Home / Suncorp Group / Determination 806127

Determination 806127

Hail storm damage claim: extent of cover for roof, guttering, building repairs; cash settlement and non-financial loss

FirmSuncorp Group
Decided2022-09-27
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed$33,767
SourceAFCA PDF

Summary

The complainant claimed for hail storm damage to his home and contents, disputing the insurer's assessment of roof, guttering and building repairs. AFCA found the insurer's assessment inadequate, ordered further investigations and cash settlement with a 15% uplift, excluded the retaining walls and paving, and ordered $1,000 non-financial loss compensation.

The insurer must cover hail-related damage it has not adequately assessed, with the wear and tear exclusion not established for guttering, and cash settlement is reasonable on updated actionable quotes with a contingencies uplift.

Issues

Subjects and remedies

home or building damagenatural disasterpay compensationpay non financial lossprovide documentsreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 806127 Financial firm AAI Limited Case number: 806127 26 August 2022 Determination | Case number: 806127 Page 2 of 12 1 Determination overview 1.1 Complaint The complainant holds home and contents insurance with the financial firm (the insurer). On 19 January 2020, the complainant lodged a claim after his home and some of its contents were damaged as a result of a severe hail storm that day. The insurer accepted the claim and has cash settled various aspects of it. However, the parties are in dispute over the extent to which the policy covers some of the building damage claimed. This includes whether or not the insurer is required to replace the roof and guttering. The insurer says it has fairly assessed its liability for the remaining items. The complainant disagrees. He also says that the insurer has caused him stress and inconvenience. 1.2 Issues and key findings Is the insurer required to cover more of the claim? Yes. The insurer’s assessment of the damage to the roof, the guttering and parts of the building has been inadequate. It is to cover the complainant for the hail related damage once that is established through further investigations. However, the insurer is not liable for repairs to the eaves above what it previously accepted, the wood bearers/retaining wall or the paving. Is the insurer entitled to cash settle the claim? Yes. Once the required further investigations are completed, the insurer is to pay a cash settlement to the complainant based on BB ’s new quotes plus a 15% uplift for contingencies. It is also to cash settle the reasonable temporary accommodation (TA) costs for the period (if any) the property will be unliveable, in line with the policy. Is the complainant entitled to non-financial loss compensation? Yes. The insurer has contributed to the delay experienced and its assessment of the hail damage was inadequate. These matters have caused the complainant stress and inconvenience. The insurer is to pay him $1,000 in non-financial loss compensation. Why is the outcome fair? The insurer’s assessment of the extent of cover (notably, for the roof and guttering) has been inadequate. It is fair that the insurer undertakes further investigations then cash settles the damage caused by the hail storm, plus a contingencies uplift. It is also fair in the circumstances that it pays $1,000 in non-financial loss compensation. 1.3 Determination This determination is substantially in favour of the complainant. Upon receiving written confirmation that the complainant accepts this determination (the notice), the insurer is to take the following steps:  within 14 days of receiving the notice, have the roof pressure cleaned  within 21 days of the pressure cleaning, request BB to urgently: Determination | Case number: 806127 Page 3 of 12 > reassess the extent of hail damage to the roof, including the proportion the damaged tiles represent of the total number of roof tiles > provide a current actionable quote for the cost of a complete roof tile replacement using new tiles of an equivalent quality to the existing tiles (noting that the existing tiles are known to have an inherent manufacturing defect so cannot be used) > provide a current actionable quote to replace the gutter so as to meet current standards > provide a current actionable quote relating to the outstanding building repairs > provide an estimate of how long the home will be unliveable due to the works  within 14 days of receiving BB ’s updated quotes, pay the complainant: > for the roof tiles, the amount calculated by multiplying the roof tile replacement quote by the proportion of damaged tiles plus a 15% contingencies uplift (noting if the proportion of damage is 60% or more, the insurer is liable for the cost of a complete roof tile replacement) > for the guttering and the outstanding building repairs, the quoted amounts plus a 15% contingencies uplift > the reasonable temporary accommodation costs for the complainant for the unliveable period (if any), in line with the policy  within 14 days of receiving the notice, pay the complainants $1,000 in non-financial loss compensation. Determination | Case number: 806127 Page 4 of 12 2 Reasons for determination 2.1 Is the insurer required to cover more of the claim? Yes. The insurer’s assessment of the damage to the roof, the guttering and parts of the building has been inadequate. It is to cover the complainant