Text of the determination
Determination
Case number 809919
Financial firm Insurance Australia Limited
Determination | Case number: 809919 Page 1 of 9
Case number: 809919 26 August 2022
1 Determination overview
1.1 Complaint
The complainant lodged a claim following several rain events occurring from January to
March 2021.
The insurer accepted the claim and offered a cash settlement of approximately $16,000, as
well as additional costs for mould remediation to internal areas and contents. The
complaina nt rejected the insurer’s offer saying it was inade quate because the insurer’s trades
were unqualified, the damage would continue to progress, and toxic mould was developing
throughout the premises.
To resolve the complaint, the complainant seeks adequate repairs, mould remediation, and
temporary accommodation. He also says the insurer mishandled the claim leading to an
unusual degree of stress and seeks non-financial compensation of $5,400.
1.2 Issues and key findings
Has the insurer assessed the full extent of its liability under the claim?
Yes. The available information indicates the insurer assessed the full extent of its liability in
terms of a scope of work at the time of assessment. It opted to cash settle the scoped repairs
for internal damage.
However, the undisputed amount was not paid at the time. For this reason, the panel
considers the settlement method outlined in section 2.1 of this determination fair in the
circumstances.
Is the complainant entitled to non-financial compensation for service issues
and delays?
The circumstances of the complaint suggest an award of compensation is warranted. This is
because the insurer’s trades observed black mould in the property which is dangerous to
human health, but the complainant was not provided accommodation or mould remediation
immediately. The insurer says the complainant refused mould remediation. The complainant
says this is incorrect. There do not appear to have been any subsequent offers for this to
have occurred which would have been reasonable given the danger posed to the
complainant. As such, the panel considers an award for compensation in the amount of
$3,000 fair in the circumstances.
Why is the outcome fair?
The outcome is fair in the circumstances because the insurer provided a reasonable scope
for rectification of insurable damage. However, it’s offer of settlement did not account for all
associated costs.
An award of compensation is also fair in the circumstances for the reasons outlined in section
2.2 of this determination.
Determination | Case number: 809919 Page 2 of 9
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is to settle the claim in accordance with sections 2.1 and 2.2 of this determination.
Determination | Case number: 809919 Page 3 of 9
2 Reasons for determination
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in property matters.
2.1 Has the insurer assessed the full extent of its liability under
the claim?
Complainant established a valid claim
The complainant holds the initial onus to establish a valid claim. That is, damage was caused
by an event covered under the policy. The insurer says the complainant failed to establish a
valid claim with regard to external property damage including the roof. It has however agreed
damage to internal components of the home and contents were caused by a storm event or
multiple storm events. As such, the complainant has established a valid claim.
Given the above, the onus shifts to the insurer to show what parts of the claim it can deny by
way of a policy condition or exclusion if it seeks to do so.
Policy covers damage caused by storm events
The policy covers the events outlined in the product disclosure statement including damage
caused by storm. Specifically, the policy covers any damage caused by:
Storm
Covered
storm
landslide or subsidence that happens immediat ely as a direct result of a storm.
For example, hail damages your roof.
Not covered
loss or damage to:
‒ retaining walls
‒ gates, fences or free standing walls if they are not structurally sound or well
maintained
‒ pontoons, jetties or bridges
‒ gravel driveways, or
‒ swimming pool/spa covers that are more than 5 years old
loss or damage caus ed by:
‒ erosion, deterioration, collapse, shrinkage or any other earth movement
‒ water which enters your home through any ta rpaulins or fixings set up while you’re
renovating or altering your home.
The policy also provides accidental damage cover which the complainant has taken. That is,
damage to the home that is caused unintentionally. This cover is also subject to certain
limitations and exclusions.
Determination | Case number: 809919 Page 4 of 9
Insurer partially accepted the claim and offered cash settlement
The insurer initially declined the claim in full saying the damage was not caused by an event
covered under the policy. That is, the damage occurred over multiple rain events over a
period. It also relied on policy exclusions for wear & tear, mould, deterioration, ground
movement and atmospheric conditions among others.
