Home / IAG / Determination 809919

Determination 809919

Storm damage claim settlement and mould remediation

FirmIAG
Decided2022-11-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$3,000
Amount claimed$5,400
SourceAFCA PDF

Summary

The complainant claimed storm damage to his home and rejected the insurer's cash settlement offer as inadequate, also seeking mould remediation and non-financial compensation. AFCA found the insurer's expert reports more persuasive on the roof's maintenance cause, required further settlement with a 20% uplift and mould remediation, and awarded $3,000 non-financial loss for delay and failure to follow up on mould.

The complainant bears the onus to establish a valid claim and the insurer must show any policy exclusion; the insurer's expert evidence shortly after the event was preferred, while non-financial loss is awarded only for unusual inconvenience or adverse effect beyond a standard claim.

Issues

Subjects and remedies

elderly or capacityhealth or medicalhome or building damagenatural disasterpay compensationpay non financial lossprovide documentsreassess claimrepair or rectify

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 809919 Financial firm Insurance Australia Limited Determination | Case number: 809919 Page 1 of 9 Case number: 809919 26 August 2022 1 Determination overview 1.1 Complaint The complainant lodged a claim following several rain events occurring from January to March 2021. The insurer accepted the claim and offered a cash settlement of approximately $16,000, as well as additional costs for mould remediation to internal areas and contents. The complaina nt rejected the insurer’s offer saying it was inade quate because the insurer’s trades were unqualified, the damage would continue to progress, and toxic mould was developing throughout the premises. To resolve the complaint, the complainant seeks adequate repairs, mould remediation, and temporary accommodation. He also says the insurer mishandled the claim leading to an unusual degree of stress and seeks non-financial compensation of $5,400. 1.2 Issues and key findings Has the insurer assessed the full extent of its liability under the claim? Yes. The available information indicates the insurer assessed the full extent of its liability in terms of a scope of work at the time of assessment. It opted to cash settle the scoped repairs for internal damage. However, the undisputed amount was not paid at the time. For this reason, the panel considers the settlement method outlined in section 2.1 of this determination fair in the circumstances. Is the complainant entitled to non-financial compensation for service issues and delays? The circumstances of the complaint suggest an award of compensation is warranted. This is because the insurer’s trades observed black mould in the property which is dangerous to human health, but the complainant was not provided accommodation or mould remediation immediately. The insurer says the complainant refused mould remediation. The complainant says this is incorrect. There do not appear to have been any subsequent offers for this to have occurred which would have been reasonable given the danger posed to the complainant. As such, the panel considers an award for compensation in the amount of $3,000 fair in the circumstances. Why is the outcome fair? The outcome is fair in the circumstances because the insurer provided a reasonable scope for rectification of insurable damage. However, it’s offer of settlement did not account for all associated costs. An award of compensation is also fair in the circumstances for the reasons outlined in section 2.2 of this determination. Determination | Case number: 809919 Page 2 of 9 1.3 Determination This determination is partially in favour of the complainant. The insurer is to settle the claim in accordance with sections 2.1 and 2.2 of this determination. Determination | Case number: 809919 Page 3 of 9 2 Reasons for determination A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in property matters. 2.1 Has the insurer assessed the full extent of its liability under the claim? Complainant established a valid claim The complainant holds the initial onus to establish a valid claim. That is, damage was caused by an event covered under the policy. The insurer says the complainant failed to establish a valid claim with regard to external property damage including the roof. It has however agreed damage to internal components of the home and contents were caused by a storm event or multiple storm events. As such, the complainant has established a valid claim. Given the above, the onus shifts to the insurer to show what parts of the claim it can deny by way of a policy condition or exclusion if it seeks to do so. Policy covers damage caused by storm events The policy covers the events outlined in the product disclosure statement including damage caused by storm. Specifically, the policy covers any damage caused by: Storm Covered  storm  landslide or subsidence that happens immediat ely as a direct result of a storm. For example, hail damages your roof. Not covered  loss or damage to: ‒ retaining walls ‒ gates, fences or free standing walls if they are