Storm damage claim settlement, contents cap, temporary accommodation and non-financial loss
Text of the determination
Determination
Case number 805271
Financial firm AAI Limited
Determination | Case number: 805271 Page 1 of 13
Case number: 805271 19 May 2022
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents policy (policy) with the financial firm
(insurer) for her home which she purchased in October 2016. On 27 July 2020, the
complainant ’s property sustained storm damage for which a claim was lodged under the
policy.
The insurer has accepted a valid claim exists under the policy. However, it is seeking to limit
its liability under the claim to only such damage which it has assessed to be caused by the
storm event.
The complainant remains dissatisfied with the insurer’s ass essment of its liability, its overall
management of the claim and final claim settlement offer. The complainant is seeking a
higher claim settlement for the building and contents damage, food allowance, temporary
accommodation costs and compensation from the insurer.
1.2 Issues and key findings
Is the insurer’s claim settlement offer for building repairs fair and reasonable?
Yes. The insurer ’s assessment of the damage to the building because of the storm event is
reasonable. However, it is fair in the circumstances that the insurer includes a 20% ($564)
contingency payment with respect to the $2,815.36, being the cost required to repair damage
caused by its appointed consultants ‘S’.
Is the insurer’s claim settlement offer for contents fair and reasonable?
Yes. The insurer’s assessment of its liability and payment of the maximum entitlement (sum
insured) for contents cover under the policy is fair in the circumstances. However, the insurer
is to also pay the complainant for expenses relating to the moving and storage of contents
whilst the insured building is being repaired in line with this determination.
Is the complainant entitled to cover for temporary accommodation?
Yes. The policy includes the benefit of cover for temporary accommodation whilst the insured
property cannot be lived in due to damage caused by an insured event. This extends to the
time it takes to repair the property to a habitable condition.
Subject to the being provided with reasonable supporting information, the insurer is to cover
the complainant for the reasonable cost of eight weeks of temporary accommodation (if
required) in line with this determination.
Is the complainant entitled to compensation?
The complainant is entitled to a further payment of $3,500 in non-financial loss compensation,
in addition to the $750 already paid by the insurer, in line with the AFCA Rules.
Determination | Case number: 805271 Page 2 of 13
1.3 Determination
This Determination is favour of the complainant.
The insurer is to:
pay the complainant a further $564, being a 20% contingency increase on the $2,815.36
payment for additional damage caused by S
cover the complainant for expenses relating to the moving and storage of contents whilst
the insured building is being repaired in line with this determination.
subject to being provided with supporting information, cover the complainant for up to 8
weeks temporary accommodation (if required) whilst the insured building is repaired
pay the complainant $3,500 in non-financial loss compensation within 14 days of her
acceptance of this determination
if not already done so, issue a payment of $1,320 for food allowance (as already agreed
between the parties).
Determination | Case number: 805271 Page 3 of 13
2 Reasons for determination
2.1 Is the insurer’s claim settlement offer for building repairs
fair and reasonable?
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more the
listed insured events, including ‘ Storm ’. Cover under these benefits is subject to the
conditions, limitations and exclusions specified in the product disclosure statement (PDS).
The insurer provided the complainant with the relevant policy documentation including the
PDS and certificate of insurance (COI). Therefore, the panel accepts the insurer is entitled to
rely on the policy provisions to assess its liability under the claim.
The complainant has established a valid claim
There is no dispute a valid claim exists under the policy for storm damage to the insured
property as well as additional policy benefits. The complaint relates to the difference in
opinions of the parties regarding the insurer’s assessment of its liability under the claim.
Conflicting opinions’, scopes of work and cost of repairs from the consultants
On the available information, the panel is satisfied the parties do not dispute the insured
building suffered water ingress damage in various locations on 27 July 2020 because of the
significant storm event. The panel accepts damage caused by storm water ingress is covered
under the policy.
On lodgement of the claim the insurer appointed consultants ‘RC’ to attend the insured
property and assess the cause and extent of the storm damage. Consultants S were also
appointed to complete restoration works and dry out the property.