The insurer later agreed to accept the following components of the claim:
Internal damages in the amount of $18, 751. 87 less the $1,000 policy excess
Mould remediation
Additional settlement for walls and ceilings required to be removed as part of the remediation
process.
Mould remediation for salvageable contents
Disposal of non-salvageable items.
The complainant rejected the insurer’s offer saying it was insufficient to rectify all claimed
damage. He also said the insurer mishandled the claim and sought non-financial
compensation in the amount of $5,400.00.
The panel notes the insurer has not put cash settlement figures forward for the additional
items it agreed to cover, nor has it considered replacement of non-salvageable content items.
Insurer provided expert reports
Expert reports were obtained by the parties.
The insurer initially appointed builder TB to assess the cause and extent of the claimed
damage. TB said the roof was in very poor condition allowing water ingress through
deteriorated or missing screws and sheets, missing battens, deteriorated facia board, short
cut sheets and debris filled gutters.
TB said:
The roof is in very poor condition and TB recommend full roof replacement. The property is in a
poorly maintained state bot h externally and int ernally.
On review of TB’s report, images have b een provided which appear to confirm the above
findings. TB provided a quote for internal repairs as the damage was consistent with storm. It
recommended a cash settlement in the amount of $16,305.98 for rectification of damage to
the ceilings in the kitchen, living room, hallway, bedroom 1, bedroom 2, bedroom 3 and
bathroom.
TB could not warrant repairs due to pre-existing maintenance issues with the roof.
The insurer appointed an internal assessor who agreed with TB noting observations made
about significant maintenance related roof issues such as missing roof screws, battens and
daylight being visible from within the roof space. It also noted partially dislodged screws
holding the cornices in place. The assessor said the property in general was in a deteriorating
state and movement related cracking was evident. The assessor also said:
The home is in a deteriorating state and windows are either tinted or insured has covered them
over, I believe that the mould is due to poor living habits & condensation due to no sarking to
the home, rooms being full of contents & no air flow.
Determination | Case number: 809919 Page 5 of 9
I'm als o of the opinion the ceiling sheets and cornices that have cracked and warped may be
due to movement in the steel frame as they are subject to movement and coming from drought
like conditions to now wet conditions this could be a contributing factor.
Whilst the insured is adamant that the roof does not leak the images supplied by the builder
would comprehensively reject the insured's claims. I also believe what water has enter ed the
roof space would have been soaked up by the ceiling insulation and this would be a
contributing factor for mould growth also.
…
I would recommend claims discuss a cash settlement with insured, but he also needs to be
made aware that the roof is in need of major rectification & I'd suggest supplying him with the
images of the roof and roof cavity.
Finally, the assessor said an allowance for mould remediation should be made in addition to
the cash settlement offer.
The complainant disputed findings of TB and the internal assessor saying water ingress was
not coming from the roof. The complainant provided photos of the roof and inside the roof
cavity adamantly stating the roof had not leaked. The panel notes however, alternate expert
information to support this position were not provided at that time.
The insurer appointed T builders to conduct an electrical make-safe. The resulting report also
referred to mould from roof leaks.
Complainant obtained a building inspector’s report
The complainant engaged building inspector IB to attend the property on 21 February 2022,
approximately one year after the claimed event. Based on his observations, IB disagreed with
points raised by the insurer’s experts.
IB found many points of water staining on ceilings throughout the property and said this was
consistent with past water damage. He noted the complainant appeared forgetful, confused,
emotional and lethargic likely from the heavily mould throughout the property which he said
also affected him while on site.
IB disagreed with the insurer’s findings saying the damage was much too widespread to have
been caused by a poorly maintained roof saying the damage was likely caused by wind
driven rain. He noted evidence of maintenance performed on the roof exterior such as
replacement of screws. IB considered the roof to be in generally good condition and did not
believe replacement was warranted.
