Text of the determination
Determination
Case number 807142
Financial firm Westpac General Insurance Limited
Determination | Case number: 807142 Page 1 of 13
Case number: 807142 4 November 2021
1 Determination overview
1.1 Complaint
The complainant holds a home building policy with the financial firm (insurer). A burst water
pipe under the concrete slab of the complainant’s property has caused water damage to the
property. For the purposes of this determination, references to the complainant includes the
complainant’s husband, the co -insured.
The insurer says the damage to the property is relatively limited and can be repaired. The
insurer has provided a cash settlement, which the complainant does not accept.
The complainant disagrees with the insurer’s assessment of the damage, including whether
there is continued moisture in the property. There are concerns that the slab may have been
impacted by water and whether all the floorboards need to be taken up to allow drying and
then be replaced. The complainant says there is mould in the property and possible damage
to the bathroom.
The insurer funded the purchase of a caravan for temporary accommodation to allow the
complainant and her family to remain on the property. They continue occupying the caravan.
The complainant says her family have health issues and cannot live in the property given its
current state.
1.2 Issues and key findings
Has the insurer adequately assessed the claim?
No. The insurer has not properly considered information provided by the complainant about
the damage to the property.
Has the insurer adequately handled the claim?
No. The information shows there has been a lack of communication between the insurer and
the complainant which has led the insurer to make an inadequate cash settlement and there
are other service issues.
Why is the outcome fair?
The outcome is fair because based on the information provided the insurer has not met its
obligations to the complainant under the terms of the policy and regarding the claim.
1.3 Determination
This determination is substantially in favour of the complainant. Upon acceptance of this
determination by the complainant, the insurer is to:
Arrange for all the floorboards to be taken up and allowed to adequately dry, together with
the slab,
Determination | Case number: 807142 Page 2 of 13
once the floor boards and slab have adequately dried, prepare a scope of works and
quotation for repair and remediation of the insured event related damage and cash settle
the complainant based upon that quotation and in accordance with the terms of the policy,
once the floorboards have been taken up, arrange for the attendance of a mould expert, to
inspect the property and provide a scope of works and quotation for mould remediation,
then cash settle the complainant based upon that quotation and in accordance with the
terms of the policy,
pay the complainant $2,500, for exploratory and rectification works and
pay the complainant $2,000, for non-financial loss.
Determination | Case number: 807142 Page 3 of 13
2 Reasons for determination
2.1 Has the insurer adequately assessed the claim?
No. The insurer has not considered all the information available. When presented with more
information the insurer has continued to justify its position about the claim.
Circumstances of the loss
The complainant was awoken by the sound of water. The water spread throughout the lower
ground floor of the insured property. The complainant contacted the insurer. A plumber
attended the property but said they could do little. The complainant’s husband, a plumber, did
works to isolate the burst pipe and re-direct water pipes so the family could have running
water.
The insurer appointed an assessor/builder (assessor). The assessor contacted the
complainant by which time the water leak had been remedied and according to the assessor
temporary accommodation was not required.
The complainant was not happy with the report by the assessor because of what she says
was discussed with them - she says this was not reflected in the report. The insurer appointed
another builder, LS.
LS had a flooring expert, UF, attend the property who moved furniture and took up some floor
boards and noted exposed holes in plaster, done to fix the burst pipe. Upon noting the
presence of mould, UF said the complainant should move out to temporary accommodation.
Eventually works stopped and drying equipment was removed from the property by the
insurer.
The policy provides coverage
The complainant’s policy insured the complainant ’ s home building and contents. The policy
was the premier care package which provided accidental damage cover to the property.
The policy provided that if a claim was made, and an insured event under the policy was
applicable, the claim should be made under that insured event.
The policy has several different insured events for which cover is provided. Each insured
event says what is covered and what is not covered.
For the purposes of this complaint, the applicable insured event is the escape of liquid. The
policy says that loss or damage caused by accidental escape of liquid from any fixed pipe or
fixed item used to hold liquid is covered.
