the house causing damage not only under the kitchen but in other areas where water has ponded under the sub floor into reactive soil causing ground movement, cracking, and other damage.  over 19 or 20 days, the hot water saturated the soil leading to settlement, hydrostatic pressure and uneven ground movement which was not seen in the prepurchase property report (June 2019) or in photographs taken in November 2016.  the insurer has not taken sufficient notice of the amount of hot water which leaked and the June prepurchase report.  a “natural disaster flood event” occurred in March 2021 and water was also trapped under the subfloor due to heavy rain which contributed to the damage.  any pre-existing damage has been made worse by the leak.  membrane failure, seepage through missing floor waste pipe and water ingress through weep holes had minimum impact noting only three weep holes flush with ground level.  building codes relied on are irrelevant because the house was built in 1977. The complainant says around 39,585 litres of water leaked through the ruptured pipe which resulted in swelling and separation of skirting boards in the kitchen, dining, lounge and living rooms. He says the flooring in the dining, lounge, master bedroom and hallway were damaged by excessive moisture in the subfloor area due to the leaking pipe. He provided the prepurchase report from 2019 which he says show there were no long-term problems in the subfloor. A summary of the report is in supporting section 3.3 of this determination. The complainant also says cracks in the inner walls of the kitchen, dining and lounge rooms started appearing after the initial attendance of PS and JE. Furthermore, he says the scope of work should include costs to repair the joists and bearers, mould remediation of the floor framing and replacement of the mouldy soil. The complainant says the amount offered is unfair as it does not address all the claimed damage. He obtained two different quotations to repair all claimed damage which includes mould treatment, replacement of soil, and bearers and joists. He also says the architrave, skirting, kitchen joinery and cabinets, as well as the kitchen island bench tops, cannot be reused once removed from the kitchen and dining areas. He referred to new cracking damage since PS and JE inspected. The insurer arranged further inspections to address these concerns and the complainant’s submissions and information provided. It said it would then prepare a final scope of works. The insurer considered the prepurchase report but did not find it compelling because the extent of the inspection was unclear. It considered the report was inadequate for the purposes of Determination | Case number: 810508 Page 8 of 25 establishing the true condition of the subfloor in 2019. It notes reference to drainage issues with rainwater coming through to the subfloor. The complainant says he and his wife are both engineers. They inspected the property many times prior to purchase and can rely on their professional expertise that it was safe and without any major defects. PS and JE provided for further reports which are summarised in supporting section 3.3 of this determination. Relying on those reports the insurer said the cracking is not related to the burst pipe but is an ongoing problem caused by seasonal ground movement. It notes the long-term issues with the foundations, drainage and cracking pre-date the policy inception on 1 February 2021. It points out the complainant’s position is not supported by independent expert evidence. The insurer provided a quotation based on an updated scope of works and made a final offer to cash settle the claim for $41,668.40. The complainant rejected the offer for many reasons including the quote is not an independent quote because CS is in the insurer’s service agreement. Analysis of submissions and material Both PS and JE reported the ruptured pipe only caused localised damage in the kitchen, lounge room and skirting in the dining room. Previous repairs to the living room floor and cracks were noted which they say were indicative of historic movement. The ruptured pipe is fixed to a brick wall in the subfloor and there is another brick wall which separates the kitchen from the dining area in the subfloor. JE says the bulk of the water from the ruptured pipe would have fallen between these two walls. JE says there is a low point at the base of the second brick wall which means the water would need to travel uphill to reach the living and dining area. JE says water can rise through soil due to capillary action but only if all the soil below it is fully saturated. Water will continue to flow downwards due to gravity. JE says for the soil to be so saturated that additional water travels up rather than down effectively means the water table would have raised locally. It says this would not have occurred due to the subject leak . Both PS and JE say the other damage is due to high levels of moisture in the subfloor area which has occurred over a long period of time. They say stormwater entering over the years through weep holes and through the gap in the paving along with drainage issues in the bathroom have all contributed to the subfloor moisture. Further, they say the subfloor is graded in a manner where the moisture gets trapped in the soil and soaks in the foundations. The complainant says the contribution of water ingress through the bathroom membrane failure would have been minimal. The insurer’s engineer and building consultant disagree with this contention. Essentially, both experts say the damage in the other parts of the property apart from kitchen and family room is