Home / IAG / Determination 807499
Determination 807499
Storm damage claim settlement amount and insurer's incorrect settlement offer
Summary
The complainant claimed storm damage to a front portico and disputed the insurer's $2,500 cash settlement after an erroneous $13,436.30 builder's quote was sent. AFCA found the portico damage was largely pre-existing corrosion, so the insurer was not liable for full replacement, but increased the plaster repair settlement by 25% to $3,125 less excess, plus statutory interest.
The insurer is liable only for the storm-caused localised damage under the policy, excluding corrosion and gradual deterioration, and the misleading offer did not cause detrimental reliance; the cash settlement was increased by 25% because the insurer did not establish $2,500 was a reasonable repair cost.
Issues
- Claim amount dispute primary · upheld
“The insurer has not provided sufficient information to establish its offer of $2,500 is the reasonable cost to repair the damage it agreed to cover.”
- Claim denial secondary · not upheld
“It would not be fair to compel the insurer to settle the claim for this amount [$13,436.30].”
- Misleading conduct secondary · not upheld
“I accept the insurer's email of 30 March 2021 was misleading regarding its settlement offer... I am not satisfied he relied on the misrepresentation to his detriment.”
Subjects and remedies
pay compensationpay interest
Text of the determination
Determination
Case number 807499
Financial firm Insurance Australia Limited
Determination | Case number: 807499 Page 1 of 6
Case number: 807499 31 January 2022
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents policy with the financial firm (insurer).
On 12 February 2021 the complainant lodged a claim for storm damage to the front portico
ceiling and roof.
The complainant initially lodged a complaint with AFCA because he was dissatisfied the
insurer and its engineer incorrectly listed the date of loss (5 February 2021) as the date the
claim was lodged. The insurer has since apologised and rectified this error.
The insurer also confirmed it would agree to cover the resultant storm damage to the plaster
section of the portico roof. In doing so, the insurer sent the complainant it s builder’s quote of
$13,436.30 for replacement of the portico. This was in error as the insurer was not intending
to cover the total replacement cost. The insurer subsequently offered to settle the resultant
damage for $2,500 less the applicable excess.
The complainant disputes this amount and wants the insurer to cover the replacement cost.
1.2 Issues and key findings
Is it fair for the insurer to pay the replacement cost?
No. The exchanged material shows the portico required rectification and replacement from
corrosion and deterioration which is unrelated to the claimed storm event. There is also no
information to show the com plainant relied on the insurer’ s incorrect offer of $13,436.30 to his
detriment. This error was rectified in a reasonable and timely manner. It would not be fair to
compel the insurer to settle the claim for this amount.
What is a fair settlement amount for the storm damage?
The insurer has not provided sufficient information to establish its offer of $2,500 is the
reasonable cost to repair the damage it agreed to cover. To bring finality to this complaint, it is
fair for the insurer to increase its settlement offer by 25%.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer is to increase its settlement offer by 25% to $3,125. The insurer is, however,
entitled to reduce the settlement by the applicable excess.
The insurer is required to apply statutory interest on any unpaid amount, pursuant to section
57 of the Insurance Contracts Act 1984 (Cth), from 28 June 2021 (the date of the insurer’s
external dispute response), until the date of payment.
Determination | Case number: 807499 Page 2 of 6
Determination | Case number: 807499 Page 3 of 6
2 Reasons for determination
2.1 Is it fair for the insurer to pay the replacement cost?
No. The exchanged material shows the portico required rectification and replacement from
corrosion and deterioration which is unrelated to the claimed storm event. There is also no
info rmation to show the complainant relied on the insurer’ s incorrect offer of $13,436.30 to his
detriment. This error was rectified in a reasonable and timely manner. It would not be fair to
compel the insurer to settle the claim for this amount.
Insurer appropriately rectified any confusion regarding the date of loss
The complainant ’s initial complaint with AFCA was the incorrect date listed as the date of
loss. The complainant was also unhappy with the wording used in t he insurer’s apology
letters. He was concerned it could make him look like someone who is deceptive.
The insurer provided several apology letters and clearly outlined the document number for the
corrected report. The insurer also provided a letter, dated 6 July 2021, acknowledging the
confusio n regarding the date of loss was its own error, not the complainant’s.
I accept the insurer clearly rectified the error and provided a fair and reasonable apology. I
consider this issue to be satisfactorily resolved.
Insurer sent a letter indicating it would settle for the replacement cost
The complainant’s policy provides cover when listed insured events cause loss or damage to
the home or contents. ‘ Storm ’ is an insured event. The complainant lodged the claim after the
underside of the portico roof collapsed following a storm event.
The parties do not dispute a storm occurred, and the insurer agreed to cover the plaster
damage evident on the portico ceiling.
On 30 March 2021, the insurer sent the complainant an email advising its builder cannot
warrant the repairs, so it will offer a cash settlement. The insurer sent the complainant its
builder’s scope of works and quote for $13,436.30. It also asked the complainant to confirm
his bank account details. I accept this would give the complainant the impression the insurer
was offering $13,436.30 in resolution of the claim.
However, the quote from the insurer’s builder was for the complete replacement of the
concrete portico. The insurer says it never intended to cover the replacement cost and these
costings were sent to the complainant in error. The insurer says it only intended to cash settle
the repair of the damaged plaster area that collapsed during the storm.