Given the circumstances of a burst water pipe, there is no issue as to whether an insured
event has occurred at the insured property.
Further, the policy provides additional benefits. These include emergency accommodation,
which provides for the cost of it up to 10% of the sum insured or the cost of accommodation
for up to 12 months from the date of the event, whichever is less.
Emergency accommodation was provided by the insurer. After being unable to find a suitable
property which would also cater for the complainant’s needs and their pets, the insurer
Determination | Case number: 807142 Page 4 of 13
assisted the complainant with the purchase of a caravan, which cost approximately $45,000.
This payment is well within the amount of 10% of the sum insured.
The policy additional benefits also include storage fees and emergency accommodation for
pets, which the panel understands have not been utilised.
The policy has been updated by a Supplementary Product Disclosure Statement (SPDS)
which applies to all policies issued after 30 June 2018. The SPDS includes an updated
section for the escape of liquid. It says that the policy provides cover for the reasonable
exploratory costs in locating the source of the damage, providing a claim for escape of liquid
is agreed to.
It provides no cover for the loss, damage or repairs to the actual item from which the liquid
escaped, or repair or replacement of undamaged parts of the insured property to match the
property that has been repaired or replaced.
As noted above, the complainant did exploratory work and repairs including re-routing the
water, which LS noted assists with any further potential similar incidents. The complainant
submitted an invoice for this exploratory work which has not been paid. Given the work and
acknowledgement from LS about this work, in the panel ’ s view it should be accounted for,
rather than waiving the excess as proposed by LS.
However, having reviewed the exchanged material, the panel notes that the invoice includes
items that would not be included as part of exploratory costs or reasonable rectification costs.
The panel is satisfied that a payment by the insurer of $2,500, will meet its obligations to the
complainant regarding this issue.
The policy provides information about how to settle a claim
The policy also provides information about how the insurer will settle a claim. The insurer has
the option to pay the reasonable cost of repair, or a cash amount. The policy details that if the
insurer agrees to pay cash, the insurer will pay the amount it would reasonably cost to repair
the property, less a reasonable amount for depreciation.
However, any cash settlement must be fair and reasonable in the circumstances.
The parties differ on what should be repaired and the costs of repairs
The complainant organised two quotes from builders to do the repairs to the property. Both
builders provided quotes which included removing the floorboards, attending to mould
remediation and undertaking a slab integrity test. Both quotes also had allowance for works to
the kitchen, bathroom and laundry. Neither quote was itemised.
The insurer’s assessor said there was limited damage to the property including no damage to
the kitchen, dining room, en-suite or laundry. It said damage was limited and estimated just
under $5,000 for repairs.
The insurer appointed LS. According to its reports, LS estimated damages at $85,000
(accepting that this was only an estimate) and said there was substantial water under the
floorboards and possible damage to walls. LS suggested continued remediation and
temporary accommodation. In a following report mould was noted.
The complainants suggested there may be water damage to some plaster cracking in the
walls, notably where the TV was. LS then engaged an engineer, LC, who provided four
reports regarding the damage.
Determination | Case number: 807142 Page 5 of 13
The bathroom and laundry
LC essentially said the water had not caused damage to the bathroom or laundry tiles based
on its observations, including having no effect on the water proofing membrane.
There have been different views about whether there is any tile damage in the bathroom and
laundry, and if so whether it is due to the insured event. The complainant has provided
various pieces of information including from the VBA and wet seal companies. The panel
does not believe that these add to the consideration of any damage.
LC has maintained throughout its reports that there was no evidence of damage to the tiles in
these rooms, including that the waterproof membrane would only be in the shower area and
not throughout the whole of the bathroom.
Despite this, the complainant ’s expert, JB, did a building inspection saying there was
excessive moisture in the bathroom and thought that further investigations were warranted by
removing the floor tiles of the bathroom to determine whether the water proofing membrane
was undermined or causing lifting away from the slab. Their comment about the laundry was
that there was generally no damage.