for the hail related damage once that is established through further investigations. However, the insurer is not liable for repairs to the eaves above what it previously accepted, the wood bearers/retaining wall or the paving. The complainant has the established a valid claim under the policy The complainant is required to show on the balance of probabilities (that it is more likely than not) that he suffered a loss caused by an insured event covered by the policy. This is known as a valid claim. The complainant holds a home and contents policy issued by the insurer. Subject to its terms and conditions, the policy provides cover for loss or damage caused by the insured events listed in the product disclosure statement (PDS ). One of the listed insured events is ‘Storm’. It is not in dispute that the complainant’s home and some of its contents sustained dama ge due to a severe hail storm on 19 January 2020. The insurer accepted the claim and has attended to some repairs and made claim payments. Accordingly, it is clear that the complainant has established a valid claim under the policy. The complainant has confirmed to AFCA that what remains in dispute is the extent of cover available for damage to the property’s:  roof and guttering system  building exterior, garage, rumpus, dining, lounge and hallway repairs  retaining walls and external paving. Once the complainant establishes a valid claim, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer has the onus of proof in establishing that an exclusion or condition applies. The standard of proof is the balance of probabilities. The parties disagree on extent of cover for the roof damage The insurer appointed BB, builder, to assist it in assessing the claim. BB attended the property on 3 February 2020 and provided a report in which it said it believed ‘ the cause of damage to be a combination of the hail experienced during the storm on the 19th of January, and maintenance’. BB provided a scope of works (SOW) and quote which allowed for the replacement of approximately 28 square metres of roofing tiles (around 300 tiles) on the basis they were storm damaged. BB provided an updated SOW/quote seven months later which allowed for the replacement of approximately 30 square metres of roofing tiles (still said to be around 300 tiles). The updated quote amount was $18,226.52. BB stated that the same tile profile can be obtained for the replacement of the hail damaged tiles. However, BB has acknowledged that given the age of the replacement tiles there will be colour variations compared with the existing tiles. BB’s updated quote allowed for tiles to be moved on the roof in an effort to minimise the variations at the front of the house. Determination | Case number: 806127 Page 5 of 12 Because the complainant remained dissatisfied with the insurer’s assessment of the extent of storm related roof damage, the insurer engaged a second builder, JL. In turn, JL arranged for SP, roofing expert, to prepare a roof r eport. After receiving SP’s report, on 1 April 2021, JL provided an assessment in which it said: In conclusion, it is our professional opinion that due to a one-off storm event, hail has impacted the roof and has damaged approximately 250 roof tiles right across the entire roof. Due to this, we would recommend having approximately 250 tiles removed and replaced due to them being damaged by hail. We also found that there were approximately four ridgetop tiles that have been impacted by hail and have been damaged, which will need to be removed and replaced. We found that there was no further sign of any storm damage to the roof and we believe that the rest of the areas of concern are due to maintenance issues only. The insurer has offered to cash settle the roof damage claim for $18,226.52, being the total of BB’s updated quote dated 31 October 2021. It relies on the following policy terms in submitting that its liability for the roof is not more substantial:  an insured is not entitled to claim to replace undamaged tiles to create a uniform finish (PDS page 95)  an insured must keep their property well maintained and in good condition (PDS page 19)  claims that are caused by or arise from wear, tear and gradual deterioration are excluded (PDS page 83). The complainant says that the insurer should pay for a full roof replacement because:  the insurer ’s assessment of storm related damage is unreliable, given that its trades have provided different numbers of affected tiles and his observation of additional damage  the actual number of affected tiles can only be assessed after pressure cleaning the roof to remove accumulated dirt and fungus growth  during its inspection, BB lifted the valley tiles and damaged the flex seals between the valley and tiles  production of the existing roof tiles ceased over 25 years ago so any remaining stock is very old and likely damaged. The manufacturer and two contractors have recommended that the existing tiles be changed to Terracotta Marseille tiles of Titan gloss finish  Marseille tiles are approximately 10 mm bigger in width and length and cannot be mixed with the existing tiles and therefore a complete replacement of roof tiles is required. In support of his position, the complainant has provided photos as well as quotations prepared in September 2020 by two roofers, CR and MR. In their covering emails, both roofers recommend a full roof replacement due to the presence of what they consider to be extensive hail