Home / IAG / Determination 807892
Determination 807892
Claim declined for storm damage to brick pier and retaining wall
Summary
The complainant claimed under a home building policy for storm damage to a brick pier and retaining wall. The insurer declined, and AFCA found the damage occurred gradually over an extended period from excluded causes, so the decline was upheld.
Engineering evidence showed the damage was gradual and caused by subterranean water runoff, root pressure and poor design, which fall within policy exclusions for gradual deterioration, settling, structural failure and faulty design; the retaining wall is also not covered for storm.
Issues
- Claim denial primary · not upheld
“The insurer is entitled to decline the claim and is not required to take any further action.”
- Inadequate claim investigation secondary · not upheld
“I find the information from S to be the more persuasive and consistent with the nature and extent of damage to the brick pier and retaining wall.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case number 807892
Financial firm Insurance Australia Limited
Determination | Case number: 807892 Page 1 of 8
Case number: 807892 11 March 2022
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents insurance policy (policy) with the
financial firm (insurer). On 22 October 2019, a claim was lodged for storm damage to a sub-
floor brick pier (brick pier) as well as a timber log retaining wall (retaining wall).
The insurer has declined the claim. The insurer says the damage to both areas was not
because of the storm but had occurred over an extended period due to structural failure of an
item, settling foundations, faulty design or workmanship and not maintaining the home in
good repair and condition, which is excluded under the policy.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
Yes. The available information does not establish the damage to the retaining wall or brick
pier is because of the claimed storm event. Rather, on balance, the damage to both areas
has occurred gradually over an extended period of time because of circumstances excluded
under the policy.
Accordingly, the insurer is entitled to decline the claim in this instance.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to decline the claim and is not required to take any further action.
Determination | Case number: 807892 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Yes. The damage to the brick pier and retaining wall has been shown to have occurred
gradually over an extended period of time due to circumstances excluded under the policy.
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more the
listed insured events, including Storm. Cover under these benefits is subject to the conditions,
limitations and exclusions specified in the product disclosure statement (PDS).
The insurer provided the complainants with the relevant policy documentation including the
PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on
the policy provisions to assess its liability under the claim.
Information from the insurer’s consultants is more persuasive
There is no dispute there exists damage in the form of the partial collapse of the retaining wall
as well as loss of foundation soils from around and under the brick pier causing its failure.
The insurer appointed building consultants ‘B’ who attended the insured property on 25
October 2019. After investigating the cause and extent of the damage, B recommended the
insurer appoint an engineer to determine the cause of the damage.
The insurer appointed engineering consultants ‘S’ who attended the insured property on 12
November 2019 to investigate the cause for the damage. From its inspection of the brick pier
and surrounding area S observed a channel in the subfloor around three meters upstream
from the damaged brick pier.
In S’s view this presents as the most plausible cause for the damage. That is, S considered
the subterranean water runoff has slowly moved and washed away the foundation materials
under the brick pier causing its failure. In S’s opinion this process has occurred over a long
period of time and is a naturally occurring. The damage to the pier is unrelated to the said
storm event and has been occurring for a long period of time.
In S’s opinion this process has occurred over a l ong period of time and is a naturally
occurring. The damage to the pier is unrelated to the said storm event and has been
occurring for a long period of time.
With respect to the partial collapse of the retaining wall, S believes this is because of
inadequate design capacity and method of construction to deal with the retaining pressures it
was constructed to withstand. Secondly, long term tree and plants roots behind the retaining
wall only further served to induce more load on the retaining wall through age and maturity.
S says inherent voids and gaps between the logs used in the construction of the wall were not
susceptible to hydrostatic pressure build-up during heavy rainfalls given the water would be
expected to dissipate through these gaps and joints. The noted collapse and dilapidated
condition of the retaining wall was considered pre-existing and unrelated to the storm event.
The complainant has provided information from plumbing consultant M who is of the opinion
the damage to the brick pier is because of a combination of water run-off from the mountain
behind the home and two broken pipes it had found under the back of the home and repaired
Determination | Case number: 807892 Page 3 of 8
on 31 May 2019. M says it was impossible to ascertain how long these pipes had been
leaking.
I note the insurer contacted M to seek further clarification of its position. M advised it could
not definitively confirm whether the water that caused the damage to the brick pier was
related to the leaking pipes or that it was from the storm event relevant to the claim. M
concedes the damage to the brick pier could have occurred over time.
I have reviewed the water service bills provided by the complainant in support of the position
that water had been leaking under the home and once the pipes were repaired, the cost of
water service came down. Having reviewed this information, I am not satisfied the difference
in the cost of the water services noted in the bills for the different time periods is so significant
or different that it could reasonably show how long or that the leaks were significant.
I am not satisfied this information is enough to allow me to set aside the findings from the
engineer in favour of the information from M or the water service bills. I find the information
from S to be the more persuasive and consistent with the nature and extent of damage to the
brick pier and retaining wall.
The insurer is entitled to decline the claim
The policy excludes from cover damage to the insured property that is caused by or arises
from subsidence, structural failure of an item, settling, shrinkage or expansion in buildings,
foundations, walls or pavement, faulty design or workmanship and not maintaining the home
in good repair.
For the reasons discussed above, I am satisfied it has been shown that the damage to the
brick pier has occurred over an extended period of time because of the natural subterranean
water flow under the home resulting in the washing away of foundation soils. Further, that the
damage to the retaining wall has also occurred over an extended period of time because of
the deterioration of the timber wall and concerns with its design and construction relevant to
its purpose.