The panel is more persuaded by the report of LC, that there has not been any damage to the
water proofing membrane of the bathroom floor tiles or laundry floor tiles.
The insurer is entitled to deny this aspect of the claim.
The slab, floorboards, walls and kitchen
LC said there was no damage to the concrete slab nor the plaster walls. It said any probl ems
were due to poor slab construction and normal movement.
As said above, LC has been consistent in its opinion, in particular about the slab, and says it
conducted testing of it by radar scanning. In relation to the floorboards LC said it will defer to
experts but says the factors for determining damage to the floorboards are to consider the
actual floorboards. LC also commented about the testing and says humidity levels aren’t
sufficient information to determine any damage to the floorboards
LS provided commentary in their report dated 21 July 2021 about various matters including
only some floorboards need to be taken up. To match the floorboards, LS says they will be
machined to fit and the whole of the floor sanded and polished.
What this does not provide for, in the panel’s view, is the possibility of water continuing to
exist below the floorboards, the drying out and checking of the concrete slab, and sufficiently
addressing the remediation of mould.
The complainants obtained a report from AT who reviewed moisture readings in July 2021. It
says these readings were high across the whole of the floorboard area and disagreed with the
readings done by the insurer’s flo oring expert, UF. AT says the underlay would have been
affected by the escape of water. The complainant also obtained a report from EG which took
moisture readings throughout the ground floor area and recommended mould remediation,
but firstly drying of the concrete slab, which extends to the kitchen area. JB said the walls
were stained and water damaged
According to the complainant, UF said that the floor membrane had broken.
It should be noted that whilst some remediation had been undertaken by the insurer, this
seemed to come to a halt when the insurer made its cash settlement. Despite different
Determination | Case number: 807142 Page 6 of 13
versions of what has happened, the fact seems to remain that, at least in July 2021, there
were high moisture readings across the ground floor and mould, which the panel expects has
continued.
From this, it seems reasonable to accept the complainant’s floor expert reports. This means
that all the floorboards should be removed to allow the facilitation of drying the slab and
checking its integrity and the integrity of the floorboards.
The insurer cash settled the claim
The insurer paid an amount to the complainant as a cash settlement for all repair works. The
complainant was surprised at receiving an amount, which she says had little explanation of
how it was calculated. She says they tried to obtain information from the insurer about the
settlement, but none was forthcoming.
The cash settlement was accompanied with a letter and two reports, one from LS and one
from LC. It was on this basis that the insurer had decided to cash the settle the claim and
seemingly based on the complainant’s request. This was also after all remediation works had
been stopped at the complainant’s property. The insurer says the cash settlement was done
in accordance with its policy conditions.
The parties differ in their opinions as to why a cash settlement was paid. From the information
provided, the complainant expressed an interest in resolving the claim for the whole loss. The
panel presumes that the complainant’s expression is based on information from her quotes.
However, the panel notes that it was only an expression of intertest. It was not a decision or a
request. This is clear from the LS report dated 12 May 2021. Some information was provided
in the reports sent with the letter to the complainant, but without any summary.
The panel is persuaded that the insurer did not adequately consider enough information in
arriving at an appropriate cash settlement of the claim.
The insurer has not adequately considered all the information
The panel is not persuaded that the insurer has adequately considered all the information
presented about this claim. Whilst there is a disagreement over whether some parts of the
property were damaged and needed repairs, it has been relatively clear that a large amount
of water has affected the downstairs section of the property. This is clear from the early
reports of LS.
It is also clear that there needs to be further drying of the property and at least a check of the
concrete slab. On the balance of the expert information about the floors, the panel is
persuaded by the complainants ’ reports that the entire floorboard area needs to be taken up,
dried and assessed. The panel is also persuaded by the complainant ’ s reports regarding the
need for mould remediation.
