Home / IAG / Determination 808921

Determination 808921

Water damage claim partly declined; loss of rent and non-financial loss disputed

FirmIAG
Decided2022-07-18
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$12,406
Non-financial loss$500
Amount claimed—
SourceAFCA PDF

Summary

The complainant's landlord insurance claim for water damage from a leaking pipe and loss of rent was partly accepted. AFCA ordered an increased cash settlement of $8,000.89, loss of rent of $7,405.70, and $500 for non-financial loss.

The timber framing damage was most likely caused by the leaking pipe within the wall cavity, while the pipe repair cost, carpet damage and maintenance were excluded, and loss of rent was payable as the property could not be tenanted until repaired.

Issues

Subjects and remedies

home or building damagetravel or overseaspay compensationpay non financial loss

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 808921 Financial firm Insurance Australia Limited Determination | Case number: 808921 Page 1 of 7 Case number: 808921 15 July 2022 1 Determination overview 1.1 Complaint The complainant held a Landlord’s Insurance policy with the financial firm (insurer) and on 11 December 2021 lodged a claim for water damage caused by a leaking pipe within the wall cavity of an upstairs bathroom. The insurer accepted liability for the water damage to the rumpus room but declined liability for repairs to the leaking pipe and the complainant’s claim for loss of rent . The insurer offered the complainant $3,000.89 to repair the accepted damage. The complainant disputes the insurer’s decision and maintains all the damage should be covered under the terms of the policy and in addition, he should be entitled for loss of rent during the repair period. In the alternative the complainant says the damage should be classified as malicious damage as the tenant knew of the water leak and failed to report the leaking pipe as required under the terms of the rental agreement. 1.2 Issues and key findings Is the insurer entitled to limit its liability for the damage claimed? Yes. The insurer should increase its offer settlement by $5,000 to include damage to the timber wall framing as set out in this determination. Is the insurer liable for loss of rent? Yes. The insurer is liable to cover the reasonable loss of rent that would have been incurred during the repair process. Is the complainant entitled to non-financial loss? Yes. Whilst on balance the insurer has acted reasonably, I accept that the complainant has been unusually inconvenienced during the claim process. Compensation of $500 for non- financial loss is fair in the circumstances. Why is the outcome fair? The outcome is fair as the policy limits the insurer’s liability for damage sustained because of listed events. 1.3 Determination This determination is partly in favour of the complainant. Within 21 days of the complainant’s acceptance of this determination the insurer should increase its cash settlement of the claim to $8,000. 89 and in addition pay the complainant’s loss of rent for 192 days at $270 per week totalling $7,405.70. In addition, the insurer is to pay the complainant $500 compensation for non-financial loss pursuant to AFCA rule D3.3. Determination | Case number: 808921 Page 2 of 7 2 Reasons for determination 2.1 Is the insurer entitled to limit its liability for the damage claimed? The complainant has the onus to prove claim falls within the terms of the policy. It is established insurance law that an insured person has the initial onus to prove, on the balance of probabilities, (that is more likely than not), that the loss or damage claimed falls within the terms of the policy. This is commonly called a prima facie claim. The complainant’s landlord insurance policy provides cover for a series of listed events including water and oil leaks, rent default and loss or damage arising from vandalism or malicious acts of a tenant or guest. The policy also includes loss of rent during repair periods. The complainant’s claim is for water damage to the rental property caused by a leaking pipe in the upstairs bathroom and loss of rent. The onus is therefore on the complainant to establish that most likely the damage arose from a leaking pipe resulting in loss of rent. The complainant says that the water damage affected the timber wall framing, the rumpus room underneath the bathroom, the carpet in the rumpus room and timber stumps and bathroom flooring. The damage was not reported until after the complain ant’s tenant had left the property. The complainant says the tenant failed to meet her obligations under the tenancy agreement in reporting maintenance issues and this should be malicious damage. The insurer provided a call recording of the conversation with DRE. It is apparent from a telephone call between the insurer and DRE that the tenant had been a long-term tenant. I note that the complainant has claimed that the insurer did not speak to DRE. The complainant has suggested that the insurer has lied with respect to this. That is clearly not correct. I accept based on the contents of that conversation that the tenant left the property having obtained alternative employment that included accommodation. I accept that the tenant informed the real estate agent prior to leaving the property and left the property on amicable terms. According to DRE the tenant had substantial belongings and it is unlikely the tenant was aware of any damage being caused by a leaking pipe in the wall cavity. DRE confirmed she did not believe that the tenant realised there was water damage until she had removed her contents on or about 9 December 2020. Although the complainant has argued the insurer did not speak to the real estate agent, the call recording clearly confirms that a discussion was held. I accept it is unlikely that the tenant was aware of damage and I accept that the damage was not malicious damage. No dispute some damage caused by leaking pipe. The insurer initially declined the claim based on a report from its builder RB following an inspection of the property on 12 December 2020. RB considered the damage to the rumpus room was caused by a broken waste pipe from an upstairs bathtub that had been in a condition for a considerable time and previously repaired using duct tape and termites which had been occurring for a considerable amount of time. RB considered the issues were