The panel notes S in completing its works removed water damaged carpets and underlays
and put in place arrangements to dry the property. In completing its works S caused some
additional damage to the insured property which the insurer accepts and has paid the
complainant $2,815.36 to repair this damage.
RC has provided reports dated 30 July 2020 and 28 March 2021, in addition to the scope of
works and quote for repairs. RC confirms the presence of storm damage to the insured
building throughout the property, mainly to carpets, walls and ceilings caused by wind driven
rainwater ingress.
There was no storm damage noted to the roof, however, several issues relating to wear and
tear as well as maintenance were identified to the roof area. There is no evidence of water
ingress into the dwelling from the roof with the water entering through aluminium windows,
sliding doors and the rangehood flue for the most part.
RC has provided a scope of works to repair the storm related damage which does not
included the wear, tear and maintenance related damage. It has estimated the cost of repairs
from the storm damage to be $41,052.85. The insurer has accepted this and further
increased the quoted building repairs to $49,263.42 to allow for a 20% contingency
contribution.
Determination | Case number: 805271 Page 4 of 13
The complainant was dissatisfied with the insurer’s position and appointed her own preferred
building consultants ‘FN’, which completed an assessment of the insured building and
provided a repair quote dated 16 December 2020 in the amount of $151,085.00. The insurer
noted this included maintenance works and damage not related to the storm and notes the
quote was not itemised.
The insured requested FN to review and re-submit its quote for consideration with all
requested information, after which FN submitted a quote and scope of works for around
$105,000.00. This was deemed excessive and again included works to repair damage
assessed to be unrelated to the storm event.
The insurer requested FN to provide a repair quote based on the accepted scope of works
from RC, which FN did not and distanced itself from the claim.
The complainant arranged for building consultants ‘FM’ to provide a quote for repairs for the
damage to the insured building. FM submitted a scope of works and associated quote dated
21 September 2021, in the amount of $101,668.40. FM confirms the complainant will need to
vacate the property whilst repairs are completed (approximately five to six months).
The insurer subsequently appointed engineering consultants ‘CR’ to investigate the cause
and extent of damage to the insured building. CR has provided two reports dated 20 January
2021 and 10 June 2021. In these reports CR confirms widespread water ingress damage.
However, CR also notes the insured building presented with pre-existing damage not caused
by the storm and which relates to wear, tear and maintenance related issues.
The information from consultants RC and CR is more compelling
The pan el acknowledges the complainant’s view that the insurer’s assessmen t of its liability
for the claimed damage is incomplete, misleading and that its management of the claim has
resulted in further loss or damage to the insured property.
The panel will consider and address the complainant’s concerns regarding the insurer’s
management of the claim later in this determination.
With respect to the complainant’s concerns regarding the insurer’s assessment of the storm
damage to the insured building and associated scope of works, the panel does not accept this
has been shown to be incomplete or unfair in the circumstances.
Having reviewed the information from S, RC and CR, the panel finds this information to be
more compelling and supported by the extent and nature of the damage to the insured
building. The panel accepts there is an absence of any evidence of storm damage to the roof
or of storm created openings which have allowed the water ingress and associated damage.
The water ingress into the building has been shown to be the result of the below contributing
factors, with the evidence indicating in several areas this had been an ongoing and pre-
existing issue:
wind driven rain through the aluminium windows and doors
failure of roof plumbing, (high-fronted gutter) allowing overflow back into the roof or
building structure
site drainage issues.
The panel accepts the complainant’s position that the insured building was constructed in line
with and meets the relevant building standards and codes in place at the time of its
construction. Further, that the insurer or its appointed consultants have not established, on
balance, there exists building defects or a failure to meet building requirements.
Determination | Case number: 805271 Page 5 of 13
The panel accepts there are, as suggested by the consultants, measures that can be taken to
minimise and/or prevent future water ingress into the insured building. However, these are
simply recommendations of preventative measures and not identification or establishment of
building defects for the purpose of the policy.