due to ground movement which has happened over years. Leak has caused damage in the dining and lounge room and cracking damage The insurer accepts the damage to the skirting board in the dining room would have resulted from the ruptured pipe. The insurer says the dining and lounge room flooring would not have Determination | Case number: 810508 Page 9 of 25 been affected by the leak because the water spray would not have travelled that far. Further, it says the moisture in the subfloor near this area would have been from the surface water runoff through the ventilation openings (weep holes). PS stated in its second report it appears as an impossible task for water to travel as far as the dining room window. PS says there was evidence of previous repairs to many cracks. Accordingly, it says the cracking does not appear to be related to the burst pipe but rather an ongoing problem caused by seasonal ground movement. The panel does not accept this reasoning. This is because part of the dining and lounge room flooring is adjacent to the brick wall which was saturated by the water coming from the leak. Thus, any potential water damage to it could, on balance, be attributed to the leak itself. The insurer relies on explanations from PS as to alternative reasons on how damage in the dining room flooring would have been affected. However, the panel notes weep holes which are sitting flush to the ground are on the opposite side of the building, from the dining room. The insurer has not provided an explanation about how the water would have travelled from the weep holes to the subfloor area of the dining and lounge room. The complainant says the cracks in the walls of the kitchen, dining, and lounge areas is evidence of ongoing ground movement caused by hydrostatic pressure exerted on the subfloor due to the subject leak. These cracks were not present during the initial attendance of both PS and JE in June 2021. PS reported it appears as an impossible task for water to travel as far as the dining room window and hence cannot be the cause of the leak by the hot water system. The panel accepts, on balance, it is plausible for these cracks to have developed after PS’s initial attendance due to the saturation of the soil from the leak resulting in cracks in the internal walls near the family room, kitchen, lounge and dining areas. Accordingly, the panel is satisfied the flooring in the dining and lounge room along with the wall cracks in the family room, kitchen, dining and lounge rooms have been caused by the water leak from the hot water pipe. Other claimed damage not caused by the leak The complainant says damage in the master bedroom, hallway, bathroom, timber framing and mouldy soil in the subfloor is due to the leaking pipe. The panel is not satisfied the damage in the master bedroom, hallway, bathroom and subfloor area, which was not near the ruptured pipe, is due to the subject leak. Further, the panel does not accept mould in the soil is due to the subject leak. The panel considers the insured damage is confined to the family room, kitchen, dining and lounge rooms. In reaching this view, the panel considers:  the master bedroom is not in the vicinity of the leaking pipe.  weep holes which are sitting flush on the ground are adjacent to the master bedroom.  EC’s report shows moisture in the master bedroom and adjacent bedroom resulted from the shower screen leak and failed membrane and inadequate drainage in the bathroom.  EC’s report shows the leak from the main bathroom and membrane failure has flowed towards the hallway entry causing damage to the flooring.  rot on the underside of the timber framing, joists and bearers in these areas appears old.  the subfloor is graded in a manner where the moisture gets trapped in the soil and on balance, resulted in mouldy soil over a period of time. Determination | Case number: 810508 Page 10 of 25  the subfloor grading does not comply with pertinent Ordinances/Codes because it was not graded to prevent accumulation of water.  as per Bureau of Meteorology data, the area received rainfalls in March 2021 which is consistent with PS and JE’s view that surface water enters the subfloor t hrough weep holes and gap in the paving causing high moisture in the proximity of the master bedroom where water was unable to escape.  much of the claimed damage pre-existed the policy commencement on 1 February 2021. The panel has carefully considered the lengthy submissions and material provided by the complainant. The panel notes the complainant, and his wife are engineers. However, their opinion is not an independent opinion. Further, the panel is satisfied the preponderance of the expert opinion from a plumber, builder and engineer supports much of the insurer’s contentions. The panel notes the complainant’s contentions the damage was caused not only by the hot water leak but because the hot water leak was not repaired quickly enough. This contention has been considered by the insurer’s builder. Having reviewed the submissions and the expert opinion and photographs, the panel considers the insurer’s builder has persuasively rebutted this contention. Further, the complainant was responsible to repair the leaking pipe. The panel notes the complainant’s submission that the burst water pipe in April 2021 must have been the cause of all the claimed damage because of the pre-purchase property report obtained in June 2019. The panel does not find this argument sufficiently persuasive in view of the nature of the pre- purchase report, and the objective evidence from photographs that the damage was such that it probably did not occur in February and March 2021 after the