maintenance issues that needed to be addressed. Determination | Case number: 808921 Page 3 of 7 The complainant obtained a plumber’s report from NP on 12 January 2021. NP completed pressure test on the shower/ bath combo and found that it had split behind the wall causing the water to flow under the house damaging the ceiling and walls. NP also considered the bathroom waste water line penetrating the wall to the outside that had been repaired using duct tape required replacing. NP did not consider this was a major cause of damage. According to NP to repair the shower/bath combo the shower breech would need to be replaced which would require removing the shower/bath taps wall including the tiles as there is no access on the wall on the opposite side. In response, the insurer obtained a report from OSB following an attendance at the property on 19 February 2021. OSB confirmed there was damage to the plasterboard walls and framing on the rumpus room caused by a leaking water pipe in the upstairs bedroom. The report from OSB supports the findings of the complainant’s plumber NP. Following receipt of this report the insurer accepted liability for the result of water damage caused by the leaking pipe in the wall cavity. I accept in the circumstances that the complainant has established a valid claim within the terms of the policy for water damage caused by the leaking pipe. Insurer is entitled to limit its liability based on relevant policy exclusions. While accepting liability for water damage to the lower level rumpus room caused by the broken pipe within the wall cavity, the insurer denied liability for cost to repair the bathroom pipe within the wall caused the damage and any maintenance repairs required. The insurer says the reports from RB and OSB establish that the main cause of damage is lack of maintenance, wear and tear and termites. Based on the report from OSB the insurer offered a cash settlement of $3,000.89 to cover resulting water damage caused by the leaking pipe. The insurer has relied upon the terms and conditions of the policy which clearly state that the cost to repair or replace the item from which water or oil leaked or escaped from is not covered. I accept the policy does not cover the cost to repair the leaking pipe. The policy also excludes liability for loss or damage caused by gradual deterioration depreciation wear and tear or vermin or insects or maintenance operations will not be covered. I am not satisfied that the report from RB is sufficient to determine that the damage was due to termites. RB admits he did not detect any live termites and did not conduct any invasive tests. I am however persuaded by the report from OSB that identified there was:  no visible termite barrier  insufficient step to the concrete slab to prevent water entry to the lower level  leaking waste pipe from the upstairs bathroom (currently duct tape)  rotting timber wall frame and skirtings  water damage/ mould to the carpet. I do not accept the damage to the carpet was caused by the leaking pipe. I accept that most likely this damage was caused as the result of the outside concrete being higher than the floor which would allow water from the ground to affect the carpet. I acknowledge the complainant disputes these findings, but he has provided no independent evidence to support Determination | Case number: 808921 Page 4 of 7 this part of the claim. My decision is based on the expert opinion provided and supported by photographs supplied by the insurer. The insurer is not liable for this damage. Further, the insurer is not liable for any damage caused by the water leaking from the broken waste pipe. That had been inadequately repaired using duct tape. Any damage due to this would be a maintenance issue. Damage to timber framing most likely caused by leaking pipe. RB in its report of 12 December 2020 considered that the rear outer facing wall had termites damage that had destroyed the timber frame and the whole rear wall needed to be replaced. RB considered the cause of damage to be from termites and water broken waste water from the upstairs bathtub causing water to leak into the internal wall attracting the imposing termites which progressively destroyed the internal wall. RB was unable to determine the presence of termites and did not conduct any invasive tests to identify termites. OSB did not conduct any invasive test but confirmed there was no visible termite barrier present. The complainant says he called a pest controller and was informed that movement in the rear wall was not necessarily termites as wood rot would do the same thing. He says it claims the pest controller was quite sure there were no termites. I note from the invoice supplied dated 29 December 2020 that the pest controller proposed treatment with Termidel, which is a live termite treatment product. As previously indicated RB was not aware of the leaking pipe in the internal wall cavity. I accept that the leaking pipe within the internal wall cavity would have caused damage to the internal wall framing. I accept it is possible this caused the attraction of termites. Equally it is likely to have progressively caused rot of the timber frames. The insurer offered to have an engineer attend and report back on the extent of the water damage to the bathroom wall and flooring and provide an additional Scope of Works. The insurer says the complainant refused the engineer entry to the property. The complainant says he did not refuse the engineer entry to the property but insisted on the engineer’s qualifications being provided. In the complain ant’s latest submission, he maintains that a person dressed as a tradesperson knock on the door and by the time he attended, the complainant had done most of the work himself and only had trims to apply and paint. He claims he said it was too late and there was nothing left for the engineer to see. He also queried whether it was an engineer given his dress. It is unfortunate that the complainant restricted the engineer’s access to the property. If the engineer had been able to attend the property it would have provided a more definitive decision as to the cause of damage. Despite this however I accept that most likely the damage to the timber wall framing should be included in the overall settlement of the claim. I accept that most likely the proximate cause of the damage to the timber frame, that is the dominant or effective