Home / IAG / Determination 807892

Determination 807892

Claim declined for storm damage to brick pier and retaining wall

FirmIAG
Decided2022-03-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed under a home building policy for storm damage to a brick pier and retaining wall. The insurer declined, and AFCA found the damage occurred gradually over an extended period from excluded causes, so the decline was upheld.

Engineering evidence showed the damage was gradual and caused by subterranean water runoff, root pressure and poor design, which fall within policy exclusions for gradual deterioration, settling, structural failure and faulty design; the retaining wall is also not covered for storm.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 807892 Financial firm Insurance Australia Limited Determination | Case number: 807892 Page 1 of 8 Case number: 807892 11 March 2022 1 Determination overview 1.1 Complaint The complainant holds a home building and contents insurance policy (policy) with the financial firm (insurer). On 22 October 2019, a claim was lodged for storm damage to a sub- floor brick pier (brick pier) as well as a timber log retaining wall (retaining wall). The insurer has declined the claim. The insurer says the damage to both areas was not because of the storm but had occurred over an extended period due to structural failure of an item, settling foundations, faulty design or workmanship and not maintaining the home in good repair and condition, which is excluded under the policy. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The available information does not establish the damage to the retaining wall or brick pier is because of the claimed storm event. Rather, on balance, the damage to both areas has occurred gradually over an extended period of time because of circumstances excluded under the policy. Accordingly, the insurer is entitled to decline the claim in this instance. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to decline the claim and is not required to take any further action. Determination | Case number: 807892 Page 2 of 8 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Yes. The damage to the brick pier and retaining wall has been shown to have occurred gradually over an extended period of time due to circumstances excluded under the policy. The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more the listed insured events, including Storm. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The insurer provided the complainants with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. Information from the insurer’s consultants is more persuasive There is no dispute there exists damage in the form of the partial collapse of the retaining wall as well as loss of foundation soils from around and under the brick pier causing its failure. The insurer appointed building consultants ‘B’ who attended the insured property on 25 October 2019. After investigating the cause and extent of the damage, B recommended the insurer appoint an engineer to determine the cause of the damage. The insurer appointed engineering consultants ‘S’ who attended the insured property on 12 November 2019 to investigate the cause for the damage. From its inspection of the brick pier and surrounding area S observed a channel in the subfloor around three meters upstream from the damaged brick pier. In S’s view this presents as the most plausible cause for the damage. That is, S considered the subterranean water runoff has slowly moved and washed away the foundation materials under the brick pier causing its failure. In S’s opinion this process has occurred over a long period of time and is a naturally occurring. The damage to the pier is unrelated to the said storm event and has been occurring for a long period of time. In S’s opinion this process has occurred over a l ong period of time and is a naturally occurring. The damage to the pier is unrelated to the said storm event and has been occurring for a long period of time. With respect to the partial collapse of the retaining wall, S believes this is because of inadequate design capacity and method of construction to deal with the retaining pressures it was constructed to withstand. Secondly, long term tree and plants roots behind the retaining wall only further served to induce more load on the retaining wall through age and maturity. S says inherent voids and gaps between the logs used in the construction of the wall were not susceptible to hydrostatic pressure build-up during heavy rainfalls given the water would be expected to dissipate through these gaps and joints. The noted collapse and dilapidated condition of the retaining wall was considered pre-existing and unrelated to the storm event. The complainant has provided information from plumbing consultant M who is of the opinion the damage to the brick pier is because of a combination of water run-off from the mountain behind the home and two broken pipes it had found under the back of the home and repaired Determination | Case number: 807892 Page 3 of 8 on 31 May 2019. M says it was impossible to ascertain how long these pipes had been leaking. I note the insurer contacted M to seek further clarification of its position. M advised it could not definitively confirm whether the water that caused the damage to the brick pier was related to the leaking pipes or that it was from the storm event relevant to the claim. M concedes the damage to the brick pier could have occurred over time. I have reviewed the water service bills provided by the complainant in support of the position that water had been leaking under the home and once the pipes were repaired, the cost of water service came down. Having reviewed this information, I am not satisfied the difference in the cost of the water services noted in the bills for the different time periods is so significant or different that it could reasonably show how long or that the leaks were significant. I am not satisfied this information is enough to allow me to set aside the findings from the engineer in favour of the information from M or the water service bills. I find the information from S to be the more persuasive and consistent with the nature and extent of damage to the brick pier and retaining wall. The insurer is entitled to decline the claim The policy excludes from cover damage to the insured property that is caused by or arises from subsidence, structural failure of an item, settling, shrinkage or expansion in buildings, foundations, walls or pavement, faulty design or workmanship and not maintaining the home in good repair. For the reasons discussed above, I am satisfied it has been shown that the damage to the brick pier has occurred over an extended period of time because of the natural subterranean water flow under the home resulting in the