policy commenced. The panel is satisfied the objective evidence shows long-standing damage which occurred (at least) in 2019 and 2020. Further, the pest report notes high moisture readings found in the bathroom and kitchen which were not investigated. Also, the pre-purchase report put the complainant on notice rainwater was entering through the subfloor. The panel accepts some damage was caused by the burst water pipe and by rainwater run-off in March 2021. However, based on the available information and for the reasons stated the panel is satisfied the proximate cause (or the dominant or effective cause) of the disputed damage was earth movement which had occurred over time and before February 2021 because of structural defects, faulty or poor workmanship or design in the subfloor and ineffective drainage in the bathroom. Further, the available information establishes the disputed damage was caused directly by or arising from events which occurred before 1 February 2021 when the policy commenced. For these reasons, the insurer is entitled to decline liability for the disputed damage. Fair the claim is cash settled The complainant says the insurer has not acted fairly because it elected to repair the damage and then subsequently offered to cash settle the claim. It is clear from the terms of the policy that the insurer has the discretion to decide which settlement method to adopt. If the insurer accepts a claim it can decide whether to repair or pay the insured the cost to repair that part of the building that suffered damage. Determination | Case number: 810508 Page 11 of 25 While acknowledging t he insurer’s discretion, the panel expects an insurer to act reasonably, fairly and consistently with utmost good faith in exercising its discretion, having regard to the circumstances of the claim. The complainant wants the insurer’s builder to undertake the repairs. He says the insurer has relationships with its builders, which allows it to get better pricing lower than the market prices. The panel accepts the factors that are contributing to the moisture in the subfloor will need to be addressed prior to the repairs being undertaken. The panel also accepts the insurer is not liable for all the claimed damage. In these circumstances, the panel is satisfied it is fair the claim is cash settled. Cash settlement amount must be fair In cash settling, the insurer must ensure the settlement amount is reasonable and sufficient for the complainant to complete the necessary work himself. That is, the amount must be arrived at having regard to all relevant factors. These include risk is passing to the complainant, since he will lose the lifetime guarantee on the work and unknown variations and contingencies may arise once repairs commence The insurer based its offer on a scope of works from JE and a quotation from CS which included repairs in the kitchen and living room and repairs to the skirting board in the dining room. The insurer added 20% builders’ margin to its quotation and a 15% contingency for any unforeseen damage. The insurer offered to pay $29,788.17 plus a 15% contingency allowance ($4,468.23) for repairs. As previously set out in this determination, the panel accepts the subject leak caused damage to the flooring in the dining and lounge room along with cracking in the walls in the family room, kitchen, lounge and dining areas. CS’s quotation does no t include costs to repair this damage. The complainant obtained two quotations from builders, EC and HG, amounting to $129,616.30 and $191,521 respectively. These quotations include repairs for damage for which the panel considers the insurer is not liable. EC’s quotation has a price breakdown of the different rooms. The kitchen, living, dining and lounge rooms cost of repairs equates to $62,057 including GST (rounded up). However, these figures include repair items such as removal and replacement of joists and bearers in the subfloor under the dining and lounge rooms which the panel accepts were not damaged by the subject leak. Further, the quotations do not include costs to repair the wall cracks in the family room, kitchen, dining and lounge room. Analysis of quotations and a fair cash settlement The panel notes JE’s initial scope of work included replacement of three rotten joists and four rotten bearers in the subfloor near the kitchen. This was later excluded from its updated scope of work as JE later considered these were not damaged by the pipe leak. The panel disagrees and does not accept this outcome is fair in the circumstances. The panel is satisfied, on balance, these three joists and four bearers probably would have been damaged due to the leak from the ruptured pipe because of:  their close proximity to the leak.  possible direct contact with the water spray.  the amount of water which sprayed before the leak was repaired. Determination | Case number: 810508 Page 12 of 25 The complainant argues the insurer should not rely on CS because CS is not independent. The complainant also requires a supervisor’s fee and a 30% contingency allowance. The panel is satisfied CS is sufficiently independent to provide a quotation for the cost of repairs based on the scope of works prepared by JE. The panel considers it is likely superv isor’s fees will be required once the final quotation is prepared because of the likely increased costs in the final quotation. The panel also considers it is fair to include these fees in the final amount payable by the insurer because there will be several trades which will be difficult for the complainant to coordinate in view of his employment duties and the unlikelihood he will be living in the house