Even it was to be accepted the damage to the retaining wall was due to the storm, the policy
does not cover damage to retaining walls caused by the insured event storm. Accordingly, in
line with the policy conditions and exclusions, the insurer is entitled to decline cover for the
damage to the brick pier and retaining wall.
Other matters
I acknowledge the complainant says the property has been insured with the insurer for
around 83 years whilst in the ownership of several relatives. Further, that because the
property has remained under cover with the insurer all this time, the insurer is not entitled to
rely on the exclusion provisions relating to wear, tear, deterioration etc to decline cover.
I am not satisfied the above concerns prevent the insurer from being able to rely on the
provisions of the contract of insurance when assessing its liability under a claim relating to the
relevant period of insurance. The decision as to whether the insurer sets aside the provisions
of contract in favour of a commercial or ex-gratia offer to accept to cover the claimed damage
rests with the insurer alone. AFCA cannot require the insurer to make a commercial or ex-
gratia decision to accept the claim.
Determination | Case number: 807892 Page 4 of 8
Why is the outcome fair?
Given the available information shows the damage claimed is the result of circumstances that
are clearly excluded from cover under the policy, it is fair to permit the insurer to rely on the
policy to decline liability for the damage.
Determination | Case number: 807892 Page 5 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant policy provisions
Storm
If loss or damage is caused by a storm.
Not covered
• Loss or damage to:
- Retaining walls
…
General exclusions and your responsibilities
There are certain situations when we don’t provide cover under your policy.
This section outlines the general exclusions that apply to all covers and benefits
we provide under your policy. …
General exclusions for all covers and benefits
The exclusions set out in this section apply to all covers and benefits under your
policy.
What we don’t cover
Determination | Case number: 807892 Page 6 of 8
Loss, damage, injury or death arising from:
• Rust, corrosion, gradual deterioration, depreciation, wear or tear
…
• Landslide or subsidence unless it happ ens immediately as a result of:
- An earthquake or explosion
- A storm or flood
…
What we don’t cover
Mechanical, structural or electrical failure of an item
The settling, shrinkage or expansion of buildings, foundations, walls or
pavements
Maintaining and occupying your home
We don’t cover loss, damage, injury or death arising from:
Faulty design or workmanship ...
Definitions
Incident – is a single occurrence, a series of occurrences arising out of one event
3.3 Relevant consultants’ information
Record Key points
S Engineering Report Failed Intermediate Brick Pier
In our opinion, the claimed heavy rainfall event would not only
affect (1) one brick pier located approximately 10 - 15m away from
the south - west alignment of the property but rather creat e a
uniform damage across most of the piers whic h was also not
observed.
Notwithstanding the above, subterranean water runoff is common
for sloped sites and is defined as rain or other sources of water
infiltrating the ground and laterally move toward s the downstream.
Determination | Case number: 807892 Page 7 of 8
Record Key points
From our inspection, the observed channel in the subfloor was
approximately 3m away upstream from the undermined brick pier
which indicates the most plausible cause of damage is related to
subsurface water runoff int o the subfloor of the building
permeating through the ground.
As such, the subterranean wat er runoff has slowly mobilised and
washed away the foundation material underside of the brick pier
causing the pier to fail as observed.
In our opinion, the damage to the single brick pie r is consistent
with subterranean and
subsurface runoff which has undermined the foundation material
of the brick pier
occurring over a long period of time.
To this end, the ongoing and naturally occurring subterranean and
subsurface water into the
subfloo r of the building permeating through the ground which has
ultimately caused one (1) brick pier to fail is pre - existing in nature
and unrelated to a specific or defined event and has been
occurring over a long period of time.
Koppers Log Retaining Wall
In general, the overall condition of the retaining wall was poor and
dilapidated with evidence of long - term rotation, movement with
evidence of vegetation growth within the wall alignment.
Rotation and partial collapse were observed to the retaining wall
part icularly about the south alignment directly behind the garage
with the displaced post s and walling still remaining
Behind the retaining wall lays various types of trees and shrubs
which are in close proximity to the alignment whic h has evidently
impacted t he long - term stability of the retaining wall by imposing
root pressures over an extended period of time.
On that basis, in our opinion, the cause of the exhibited rotation
and collapse appeared to be consistent with exerting earth and
root pressures over a period of time.
In ensuring the safety of the occupants, make safe works are to be
administered immediat ely by supporting the failed ret aining wall
utilising temporary props.
In our opinion, the cause of the wall's failure is due to non -
compliant and inad equate design of the ret aining wall which had
ultimately rotated from the exerting earth and root pressure over
an extended period of time and caused the partial failure.
As such, the cause of observed damage and the partial failure of
the retaining wall c an be attributed to the following factors:
- Inadequate design capacity and construction method to
accommodate retaining pressures relative to overturning capacity
considering the height of the retaining wall.
Long term tree and plants roots behind the retaining wall which
induce load on the retaining wall through age and maturity.
Determination | Case number: 807892 Page 8 of 8
Record Key points
M Plumber Report and Tax
Invoice
Regarding the dropped pier under the hous e, M found:
- it to be water - runoff from the mountain behind the property running
under the house th rough weak spots in the ground
- in addition, were two broken pipes previously found and repaired
under the back on 31 May 2019
In M’s opinion, it was not possible to ascertain how long the
pipes had been leaking for.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.