Home / RACQ / Determination 807563

Determination 807563

Claim declined for cracking damage to ceilings and cornices; insurer relied on earth movement exclusion

FirmRACQ
Decided2021-11-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for cracking ceiling damage, linked to Cyclone Yasi and earlier insurer-authorised repairs. AFCA found the damage resulted from long-term foundation ground movement, which is excluded, and determined the insurer may decline the claim.

Engineer evidence showed the damage was caused by long-term reactive clay soil foundation movement, an excluded earth movement, and the complainant provided no contrary expert evidence.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All RACQ determinations · Find similar determinations

Text of the determination

Determination Case number 807563 Financial firm RACQ Insurance Limited Determination | Case number: 807563 Page 1 of 8 Case number: 807563 17 November 2021 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy (policy) with the financial firm (insurer). On 6 November 2020, a claim was lodged for damage to the insured building said to have been noted four years prior. The complainant says the damage relates to Cyclone Yasi (Yasi) that occurred on 3 February 2011 and/or poor repairs completed by the insurer under a claim lodged after Yasi. The insurer has declined the claim. The insurer says the damage claimed has not been shown to relate to Yasi, repairs authorised under a previous claim nor an event to which the policy responds. Further, that the policy generally excludes loss or damage because of earth movement, which is what has been identified to be the cause for the damage to the insured building. The complainant rem ains dissatisfied with the insurer‟s assessment of its liability. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The available information does not show the damage to the insured building is the result of Yasi or repairs and rectification works authorised by the insurer under a previous claim. The damage has, on the balance of probabilities, been shown to be because of foundation ground movement over an extended period of time, which is excluded from cover under the policy. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to decline the claim and is not required to take any further action. Determination | Case number: 807563 Page 2 of 8 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more the listed insured events, including Storm . The policy also includes the Advanced Cover optional additional benefit, which covers accidental loss or damage caused by an unintended or unexpected event or incident. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The insurer is entitled to rely on the policy provisions to assess its liability The insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. A valid claim exists under the policy There is no dispute the insured building presents with cracking damage to ceilings and cornices in several rooms and which was not expected nor intended by the complainant. As such, I accept a valid claim exists under the advanced cover benefit. The onus, therefore, rests with the insurer to show an entitlement to decline or limit its liability under the complainant ‟ s claim in line with the policy provisions. The complainant says the damage is due to defective repairs by the insurer On 6 November 2020, the complainant contacted the insurer to lodge a claim for cracking damage to several ceilings within the insured dwelling, which he advised was noticed four years prior. The complaint says the damage to the insured building is because of the damage caused by Cyclone Yasi and the subsequent repairs authorised by the insurer. He notes the insurer was required to arrange rectification works on three occasions after the original repairs to the insured building. The complainant says the current damage is in the same area as the previous repairs. Further, that the insured as opposed to replacing the damaged ceiling and cornices under the previous claim merely undertook patching and repainting works, which is why the damage has reappeared. Evidence from the consultants’ does not support the complainant’s position The insurer appointed loss adjusters „SG‟ to investigate the cause and extent of the damage. Building consultants „P‟ were appointed by SG and attended the insured property on 10 November 2020. P confirmed there was cracking damage to ceilings and cornices in the lounge room, kitchen, hallway and bedroom areas. P recommended the appointment of an engineer to investigate the cause of the damage. Determination | Case number: 807563 Page 3 of 8 Engineers „SE‟ were appointed and attended the insured property on 10 February 2021 . SE provided a detailed report dated 17 March 2021 with its findings, relevant information from this report has been provided in section 3.2 of this determination. SE concluded that:  The cracking and movement-related damage to the insured property was not due to Yasi or any single definable event  The cause of the cracking and movement-related damage is a result of historic, long term and on-going foundation movements due to underlying reactive clay soils  The insured property w ill remain susceptible to normal