The panel is satisfied the available information shows there exist pre-existing issues with the
building which have been allowing water ingress into the insured building for some time as
well as associated pre-existing damage (not caused by the storm giving rise to the claim).
The panel accepts the scope of works and associated repair quotes from FN and FM include
repairs not covered under the policy, maintenance works and are excessive.
The policy does not provide any cover for pre-existing damage. As a result, the panel is
satisfied the insurer is not required to accept the complainant’s proposed scope of works
which includes pre-existing damage and maintenance related works as identified by RC and
CR.
The panel notes the additional information provided by FM in support of its position that the
particleboard flooring requires complete replacement and cannot be repaired due to the
damage. However, the panel is not convinced the available information establishes the
particleboard flooring at the insured property requires complete replacement. Rather, the
panel accepts this damage can be repaired with screw fixings to the floorboards in the areas
required.
The panel notes the information from the parties relating to some cracking noted to plaster
walls/lining and in the area of the timber staircase as well. The panel is not satisfied this has
been shown to be related to or caused by the storm event or make safe works completed to
the roof. Rather, these cracks are consistent with the expected movement over time.
The panel accepts the complainant’s concern that the in surer should be obliged to cover the
cost to remove the make safe works completed including damage to the timber fascia caused
by connecting the tarps to this area. The panel notes the insurer has late in the complainant
accepted this and offered to pay $1,500 towards these works. Without information to the
contrary, the panel accepts the insurer’s offer to be fair in the circumstances.
Having considered all the information, the panel is of the view the opinions from RC and CR
are the more compelling and supported by the available information including photographs.
Accordingly, the panel accepts the insurer has shown, on balance, it is not obliged to cover all
the damage claimed and its assessment of its liability for the building damage is fair in the
circumstances.
Insurer is entitled to cash settle the complainant under the claim
The complainant says the insurer’s assessment of its liability is unreasonable and it is her
preference that the insurer authorise and arrange the repairs. Alternatively, if the insurer is
not prepared to authorise and manage the repairs, it should be required to pay for the all the
repairs (quoted by her preferred builder).
The insurer has elected to cash settle the complainant in line with its entitlements under the
policy. The insurer says, given it cannot warrant the repairs because of the pre-existing
issues/damage to the insured building, it is unable to authorise repairs under the claim.
The panel is satisfied, given the pre-existing damage and issues noted by the consultants,
that it is reasonable for the insurer to exercise its entitlement to settle the claim by way of a
cash settlement. Further, that in settling the claim, the insurer’s obligations are limited to
covering the damage it has assessed to be consistent with the storm event giving rise to
Determination | Case number: 805271 Page 6 of 13
claim, additional damage caused by S and the cost to remove/repair the make safe works
authorised under the claim.
The insurer is not required to increase its payment for the electrical goods
It is not in dispute, the storm event damaged 12 downlights, the dishwasher, the oven, the
cooktop and the rangehood. On the available material, the panel is satisfied the insurer
issued the following payments for replacement of the goods:
$780 + 20% contingency cost for the downlights
$798 + 20% contingency cost for the oven
$865 + 20% contingency cost for the cooktop
$360 + 20% contingency cost for the rangehood
$2,689 for the dishwasher.
The complainant indicated the payments for the cook top and the oven are insufficient. In
support, the complainant provided a Harvey Norman quote for the oven and the cooktop.
The panel does not consider the insurer is required to increase its payment for the oven
and/or the cooktop. This is because the Harvey Norman quote for the oven is lower than the
payment issued by the insurer, while the cooktop quote is for a brand (Electrolux) that is
different to the one damaged during the storm (Belling).
The panel is satisfied the insurer issued a payment based on a cost required to replace a
Belling cooktop. Furthermore, this is also consistent with the brand listed on the repair quote
commissioned by the complainant ’s preferred repairer.