Fair for the insurer to limit its liability to the localised plaster repair
I accept the insurer is not required to cover the cost to replace the entire concrete portico.
The insurer’s engineer’s (MB) report shows there was damage unrelated to the storm event
which already required repair and replacement.
The policy covers loss or damage caused by ‘ a single occurrence, or a series of occurrences
arising out of the one event ’ . Therefore, the policy intends to cover storm damage caused by
a one-off identifiable storm event.
T he policy excludes cover for loss or damage caused by ‘r ust, corrosion, gradual
deterioration, depreciation, wear or tear’ . The policy is not intended to cover damage that was
Determination | Case number: 807499 Page 4 of 6
existing before the claimed storm event. Nor is it intended to cover deterioration and corrosion
that occurs over time from exposure to the elements in the normal course of the portico’s
serviceable life.
MB’s report identifies a large amount of existing corrosion and deterioration to the portico. MB
says there are internal stresses caused by the corrosion of the steel mesh reinforcement from
prolonged exposure to moisture and oxygen.
MB concludes:
we are of the opinion that the portico roof / ceiling has been at a dilapidated state
for a considerable time and that the corrosion and consequential expansion of the
reinforcing steel would have been of a gradual occurrence up to a point where the
concrete bond had broken down sufficient that it could no longer support it’s own
weight, as a consequence the portico roof slab has suffered localised failure.
The complainant also provided a report from his own builder which states approximately 60%
of the underside of the portico roof has concrete cancer and it is beyond repair. There is no
information to show this occurred from the claimed storm event on 5 February 2021.
For these reasons, I accept it is fair for the insurer to limit its liability to the repair of the portico
ceiling area that has fallen away.
Not fair to hold the insurer liable to $13,436.30 in this instance
I appreciate the complainant was initially offered a cash settlement based on the replacement
cost of the portico. However, I do not agree it would be fair to hold the insurer liable to pay the
complainant $13,436.30 in this instance. This is because I am not satisfied the complainant
relied on the insurer’s email to his detri ment.
I have reviewed the available claim notes. These show on 17 March 2021 the insurer and
complainant discussed MB’s report over the phone. The notes say:
Reading through the report [complainant] was happy to understand why we
wouldn’t be covering the replacement of the patico slab, and will wait to find out
how much the CS would be for the section which fell [sic]
The complainant was aware the insurer was not intending to cover the full replacement cost
of the concrete portico before it sent its email of 30 March 2021.
The insurer’s claim notes show , on 19 April 2021, during a phone call between the parties it
was identified that the complainant had not yet read the email of 30 March 2021 with the
incorrect offer. It was at this point both parties identified the incorrect quoted amount.
On 22 April 2201 the insurer clarified it would not be cash settling the claim for $13,436.30 as
this covered the cost to rectify the other issues identified by MB that were not claim related.
I accept the insurer’s email of 30 March 2021 was misleading regarding its settlement offer.
However, when an insurer makes a misrepresentation the remedy is to consider whether the
complainant relied on the misrepresentation to his detriment. I am not satisfied he did.
The complainant only became aware of the incorrect offer on 19 April 2021 and the insurer
quickly corrected any misunderstanding. While I accept it was frustrating for the complainant,
Determination | Case number: 807499 Page 5 of 6
I am not satisfied he suffered a loss because of this, or that it would be fair to hold the insurer
liable to cash settle the replacement cost in this instance.
2.2 What is a fair settlement amount for the storm damage?
The insurer has not provided sufficient information to establish its offer of $2,500 is the
reasonable cost to repair the damage it agreed to cover. To bring finality to this complaint, it is
fair for the insurer to increase its settlement offer by 25%.
Insurer has not established $2,500 is a fair and reasonable amount
The policy says, if the insurer agrees to cover a claim for building damage, it will choose to:
arrange for repairers, builders or suppliers to repair or rebuild the damage, or
pay the reasonable cost to repair or rebuild the damage.
Given the insurer wants to cash settle the repair cost, it must ensure the proposed cash
settlement is a fair and reasonable amount to address the damage it agreed to cover.
The insurer’s correspondence shows it offered $2,500 for the plaster damage. It has not
provided a quote or any confirmation from its builder that the repair can be completed for this
amount.
I note the complainant provided his own quote for $1,150 for the plaster repair. He says this
was provided in error and should not be considered because it was only completed over the
phone. The quote specifically states:
the address (and therefore the damage) has not been sighted
variations will be required if unsighted issues arise.
I therefore do not accept this quote is actionable or reflective of an adequate or reasonable
repair cost.
Fair for the insurer to make a further allowance of 25%
In the absence of any further information from either party, and to bring finality to this
complaint, I consider it fair for the insurer to increase its offer of $2,500 by 25%. This will
address the likelihood of additional costs from unforeseen contingencies, especially as the
insurer’s own builder cannot guarantee the work. It also addresses the complainant’s lack of
access to the policy entitlement to a lifetime guarantee on repairs when the insurer cash
settles a claim.
This brings the final settlement to $3,125. The insurer is, however, entitled to reduce the
settlement amount by the applicable excess in accordance with the policy terms.
The insurer is required to apply statutory interest on any unpaid amount, pursuant to section
57 of the Insurance Contracts Act 1984 (Cth), from 28 June 2021 (the date of the insurer’s
external dispute response), until the date of payment.
Determination | Case number: 807499 Page 6 of 6
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.