not structurally sound or well maintained ‒ pontoons, jetties or bridges ‒ gravel driveways, or ‒ swimming pool/spa covers that are more than 5 years old  loss or damage caus ed by: ‒ erosion, deterioration, collapse, shrinkage or any other earth movement ‒ water which enters your home through any ta rpaulins or fixings set up while you’re renovating or altering your home. The policy also provides accidental damage cover which the complainant has taken. That is, damage to the home that is caused unintentionally. This cover is also subject to certain limitations and exclusions. Determination | Case number: 809919 Page 4 of 9 Insurer partially accepted the claim and offered cash settlement The insurer initially declined the claim in full saying the damage was not caused by an event covered under the policy. That is, the damage occurred over multiple rain events over a period. It also relied on policy exclusions for wear & tear, mould, deterioration, ground movement and atmospheric conditions among others. The insurer later agreed to accept the following components of the claim:  Internal damages in the amount of $18, 751. 87 less the $1,000 policy excess  Mould remediation  Additional settlement for walls and ceilings required to be removed as part of the remediation process.  Mould remediation for salvageable contents  Disposal of non-salvageable items. The complainant rejected the insurer’s offer saying it was insufficient to rectify all claimed damage. He also said the insurer mishandled the claim and sought non-financial compensation in the amount of $5,400.00. The panel notes the insurer has not put cash settlement figures forward for the additional items it agreed to cover, nor has it considered replacement of non-salvageable content items. Insurer provided expert reports Expert reports were obtained by the parties. The insurer initially appointed builder TB to assess the cause and extent of the claimed damage. TB said the roof was in very poor condition allowing water ingress through deteriorated or missing screws and sheets, missing battens, deteriorated facia board, short cut sheets and debris filled gutters. TB said: The roof is in very poor condition and TB recommend full roof replacement. The property is in a poorly maintained state bot h externally and int ernally. On review of TB’s report, images have b een provided which appear to confirm the above findings. TB provided a quote for internal repairs as the damage was consistent with storm. It recommended a cash settlement in the amount of $16,305.98 for rectification of damage to the ceilings in the kitchen, living room, hallway, bedroom 1, bedroom 2, bedroom 3 and bathroom. TB could not warrant repairs due to pre-existing maintenance issues with the roof. The insurer appointed an internal assessor who agreed with TB noting observations made about significant maintenance related roof issues such as missing roof screws, battens and daylight being visible from within the roof space. It also noted partially dislodged screws holding the cornices in place. The assessor said the property in general was in a deteriorating state and movement related cracking was evident. The assessor also said: The home is in a deteriorating state and windows are either tinted or insured has covered them over, I believe that the mould is due to poor living habits & condensation due to no sarking to the home, rooms being full of contents & no air flow. Determination | Case number: 809919 Page 5 of 9 I'm als o of the opinion the ceiling sheets and cornices that have cracked and warped may be due to movement in the steel frame as they are subject to movement and coming from drought like conditions to now wet conditions this could be a contributing factor. Whilst the insured is adamant that the roof does not leak the images supplied by the builder would comprehensively reject the insured's claims. I also believe what water has enter ed the roof space would have been soaked up by the ceiling insulation and this would be a contributing factor for mould growth also. … I would recommend claims discuss a cash settlement with insured, but he also needs to be made aware that the roof is in need of major rectification & I'd suggest supplying him with the images of the roof and roof cavity. Finally, the assessor said an allowance for mould remediation should be made in addition to the cash settlement offer. The complainant disputed findings of TB and the internal assessor saying water ingress was not coming from the roof. The complainant provided photos of the roof and inside the roof cavity adamantly stating the roof had not leaked. The panel notes however, alternate expert information to support this position were not provided at that time. The insurer appointed T builders to conduct an electrical make-safe. The resulting report also referred to mould from roof leaks. Complainant obtained a building inspector’s report The complainant engaged building inspector IB to attend the property on 21 February 2022, approximately one year after the claimed event. Based on his observations, IB disagreed with points raised by the insurer’s experts. IB found many points of water staining on ceilings throughout