damage. Insurer’s assessment of roof damage has been inadequate The panel accepts that the insurer is only obliged to pay for repair of tiles damaged by the hailstorm and is not required to provide a matching finish with the undamaged tiles. However, the panel is not satisfied that the insurer has adequately assessed the extent of the hail damage given:  the variations in the numbers of affected tiles put forward by BB and JL/SP  some damage may be hidden by the extensive moss/fungus on the roof shown in photos taken by SP. Determination | Case number: 806127 Page 6 of 12 The policy states: If we repair (or pay you what it would cost us to repair), we will at our option repair on a ‘new for old’ basis or repair to a similar condition to what your home was in before the loss or damage occurred. T he meaning of ‘new for old’ includes that the insurer will rebuild, replace or repair with new items or new materials that are commercially available at the time of replacement or repair from Australian suppliers. The policy states that ‘new for old’ does not mean ‘of a better standard, specification or quality than when new’. Page 95 of the PDS confirms: If we need to source material in order to repair or rebuild your home, we will do our best to obtain new materials that are the same type, standard and specification. If the same is not available, we will use materials of a similar type, standard and specification that are commercially available and compliant with current building regulations. The insurer has proposed accessing replacements from stockpiles of a style of tile that has not been manufactured for over a quarter of a century. The panel notes that the insurer’s assessor says those tiles have an inherent manufacturing defect where the glazed face delaminates over time. It would not be reasonable for the insurer to replace the damaged tiles with tiles that are unlikely to be fit for purpose. Accordingly, the insurer must identify new tiles of an equivalent quality to the existing tiles (noting that the existing tiles are known to have an inherent manufacturing defect so cannot be used). The complainant wants Marseille tiles to be used. However, the panel unable to determine those tiles are equivalent to the existing tiles or if they are of a better standard, specification or quality. The panel notes that the insurer’s assessor has confirmed that the ‘ Australian Building Code of Australia is followed which states when a tiled roof reaches 60% of damage that new roof will be authorised’. This means that if it is established that at least 60% of the roof has been hail damaged, the insurer is to pay for a full roof replacement. The insurer is to undertake the further investigations set out at the end of this section of the determination. Parties disagree on extent of cover for damage to guttering In its report dated 3 February 2020, BB suggested that the cause of the need to replace guttering was maintenance related. However, as noted above, BB also concluded that the damage to the property was caused by a combination of the storm and maintenance issues. In its report dated 6 April 2021, SP said: We found that the roof's guttering has several rust holes within the gutters. We believe that this is due to the gutters rusting quite severely as there is a large build-up of debris within the gutters that is causing them to hold water, which is causing them to rust. Due to this, we recommend having the rusted sections of Determination | Case number: 806127 Page 7 of 12 the guttering removed and replaced, and having all the gutters cleaned to allow the water to drain away correctly. We do believe that hail has impacted the gutters and may have caused some of the holes to develop, but we believe that if the gutters were in better condition, this would not have occurred. The insurer says that the damage to the guttering is due to the complainant’s failure to maintain it in good condition. Relying on the wear, tear and gradual deterioration general exclusion, the insurer denies it is liable for any damage to the guttering. The complainant says that only three months prior to the storm, he cleaned the gutters with a blower and they were in good working order with no noticeable rusting. He says that the storm battered the guttering and altered its contours. The complainant also says he was told that the insurer would send someone to clean the storm related debris from the gutters but this never occurred. In September 2021, he said: The accumulated dirt and pine needles over a period of 18 months have caused acceleration of rusting process in many locations due to paint or galvanising coat damages, dents and holes created by the hail stones. Some sections are almost falling off due to accelerated rusting. I was not given an option to hire someone to clean the gutters as I was expecting [the insurer] to complete the gutter cleaning soon after the first inspection. The gutter remains in the same condition today. Insurer is obliged to cover the guttering As the complainant has established a valid claim, the insurer is liable for the loss unless it shows an exclusion or limiting condition applies. The insurer relies on the reports of BB and SP in stating the damage to the gutter is due to maintenance issues, rather than the storm. However, both those experts appear to accept that the guttering sustained at least some hail damage. The photographic evidence available suggests a very limited amount of corrosion was