The panel has considered th e complainant’s concerns regarding the dishwasher and is
satisfied the insurer has in fact made an overpayment for the dishwasher. This is because it
made two separate payments. Please refer to section 3.3 of this Determination for further
details. The panel does not consider it fair and reasonable that the insurer should be required
to increase its payment for the dishwasher.
Insurer is to increase cash settlement for damage caused by S
There is no dispute S caused some damage at the insured property whilst completing make
safe works and drying out the property. The insurer has assessed the cost to repair this
damage as $2,815.36 pursuant to a scope of works and quote issued by RC on 29 October
2020.
There is insufficient material (if any) to show S caused more damage than that accepted by
the insurer or that the damage cannot be repaired for the cost assessed by RC. Just because
the complainant has sourced a higher quote for repairs does not establish RC ’ s scope of
works and associated quote is insufficient.
In saying that and considering what is fair in the circumstances, the panel determines the
insurer is to increase this settlement amount by a 20% contingency cost i.e. increase the
settlement by a further $564.
2.2 Is the insurer’s claim settlement offer for contents fair and
reasonable?
Maximum entitlement for contents cover under the policy is $69,500
A review of the applicable policy shows the complainant holds cover for damage to insured
contents, up to the limit of $69,500.
Determination | Case number: 805271 Page 7 of 13
On the available material, following the complainant’s claim lodgement, the insurer authorised
an assessment and make safe of the property. This involved a drying out period using 12
blowers and a humidifier installed at the property by S until 19 August 2020.
Further, the complainant stored many of her contents items inside the garage and at her
parents’ property (the stored content s items). The stored contents items were assessed by
the insurer around March 2021, when it was determined some were stored damp which
resulted in further damage with most items not salvageable. This resulted in overall contents
damage to exceed the policy limit of $69,500.
The complainant does not dispute she placed the stored contents items in storage following
the storm. The complainant says the insurer should cover damage to the stored contents
items because:
the insurer was aware of the stored contents items
had she and her friends not moved the stored contents items (which included downstairs
furniture) upon attendance on 29 July 2020, S would have had to do it to remove the
carpet
the insurer instructed S to inspect the carpet only, at no time was S instructed to inspect
the contents.
Insurer is not required to increase its cash settlement for the contents
The insurer says it is unable to increase cover for the damage to the stored contents items
because the policy is limited to $69,500 cover. The insurer says it has met its maximum
obligation under the policy.
On the available material, the panel is satisfied the insurer made a total payment of
$74,150.91 for damaged contents. The overpayment represents the incorrect inclusion of
vinyl and vehicle damage, which should have been included under the building policy cover.
The Panel is not persuaded it would be fair in the circumstances to require the insurer to pay
more than the policy sum insured for the complainant’s contents loss. The panel
acknowledges the complainant’s view that she has suffered over $32,000 in contents loss
due to the insurer’s delay in assessing the damaged contents stored in the garage.
The available information shows the insurer did approach the complainant seeking to arrange
an assessment of the contents in the garage on or around 6 August 2020. However, the
complainant declined at the time and no concerns were raised by her about the contents until
around November 2020.
Further, there is an absence of any information which supports the contents suffered
additional damage whilst stored in the garage or because of a delayed assessment. It is
equally possible that the contents items were saturated and damaged whilst inside the
insured dwelling because of the stormwater ingress.
The p anel considers the insurer’s c laim settlement relating to the contents fair and reasonable
and that it has met its maximum liability for contents cover under the policy.
Insurer is not required to cover the damaged fridge
The complainant claims the insurer is liable for damage to her fridge and should therefore be
covered under the claim. She says S’s drying equipment caused the power to continuously
trip which has damaged the fridge and that the insurer delayed assessment of the fridge until
March 2021.
Determination | Case number: 805271 Page 8 of 13
The panel is not satisfied the available information supports the complainant’s position
regarding the damaged fridge. Rather, the only information relating to an assessment of the
fridge has been provided by consultants ‘A’, which found the damage resulted from a blocked
pipe i.e. a wear and tear issue. The policy does not respond to such loss and therefore, the
panel accepts the insurer is entitled to decline cover for the fridge under the claim.