during repairs. The panel is not satisfied it is fair that the 15% contingency is provided in view of the increase in the cost of repairs and labour because of COVID-19. It considers a 30% contingency is excessive. In all the circumstances the panel is satisfied a contingency of 20% is fair. Relying on EC, the complainant says the architrave, skirting, kitchen joinery and cabinets, as well as the kitchen island bench tops, cannot be reused once removed from the kitchen and dining areas as these items have already been damaged by the insured event and it will be difficult to remove the items and preserve them for future use. He says when they are removed, the chances are that they will crack. EC’s quote describes the demolisher’s work in the kitchen and living room which inc ludes careful removal of the bench pantry unit, granite benchtops, cabinets and architraves. EC notes the cabinet end panels and kick boards to the cabinets and the pantry door are to be removed and disposed ( “ the items to be removed ” ). EC’s quote notes th e re-use of kitchen cabinets and joinery and architrave in kitchen and dining area is not possible. EC says the scope may change and may incur additional cost as it may not be able to completely re-use all the kitchen items mentioned in the scope depending on their current condition, but EC says it will re-use as much as it can. JE’s scope of works describes these items to be removed, kept safe and reinstalled. The insurer says if these items cannot be reused then the cost should come from the contingency amount. The panel does not consider this outcome fair in circumstances where the complainant’s claim is to be cash settled resulting in the complainant assuming the risk that variations and contingencies may occur once repairs commence. The panel accepts EC has foreshadowed a real and potential risk that “the items to be removed” may not be safely replaced. In all the circumstances, the panel is satisfied it is fair to accept the complain ant’s submissions on this point. The panel is satisfied it is fair the insurer should include a separate amount to not only dismantle but to dispose and provide new items in a revised scope and quote for “the items to be removed”. The panel does not accept it is fair that if the old items cannot be re-used they should come from the contingency fee. Determination | Case number: 810508 Page 13 of 25 Cash settlement mechanism described Should the complainant accept this determination then within seven days of notification of acceptance the insurer is to resolve the claim in the manner described below. Based on the available information and for the reasons stated, the panel is satisfied it is fair in the circumstances the claim should be resolved in this way:  JE to prepare a new scope of works by consolidating the scope from his first scope of works date d 28 October 21 “Individual Room Reconstruction: Damage caused by burst pipe” to include the flooring in the dining and lounge rooms, the removal and replacement of four bearers and three joists under the kitchen, repairs to the cracks in the family room, kitchen, dining and lounge rooms and “the items to be removed” (JE’s new scope of works)  CS to update its quote once JE’s new scope of works is received (CS’s new quote)  CS to provide an estimate of the repair time under JE’s new scope of works so the temporary accommodation benefit can be calculated  the insurer to provide a cash settlement to the complainant based on JE’s new scope of works and CS’s new quote which will include supervisor’s fees, a 20% builder’s margin and a further uplift of 20% for contingencies and variations which may occur once repairs commence. If the complainant wishes to obtain a quotation pursuant to JE’s new scope of works, then he is entitled to do so within 14 days of receipt of JE’s new scope of works and CS’s new quote. The parties are encouraged to work together to finalise the claim and the cost of repairs. If the parties are unable to agree, the parties can return to AFCA for a decision about the cost of repairs. As the insurer will cash settle the claim, it is to pay interest pursuant to section 57 of the Insurance Contracts Act (the Act) on the final cash settlement from 30 November 2021 (the date of its final offer) until settlement. Insurer required to pay temporary accommodation Subject to limits, the policy provides cover for alternative temporary accommodation for up to 12 months if the insured property is damaged and the insured is unable to live in the property as a result. It is not in dispute the property will be unliveable during the repairs. CS estimated it would take four weeks to repair the kitchen and living room areas. EC estimated it would take 12 weeks for the repairs, but its scope of work includes repairs for which the panel considers the insurer is not liable. The insurer has offered to pay for temporary accommodation: $6,412.00 (28 days x $229). The parties’ position on this issue was governed by quotations which are now mostly redundant. The panel is satisfied the fairest way to resolve this issue is to require CS to estimate the time it would take to undertake the repairs which will be required pursuant to JE’s new scope of works as set out above. Once determined, the panel is satisfied it is fair the insurer pay to the complainant for temporary accommodation at $229 per day for the time CS says it will take to do the repairs required pursuant to JE’s new scope of works as set out above. Determination | Case number: 810508 Page 14 of 25 2.2 Is the insurer required to increase its non-financial offer? Compensation payable in some circumstances AFCA may award