Partial claim denial for particle board and flooring damage and mould remediation following raw sewage overflow
Text of the determination
Determination
Case number 808164
Financial firm AAI Limited
Determination | Case number: 808164 Page 1 of 10
Case number: 808164 31 January 2022
1 Determination overview
1.1 Complaint
The complainants hold a landlord insurance policy with the financial firm (insurer).
The complainants lodged a claim for damage after raw sewage overflowed from the main
bathroom toilet in early 2021.
After its assessment, the insurer partially accepted the claim, but that was only for the
damaged floorboards in the hallway and bedroom 2. The insurer also advised that it would
not cover the damaged particle boards, as they showed signs of long-term wood rot, which
was excluded from cover.
The complainants remain dissatisfied with the in surer’s decision . They want the insurer to
include the flooring in the kitchen and dining rooms in its scope of works, to accept the
damage to the particle boards, and to cover the mould remediation at the property. The
complainant is also claiming loss of rent during the period of repairs.
1.2 Issues and key findings
Is the insurer liable for damage to the particle boards?
The complainants have established a valid claim for the damaged particle boards. On the
available evidence, the sewage leak damaged the particle boards (including by the
development of mould) to the extent they required replacement. The insurer is required to
cover that damage.
Is insurer required to replace floorboards in kitchen, dining room, bedroom 3?
The insurer is not required to cover undamaged areas; nor is it required to cover areas in
another room in order to create a uniform appearance. It is, however, required to do its best
to find and use materials which match as closely as possible. The evidence does not show
the floorboards in the kitchen and dining room sustained damage due the insured event, so
the insurer is not required to replace those. They are also separate ‘rooms’ from the hallway
under the terms of the policy. However, it is liable for the bedroom 3 flooring, which did
sustain water damage from the claimed event.
Is the insurer required to undertake mould remediation?
The evidence shows there is mould from the insured event. The insurer is required to cover
the necessary mould remediation.
Are the complainants entitled to any further benefits?
The available evidence indicates, on balance, the necessary remediation and repair work will
take around three weeks. Given the need to address the mould and to remove flooring in high
traffic areas of the home, I consider it reasonable to regard the property as not being in a
liveable condition for at least that period. The complainants are entitled to loss of rent as set
out in section 2.4 below.
Determination | Case number: 808164 Page 2 of 10
It is also fair in the circumstances that the insurer reimburse the complainants the cost of their
experts’ (PA and ACC) reports, subject to receipt of any evidence of those costs and
payments which has not already been provided.
As well, given the insurer’s failure to rec ognise the additional claim-related damage, and the
avoidable inconvenience and upset to the complainants which resulted, it is fair that the
insurer pay $500 compensation for non-financial loss.
Why is the outcome fair?
It would not be fair to require the insurer to cover more than the issues or areas for which it is
liable under the policy.
1.3 Determination
This determination is substantially in favour of the complainants. The insurer is required to
cover the repair of damaged particle boards, and the bedroom 3 flooring in accordance with
the terms of the policy. That is in addition to the areas already accepted (hallway and
bedroom 2 flooring). It is also required to cover full mould remediation.
The insurer is required to either complete the necessary repair and mould remediation work
itself, or cash settle based on actionable quotes already provided or to be provided by the
complainants (as set out in section 2.4 below).
As well, it is required to pay loss of rent for four weeks ($1,800).
Determination | Case number: 808164 Page 3 of 10
2 Reasons for determination
2.1 Is insurer liable for damage to the particle boards?
Onus on complainants to establish valid claim
The onus is on the complainants to establish, on balance, the claim falls within the scope of
cover under the policy. This is known as a valid or prima facie claim.
The complainants’ policy covers loss or damage caused by any of the insured events
specifically listed in the product disclosure statement (PDS), subject to limitations and
exclusions. One insured event is ‘escape of liquid’.
There is no dispute raw sewage overflowed from the main bathroom toilet causing damage in
areas of the property. I am satisfied the complainants have established a valid claim under
the policy.
The onus therefore shifts to the insurer to establish it is entitled to decline part of the claim.
Insurer considers the damage in dispute excluded under the policy
On the basis of its expert reports, the insurer denied the claim for the damaged particle
boards, saying the damage was due to wear, tear and deterioration.
When considering whether the exclusion applies to defeat the claim, it is appropriate to
determine the proximate cause of the loss.
The proximate cause is not necessarily the first, last or the sole cause of the loss. It is the
effective, dominant or operative cause. If there are several causes operating
contemporaneously, then each must be examined for the qualities of predominance and
efficiency as the active, efficient cause sets a relevant train of events in motion.
The insurer argues that the claimed toilet overflow event was not the proximate cause of the
damage to the particle boards; instead, it says the damage was caused by a combination of
general exclusions (wear and tear and deterioration), since the evidence shows progressive
wood rot.
