Cash settlement amount for water/subsidence damage from cracked downpipe

FirmIAG
Decided2022-05-16
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed further external and internal damage from a cracked downpipe leak beyond the insurer's cash settlement. AFCA found the insurer's settlement fair and the policy did not respond to the external damage, so the determination is in favour of the insurer.

The policy's subsidence cover requires loss to occur within 72 hours of a listed event such as liquid escaping from a pipe, and the complainant did not establish this, while the exclusion for settling or earth movement applied.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All IAG determinations · Find similar determinations

Text of the determination

Amended Determination Case number 805084 Financial firm Insurance Australia Limited Amended Determination | Case number: 805084 Page 1 of 9 Case number: 805084 23 May 2022 1 Determination overview 1.1 Complaint The complainant holds a listed events home and contents insurance policy with the financial firm (insurer). The complainant initially lodged a claim with the insurer for damage caused by construction works at a neighbouring property. The claim was subject to a previous AFCA complaint (748053) and a determination was issued, which found partially in favour of the complainant. The AFCA determination noted the following: Accordingly, I determine the insurer is required to cover the complainant for the water damage caused to the insured building and contents under the claim. In the interest of clarity, the insurer is not required to cover the initial building (movement) damage in the shower, as this is not the result of an insured event. Its liability is limited to any resultant water damage caused by the escape of liquid only. The insurer offered a cash settlement, consistent with its quote from OSB, for the resultant water damage. The complainant disagreed with this amount saying he has previously assumed the damage was from the neighbouring property. He says he was incorrect and says the report from PD (the plumber) explained the ensuite is now unusable due to the cracked downpipe it found. He says the whole corner of the house is out of alignment due to the escape of liquid event. This dispute is around whether the insurer is obligated to increase its cash settlement based on the newly discovered leak in the cracked downpipe. The complainant is looking to have the entire bathroom replaced, warranty on the works and the cracks to the concrete footpath to be repaired, which he says is all from the escape of liquid event. The insurer disagrees and says its cash settlement was fair in the circumstances. It says the damage to the concrete path was caused by „settling‟ and „any earth movement‟, which are both policy exclusions. 1.2 Issues and key findings Has the insurer correctly cash settled the complainant? Yes. Although the complainant says there is now additional damage which the insurer did not account for, the complainant has not established why the insurer is obligated to cover all the damage he is claiming for. Amended Determination | Case number: 805084 Page 2 of 9 Is the complainant entitled to compensation? No. The complainant elected to dispute the insurer‟s quote after the previous AFCA determination. This does not entitle him to compensation in accordance with the AFCA approach. Why is the outcome fair? This outcome is fair because, although there is no dispute there was a cracked downpipe, the information does not support that the external damage to the property was caused by an event coverable by the policy. The submissions also do not support why there should be an increase in the cash settlement. 1.3 Determination This determination is in favour of the insurer. If it has not already done so, the insurer should cash settle the complainant its quote of $6,136.63 plus an uplift of 20% to cover any repair contingencies (less the applicable excess). No further action is required. Amended Determination | Case number: 805084 Page 3 of 9 2 Reasons for determination 2.1 Has the insurer correctly cash settled the complainant? Yes. Although the complainant says there is now additional damage which the insurer did not account for, the complainant has not established why the insurer is obligated to cover all the damage he is claiming for. Complainant says reports confirm the actual leak and additional damage On 23 August 2021, the complainant sent through to AFCA, information from PD. A summary of the relevant expert findings is in section 3.2 of this determination. The complainant was relying on comments made by PD, which stated the cracked elbow was the cause of the damage. The complainant says this is enough to confirm why the insurer should increase its cash settlement. He also says water could only run down the outside of the pipe into the ground near the footing and settle along the concrete join next to the house. On 3 October 2021, the complainant says a building inspection was carried out by RG (building consultant). RG found brickwork mortar cracking, typical of significant subsidence. Although the complainant is requesting AFCA to review the images taken by RG and images after the cracked downpipe was repaired, RG‟s view was that the damage was caused by the civil works as his images are based on this being the cause of damage. The concern in using the RG report is the cause of the cracking was linked solely to the civil works. This was ruled out as the cause of the current damage and supported by the fact RG makes no mention of a cracked downpipe. As both parties have ruled civil works out as the cause of damage, the RG report and its images add little value to this complaint. In emails to AFCA, the complainant says since the cracked downpipe has been repaired, the