seasonal moisture-related reactive clay foundation movements. Given the above, the insurer has declined indemnity for the cost to repair the cracking damage. It says there is no evidence linking this damage to the Yasi event not repairs authorised by the insurer under the previous claim (including rectification works). The insurer says the policy generally excludes from cover loss or damage to the insured building caused by or arising in connection with subsidence, earth shrinkage or expansion or any other earth movement no matter how it is caused. This is unless the damage is shown to be due to an earthquake or if it occurs within 72 hours of a flood or water run-off event, which is not the case in this instance. The insurer is entitled to decline the claim I acknowledge the complainant disputes the insurer‟s assessment of the evidence and its liability under the claim. He says the insurer failed to replace the damaged ceiling(s) previously and only did patching and repainting works. He believes the cracks now present are because of poor workmanship by the insurer ‟s appointed consultants under his previous Yasi claim in 2011. I note the complainant has not provided any supporting information, from a suitably qualified consultant or otherwise, and relies on his view that this present damage relates to previous repairs authorised by the insurer (including rectification works in 2012-2013). Without persuasive supporting information, I am not satisfied the complainant has been successful in showing the current cracking damage to ceilings and cornices is linked to the previous Yasi claim and repairs authorised by the insurer under his previous claim. Rather, on balance, the evidence in the form of reports and communications from consultants „ST‟ under the previous claim show complete ceiling replacement works were authorised and completed in 2012-2013 for $10,329.53. There is no evidence the damage now claimed being present or appearing in 2015-2016 or if so, why this was not brought to the attention of the insurer four years prior to the complainant lodging the recent claim on 6 November 2020. Having reviewed the evidence from SE, I am satisfied a detailed investigation was completed by the engineer including investigating/assessing the site, foundation soils classification, a floor level survey, the nature and categories of the cracks and weather conditions over the previous two years in the complainant‟s area . I am satisfied SE is adequately qualified to undertake the above noted investigations as well as provide expert opinion on the cause and extent of the cracking damage to the insured property. SE concludes that the damage is not related to Yasi or previous repairs nor any single identifiable event. Determination | Case number: 807563 Page 4 of 8 Rather, the cracking damage to the various areas in the insured dwelling is consistent with ongoing long term foundational ground movement. SE has provided information and analysis in support of its findings. As noted above, there is an absence of any equally compelling or qualified evidence to the contrary which may bring SE ‟s findings into question. In the absence of such and accepting SE‟s evidence, I am satisfied the insurer has established an entitlement to decline the claim in line with the policy exclusions. Accordingly, I determine the insurer is entitled to decline the claim and is not required to take any further action. Why is the outcome fair? Given the absence of persuasive evidence to the contrary and having regard to the information from the consultants appointed by the insurer, it is fair in all the circumstances to permit the insurer to rely on the policy exclusions to decline the claim. There is no evidence which can reasonably be relied upon to find the present cracking damage (over 10 years after Yasi) is related to Yasi or previous repairs authorised by the insurer. Determination | Case number: 807563 Page 5 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. 3.2 Relevant con sultants’ evidence Record Key points Evidence from ST under previous claim Fourth Report  Complainant contacted ST on 24 July 2012 to advise the repairs completed to the ceiling had begun to fail  Found ceilings in the open lounge area had rec eived large quantity of water ingress during Yasi through ridge cap  Ceiling when wet has bowed and then dried in this shape, needs complete replac ement  The cracking to the ceiling is due to repairs to original cracking not being carried out to manufacturer‟s specifica tions. Subsequent expansion and contraction and the inadequate repairs weakening the cracked areas has resulted in cracks re - appearing  As ceiling requires complete replacement, ST would tender out for quotes and report back. Fifth Report  Tender received in the amount of $10,329.53 to undertake the rectification ST submits tax invoice 7 November 2020 - $10,329.52 Email 16 August 2013  Confirming all rectification works had been completed and the complainant confirmed he was happy with the works. Determination | Case number: 807563 Page 6 of 8 Record Key points P Builder’s Report 23 November 2020  Attended 10 November 2020  Areas of damage noted were in the lounge room, kitchen, hallway and bedroom  Recommends appointing an engineer to investigate the cause and extent of the damage to the ceilings in these areas. SE Engineer’s Report 17 March 2021  The Insured stated that the repair Builder‟s undertook patching and painting only, which the Ins ured believes has caused the issues to re - occur  Cracking to cornices is evident in 4 locations; 3 within the front lounge room / entry and 1 within the Dining Room. The Open Plan living area was measured approximately 10m long x 5.6m wide.  