Given all the information provided in this complaint, the panel is of the view that the insurer is
to:
Arrange for all the floorboards to be taken up and allowed to adequately dry, together with
the slab,
Once the floor boards and slab have adequately dried, prepare a scope of works and
quotation for repair and remediation, and cash settle the complainant based upon that
quotation and in accordance with the terms of the policy,
Determination | Case number: 807142 Page 7 of 13
Once the floorboards have been taken up, arrange for the attendance of a mould expert, to
inspect the property and provide a scope of works and quotation for mould remediation,
then cash settle the complainant based upon that quotation.
The insurer is not required to pay interest on these cash settlements as the quotations will be
current.
The insurer is entitled to deduct from the cash settlements any amounts previously paid to the
complainant for the same repairs or remediation.
2.2 Has the insurer adequately handled the claim?
The insurer has not adequately handled the claim. There have been communication
challenges between the parties
The insurer said to remove all furniture and get out of the property
As stated above, the complainant was told by the insurer’s representative to clear all the
furniture and vacate the property. The content of subsequent communication between the
parties is have disputed.
The insurer was happy to provide temporary accommodation, obviously to facilitate repairs to
the property. This led to the insurer providing a sum of money in advance for the complaint to
purchase a caravan, which they have on site at the property.
Whilst the caravan provides limited living space for the family which has grown and has
medical issues, it was at the complainant’s suggestion because they wanted to be close to
their property and had animals to care for. Other alternatives for accommodation for the
family or the pets was not considered satisfactory for various reasons by the complainant.
The family remains in the caravan.
The cash settlement was with little explanation
The complainant says that there were conversations about the possibility of a cash settlement
of the claim. It seems from the information provided that any works were stopped and the
insurer’s builder’s removed equipment and no further works were completed.
From the information provided, the possibility of a cash settlement was mainly about exploring
options rather than a definitive expression and then proceeded based on miscommunication
and a different understanding of the insurance process, certainly from the complainant’s
perspective.
This led to the insurer depositing money into the complainant’s bank account, based on its
assessment of the works needed. The insurer provided limited information about the cash
settlement. Rather than providing an explanation about the assessment and calculation in a
letter, it sent its expert reports along with the letter about the cash settlement.
The complainant says she has attempted to find out more information from the insurer about
why the money was received and how to it was determined. The complainant says she has
attempted to pursue this with the insurer and their bank where they took out the insurance.
The cash settlement monies remain with the complainant – from the information available it
has not been utilised.
Determination | Case number: 807142 Page 8 of 13
The service was inadequate
Considering the available information, there has been a lack of clear information by both
parties. The insurer progressed the claim up to a point, including the assistance in purchasing
a caravan for accommodation as requested by the complainant, however, there was a
continued, perceived or otherwise, lack of communication.
Given all the circumstances of the claim, including what has been described above, the panel
is satisfied that the insurer’s service in handling the claim has not been adequate.
The allowance for non-financial loss is not to be given lightly. In this situation, the insurer
should pay the complainant $2,000 for non-financial loss.
2.3 Why is the outcome fair?
The outcome is fair because based on the information provided the insurer has not met its
obligations to the complainant under the terms of the policy and regarding the claim.
Determination | Case number: 807142 Page 9 of 13
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 807142 Page 10 of 13
3.2 Product Disclosure Statement (PDS)
SPDS
Escape of liquid
Covered
Loss or damage caused by the sudden and accidental escape of liquid from any fixed
pipe, fixed tank, waterbed, fish tank, or fixed item used to hold liquid.
We will also pay reasonable ex ploratory costs in locating the source of the damage,
provided we have agreed to pay for the loss or damage caus ed by the escape of liquid.
Not covered
• Loss, damage or repairs to the item from which the l iquid escaped, …
• repair or replacement of undamaged parts of your building and/or contents to
match property that has been repaired or replaced, or ….
PDS
Covered
Accidental loss or damage to:
• your building and/or contents at the site, or
• your contents while temporarily removed
elsewhere in Australia.
If loss or damage is caused by any other insured event, you must claim under that
section of your policy.
For every claim we agree to pay, your excess will be the greater of your basic
excess or $300.
Not covered …
Any loss or damage excluded under any insured events, unless otherwise stated.