IB also disagreed with the insurer’s assertion roof sheets needed to be replaced saying holes
created by missed battens would usually be rectified using silicone and saying short cut roof
sheets were not a point of water ingress.
On consideration, the panel disagrees with certain points made by IB. It notes IB’s attendance
was almost 12 months after claim lodgement and considers it reasonable further damage
would have occurred in that time, and existing damage would have significantly progressed.
For this reason, the panel considers the insurer’s reports to be more persuasive as they were
produced shortly after the claimed event and are therefore likely to be more accurate.
In particular, IB’s assertion regarding silicone being a standard method used to repair holes is
problematic. Silicone breaks down over time and as such, is considered a temporary stop gap
rather than a permanent fix.
Determination | Case number: 809919 Page 6 of 9
The panel also notes the comments about it being impossible for short cut roof sheets to be
points of water ingress while asserting wind driven rain entered the property. It is considered
wind driven rain would be more likely to enter at points where a roof sheet has been cut short,
and it is known water may track to different locations before presenting internally. It would
also make the development of mould more likely.
IB also asserted blocked gutters could not result in water backflowing into the property.
However, images have been provided clearly showing gutters being full of debris. Blocked
gutters are known to cause water ingress during periods of heavy rain.
IB concludes the insurer’s assessors have made the clear assumption the property had
significant damage prior to the storm event as claimed by the home owner but had not
provided evidence of such. It is unclear what purpose this statement serves as again; the
insurer has agreed to rectify internal damage saying only there was no evidence the
deteriorated state of the roof was caused by a one-off storm event. IB appears to agree there
are issues with the roof, but they could not have caused such widespread internal damage.
The panel notes comments about no obvious damage being present in pre-purchase images.
As stated, however, the insurer does not dispute water damage occurred because of storm
events. Rather, the complaint i s about the extent of the insurer’s liability regarding those
events. Neither party has alleged any damage to the roof resulted from the storm or storms.
Overall, and d espite IB’s assertions, images clearly show deteriorated and protruding roof
screws, gutters blocked with debris and other maintenance related issues. The panel accepts
these could reasonably have caused water ingress over time.
Insurer to increase offer
Overall, the panel accepts the insurer’s findings. Maintenance issues relating to the r oof are
clearly evident in the expert reports and images and the complainant has not established
these were caused by a one-off storm or accident event.
The insurer has accepted internal damages from the original storm including a 15% uplift. In
the absence of an alternate estimate from the complainant, and as the insurer’s inspections
occurred reasonably soon after the reported date of the claimed events, the panel considers
the cash settlement offer was likely appropriate at that time.
It is noted damage has likely progressed since the insurer’s assessments and more recent
events may have caused more damage as well. It is also noted repair costs may have
increased. Although the insurer should not be held liable for the further progression of
damage due to rejection of its original offer, it also did not settle the complainant the
undisputed amounts in a timely manner and therefore the complainant may not have had the
means to have any work carried out.
As such, and to account for contingencies, transference of risk and the loss of any lifetime
guarantees, the panel considers a 20% uplift to be appropriate in the circumstances.
Additional settlement for walls and ceilings required to be removed as part of the remediation
process should be included in the above settlement prior to applying the 20% uplift.
In addition, a fair offer for mould remediation of the property based on an actionable quote
should be made including the cost of a hygienist to confirm the result of such remediation.
Alternatively, the insurer may opt to conduct these works itself.
Determination | Case number: 809919 Page 7 of 9
Contents require further consideration
The insurer agreed to settle the complainant for mould remediation of salvageable contents,
as well as disposal of non-salvageable contents. Given the ins urer’s acceptance of this claim
component, it is also appropriate for the insurer to settle the complainant for non-salvageable
items disposed of due to the original event.
