Home / IAG / Determination 807894
Determination 807894
Water leak pipe repair costs, carpet, cash settlement and claim handling
Summary
The complainant claimed for a leaking pipe repair, carpet replacement and related water damage under a home building policy. AFCA held the pipe repair and carpet were not covered, but increased the cash settlement for building damage and awarded $750 for non-financial loss due to claims handling delays.
The policy expressly excludes the cost to repair or replace the item that leaked, and carpets are not part of the home for a non-landlord, but the insurer's delayed and poorly communicated handling caused unusual inconvenience.
Issues
- Claim denial primary · not upheld
“The policy specifically excludes cover for the cost to repair or replace the item that the water or oil leaked or escaped from.”
- Claim amount dispute secondary · upheld
“The offer to cash settle the claim should be increased by 25% to $10,668.42 to cover the possible contingencies.”
- Delay secondary · upheld
“The claim for the leaking pipe was not lodged until 7 April 2021 and the insurer did not notify the complainant immediately.”
- Poor communication secondary · upheld
“The insurer should have been more proactive in notifying the complainant of its findings and in obtaining relevant scope of works.”
Subjects and remedies
pay claimpay non financial loss
Text of the determination
Determination
Case number 807894
Financial firm Insurance Australia Limited
Determination | Case number: 807894 Page 1 of 7
Case number: 807894 10 February 2022
1 Determination overview
1.1 Complaint
The complainant held a Home Building Insurance policy with the financial firm (insurer) and
lodged a claim on the policy for water damage following a storm in or about January 2021.
During investigation of the damage the insurer’s plumber identified a leak ing pipe under the
concrete slab to the house and a new claim was lodged on behalf of the complainant.
A dispute has arisen as to the insurer’s liability with respect to damage arising from the
leaking pipe. The insurer accepts liability for damage arising from the leaking pipe but denies
liability for the costs associated with the repair of the leaking pipe or replacement of the
carpet.
1.2 Issues and key findings
Is the insurer liable for the costs to repair the leaking pipe?
No. The policy is clear and unambiguous. The policy provides cover for loss or damage
caused by water leaking or escaping from a pipe but does not cover the costs to repair or
replace the item that the water escaped from.
Is the insurer liable for the costs to replace the carpet?
No. The carpet was not covered under the building insurance policy held by the complainant.
Is the offer to cash settle the claim fair in all the circumstances?
No. The offer to cash settle the claim should be increased by 25% to $10,668.42 to cover the
possible contingencies for damage caused by the leaking pipe. The insurer should also pay
the complainant $759.22 for the storm related damage.
Is the complainant entitled to compensation for non-financial loss?
Yes. The insurer’s claims hand ling has caused an unusual degree of physical inconvenience.
In the circumstances, it is fair that the insurer pay compensation of $750.00 for non-financial
loss.
1.3 Determination
This determination is partially in favour of the complainant.
Within 21 days o f the complainant’s acceptance of this determination, the insurer is to pay the
complainant $10,668.42 to cover the loss or damage caused by the leaking pipe plus $759.22
for the storm related damage. The insurer is to also pay the complainant $750.00
compensation for non-financial loss pursuant to AFCA Rule D3.3.
The insurer has otherwise met its liability in accordance with the terms and conditions of the
policy.
Determination | Case number: 807894 Page 2 of 7
2 Reasons for determination
2.1 Is the insurer liable for the costs to repair the leaking pipe?
No. The policy is clear and unambiguous. The policy provides cover for loss or damage
caused by water leaking or escaping from a pipe but does not cover the costs to repair or
replace the item that the water escaped from.
Policy covers loss or damage caused by leaking pipe
The complainant’s policy is a Home Buildings Insurance policy that provides cover for
damage to the building from a series of listed events including storm and water and oil leaks
subject to various terms and conditions. The relevant policy provision is set out in section 3.2
of this determination.
The claim notes record the complainant lodged an initial claim following a storm in or about
January 2021. According to the initial report provided by the insurer’s builder MAAS, the
complainant advised that he had suffered water damage to a bedroom and a stain to his
carpet which he believed was caused by recent heavy rain.
MAAS confirmed there was storm related damage and recommended liability be accepted for
that. It did not however consider the wet carpet identified in the dining and kitchen area to be
caused by storm and further noted that the insured was not covered for contents damage.