2.3 Is the complainant covered for temporary accommodation?
Policy includes temporary accommodation benefit subject to limitations
The policy provides cover for temporary accommodation for a maximum of 52 weeks, up to
10% of the home sum insured. That applies when an insured event damages the home to the
extent the insured cannot live there and is intended to cover reasonable temporary
accommodation costs for the time it will take to repair or rebuild the home to a liveable
condition.
Complainant is entitled to some temporary accommodation cover
The complainant is of the opinion the insurer is obliged to cover her for approximately five to
six months of temporary accommodation in line with advice from her preferred consultant FM.
This is based on FM’s expected timeframe it will take to complete the repairs to the insured
building provided in its quote.
A review of the information from the insurer’s consultants does not clearly inform as to
whether temporary accommodation would be necessary whilst repairs are being completed.
RC does however provide a view that the repair should be able to be completed in a six to
eight weeks period.
Given RC is not the consultant who is to complete the repairs nor is the insurer authorising
the repairs, the panel is of the opinion it is fair in the c ircumstances to accept FM’s opinion
that the complainant will require temporary accommodation whilst it completes the repairs.
However, in line with matters considered above, the panel is of the opinion FM’s proposed
scope of works include damage not covered under the policy. The panel accepts although
temporary accommodation will be needed, FM’s estimated repairs time of five to six months is
excessive.
Therefore, subject to the complainant providing information showing she has incurred
reasonable temporary accommodation expenses over the period of repairs, the insurer is to
cover her for up to 8 weeks of accommodation expenses.
On the available material, the panel understands the insurer provided temporary
accommodation to the complainant from 31 July 2020 to 20 August 2020. Following this
period, the insurer was made aware the complainant’s cooking appliances were faulty due to
the storm event. As a result, the insurer issued the following payments to the complainant:
$3,060.00 on 19 January 2021 for take away food (food allowance) calculated at $20 per
day from 20 August 2020 to 19 January 2021
$506.00 on 8 April 2021 for a portable cooking appliance from the Good Guys.
In addition to the above, the insurer has agreed to issue a further payment of $1,030.00 for
food allowance calculated at $20 per day from 20 January 2021 to 24 March 2021. The panel
accepts this as being reasonable in the circumstances.
There is also no information showing the complainant has incurred any additional costs
relating to temporary accommodation at this stage.
Determination | Case number: 805271 Page 9 of 13
2.4 Is the insurer liable for compensation?
Compensation for indirect financial loss and non-financial loss may be paid
The complainant says the insurer’s claim processing caused her an enormous emotional
distress and inconvenience. Amongst other things, the complainant says the insurer:
repeatedly provided incomplete scope of works which caused unreasonable delays to the
claim process
failed to act in good faith when handling the claim. She says the insurer was aware she
experienced vulnerability during the claim, despite this, the insurer’s actions and delays
compounded the stress and made her more vulnerable
claim processing delays resulted in reduction of her Centrelink payments.
Under its Rules, AFCA can award compensation (capped at $5,400) where the insurer’s
handling of a claim causes the complainant indirect financial loss. That would include a
financial loss (outside the normal insured loss) due to the insurer’s claims handling, and
reasonably foreseeable if the insurer fails to handle the claim appropriately.
AFCA can also award the complainant compensation for non-financial loss (capped at
$5,400) under its Rules. This is usually considered where the insurer:
takes an unusual amount of time to resolve the comp lainant’s situation
causes her to experience unusual physical inconvenience
unusually interferes with her expectation of enjoyment or peace of mind.
No dispute makes safe caused further damage and claim experience was poor
There is no dispute restorer S’ services, engaged and authorised by the insurer, resulted in
further damage to the insured property. The panel accepts this inevitably caused some claim
processing delays and the complainant understandably felt she needed to be heavily involved
in the claim process. The insurer has accepted to pay the complainant for the cost to repair
the additional damage caused by S.