movement to the building has stopped. He says this is supported by the images he submitted showing the property gradually returning to its original state. I acknowledge the complainant‟s position regarding the cracked downpipe. However, AFCA must consider whether the policy responds to the additional damage the complainant is now claiming for and whether the insurer should increase its cash settlement. Insurer says the crack was not large enough to cause the movement The parties agreed to another engineer (MC) attending the complainant‟s property because there was a disagreement around what the cause of damage was. The insurer initially engaged the services of CE (the first engineer) to provide its view on the cause of damage. MC agreed with CE that the damage was caused by a combination of seasonal ground movement and the quantity of water leaking from the downpipe could not cause the level of movement the complainant is now seeking coverage for. MC also stated the cracks to the concrete path are due to normal movements and wear and tear. The complainant disagreed with MC, stating the following:  the insurer cannot prove the cracked downpipe did not cause any of the damage Amended Determination | Case number: 805084 Page 4 of 9  with the water having nowhere to go, it went alongside the house and caused reactive ground movement  the footing movement has caused damage to the ensuite, brickwork mortar, pathway concrete movement and gate movement. In his emails of 1 October 2021, the complainant says it was proven the water leak existed, and any water leak overtime will cause reactive ground movement, which has travelled along the side of his house. This has caused the footing to move and caused all other damage. Based on the comments made by MC, however, the insurer says the policy does not respond to the complainant‟s claim. C omplainant’s policy does not respond to the loss being claimed The complainant sought a view from his own engineer (EBIS). There appears to be no dispute the cracked downpipe has leaked, this is supported by EBIS who says the leak has caused „upward movement of the house‟ and the shower screen and failure of the waterproofing would be attributed to this upward movement. EBIS notes there are high levels of moisture in the clay. EBIS provides no comment on whether the issues listed by MC are implausible. EBIS says the water coming from the cracked downpipe would allow “water to spill out and increase moisture in the clays” and that t he cause of the damage to the home was due to swelling of the foundation soils. MC and EBIS both confirmed the damage was caused by earth movement as there is increased moisture in the soil. This, however, does not mean the policy responds to the complainant‟s claim. Nor does it support the complainant‟s position as to why the cash settlement should be increased. The complainant‟s policy covers a range of listed events including subsidence if it occurs within 72 hours of; an earthquake or explosion; a storm or flood, including rainwater or wind; or liquid escaping from a fixed pipe, or an object attached to a pipe, fixed gutter, fixed tank or drain. There is no dispute the property sustained damage because of movement, which has resulted in damage including cracking in walls, bricks, the concrete path and a cracked shower base. For the policy to respond the complainant needs to establish the damage sustained, occurred within 72 hours of one of the circumstances outlined in the policy. Consistent with the previous AFCA determination, the insurer agreed to cover the relevant internal damage. The complainant wanted external damage included in this quote. The complainant says the water leaking from the cracked downpipe has saturated the subsoil, and the water travelled under the concrete. However, the damage to the property was caused over time and the complainant has not established this occurred within 72 hours of the liquid leaking (in accordance with the policy terms). I acknowledge it may be difficult now for EBIS to provide an accurate timeframe for when the damage occurred. However, it is up to the complainant to be able to establish the external damage and the cash settlement increase he is expecting falls within the specific terms of the policy. The complainant has not shown the proximate cause of the damage was the leak, as identified by the various experts. Rather, it appears a competing number of issues have caused damage to the property. Amended Determination | Case number: 805084 Page 5 of 9 Based on the submissions provided, I am not satisfied the complainant has met his onus to establish the cause of the damage was the leaking pipe, as required by the policy. The insurer has already provided a settlement amount for the relevant internal damage and I consider this a fair settlement. Insurer’s cash settlement is fair the circumstances As noted above , I consider the insurer‟s cash settlement fair in the circumstances. The complainant submitted his own quote, which I consider unreasonable as the insurer is not liable for the external damage he says is caused by the same event. The insurer should finalise payment, as stated in section 1.3 of this determination, to the complainant within 14 business days of the complainant accepting this determination. 