compensation (capped at $5,400) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant’s expectation of enjoyment or pea ce of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience. AFCA expects the complainant to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. Fair the insurer pays $4,000 compensation The complainant complains about delay and the stress caused by the insurer’s claims management. He seeks $5,400 compensation. The insurer accepts the claim was prolonged due to insufficient investigations carried out initially but says it took reasonable steps to remedy this and progress the claim. It argues the time taken is not unreasonable given the complexity of the claim and the requirement for further investigations to determine causation. It said it provided regular updates to the complainant, apologises to the complainant for any inconvenience caused and in recognition of the inconvenience offered $1,000 compensation. The claim was made in April 2021. The insurer arranged the make safe and a building assessment in a timely manner. The insurer’s final offer was not made until 30 November 2021. The panel acknowledges the complexity of the claim, but as set out in this determination, the panel considers the insurer’s settlement offer and scope of work was inadequate. The panel accepts this aspect of the complainant’s claims experience caused inconvenience and stress to the complainant. Given this, and considering AFCA’s conservative approach, the panel accepts it is fair the insurer pays the complainant $4,000 non-financial loss compensation. 2.3 Why is the outcome fair? The insurer is entitled to settle the claim based on its policy terms and expert opinion. As the panel accepts the available information establishes much of the claimed damage was caused before the policy commenced, it would not be fair for the insurer to pay all the claimed damage. As the claim is to be cash settled, it is fair the insurer makes adequate provision for contingencies and variations which may occur once repairs commence. Determination | Case number: 810508 Page 15 of 25 3 Supporting information 3.1 Process This matter was determined by a panel Due to the nature of this dispute, it has been referred to a panel for determination. The panel comprises the ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive experience in the insurance industry. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). AFCA’s approach to this complaint A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. Caselaw and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common-sense approach is taken to determine proximate cause. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 810508 Page 16 of 25 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response. Both the polic y document and the Notice have been exchanged with the complainant. We will cover Water or liquid damage Loss or damage caused by water or liquid escaping from:  a fixed pipe or an object attached to a pipe, fixed gutter, fixed tank or a drain  a bath, basin, sauna, spa, shower base or shower wall, sink toilet or tiled floor that has drainage holes ….. We won’t cover Loss or damage caused by water or liquid entering your buildings: …. .  because of a structural defect faulty design or faulty workmanship Additional buildings benefits Alternative temporary accommodation (including for pets) Costs of alternative accommodation for up to 12 months if your buildings suffered loss or damage and you are unable to live in your buildings as a result. Accidental loss or damage We will cover We will cover unintended and unexpected loss or damage to your buildings We won’t cover Damage caused by an event excluded under any section of this policy Building and contents cover exclusions We will not pay for any loss or damage which is caused directly or indirectly by:  settling shrinkage or any movement of earth  erosion, rust, corrosion, gradual deterioration, depreciation, wear and tear  a defect in an item, structural defects, faulty or poor workmanship or design  previous damage that has not been repaired General exclusions We will not pay for any loss or damage, or liability caused directly by or arising from:  any event that does not occur within your period of insurance  mildew, atmospheric or climatic conditions Determination | Case number: 810508 Page 17 of 25 3.3 Extracts from material relied on by the parties Record Key points Prepurchase report 20 June 19  Visual prepurchase building inspection report and photographs 20 June 2019  No major defects found  Overall condition of the building average with the subfloor space described as fair  Inspected part of the subfloor and one photo only provided  Weep holes to property unobstructed.  Summary of minor defects (which can potentially bec ome major defects in future if not rectified) included subfloor rainwater a ccess through side of subfloor  Subfloor ventilation fair, dampness normal, subfloor cleanliness fair, timber formwork fair, low - lying foundation areas fair, drainage - rainwat er access through side of subfloor  Bearers and joists fair, piers fair, wood de c ay damage not found.  Sewer drainage and plumbing pipes fair  General site not es - stormwater drainage and surface drainage:…. It is essential to prevent surface waters from entering the sub floor area of timber floored dwellings to prevent rising damp fr om causing peaking and cupping to the timber flooring materials. This drainage gives best results once fitted on the high side elevations of this as inspected dwelling or building (I refer to AS2870 for compliant instructions if required.)  