An expansion joint was observed to the ceiling in the main hallway but not extended through the cornices.  Floor finishes to the house vary and include vinyl, tiles and carpet.  The recorded maximum level difference over the floor of the house was 18mm.  Low points were recorded near to the front door / ent ry and lounge room to the north - western corner of the house, to the rear south - western corner in the family room and at the western end of the main hallway.  The high point was rec orded in bedroom 2 near to the middle of the northern external wall of the house.  The patterns of the contours indic ate a relatively planar floor with minor falls (i.e., drying settlements) recorded towards the north - western and south - western corners of the house where the cracking and movement - related damage was observed  In any case, it is our opinion that the current ceiling and cornice damage to the house is not due to works undertaken by the repair Builders, and instead relates to ground and foundation movements which have occurred over an extended period of time since the repairs and due to “abnormal” soil moisture conditions which are present .  The last two y ears in Towns ville have had long periods of very dry weat her/low rainfall and therefore the mechanism for the cracking and movement - related damage to the house is in our opinion due to reactive soils shrinking resulting in “settlement” of the building footings. Furthermore, the floor level survey shows falls towards the north - western and sout h - western corners of the hous e where the cracking and movement - related damage was observed which in our opinion relates to edge drying foundation settlements during prolonged dry periods.  Based on all the available information, footing movement and the cracking and movement - related damage to the house is expected to have occurred as a result of long term and ongoing differential moisture cont ent var iations within the underlying reactive clay soils. Determination | Case number: 807563 Page 7 of 8 Record Key points  On the basis of the above observations and discussion, our conclusions are as follows:  The cracking and movement - relat ed damage to the house has not been c aused by Cyclone Yasi or any single definable event.  The cause of the cracking and movement - related damage to the house is a result of historic, long term and on - going foundation movements due to underlying reactive clay soils and the reasons outlined by paragraph 6.6.  The house will remain susceptible to normal seasonal moisture - related reactive clay foundation movements.  For maintenance and landscaping guidance, e.g. hard surfacing adjacent to buildings, trees near to the house, garden beds adjacent to the building, drainage of the site etc., the Ins ured should mak e reference to Appendix B in AS 2870 “Performance Requirements and Foundation Maintenance” and the CSIRO publication BTF 18 “Foundation Maintenance and Footing Performance: A Homeowner‟s Guide”, (available on the CSIRO website) and act upon t he advice contained within those documents 3.3 Relevant policy provisions Your cover Insured events We cover loss or damage to your home or contents that is caused by certain events. We call them insured events. For us to cover you for loss or damage caused by an insured event, the event must happen: • at the insured address; and • during the period of insurance. We don‟t cover some situations, events and types of loss or damage to your home or contents. Those exclusions are set out in this section under each of the insured events. … Optional Benefits Determination | Case number: 807563 Page 8 of 8 You can add optional benefits to your policy to increase your cover for your home or contents. Depending on the benefit you choose, you can insure your home or contents: • for more $ than the general limits shown in Table 3 on page 69 and Table 5 on page 71 • for other types of loss or damage that we don‟t normally cover. Advanced Cover Under this benefit, we cover you for accidental damage and motor burnout. Accidental damage is loss or damage caused by an event or incident which you didn‟t intend or expect. … General exclusions These general exclusions apply to all of the cover we provide under your policy. We don‟t cover you under your policy for loss or damage to your home or contents or legal liability which is caused by or arises in connection with any of the following items, events or circumstances: … or expansion or any other earth movement no matter how it is caused (but we do cover earthquake and we cover some landslide or subsidence that happens within 72 hours of the first loss or damage to your home or contents caused by the flood or water runoff – see page 22).

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.