How we settle your claim.
Determination | Case number: 807142 Page 11 of 13
Repairing or replacing.
When we agree to pay a claim for loss or damage:
We may choose to pay:
• the reasonable cost of repair, or
• the reasonable costs of replacement to new condition with property of the
same size and specification or with items as near to original as is currently
possible, or
• a cash amount. If we agree to pay cash, we’ll pay the amount it would
reasonably cost to repair or replace the property. …
We will pay:
• to match materials, items or construction with those that existed before the
loss or damage occurred or, where that is not possible, with the nearest
similar materials, items or construction, and only those costs that directly
apply to the part of your property that has suffered the loss or damage.
We may receive:
• a discount from our suppliers for replacing your property. If we choose to pay
a cash amount, we are entitled to deduct the discount we would have received
if we had replaced the property.
If the loss or damage:
• involves wall coverings, floor coverings or window coverings that are present
in more than one room of the hom e, we’ll only repair or replace those wall
coverings, floor coverings or window coverings in the room or rooms, hall or
passageway where the damage occurred. However, if such loss or damage
involves tiled or timber floor or wall coverings, we’ll only pay up to a maximum
of $1,000 to match undamaged tiled or timber wall or floor coverings in the
room or rooms, hall or passageway where the damage occurred to create a
uniform appearance. …
Determination | Case number: 807142 Page 12 of 13
3.3 Expert Reports
Record Key points
FF
LS Report
13 - 05 - 2021 .
As at the time of my inspection, moisture readings taken to
plasterboard wall linings remain elevat ed and in the likelihood that
structural timber members within the wall cavity
are saturated, it may be necessary for plaster wall linings to be
removed to facilitate structural drying, however, we will be guided
by our remediation expert in so far as th ose requirements.
Notwithstanding that, it does appear that a substantial amount of
water has remained trapped beneath the floor system in the weeks
since thi s leak was discovered/ rectified so we have initiated the
moving/redistribution of furniture so that we can lift the floor to
facilitate structural drying of the primary concrete slab.
Given significant sections of floating floorboards will need to be
strip ped up to facilitate structural drying works and will present a
considerable trip haz ard and that structural drying of the slab itself
will create a dust - filled environment, the decision has been taken
that the customers/their family will require temporar y
accommodation throughout the entire duration of the claim (that is,
remediation/structural drying and repairs).
FF
LC Report
19 - 05 - 2021 & 02 - 09 - 2021
It is the opinion of LC that the report ed escape of water has not
compromised or damaged the conc rete slab …
Testing of the concrete slab confirms that the detailing and
positioning of the slab shrinkage reinforcement is incorrect and
inadequate …
It is advised that given the escape of water has not caused slab or
building movement, the obs erved cracking to the plaster walls has
not been caused by the escape of water …
It is the opinion of LC that the report ed escape of water has not
caused damage to the waterproof membrane
..is the opinion of LC that minor plaster wall cracking has been
caused by normal building stresses due to differential footing
movement and normal structural movement…
It is the opinion of LC that the reported escape of water has not
caused damage to the tiles in the bathroom or laundry… .,
It is the opinion of LC that the report ed esca pe of water has not
caused damage to the waterproof membrane …
I t herefore advise that the provided reports provide no new data,
testing or evidence to alter the findings of our investigatio n.
The suggestion that the leak has caused water migration from
be neath the slab to da mage the membrane is incorrect.
Complainant
AT Report
06 - 08 - 2021
Based on our findings we recommend that all the EFT on the
ground floor is taken up and replaced
Determination | Case number: 807142 Page 13 of 13
Complainant
JB Report
07 - 06 - 2021
It is highly recommended that the flooring be removed to dry out
the slab
…dry slab and make sure there is no mould…
Complainant
EG Report
26 - 07 - 2021
… it is not possible for this sub floor to dry out without flooring
removal
These levels are elevat ed above the normal fungal ecology for the
area as evidenced by the external readings and remediation of the
affected areas is recommended