the property and said this was consistent with past water damage. He noted the complainant appeared forgetful, confused, emotional and lethargic likely from the heavily mould throughout the property which he said also affected him while on site. IB disagreed with the insurer’s findings saying the damage was much too widespread to have been caused by a poorly maintained roof saying the damage was likely caused by wind driven rain. He noted evidence of maintenance performed on the roof exterior such as replacement of screws. IB considered the roof to be in generally good condition and did not believe replacement was warranted. IB also disagreed with the insurer’s assertion roof sheets needed to be replaced saying holes created by missed battens would usually be rectified using silicone and saying short cut roof sheets were not a point of water ingress. On consideration, the panel disagrees with certain points made by IB. It notes IB’s attendance was almost 12 months after claim lodgement and considers it reasonable further damage would have occurred in that time, and existing damage would have significantly progressed. For this reason, the panel considers the insurer’s reports to be more persuasive as they were produced shortly after the claimed event and are therefore likely to be more accurate. In particular, IB’s assertion regarding silicone being a standard method used to repair holes is problematic. Silicone breaks down over time and as such, is considered a temporary stop gap rather than a permanent fix. Determination | Case number: 809919 Page 6 of 9 The panel also notes the comments about it being impossible for short cut roof sheets to be points of water ingress while asserting wind driven rain entered the property. It is considered wind driven rain would be more likely to enter at points where a roof sheet has been cut short, and it is known water may track to different locations before presenting internally. It would also make the development of mould more likely. IB also asserted blocked gutters could not result in water backflowing into the property. However, images have been provided clearly showing gutters being full of debris. Blocked gutters are known to cause water ingress during periods of heavy rain. IB concludes the insurer’s assessors have made the clear assumption the property had significant damage prior to the storm event as claimed by the home owner but had not provided evidence of such. It is unclear what purpose this statement serves as again; the insurer has agreed to rectify internal damage saying only there was no evidence the deteriorated state of the roof was caused by a one-off storm event. IB appears to agree there are issues with the roof, but they could not have caused such widespread internal damage. The panel notes comments about no obvious damage being present in pre-purchase images. As stated, however, the insurer does not dispute water damage occurred because of storm events. Rather, the complaint i s about the extent of the insurer’s liability regarding those events. Neither party has alleged any damage to the roof resulted from the storm or storms. Overall, and d espite IB’s assertions, images clearly show deteriorated and protruding roof screws, gutters blocked with debris and other maintenance related issues. The panel accepts these could reasonably have caused water ingress over time. Insurer to increase offer Overall, the panel accepts the insurer’s findings. Maintenance issues relating to the r oof are clearly evident in the expert reports and images and the complainant has not established these were caused by a one-off storm or accident event. The insurer has accepted internal damages from the original storm including a 15% uplift. In the absence of an alternate estimate from the complainant, and as the insurer’s inspections occurred reasonably soon after the reported date of the claimed events, the panel considers the cash settlement offer was likely appropriate at that time. It is noted damage has likely progressed since the insurer’s assessments and more recent events may have caused more damage as well. It is also noted repair costs may have increased. Although the insurer should not be held liable for the further progression of damage due to rejection of its original offer, it also did not settle the complainant the undisputed amounts in a timely manner and therefore the complainant may not have had the means to have any work carried out. As such, and to account for contingencies, transference of risk and the loss of any lifetime guarantees, the panel considers a 20% uplift to be appropriate in the circumstances. Additional settlement for walls and ceilings required to be removed as part of the remediation process should be included in the above settlement prior to applying the 20% uplift. In addition, a fair offer for mould remediation of the property based on an actionable quote should be made including the cost of a hygienist to confirm the result of such remediation. Alternatively, the insurer may opt to conduct these works itself. Determination | Case number: 809919 Page 7 of 9 Contents require further consideration The insurer agreed to settle the complainant for mould