present immediately after the storm, the storm damaged the contouring of the gutter and that there was much more widespread corrosion more than a year later. The insurer has not contradicted the complainant ’s statement he had cleared out the gutters three months before the storm. Further, the insurer did not clean out the storm related debris and it is reasonable to accept that debris accumulation would have continued over time and accelerated the damage to the gutter. The insurer bears the onus of proof in establishing the application of an exclusion. The panel is not satisfied the insurer has met that onus. Nor has it put forward any apportionment between the seemingly limited pre-existing damage to the guttering and the storm related damage. Further, delay in clearing the storm debris appears to be the dominant cause for the current damage . Accordingly, the insurer is required to cover the cost of replacing the guttering. In doing so, it is to ensure the gutters meet current standards given the policy includes the following additional benefit (set out on page 44 of the PDS): When we are rebuilding or repairing damaged parts of your home, we will pay the reasonable and necessary costs: Determination | Case number: 806127 Page 8 of 12 … • to make the damaged parts of your home comply with the current home building regulations and laws. Building exterior, garage, rumpus, dining lounge and hallway repair cost claims The complainant is claiming various costs in relation to these areas, including:  Additional costs for the rumpus and lounge ceiling repairs  Light fittings to garage and rumpus room  Eaves replacement and painting  Various costs for painting he says are underquoted  Insulation replacement above dining area. The insurer previously offered the complainant a cash settlement of $22,796.77 based on an SOW/quote dated 31 October 2020 from BB (separate to its SOW/quote of the same date relating to roof repairs). O n 5 May 2021, the insurer’s assessor also recommended the removal and replacement of the rumpus room ceiling be allowed for in the sum of $2,226.62 ex GST ($2,449.28 incl GST). That amount does not appear to have been paid. The complainant says BB underestimated the costs involved and made errors. He says BB’s SOW/quote should total $33,766.62. Further, on 21 September 2021, the complainant submitted that BB did not allow for the following in repairing the dining/lounge room:  replace the entire ceiling of lounge and dining room (based on JL’s quote to replace rumpus room ceiling) - $2,448.60 incl GST  elec trician’s charges ( removal and reinstallation of chandeliers, security PIR wall lights and downlights) - $440.00 incl GST  removal of rubbish & hazardous materials (estimate only) - $660.00 incl GST  sealing off the area for personal protection of inhabitants - $440.00 incl GST  removal of furniture and re-arrangement - $220.00 incl GST. The panel is satisfied that the complainant has raised sufficient concerns about BB’s quote that a reassessment is required. It is also now the case that BB’s quote is close to two years old. The insurer is to take the steps set out at the end of this section of the determination. The insurer’s assessor and JL have confirmed the storm damage to the eaves was minor and limited to the back portion of the property. BB’s quotation adequately allowed for this damage. The complainant’s photographs do not support a finding that any additional work is required to the eaves due to the storm. Nor has he provided a building report to justify his position. Therefore, the insurer is not liable to increase the offer for the eaves. Insurer is not liable for wood bearer retaining walls and outdoor pavers The complainant is claiming for wood bearer retaining walls, saying they were hail damaged, meaning they need to be replaced. He seeks the replacement cost based on his quotation for the sum of $10,285 inclusive of GST. Based on the available information, the panel is not satisfied that the complainant has proven that the wood bearers were hail damaged. Further, even if he had, the PDS states that the Determination | Case number: 806127 Page 9 of 12 ‘Storm’ insured event does not cover loss or damage to retaining walls, sea walls, garden borders and free standing outdoor walls. Accordingly, the insurer is not liable. The complainant also says hail scuffed the paving at the rear of his property. The insurer says the damage was scuffing due to dirt and grime on the surface of the weathered paving rather than damage to the pavers themselves. In time, they will return to the visual state they were in prior to the hailstorm. The panel agrees, so the insurer is not liable for the outdoor paving as it has not been damaged by the storm. The insurer is to arrange further investigations In light of the panel’s findings set out above, the insurer is to have the roof pressure cleaned. It is then to ask its builder, BB, to:  reassess the extent of hail damage to the roof, including the proportion the damaged tiles represent of the total number of roof tiles  provide a current actionable quote for the cost of a complete roof tile replacement using new tiles of an equivalent quality to the existing tiles (noting that the existing tiles are known to have an inherent manufacturing defect so cannot be used)  provide a current actionable quote for replacing the gutter. The new gutter is to meet current building standards  provide a current SOW/quote relating to the outstanding building repairs. BB is to specifically consider the concerns raised by the complainant concerning its quote dated 31 October 2020 and the matters raised by the complainant on 21 September 2021. It is also to allow for the rumpus room ceiling work the insurer’s assessor recommended be accepted  estimate how long (if at all) the property will be unfit to be lived in due to the works . 