The insurer subsequently had a plumber H attend the property on 2 March 2021. After
conducting a pressure test H identified there was water leaking from a pipe under the
concrete slab of the home. H considered the water was leaking in the hallway and had
caused the carpet to be drenched. A separate claim was lodged by the insurer for the
complainant on 7 April 2021 under the insured event of water and oil leaks.
The parties do not dispute there was a leaking pipe under the concrete slab that required
repair or that there was damage caused by the leaking pipe. The insurer has accepted liability
for damage to the building caused by the leaking pipe.
Policy does not cover cost to repair leaking pipe
The complainant claims the policy extends to cover the cost to repair or replace the pipe. I do
not agree.
The complainant does not dispute receiving the policy documents. The policy is clear and
unambiguous.
Under the insured event, water and oil leaks, the policy provides cover for loss or damage
caused to the insured building by water or oil leaking or escaping from an item including a
pipe. The policy specifically excludes cover for the cost to repair or replace the item that the
water or oil leaked or escaped from.
There is no information to suggest that the complainant has been misled as to the terms and
conditions of the policy. The policy does not cover the cost to repair the leaking pipes. It is fair
that the insurer is entitled to rely upon the terms and conditions of the policy to refuse the
complainant’s claim for the costs associated with repairing and replacing the leaking pipe.
Determination | Case number: 807894 Page 3 of 7
2.2 Is the insurer liable for the costs to replace the carpet?
No. The carpet was not covered under the building insurance policy held by the complainant.
Policy does not cover damage to carpets
The complainant’s policy is a Building Insurance policy. It does not cover contents.
Under the building insurance, the policy provides cover for loss or damage to the home
building which includes fixtures and items permanently attached or fixed to the home. The
policy makes it clear that it does not consider carpets to be part of the home, unless you are a
landlord. The relevant terms of the policy are set out in section 3.2 of this determination.
The complainant was not a landlord but was residing in the home at the time of the loss. It is
fair in the circumstances that the insurer is entitled to rely upon the terms and conditions of
the policy to refuse cover for the damage to the carpets.
2.3 Is the offer to cash settle the claim fair in all the
circumstances?
No. The offer to cash settle the claim should be increased by 25% to $10,668.42 to cover the
possible contingencies for damage caused by the leaking pipe. The insurer should also pay
the complainant $759.22 for the storm related damage.
Insurer has accepted liability for building damage
The policy provides the insurer with a discretion whether to repair, replace or cash settle the
complainant for the damage sustained. Such discretion must be exercised fairly, reasonably
and consistent with utmost good faith. The insurer’s claim notes record the complainant has
asked for the claim to be cash settled as he wants to use his own builders to complete the
repair.
The insurer accepted liability for the loss or damage caused by the leaking pipe. It has agreed
to cover damage to the kitchen dining room, including the removal and disposal of sheet and
vinyl flooring, damaged timber skirting boards, walls, skirting and architraves. It has also
agreed to repair the linen press, walk in pantry and provide general clean up.
The insurer’s engineer B concluded that the damage to the property was caused by a
combination of the water leak and normally expected seasonal soil differential foundation
movement. B considered the foundation movement had been exacerbated by the leaking pipe
causing the soil in the vicinity to become saturated, resulting in damage to the existing floor
coverings and potentially damage to part of the concrete slab. B recommended that the soil
be allowed to dry out over a period of 12 months after the repairs to the leaking pipe had
been completed.
The insurer obtained a subsequent scope of works from CFT a building consultants and
engineers. CFT provided a detailed scope of works for the repairs to the damage but did not
include in the scope of works any allowance for the relevelling or replacement of any part of
the concrete slab.
The insurer offered to cash settle the claim based on a quote obtained from PCR, a building
company, based on the scope of works provided by CFT. PCR have quoted $8,534.68. I
accept the quote from PCR is detailed and covers the observed damage to the complainant ’s
property caused by the leaking pipe. The quote however makes no allowance for
Determination | Case number: 807894 Page 4 of 7
contingencies that may arise in the repair process or the cost to repair any damage to the
concrete slab as identified by the engineer B.
I consider it fair that when cash set tling the complainant’s claim, the insurer includes an
allowance for the contingencies that can occur during the repair process. The contingencies
take into account the transfer of risk to the complainant n a cash settlement. In the
complainant’s case, whi lst much of the damage identified is relatively minor, there is a risk
that additional repairs will be required relevel the concrete slab.