Parties ’ experts disagree on the cause of the damage
In its assessment report dated 20 April 2021, the insurer’s builder noted the following:
particle boards under the floor boards in the hallway were in poor condition
particle board subfloor is wet and mouldy
rotten sections near the hallway and bathroom are due to prolonged exposure to water.
Further site inspections carried out by RCC noted that that long term and pre-existing
damage was sustained to a section of the particle board flooring which is consistent with a
long-term leak from the bathroom.
RCC also stated no recent water staining was observed to the particle board flooring, noting
this is something that would be expected if the damage related to the recent claim. Overall
RCC concluded part of the damage to the particle board was not related to the recent escape
of liquid from the overflowing toilet.
Determination | Case number: 808164 Page 4 of 10
The complainants disputed that opinion. To support their position, they provided a letter from
their carpenter (SDC) dated 19 May 2021, which confirmed the complainants had previously
replaced damaged particleboard sheeting in the hallway area in 2009.
The complainants further argued that RCC’s position regarding the damage was i ncorrect, as
there was (since 2009) no other water leakage before the recent claimed event. The
complainants claim they had spoken to the insurer’s expert who informed them the damage
was caused by the sewer water leak. However, there is no written confirmation of that
comment from the insurer’s expert.
To further support their position, the complainants engaged their own expert, a mechanical
ventilation expert (PA). In his inspection report, PA made the following observations:
areas around the bathroom and down the hallway area did see some space that looked
like it had been damp not so long ago
looking into the rest of the sub-floor areas there are mostly dry areas within
in the sub-floor the yellow tongue flooring had excessive mould and moisture damage, it
had spread out where the water damage had soaked through the timber flooring above
and then down into the yellow tongue flooring and causing the mould to grow and spread.
PA concluded this damage was only new as it was so far only within the sub-floor areas,
noting had it been old established mould it would have spread up into the living areas of the
home by now.
Proximate cause of damage was, on balance, the raw sewerage leak
I consider the professional opinion of the complainants’ expert (PA) more compelling as to the
likely cause of the condition of the particle board. PA provided a more detailed and
comprehensive explanation regarding the damage than the insurer’s experts .
The complainants’ experts have also supported their position with photographs of the
damage. I am satisfied the images show water damage in areas which appear, on balance, to
still be wet. The insurer has accepted and agrees the particle boards are mouldy and wet. As
well, the damage to the particle boards (including the mould which had yet not spread) was
localised to the areas where the escape of liquid occurred.
I therefore accept that rather than being long-term or aged, the water staining and damage is
more likely than not to have occurred as a result of the claimed leak. Even if there had been
previous leaks into the particle board, and there was a degree of wear and tear and
deterioration, I am not satisfied those prior issues (if any) would have required replacement of
the particle boards. Instead, I am satisfied on balance the sewage leak/overflow was the
dominant, effective and operative cause of that damage.
The insurer has not established exclusions apply to entitle it to decline cover for the damaged
particle boards.
2.2 Is insurer liable for floorboards in kitchen, dining room,
bedroom 3?
Complainants say bedroom 3 sustained damage due to the claimed event
The complainants say a representative from RCC told them bedroom 3 was also damaged. I
also note that in the insure r’s claim file notes of 3 May 2021, it records RRC as saying there
was damage to 2 bedrooms, and not just one.
Determination | Case number: 808164 Page 5 of 10
The complainants’ mechanical ventilation expert report (by DD) dated June 2021 indicated
that an inspection of the bathroom and hallway leading into the bedroom opposite the
bathroom showed the floor swelling and cupping with small bows. Further, the cleaning and
restoration company (AAC), on 25 June 2021, noted high levels of mould in bedroom 3. In
AAC’s opinion, the floorboards appeared to have water damage and the mould identified was
noted as having been possibly associated with the flooding event.
PA also reported that moisture readings showed moisture had entered bedroom 3, as well as
down the hallway and into bedroom 2. PA noted skirting boards buckling and bending in
affected areas and considered all the timber in bedrooms 2 and 3 and the hallway had in
some way been affected by moisture and needed replacing.
Insurer has not provided any further evidence to establish its exclusion
Having reviewed the expert evidence, I am satisfied on balance that at the time of the claimed
event, water damage would likely have caused damage to the floorboards in bedroom 3
which were near the bathroom from which the leak emerged, and the other affected areas -
hallway and bedroom 2.
The insurer is required to accept the floorboard damage to bedroom 3 and settle that part of
the claim in accordance with its policy terms and conditions; together with the hallway and
bedroom 2, as already accepted.
To be clear, I accept (as PA has stated) that repair of the floorboard damage will require
drying out of the subfloor, and treatment/drying of the soil below into which water has leaked,
to prevent mould spreading.