2.2 Is the complainant entitled to compensation? No. The complainant elected to dispute the quote after the previous AFCA determination. This does not entitle him to compensation in accordance with the AFCA approach. AFCA may award compensation for non-financial loss Under AFCA‟s Rules, we can award up to $5,400 compensation for n on-financial loss. We will only award this type of compensation if a complainant suffers an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the complainant‟s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation for non-financial loss. Non-financial loss compensation is not warranted The complainant initially requested AFCA consider compensation for “extended delay and lengthy timeframe”. On 15 August 2021, he advised AFCA of his hourly rates and would like the insurer to compensate him for causing him stress and inconvenience due to this complaint. On 16 August 2021, the AFCA case worker advised the complainant AFCA does not award compensation for the ordinary inconvenience that comes with making a claim and pursuing a complaint against a financial firm. The complainant was requested to clarify how the insurer has delayed the claim and the steps he took to mitigate these delays. No new information was submitted substantiating the claim for compensation. Based on the AFCA approach to compensation, I do not consider this is warranted in the circumstances. 2.3 Why is the outcome fair? This outcome is fair because, although there is no dispute there was a cracked downpipe, the information does not support that the external damage to the property was caused by an event coverable by the policy. The submissions also do not support why there should be an increase in the cash settlement. Amended Determination | Case number: 805084 Page 6 of 9 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Amended Determination | Case number: 805084 Page 7 of 9 3.2 Relevant policy wording Pages 9 - 12 Listed events cover If you have chosen Listed Events Home Insurance, we will cover your buildings or contents for loss or damage as a result of the incidents listed on pages 9-14. [ … ] Any cover we provide is subject to exclusions. For exclusions to this cover , see page 32. [ … ] Landslide or subsidence Under Listed Events, we will cover your buildings or contents for loss or damage as a result of a landslide or subsidence. We will only do this if the loss or damage occurs within 72 hours of:  An earthquake or explosion  A storm or flood, including rainwater or wind, or  Liquid escaping from a fixed pipe, or an object attached to a pipe, fixed gutter, fixed tank or a drain. [ … ] Page 32 Exclusions to Your Cover Any cover we provide is subject to the following exclusions. Listed Events, Accidental Damage, additional cover and Strata Title Mortgagee Protection exclusions We will not cover any loss or damage as a result of, or caused by:  settling, shrinkage, or any movement of earth Amended Determination | Case number: 805084 Page 8 of 9 3.3 Relevant expert reports Record Key points Financial firm’s expert ( PD ) Report 23 - 03 - 2021  Inspected 90mm downpipes front R hand corner – fail. Crack found at bottom of elbow.  Used infra - red camera to inspect internal damaged areas. Found ensuite bathroom shower failed.  Shower waterproofing is leaking allowing water to penetrate wall and bathroom carpet.  Shower breeching piece was tested and passed. Financial firm’s expert ( MC ) Report 22 - 09 - 2021  it agrees with the previous engineers‟ conclusion that the cause of damage was a combination of seas onal ground movement, the effect of vegetation adjacent to the property and poor building practices  it also agreed the crack in the downpipe was too small to allow significant escape of water and unlikely to result in reactive ground movement  the leak in the downpipe is insignific ant and would not be capable of causing movement in the pathway because of reactive ground movement  pathway s such as the one the complainant has is constructed with reinforced concrete not capable of withstanding minor normal movements; there was no damage to the pathway, only normal separations between sections of the pat h and the residence and in between isol ated sections of the pat h  the cause of damage is reactive ground movement and cracking to the brickwork is cosmetic and may be repaired following repairs to the waterproofing membrane  the cracked elbow pipe was located several metres away from the residenc e and the small amount of water which did escape would not be able to track under the residence . Complainant’s expert ( EBIS) Report 28 - 01 - 2022  Water leak as caused the damage to the residence by introducing abnormal moisture conditions to the clay foundat ion .  The 11 - month delay in repairs has resulted in the movement wors ening.  The plac ement of a path would normally reduce or stabilise the increase or decreas e of soil moisture , however, here the leak has circumvented the protection afforded by the path.  Th e gaps have closed during dryer weather indicating the moisture is causing the clay to shrink and swell.  Gates at the front of the house cannot be shut properly.  An opening in the pat hway revealed high moisture levels in the clay at depth which would be causing the localised upward heave of the footings.  Clays were found to be moderat ely reactive as reflected in the M classification.  The plumbing report identified a break in the pipework adjacent Amended Determination | Case number: 805084 Page 9 of 9 Record Key points to the shower. Also, a broken pipe at the front corner of t he house (now repaired) would allow wat er to spill out and increase moisture in the clays.  The separation of the shower screen and failure of the waterproofing would be expected by the upward movement at the end of the house.  Damage to waterproofing has be en caused by upward movement of the footing at the end of the house. This is likely to have occurred as the extension was constructed.  Soils at the end of the house wet up, causing the clay foundation to swell and move the footing upwards.  Poor drainage conditions and a broken shower pipe, downpipe and stormwater pipe have fed the high moisture causing the clays to swell. This has caused upward movement of the footings, resulting in the cracking of the finishes and failure of the waterproofing in the show er.