Mechanism to settle the claim
On balance, the panel considers the following method of settlement to be fair in the
circumstances:
The insurer is to obtain an updated quotation for internal damages based upon TB’s original quote .
The quote is to provide an estimate of the time required to complete the repairs
The insurer is to obtain an updated quotation for mould remediation of building, including an estimate
of the time required to complet e the repairs
The insurer is to obtain an updated quotation for removal of walls and ceilings including an estimate
of the time required to complet e the repairs
Cost and value and disposal of non-salvageable items to be determined by the insurer
The insurer is to obtain an updated quotation for repairs to salvageable cont ents .
If the insurer chooses to cash settle the claim, it is to do so bases upon actionable quotes and
to apply a 20% uplift to cover contingencies and loss of guarantee. This does not apply to
cost and value of non-salvageable items. The insurer is entitled to deduct any applicable
policy excess.
The parties are to work together to determine insurer’s liability for replacement of non -
salvageable contents.
Given the level of mould in the property, the panel also considers it fair for a hygienist to be
engaged following mould remediation work. If the matter is cash settled an allowance for this
service is to be based upon an actionable quotation and should include the 20% uplift.
In the interest of health and safety, the insurer should continue to provide accommodation
until the repairs have been completed or, if cash settled, the maximum time period estimated
in the above quotations, subject to the terms of the policy.
Insurer not required to reimburse report fees
The complainant’s building inspection report did not ultimately aid the complainant’s position.
As such, the insurer is not required to reimburse any fee charged.
2.2 Is the complainant entitled to non-financial compensation
for service issues and delays?
AFCA can award non-financial loss in certain circumstances
The complainant seeks non-financial for stress and inconvenience due to the way the insurer
handled the claim.
AFCA will only award compensation for non-financial loss where there has been an unusual
amount of physical inconvenience, time taken to resolve a situation, or interference with the
complainant ’ s expectation of enjoyment or peace of mind. Compensation is capped at an
award of $5400.
Determination | Case number: 809919 Page 8 of 9
In assessing whether to award compensation, AFCA expects complainants to be moderately
robust, bear the normal degree of inconvenience experienced when a problem occurs, and
take reasonable steps to minimise the inconvenience suffered. Where a complainant has
contributed to their loss arising from the insurer’s conduct, the level of compensation may be
reduced accordingly.
Insurer to pay non-financial compensation
The insurer acknowledges the property contains significant mould and this has been
documented in the expert reports. Temporary accommodation was provided in early 2022.
However, mould remediation and the engagement of a hygienist has not been done to date.
The insurer says it offered a mould make safe early in the process, which the complainant
rejected. The complainant says he did not reject any attendances or work proposed by the
insurer. Regardless, given the severe health implications of the complainant living in a
property containing black mould the panel considers the insurer had a duty of care to pursue
this. However, there is no mention in the correspondence between the parties of any such
follow up.
Claim file notes mention mould remediation many times but no information has been provided
to show it has been done, nor that a hygienist was appointed to confirm the efficacy of any
such work.
The insurer also did not settle the undisputed amounts or obtain costings for several items it
accepted. As such, the complainant was not provided with the means to conduct any repairs
or remediation.
The panel is of the view that the insurer should have considered the complainant was a
vulnerable person and should have treated the claim and the complainant in light of that.
Given the above, the panel is satisfied the complainant has been adversely affected beyond
what would be expected in a standard insurance claim. It is therefore considered reasonable
for the insurer to pay the complainant for non-financial compensation in the amount of $3,000.
2.3 Why is the outcome fair?
The outcome is fair in the circumstances because the insurer assessed the extent of its
liability with regard to a scope, but its cash settlement offer did not include all works it
accepted as part of the claim. It also did not settle the undisputed amounts after making its
initial offer of settlement. The method of settlement set out above provides a fair outcome to
both the complainant and the insurer.
Determination | Case number: 809919 Page 9 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections we may find that a claim cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.