Shower leakage f ound: NO Prepurchase pe st report 20 June 19  At the time of inspection, no visible leaks or mould were found  High moisture areas should be investigated  High moisture readings were found in the bathroom/kitchen areas and swimming pool area  Claim no expertise in plumbing and drainage, however it appears that drainage is generally AVERAGE  RAINWATER ACCESS THROUGH SIDE OF SUBFLOOR  Weep holes in external walls were clear allowing air free flow Determination | Case number: 810508 Page 18 of 25 Record Key points Insurer’s expert (CS) 08 - 06 - 2021  Complainant concerned about the floor outside the bat hroom  Perimeter of room was mould affected consistent with a leak from the shower  Plumber performed full leak detection to main bathroom  Damage to hallway floor outside bathroom aris es from escape of liquid from the failed membrane and shower screen  Floor tiles fall away from floor waste and no drainage connected to drainage  Mould on dirt to subfloor and underside timber floor through 80% of the house consistent with multiple water issues that have occurred over time  Elevated levels of moisture to subfloor appear more consistent to storms causing damage to the flooring through internals  Mould in the bedroom next to the bathroom due to escape of liquid from bathroom  Rippling to the flooring consistent from the bearer and joist compromised from wood rot that has been an ongoing event  Damage to the kitchen floor consistent to a burst pipe that has been repaired but kitchen particle floor cannot be repaired until the moisture has been treat ed – maintenance required to pre vent stormwat er from entering the subfloor and escape of liquid from the bathroom Determination | Case number: 810508 Page 19 of 25 Record Key points Insurer’s expert (PS) Engineering Report 30 - 06 - 2021  Senior structural and civil engineer inspected, and photographed property 18 June 21 and reviewed documents provided by insurer including earlier plumbing reports  Report describes his findings  Complainant said started losing hot water in mid - April and ki tchen floor lifted  Damage to the kitchen floor was caused by the hot water leak age.  Rest of the damage to the floor and bathroom was most likely due to underlying soil movement caused by seasonal changes.  Inspection showed a pattern of ground movement whi ch has been exposed to natural elements, mainly surface water entering the subfloor area at will and for a long time.  Movement and subs equent subsidence has not been caused by a single event, but rather a gradual issue over a long term.  Subfloor, floor and bathroom damages in other parts of the residence refer to the age, lack of property foundation, poor maintenance, and long - t erm soil movement  Surface water ponding under the floor of the lifetime of the house has caused the damage to the other parts of the floor  Primary cause of the damage sustained to the other parts of the premise floorboards is the ground movement combined with lack of appro priate foundation and age.  Water damages to the bathroom floor and wall tiles appeared pre - existing and can possibly be due to poor maintenance or late awareness.  Water seeping gradually through bathroom walls damaging the floor and wall and unrelated to recent water leak  Water damaged timber framing under kitchen to be replaced as beyond repair but prior to that work damaged brick piers and timber supports are to be realigned on appropriat ely designed pad footings.  Photographs support findings including uns ealed gap along the paving and turf too high and close to vents Insurer’s expert (JE) Caus ation Report 30 - 06 - 2021  This builder inspected and photographed property 18 June 21  Describes damage he saw in the hous e and subfloor and summarises other rep orts provided  Water escapes from the shower screen. Water runs to the floor waste and drops into the subfloor causing framing to rot. Water flows out to the hallway bec ause the tiling is not graded to the floor waste. Bathroom not constructed in accordanc e with code.  External tiling installed at a level higher than the ground level under the subfloor and surface water enters the subfloor through the brick vents which are higher than ground level  Water flowing into the gap between the external wall and concrete path and is absorbed into the brickwork below the damp proof course and once the brick is saturated the moisture escapes into the subfloor contributing to subfloor dampness – code breach Determination | Case number: 810508 Page 20 of 25 Record Key points  Gr ound level to the subfloor is lower than the ground level outside and once surface water enters under the hous e it cannot escape – code breach  Damage to the flooring in the kitchen and family room was due to burst pipe and pre - existing extremely high leve ls of moisture to the subfloor area.  Damage to the kitchen cupboards and joinery was due to the burst water pipe.  Detachment of the skirting boards in the living room on the wall which backs onto the kitchen is due to the burst water pipe  Damage to the eng ineered floors in the dining, lounge and hallway is due to pre - existing extremely high levels of moisture to the subfloor area.  Any damage sustained to the master bedroom or the small bedroom adjacent to the bat hroom is due to pre - existing extremely high l evels of moisture to the subfloor area.  