remediation of salvageable contents, as well as disposal of non-salvageable contents. Given the ins urer’s acceptance of this claim component, it is also appropriate for the insurer to settle the complainant for non-salvageable items disposed of due to the original event. Mechanism to settle the claim On balance, the panel considers the following method of settlement to be fair in the circumstances:  The insurer is to obtain an updated quotation for internal damages based upon TB’s original quote . The quote is to provide an estimate of the time required to complete the repairs  The insurer is to obtain an updated quotation for mould remediation of building, including an estimate of the time required to complet e the repairs  The insurer is to obtain an updated quotation for removal of walls and ceilings including an estimate of the time required to complet e the repairs  Cost and value and disposal of non-salvageable items to be determined by the insurer  The insurer is to obtain an updated quotation for repairs to salvageable cont ents . If the insurer chooses to cash settle the claim, it is to do so bases upon actionable quotes and to apply a 20% uplift to cover contingencies and loss of guarantee. This does not apply to cost and value of non-salvageable items. The insurer is entitled to deduct any applicable policy excess. The parties are to work together to determine insurer’s liability for replacement of non - salvageable contents. Given the level of mould in the property, the panel also considers it fair for a hygienist to be engaged following mould remediation work. If the matter is cash settled an allowance for this service is to be based upon an actionable quotation and should include the 20% uplift. In the interest of health and safety, the insurer should continue to provide accommodation until the repairs have been completed or, if cash settled, the maximum time period estimated in the above quotations, subject to the terms of the policy. Insurer not required to reimburse report fees The complainant’s building inspection report did not ultimately aid the complainant’s position. As such, the insurer is not required to reimburse any fee charged. 2.2 Is the complainant entitled to non-financial compensation for service issues and delays? AFCA can award non-financial loss in certain circumstances The complainant seeks non-financial for stress and inconvenience due to the way the insurer handled the claim. AFCA will only award compensation for non-financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant ’ s expectation of enjoyment or peace of mind. Compensation is capped at an award of $5400. Determination | Case number: 809919 Page 8 of 9 In assessing whether to award compensation, AFCA expects complainants to be moderately robust, bear the normal degree of inconvenience experienced when a problem occurs, and take reasonable steps to minimise the inconvenience suffered. Where a complainant has contributed to their loss arising from the insurer’s conduct, the level of compensation may be reduced accordingly. Insurer to pay non-financial compensation The insurer acknowledges the property contains significant mould and this has been documented in the expert reports. Temporary accommodation was provided in early 2022. However, mould remediation and the engagement of a hygienist has not been done to date. The insurer says it offered a mould make safe early in the process, which the complainant rejected. The complainant says he did not reject any attendances or work proposed by the insurer. Regardless, given the severe health implications of the complainant living in a property containing black mould the panel considers the insurer had a duty of care to pursue this. However, there is no mention in the correspondence between the parties of any such follow up. Claim file notes mention mould remediation many times but no information has been provided to show it has been done, nor that a hygienist was appointed to confirm the efficacy of any such work. The insurer also did not settle the undisputed amounts or obtain costings for several items it accepted. As such, the complainant was not provided with the means to conduct any repairs or remediation. The panel is of the view that the insurer should have considered the complainant was a vulnerable person and should have treated the claim and the complainant in light of that. Given the above, the panel is satisfied the complainant has been adversely affected beyond what would be expected in a standard insurance claim. It is therefore considered reasonable for the insurer to pay the complainant for non-financial compensation in the amount of $3,000. 2.3 Why is the outcome fair? The outcome is fair in the circumstances because the insurer assessed the extent of its liability with regard to a scope, but its cash settlement offer did not include all works it accepted as part of the claim. It also did not settle the undisputed amounts after making its initial offer of settlement. The method of settlement set out above provides a fair outcome to both the complainant and the insurer. Determination | Case number: 809919 Page 9 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.