cause of the damage to the timber framing was the damage caused by the leaking pipe within the wall cavity. Insurer is to increase offer. There is limited information as to the actual cost incurred to repair the water damage to the property. The quote provided by OSB of $3,089 covers the removal and replacement of part Determination | Case number: 808921 Page 5 of 7 of the timber wall, removal and replacement of the skirting, removal and replacement of plaster and paint. The complainant provided a quote from RRR dated 4 August 2021 for $12,987.70. That quote included cost to remove the leaking plumbing and replace it. It is not an itemised quote nor does the quote look at the cost for replacing the timber wall. The complainant in his latest submission has confirmed he has completed the work himself and provided an excel spreadsheet covering parts of $2,250.30. Doing the best, I can from the available information and in the absence of any clear statement as to the cost to complete the repairs, I consider it fair that the insurer allows a further $5,000 to cover the cost of replacing the timber wall framing on top of the $3,000.89 already offered. 2.2 Is the insurer liable for Ioss of rent? The insurer initially denied the claim for loss of rent on the basis at the time of the incident the complainant had no current lease or any tenant within the property. The insurer subsequently acknowledged in its final decision of 4 August 2021 that as the water damage could only be identified after the tenant had vacated the property it would not be fair for the insurer to deny a claim for loss of rent on the basis there was no rental agreement at the time. The policy provides cover if a listed event causes loss or damage to the rental property and the insurer agrees that the tenants cannot live in the property and need to move out until repaired or rebuilt. The insurer does not agree that the property was unliveable due to the claimed water damage. I disagree with the insurer on this aspect of the claim. I am satisfied that due to a combination of both the damage caused by the leaking pipe and the other damage, the property could not be reasonably tenanted and the damage resulting from the water leak had been repaired. I accept based on the information provided by DRE that the property could not have been tenanted in its unrepaired state. The insurer partially accepted the claim on 25 May 2021. It is not explained why it took nearly 5 months after receiving the report from NB plumbing and 3 months after the report from OSB to make this decision. I accept it was fair that the complainant had not commenced repairs until the insurer had determined liability. As liability was subsequently accepted (in part) it is reasonable that the insurer covers the loss of rent from 9 December 2020. Following receipt of the partial acceptance of the claim and despite the complainant’s rejection of that decision, I accept that the complainant did commence repairs. It is unclear exactly when those repairs commenced although it would appear the complainant had notified the insurer prior to receiving the final decision letter dated 4 August 2021. The insurer is only liable for loss of rent for the time it would take to repair the damage covered under the listed events. It is not liable to pay loss of rent for the time it would take the complainant to complete necessary maintenance works on the property. I consider a reasonable period to complete the repairs caused by the water damage to be four weeks from the partial acceptance of the claim. Again, doing the best I can from the available information this would result in the loss of rent payable for the period from 12 December 2020 until the 22 June 2021 a period of 192 days. The property was rented at $270 per week or $38.57 per week. The complainant says it would have been rented at $300 to $350 per week. In the absence of any ongoing rental Determination | Case number: 808921 Page 6 of 7 agreement, I consider it fair that the loss of rent be calculated based on the rent received of $270 per week. The insurer is liable to pay the complainant $7,405.70 being 192 days loss of rent at $38.57 per day. 2.3 Is the complainant entitled to compensation for non- financial loss? AFCA can award compensation for non-financial loss. Under AFCA rule D3.3 AFCA can award compensation for non-financial of up to $5,400 where a person has suffered an unusual degree of physical inconvenience or time taken to resolve a situation. AFCA takes a conservative approach to the award of compensation and expects a complainant to be moderately robust in dealing with the normal inconvenience associated with a claim. Complainant suffered an unusual delay in claim process. The available information indicates that the insurer took an unusual period from receiving relevant inf ormation supporting the complainant’s claim , to make its decision to partially accept the claim on 25 May 2021. It then took over 2 months to then make its final decision on 4 August 2021 in which it also accepted liability for the loss of rent. While I accept that the complainant’s actions and comments may not have assisted in the resolution of the matter, I consider the insurer has taken an unusual degree of time to resolve the claim. I also acknowledge the complainant has made several unsubstantiated accusations against the insurer and the insurer’s tradespeople which do not assist in the resolution of this matter. It is apparent that the complainant did not accept the attendance of the insurer’ s appointed engineer and made unsubstantiated allegations as to the conduct of the insurer’s expert and the insurer’s representative. In the circumstances and given the available information, I consider it fair that the insurer pay compensation of $500 for non-financial loss as per AFCA rule D3.3. 2.4 Why is the outcome fair? The outcome is fair as the policy limits the insurer’s liability for damage sustained because of listed events. The determination follows consideration of all the information provided including the numerous submissions made by the complainant. It provides for additional compensation for damage sustained and loss of rent in accordance with the terms of the policy. In addition, an allowance has been provided due to the initial delays in determining liability. Determination | Case number: 808921 Page 7 of 7 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.