The complainant has described the impact this has had on her life. Her submissions convey
her exasperation, stress and distress in having had to manage the claim for almost two years.
She says this is compounded by the financial hardship brought about as her Centrelink
payments were reduced.
The complainant’s submissions in support of the claim for non -financial loss are extensive.
The insurer recognised there were some issues with the claim and have issued a payment of
$750 as a way of compensation.
The panel does not consider the insurer is required to compensate the complainant for the
loss of Centrelink payments. This is because, on the available material, the Centrelink
payments were made to assist in her care for the complainant’s father and are not covered
under the policy.
The insurer to pay the complainant non-financial loss compensation
The panel considers the insurer’s po or claim processing caused the complainant severe
stress and inconvenience which warrants compensation.
This is because:
the temporary accommodation period was continually extended at two-day intervals
the insurer’s final scope of works w as not issued until May 2021
the complainant was required to be heavily involved in the claim processing
Determination | Case number: 805271 Page 10 of 13
the insurer issued a payment for portable cooking appliances at a Good Guys store that is
over a 100km away from the complainant
the complainant was experiencing severe stress and inconvenience during the lengthy
processing of her claim
additional damage was done to the insured property by the insurer’s appointed
consultants.
The panel is satisfied the insurer’s poor management of the assessing process as well as
unusual delays experienced under the claim will have caused stress, anxiety, physical
inconvenience and unreasonable delays under the claim.
The panel notes the insurer in accepting its failures under the claim has paid the complainant
$750 in non-financial loss compensation. The panel is not satisfied this is a fair outcome and
determines the insurer is to arrange payment of a further $3,500 (in addition to the $750) to
the complainant within 14 days of her accepting this determination.
Determination | Case number: 805271 Page 11 of 13
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer advocacy
a member with extensive experience as an industry representative.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 AFCA Rules
D.3.3 An AFCA Decision Maker may decide that the Financial Firm is to compensate
the Complainant for non-financial loss:
Determination | Case number: 805271 Page 12 of 13
a) for a complaint relating to an individual’s privacy rights - injury has occurred to
the Complainant’s feelings or humiliation has been suffered by the Complainant;
or
b) for other complaints – an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with the Complainant’s
expectation of enjoyment or peace of mind has occurred.
3.3 Claim related payment details
Date Other Items $
17 August 2020 Food spoilage (part of make safe) 400
12 November 2020 Electricity bill
Restorer’s S damage (repair cost)
691.60
2,815.36
2 December 2020 Indoor plants damaged by blowers (replacement) 2,074.81
22 December 2020 Roof mak e safe by complainant’s preferred ex pert 1 ,500
19 January 2021 Food allowance @ $140 pw (as cooking applianc es were
damaged)
Car damaged by restorer S (error)
3,060
550
8 April 2021 Cooking facilities (portable kitchen – Good Guys) 506
22 April 2021 Compens ation 750
Building Items
12 November 2020 Dishwasher replacement (supply)
Dishwasher (removal and install)
1,200
500
24 February 2021 Dishwasher replacement 989
11 August 202 1 Building repairs (incl. 20% contingency cost) 49,263.42
Content item s
2 December 2020 B linds 191.95
15 December 2020 Mattress replacement x 3
O utdoor cushions x 2
Mirror repairs (re - silvering)
Dining char x 3 (repairs)
Leather tub chair (repair)
3,553
2,018.80
380
420
180
16 December 2020 Bed side table x 2 (repairs)
Chest of drawers (repairs)
Outdoor stools
240
180
2,990
Determination | Case number: 805271 Page 13 of 13
Outdoor setting 12,895
22 December 2020 Damaged cushions x 4 (replacement) 100
8 April 2021 Cont ents incl. carpet and vinyl replacement 35,891.36
14 June 2021 Remaining contents sum insured 7,139.80
1 September 2021 Payment for car damage (initially made under contents)
Payment for vinyl that was initially paid under cont ents,
when it should have been building
550
7,421
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.