Before remedial work can start the membrane to the bathroom needs to be reinstated and the subfloor needs to be drained and the house protected from the effects of surface water to comply with building codes Insurer’s expert (JE) Report and Scope of Works 28 - 10 - 2021  Reins pected 18 October 21 and photographed cracks pointed out by complainant and reviewed complainant documents and submissions  Included cracking in a scope of works but cannot comment whet her cracking related to burst pipe  Mould to bathroom and ensuite not due to burst pipe but due to pre - e xisting moisture under the floor and will continue until bathroom drainage repaired and sub floor correctly graded  Floor framing under remaining areas is rotten due to long - term moisture under the floor and not due to several months of water ponding under the house from burst pipe  Rooms will continue to experience mould until bathroom drainage is repaired and subfloor area graded  Texture coating to bricks failing bec ause of presence of moisture which is not due to the burst pipe  Moisture caused by rainwater run - off and inadequate subfloor drainage  Water from burst pipe cannot reach brickwork at front of house because pressure from burst pipe not great enough and water ponding at the base of the burst pipe cannot travel uphill  Damage caused by the pipe was confined to the kitchen and family room and the detached skirting in the dining room.  Sk irting in the dining room is close enough to the burst pipe to be caused by the leak.  Other damage throughout the house is due to inadequate and illegal sewer and stormwat er damage.  Previous repairs to living room floor indicate historic movement Determination | Case number: 810508 Page 21 of 25 Record Key points  Ventilat ion openings provide an easy access for surface water to enter subfloor  Ground level under the floor is significantly lower than the surrounding ground level and surface water can’t escape and saturates the soil  Problem is once wat er is under the house i t cannot drain away  Refers to 3 omissions in the prepurchase inspection which were all present at the time of ins pection including no sewer drainage to bathroom floor waste, rotten floor framing timber, and inadequate grading of the subfloor foundations. Because of omissions says report is of insufficient depth and scope to be relied on  Prepurchase report does not include any photos of the bearers, joists or brick pier so no evidence of deterioration in subfloor in June 2019.  Does not dispute the amount of moisture which may have leaked from the burst pipe but does not believe leak responsible for damage to dining and lounge room because the velocity of the water was not great enough to reac h the centre of the lounge room, the centre of the lounge room is wet on top meaning water must’ve come from some other cause: subfloor drainage and location of weep holes will caus e the soil to become wet: and there are examples of pre - existing damage in lounge room  Building should have complied with 1973 Ordinance wh ich included the subsoil should be effectively drained; the ground surface under the building should be re - graded and provided with adequate outlets to prevent accumulation of water under the building; the ground beneath the building should be covered with an approved damp resisting material  Extension including the kitchen and family room probably occurred when building code in force which included that the ground must be graded so the area under the building is above the adjacent external finished ground level and surface water prevented from ponding  Previous repairs to the living room flooring indicate that there has been historic movement to the floor framing and flooring in the room.  Ventilation openings provide an easy access for surface water to ente r the subfloor.  Ground level under the floor is significantly lower than the ground level.  Surface ground water is unable to escape which has saturated the soil  Surface rainwater has been entering the subfloor for some time and has saturated from the top a nd caused historic damage. Accordingly, the damage to the flooring in the dining and lounge room is not attributable to the ruptured water pipe.  The reason I concluded the damage due to the burst pipe was Determination | Case number: 810508 Page 22 of 25 Record Key points confined to the kitchen and family room was because I found the soil under the centre of the lounge room to be wet. The burst pipe did not spray water onto the top of the soil as far as this point  There’s a brick wall under the kitchen floor running north and south located between the sink cupboard and th e island bench (brick wall 1). Rupt ured pipe fixed to brick wall 1  Wall below floor level which separates the kitchen from the dining room is a single skin brick wall with attached piers (brick wall 2). Kitchen on east of wall and dining on west of wall  Photo of brick wall 2 taken from the dining room while water exiting the pipe whic h shows water is spraying about 900mm from brick wall which is 3m short of the observed wet area under the dining room  Water at the extent of its spray would have dropped d own int o the soil immediately below and percolated into foundations  Bulk of 435kl of water would have fallen between the two brick walls. To travel as far as the lounge room would require the water to travel uphill as there is a low point at the base of t he brick wall 2  Water can rise through soil due to capillary action but only if all the soil below it is full saturated. Water will continue to flow downwards due to gravity. For the soil to be so saturated that additional water travels up rather than dow n effectively mean the water table has been raised locally. Clearly this would not occur by the addition of 435kl of water.  This led me to conclude that the subsoil under the dining area has been wetted by continuous surface water flow over a prolonged per iod rather than by escaped water from the burst pipe.  