washing away of foundation soils. Further, that the damage to the retaining wall has also occurred over an extended period of time because of the deterioration of the timber wall and concerns with its design and construction relevant to its purpose. Even it was to be accepted the damage to the retaining wall was due to the storm, the policy does not cover damage to retaining walls caused by the insured event storm. Accordingly, in line with the policy conditions and exclusions, the insurer is entitled to decline cover for the damage to the brick pier and retaining wall. Other matters I acknowledge the complainant says the property has been insured with the insurer for around 83 years whilst in the ownership of several relatives. Further, that because the property has remained under cover with the insurer all this time, the insurer is not entitled to rely on the exclusion provisions relating to wear, tear, deterioration etc to decline cover. I am not satisfied the above concerns prevent the insurer from being able to rely on the provisions of the contract of insurance when assessing its liability under a claim relating to the relevant period of insurance. The decision as to whether the insurer sets aside the provisions of contract in favour of a commercial or ex-gratia offer to accept to cover the claimed damage rests with the insurer alone. AFCA cannot require the insurer to make a commercial or ex- gratia decision to accept the claim. Determination | Case number: 807892 Page 4 of 8 Why is the outcome fair? Given the available information shows the damage claimed is the result of circumstances that are clearly excluded from cover under the policy, it is fair to permit the insurer to rely on the policy to decline liability for the damage. Determination | Case number: 807892 Page 5 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant policy provisions Storm If loss or damage is caused by a storm. Not covered • Loss or damage to: - Retaining walls … General exclusions and your responsibilities There are certain situations when we don’t provide cover under your policy. This section outlines the general exclusions that apply to all covers and benefits we provide under your policy. … General exclusions for all covers and benefits The exclusions set out in this section apply to all covers and benefits under your policy. What we don’t cover Determination | Case number: 807892 Page 6 of 8 Loss, damage, injury or death arising from: • Rust, corrosion, gradual deterioration, depreciation, wear or tear … • Landslide or subsidence unless it happ ens immediately as a result of: - An earthquake or explosion - A storm or flood … What we don’t cover  Mechanical, structural or electrical failure of an item  The settling, shrinkage or expansion of buildings, foundations, walls or pavements Maintaining and occupying your home We don’t cover loss, damage, injury or death arising from:  Faulty design or workmanship ... Definitions Incident – is a single occurrence, a series of occurrences arising out of one event 3.3 Relevant consultants’ information Record Key points S Engineering Report Failed Intermediate Brick Pier  In our opinion, the claimed heavy rainfall event would not only affect (1) one brick pier located approximately 10 - 15m away from the south - west alignment of the property but rather creat e a uniform damage across most of the piers whic h was also not observed.  Notwithstanding the above, subterranean water runoff is common for sloped sites and is defined as rain or other sources of water infiltrating the ground and laterally move toward s the downstream. Determination | Case number: 807892 Page 7 of 8 Record Key points  From our inspection, the observed channel in the subfloor was approximately 3m away upstream from the undermined brick pier which indicates the most plausible cause of damage is related to subsurface water runoff int o the subfloor of the building permeating through the ground.  As such, the subterranean wat er runoff has slowly mobilised and washed away the foundation material underside of the brick pier causing the pier to fail as observed.  In our opinion, the damage to the single brick pie r is consistent with subterranean and  subsurface runoff which has undermined the foundation material of the brick pier  occurring over a long period of time.  To this end, the ongoing and naturally occurring subterranean and subsurface water into the  subfloo r of the building permeating through the ground which has ultimately caused one (1) brick pier to fail is pre - existing in nature and unrelated to a specific or defined event and has been occurring over a long period of time. Koppers Log Retaining Wall  In general, the overall condition of the retaining wall was poor and dilapidated with evidence of long - term rotation, movement with evidence of vegetation growth within the wall alignment.  Rotation and partial collapse were observed to the retaining wall part icularly about the south alignment directly behind the garage with the displaced post s and walling still remaining  Behind the retaining wall lays various types of trees and shrubs which are in close proximity to the alignment whic h has evidently impacted t he long - term stability of the retaining wall by imposing root pressures over an extended period of time.  On that basis, in our opinion, the cause of the exhibited rotation and collapse appeared to be consistent with exerting earth and root pressures over a period of time.  In ensuring the safety of the occupants, make safe works are to be administered immediat ely by supporting the failed ret aining wall utilising temporary props.  In our opinion, the cause of the wall's failure is due to non - compliant and inad equate design of the ret aining wall which had ultimately rotated from the exerting earth and root pressure over an extended period of time and caused the partial failure.  As such, the cause of observed damage and the partial failure of the retaining wall c an be attributed to the following factors: - Inadequate design capacity and construction method to accommodate retaining pressures relative to overturning capacity considering the height of the retaining wall.  Long term tree and plants roots behind the retaining wall which induce load on the retaining wall through age and maturity. Determination | Case number: 807892 Page 8 of 8 Record Key points M Plumber Report and Tax Invoice  Regarding the dropped pier under the hous e, M found: - it to be water - runoff from the mountain behind the property running under the house th rough weak spots in the ground - in addition, were two broken pipes previously found and repaired under the back on 31 May 2019  In M’s opinion, it was not possible to ascertain how long the pipes had been leaking for.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.