In the circumstances, I consider it fair that the insurer pays the complainant $8,534.68 as per
the quote provided by PCR plus $2,133.74 representing a 25% contingency allowance,
making a total payment of $10,668.42.
Further, according to the MAAS report of 12 February 2021, the insurer had identified
damage caused by the storm. MAAS provided a repair estimate of $759.22. There is no
information to dispute that this is a fair estimate to enable the complainant to complete the
repairs to the ceiling damaged in the storm. The insurer has agreed to pay this amount to the
complainant. If it has not already done so the insurer should include this amount in the cash
settlement sent to the complainant.
2.4 Is the complainant entitled to compensation for non-
financial loss?
AFCA can award compensation for non-financial loss
AFCA can award compensation up to $5,400 where a complainant suffers an unusual degree
of physical inconvenience or time taken to resolve a situation or loss of enjoyment or peace of
mind. AFCA takes a conservative approach to the award of compensation for non-financial
loss and expects a complainant to be moderately robust when dealing with the delays that
would normally occur in a claims process.
Claim process has caused complainant an unusual degree of inconvenience.
The complainant initially reported storm damage and water damage to the carpets which was
identified in January 2021. This was confirmed in a report from MAAS dated 12 February
2021.
The insurer appointed a plumber ‘ H ’ to assess the cause of the damage to the carpet. H
confirmed on 2 March 2021 that it was caused by a leaking pipe which was a separate
insured event under the policy. The insured claim notes indicate the insurer did not notify the
complainant immediately of the cause of damage or the need to repair the pipe.
The claim notes indicate the claim for the leaking pipe was not lodged until 7 April 2021. This
occurred after the complainant called to make an enquiry on his storm claim. It would have
been fair and good industry practice for the insurer to have contacted the complainant
immediately it received notification of the leaking pipe.
A delay occurred in the repair of the leaking pipe while the complainant and insurer disputed
liability for the cost of those repairs. It is not clear exactly when the complainant repaired the
leaking pipe. The claim notes indicate he informed the insurer on 10 June 2021 that the pipes
had been fixed. I note the insurer claimed after the conciliation in in this matter in August
2021, that it first become aware that the pipes were repaired during the conciliation. This is
not correct.
Determination | Case number: 807894 Page 5 of 7
I accept that the insurer was entitled to refuse liability for the cost of repairing the leaking
pipes. I consider however that the insurer should have be more proactive in notifying the
complainant of its findings and in obtaining relevant scope of works for the completion of the
repairs. An earlier notification may have allowed the complainant to repair the leak earlier and
limit the subsequent damage.
I consider it fair in the circumstances that the insurer pays the complainant a $750.00
compensation for non-financial loss.
Determination | Case number: 807894 Page 6 of 7
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant policy provisions
The buildings we insure
Under Buildings Insura nce, we cover loss or dama ge to your home building(s ) that you own.
Your home
Your home incl udes :
domes ti c residential buildings a t your site tha t can be locked up
home improvements a t your si te – for exa mple, ga rage, ca rport or in-ground pool
fi xtures or i tems permanentl y a ttached or fi xed to your home – for exa mple, li ght fi xtures, built in wa rdrobes ,
ki tchen cupboa rds and floa ting floorboards .
We don’t consider ca rpet s to be pa rt of your home unless you a re a landlord – see page 38.
Water and oil leaks
Buildings Insurance Contents Insurance
Home
Home Plus
If loss or dama ge is caused by water or oil leaking or escaping from an i tem shown here.
Covered
wa ter or oil leaking or escaping from: gutters, drainpipes or pipes loca ted a t or on the si te
wa ter mains or wa ter suppl y pipes
sani tary fi xtures – for example, ba ths or toilets
appliances – for example, washing machines or dishwashers
wa terbeds
aqua riums
wa ter tanks, or
swi mming pools
oil leaking from a fixed hea ting s ys tem or sealed portable hea ter
landslide or subsidence tha t happens immedia tel y as a di rect resul t of a water or oil leak referred to above
cos ts to loca te the cause of dama ge (if we a gree to pa y these cos ts before you make any a rrangements ).
Determination | Case number: 807894 Page 7 of 7
Not covered
loss or damage caused by: s torm, flood, rainwa ter run -off, s torm surge or acti ons of the sea
wa ter leaking or es caping from a shower recess or shower base
erosion, deteriora tion, collapse, shri nkage or any other ea rth movement
cos ts to repai r or repla ce the i tem tha t the wa ter or oil leaked or escaped from.