Velocity of water from the burst pipe was not great enough to reach the centre of the lounge room.  Subfloor drainage and location of weep holes will caus e the soil to become wet.  Examples of pre - existin g damage in the lounge room including the pre - finished veneer timber flooring system which has been repaired, and the tilted pier and the warped hardwood framing in the family room which are further evidence that moisture has been present in the soil for y ears.  Storm in March 2021 allowed water to ent er the subfloor and saturate the soil which also occurs during any heavy rain  Ground under the subfloor has not been graded to drain water away which explains the saturation of the subfloor  Not possible that one storm event can cause the foundations to become so saturated that footings settle, and hardwood timber deflect  March 21 storm would have increased the moisture content of the soil. But this has only exacerbated a pre - existing condition and would not h ave caused deflection of any framing timbers or settlement of the piers. Determination | Case number: 810508 Page 23 of 25 Record Key points  Only the first 350 litres of water from the storage hot water heater would have been hot. After the pipe ruptured, the escaping water would have been lukewarm at best as the tank woul d have been constantly refilling with cold wat er and the element would not have time to reheat the water. Other areas of the house have suffered damage due to moisture from inadequate sewer and stormwater drainage.  If inadequate drainage is rectified prope rty will dry out and further deterioration will be minimal  Provided scope of works. Insurer’s expert (PS) Engineering report in second Reply 17 - 08 - 2021  Photographs of cracking in the house (dated18 October 21) reviewed as well as visual inspection through a video call  Cracks observed during rec ent site visit described  Reiterates his opinion and rebuts complainant’s arguments  Impossible for water to trav el as far as the dining room window and ensuite and hallway  Cracking does not appear to be related to the burst pipe but rather an ongoing problem caused by seasonal ground movement. There was numerous evidence of repairs to many cracks in support of this contention.  Floor framing appeared rotten, an indication of exposure to a lifetime of underground moisture. The leakage lasted a month or two which is not considered long enough time to cause this type of damage. The moisture trapped in the subfloor comb ined with water entering this area have caused the ground movement and gradual deterioration of the subfloor framing.  Cracking will continue unless steps are taken to prevent water entering and ponding in the subfloor  Cracks and gaps opening in various pl aces are a clear indication of general ground movement that are seen in various plac es and cannot be related to a single event.  Foundation saturated for many years – volume larger than the failed hot water leakage  Undulation in the bearers and joists of t he subfloor framing is more solid evidenc e of a long - term issue. These were observed under the family room; the curvat ure cannot be caused by a short - term moisture exposure. Ground movement is a force large enough to deform the timber and only over a very long time.  No evidence supporting the claim. All the evidence gat hered so far attributing to the seasonal ground movement as previously stated. New evidence can only support this fact because of the repairs found during the inspection. It is evident that m ost of the cracking are pre - existing that has reappeared and hence cannot be related to the hot wat er system failure.  Prepurchase report two years old. Cracks likely to have been repaired and not visible during inspection; tilting pier and floor Determination | Case number: 810508 Page 24 of 25 Record Key points framing mo vement possible since the report; dispersed water not capable of changing the moisture content in the soil beneath the kitchen floor in such a short period of time and not related to ground movement; fact no mould apparent in 2019 doesn’t mean the floor wa s in healthy condition - referred to as fair  Visual prepurchase inspection limited  As for rainfall, water can still enter the subfloor, pond and saturat e the soil over years – volume of water by this proc ess is large and over time and not comparable to b urst hot water pipe  Volume of water escaping from burst pipe is not considered large and over a short period compared to long - t erm water entering subfloor  Water pressure not high enough to spray the water ac ross the whole house and limited to the kitchen area; and bathroom too far from the event and spray of water would not reach the floor framing underneath  Information from complainant may support site founded on expansive soils and supports ground movement theory  Soil movement normally occurs due to moi sture changes which caused swelling or shrinkage and not relat ed to described hydrostatic pressure  No doubt about the volume of water escaping from the burst pipe and soaks the ground underneat h but the volume disperses over short period of time and not ov er years. The leak is not responsible for ground movement  Even if only two weep holes are below the surface it is still enough for water to enter and over years is noticeable volume 3.4 Other relevant material considered and relied on  Parties’ submissions/emails and all attachments to all submissions/emails.  Expert reports.  Complainant submissions including numerous attachments and complainant’s comm entary on material from insurer.  Photographs.  Correspondence between the parties. Determination | Case number: 810508 Page 25 of 25