2.2 Is the insurer entitled to cash settle the claim? Yes. Once the required further investigations are completed, the insurer is to pay a cash settlement to the complainant based on BB’s new quotes plus a 15% uplift for contingencies. It is also to cash settle the reasonable temporary accommodation (TA) costs for the period (if any) the property will be unliveable, in line with the policy. The insurer is entitled to cash settle The PDS gives the insurer the option to pay (cash settle) an insured the cost of covered repairs rather than attend to the repair work. Nevertheless, the insurer must act reasonably in choosing whether to exercise that option and in determining the cash settlement amount. Given the determination that the insurer is not liable for all of the required repairs, the panel is satisfied that it is fair and reasonable for the insurer to proceed by way of a cash settlement. Cash settlement should be based on an actionable quote and include an uplift When an insurer cash settles a claim, it transfers to the insured the risk that the cost of repairs may unexpectedly increase and/or that additional works not quoted are required. The insured also loses the insurer’s warranty that would apply to repairs arranged by the insurer. In the circumstances, there is a reasonable expectation that when cash settling a claim an insurer will base its offer on a recent quote that is actionable for a retail customer. Further, it Determination | Case number: 806127 Page 10 of 12 should increase (uplift) the quoted figure by applying a fair percentage, to allow for the transfer of risk, conti ngencies and loss of access to the insurer’s repair warranty . The panel has determined that it is necessary for BB to provide updated quotes relating to the roof and outstanding building repairs and a new quote to replace the guttering. Once those quotes are available, they will represent current prices so may be regarded as actionable. The panel considers an appropriate uplift in the circumstances is 15%. TA costs may be payable As set out on page 45 of the PDS, the policy includes as an automatic additional benefit cover for TA costs. If the insurer agrees that the home is unfit for the insured to live in as a result of covered damage, it will cover the insured for TA costs during the time it takes to repair the home or for the period it remains unfit to live in (for a maximum period of 12 months). The maximum sum payable is 20% of the sum insured. The quotes BB is to provide will presumably outline reasonably extensive work that may render the complainant’s home unfit to be lived in for a period. Accordingly, when the insurer asks BB to provide its new quotes it is to specify that the BB is to include an estimate of the period (if any) during which the home will be unfit to be lived in due to the work. The insurer is then to pay the complainant the reasonable TA costs for the complainants over the unliveable period (if any), in line with the policy terms. 2.3 Is the complainant entitled to non-financial compensation? Yes. The insurer has contributed to the delay experienced and its assessment of the hail damage was inadequate. These matters have caused the complainant stress and inconvenience. The insurer is to pay him $1,000 in non-financial loss compensation. AFCA can award compensation for poor claim handling Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (capped at $5,400) where the insurer’s actions have caused an unusual amount of:  physical inconvenience  time taken to resolve the situation  interference with the complainant’s expectation of enjoyment or peace of mind. Insurer has unreasonably caused stress and inconvenience The complainant says that his claims experience has been harrowing, characterised by unreasonable delays and a lack of interest on the part of the insurer to reach a fair resolution. The issues the subject of the claim have been on foot for over two years. Even accepting that some of the delay was outside the insurer’s control, that is too long, particularl y taking into account the fact that the complainant has had to continue to live in a damaged home. The panel also considers that the insurer’s continuing cash settlement offer based on increasingly old quotes and without consideration of a contingencies uplift or potential TA costs entitlement has not been reasonable. Determination | Case number: 806127 Page 11 of 12 The panel accepts that these matters have caused the complainant stress and inconvenience. In all the circumstances, it is reasonable that the insurer pays him $1,000 in non-financial loss compensation. 2.4 Why is the outcome fair? The insurer’s assessment of the extent of cover (notably, for the roof and guttering) has been inadequate. It is fair that the insurer undertakes further investigations then cash settles the damage caused by the hail storm, plus a contingencies uplift. It is also fair in the circumstances that it pays $1,000 in non- financial loss compensation. Determination | Case number: 806127 Page 12 of 12 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.