Policy wording is clear regarding repair of damaged part of insured property
The complainants stated that damage to the subfloor extends beyond the point for which the
insurer has provided cover. They say it is impossible to replace the floorboards without going
beyond the wall where the kitchen begins.
The complainants also say they were told by RCC that the open plan lounge and kitchen
would be included in the scope of repairs.
The product disclosure statement (PDS) confirms the insurer is only obliged to repair or
rebuild parts that are damaged in the incident and covered by the policy:
We will only repair or rebuild the parts that are damaged in the incident covered
by your policy. You cannot claim to replace undamaged parts of your home to
create a uniform appearance…
The PDS also clearly explains that if the insurer authorises repairs, it will do its best to obtain
new materials that are the same type, standard and specification:
If we need to source material in order to repair or rebuild the home, we will do our
best to obtain new materials that are the same type, standard and specification. If
the same is not available, we will use new materials of a similar type, standard
and specification that are commercially available and compliant with current
building regulations.
Determination | Case number: 808164 Page 6 of 10
In summary, I am satisfied the insurer is not obliged under the policy to replace undamaged
parts of an area otherwise affected by an insured incident to create a uniform appearance;
although it is required to make appropriate and reasonable efforts to source new materials as
specified under the policy.
Insurer is only required to replace floorboards which are part of the same room
The policy also limits the insurer’s liability in resp ect of undamaged parts as follows:
If we cannot match the new materials with the undamaged parts, we will only pay
extra to create a uniform appearance when: …
• floor coverings are damaged (including tiles) we will pay extra to replace
continuously joined undamaged floor coverings of the same material in the same
room, stairs, hallway or passageway* where the damage occurred. (Emphasis
added)
The policy defines what is considered to be the same ‘ room ’. It states that a room is an area
starting and finishing at:
its nearest walls;
nearest doorway, archway or similar opening of any width;
a change in the floor or wall covering.
A hallway next to a room is not the same room, even if it has the same floor or
wall covering as the room. Any archway or similar opening separates a room
unless it is a combined lounge-dining room …
RCC’s inspection report confirms damage sustained to the flooring from the sewerage
overflow damaged the hallway and bedroom 2. Accordingly, the proposed scope of works
included repairs to these areas, noting it would provide for matching existing profiles of
undamaged flooring through the remainder of the property.
The complainants state the damage to the subfloor extends beyond the point up to which the
insurer has accepted liability. The complainants say the assessor had informed them that the
kitchen and dining were to be covered under the claim. To support their position, the
complainants have attached photographs and a diagram (floorplan) of the house to show the
damage went beyond the hallway.
I have reviewed the photographs of the kitchen and dining room and they do not show any
damage to the floorboards in those areas, which are separate rooms (for the purposes of the
policy) from the hallway. I have seen nothing to show the repaired flooring cannot be matched
to the existing undamaged areas; and even if exact matching is not possible, the insurer is
not responsible for that under the policy.
Insurer is not required to cover undamaged kitchen/dining room floorboards
The policy is cle ar as to the insurer’s obligations in dealing with repairs of part only of the
property: it is not required to repair undamaged areas or unaffected areas in a separate room.
I appreciate the complainants are unhappy the repairs will not extend beyond a certain point,
and there may be issues with matching the floorboards. However, the expert evidence
indicates the floorboards in the kitchen and dining room did not sustain damage due the
Determination | Case number: 808164 Page 7 of 10
insured event. An inspection by the complainants’ mechanical ventilation expert, dated 9 June
2021, confirmed the flooring throughout the rest of the home (apart from hallway and 2
bedrooms) seemed fine.
The insurer is not required to repair the floorboards beyond the damaged sections.
2.3 Is the insurer required to undertake mould remediation?
Experts have differing opinions regarding the mould
The complainants seek $9,810.28 to cover the cost of mould remediation necessitated by the
claimed event, and have provided a mould and moisture assessment report and quote (dated
13 July 2021) from AAC in support.
When the claim was lodged , the insurer’s assessors indicated no mould was observable
within the internal main dwelling. The insurer’s restorer (RCC) , whilst noting the particle board
was mouldy and wet, said that was due to prolonged exposure and not consistent with a one-
off claimed event. RCC was of the opinion there was mould, but this was due to a
combination of poor inadequate subfloor ventilation and long term pre-existing water damage.
The complainants are relying on the report of its mould specialist, ACC, noted visible mould
growth underneath the hallway floorboards and in bedrooms 2 and 3, consistent with the
flooding event.
ACC further stated there was very high humidity throughout the property and elevated
moisture levels were confirmed on the timber frame, around the door, skirting boards and
floorboards. ACC recommended removal of floorboards in the hallway and both bedrooms, as
well as the particle board from under the floorboards,since visible mould was found in those
areas. ACC also suggested the disposal of all affected porous materials, if any, from the site
due to mould contamination. ACC observed that the damage appeared new, as it was so far
only within the sub-floor areas, noting had it been old established mould it would have spread
up into the living areas of the home by that stage.
No compelling evidence to exclude the mould damage
I consider ACC’s opinion regarding the mould to be persuasive. This is because it shows
(supported by photos provided) the reported mould growth appears to be limited to areas in
which the claimed event caused water damage to the floorboards, and it explains the loss
claimed by the complainants as being attributable to the sewerage overflow. I accept AC C’s
opinion that had the mould damage being there for some time, the mould would not be limited
to only the subfloor but would likely have spread up to the living areas of the home.
The insurer has not provided compelling evidence to show the mould was not due to the
claimed event, or should otherwise be excluded. The insurer says it engaged its external
assessor to address ACC’s report, however, it s expert did not provide a written opinion or
report to refute ACC’s findings and conc lusions.
The onus is on the insurer to show it has grounds to limit or deny the claim under the policy. I
am not satisfied it has done this with regard to the claimed mould damage. I am satisfied
there is mould damage and the proximate cause of that is, on balance, the raw sewage
overflow.
The insurer is liable for a full mould assessment and remediation of resulting damage.
Determination | Case number: 808164 Page 8 of 10
2.4 Are the complainants entitled to any further benefits?
Policy provides cover for loss of rent
The complainants believe loss of rent should be covered while the repairs are being carried
out.
The policy provides for loss of rent following an insured event, when the insurer agrees the
property cannot be lived in. The policy also states the insurer will pay the weekly rental
amount for the reasonable time it should take to repair or rebuild so the property can be lived
in again.
The insurer’s claim file notes record RCC as indicating the damage would take 3 weeks to
repair, and that commensurate loss of rent would apply.
I am satisfied that given the nature and location of the claim-related damage (including in
particular the mould remediation, and health impacts of that issue) the property should be
regarded as not being able to be lived in for the period of repairs.
The complainant has provided rental receipt statements showing rent was paid at $450 per
week. That means the insurer is liable for a minimum of $1,350 loss of rent.
To be clear, if the claim is cash settled and the complainants (rather than the insurer) are
undertaking repairs, they must take steps to proceed with repairs as expeditiously as
possible, to reduce the period during which the house is unliveable. It may be, however, that
unexpected issues are discovered which (for reasons outside the complainants’ control)
extend the period of repairs. In the interests of finalising this complaint, and to allow for
contingencies, if the claim is cash settled then the insurer is required to pay $1,800, covering
4 weeks’ loss of rent.
If the insurer undertakes repairs, it is required to pay loss of rent for the actual period during
which repairs make the house unliveable.
Fair that complainants’ report fees be reimbursed
The complainants paid PA $220 for his report. It is not clear if they also paid ACC for their
report. I consider those reports assisted in the resolution of this complaint. It is therefore fair
that the complainant be reimbursed the cost of PA’s report; and if applicable, the cost of
ACC’s report (subject to the provision of evidence of that latter cost and payment).
Compensation for non-financial loss is warranted
The complainants have had the significant inconvenience and concern of delays in having
their claim appropriately finalised. In the particular circumstances, I consider it fair that the
insurer pay $500 compensation for non-financial loss.
Any cash settlement to be based on actionable quotes
Given the nature and extent of the damage, it is likely that a cash settlement will be the
appropriate way to finalise the claim. In that case, the settlement amount must be reasonable
and sufficient to allow the complainants to repair the claim-related damage. It is also fair that
the amount include a contingency for any further unexpected damage arising from the claim,
and to allow for the transfer of risk.
The complainants have provided quotes from their preferred providers for repairs and mould
remediation work. There is nothing to suggest those quotes were unreasonable, although the
Determination | Case number: 808164 Page 9 of 10
flooring replacement quote did include the kitchen and dining room, and those areas are not
covered under the claim.
Those quotes are also now out of date. The complainants should obtain new amended and
detailed quotes, clearly itemising the areas covered by the claim, and provide those to the
insurer for its review. Those quotes should form the basis of the cash settlement. The insurer
is required to add 10% of the quoted amounts onto the final cash settlement, to allow for
contingencies.
2.5 Why is the outcome fair?
I am satisfied the outcome is fair in all the circumstances. The available evidence shows, on
balance, the damage to the particle boards, bedroom three flooring and the mould was
caused by the raw sewerage leak (as were the areas already accepted by the insurer). It
would not be fair to allow the insurer to avoid liability for that part of the claim in those
circumstances.
At the same time, it would not be fair to require the insurer to cover the undamaged areas of
flooring when the policy does not oblige it to do so.
Determination | Case number: 808164 Page 10 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.