Text of the determination
Determination
Case number 804691
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 804691 Page 1 of 11
Case number: 804691 14 December 2021
1 Determination overview
1.1 Complaint
The insured includes the complainant and two others. For the sake of brevity and
convenience, in this determination all references to the complainant include references to the
other insureds.
The complainant holds a home and contents policy with the financial firm (the insurer). In
September 2020, he lodged a claim for damage to the jetty at the insured site which he says
was damaged in a storm in July 2020. He later claimed the jetty was damaged in a flood
event in November 2016.
Relying on its expert opinion, the insurer said the claimed damage was not caused by storm
or by flood and in the circumstances, it was entitled to decline the claim.
The complainant is dissatisfied with the insurer’s decision and requires his claim is pa id. He
also says section 46 of the Insurance Contracts Act (the Act) provides a remedy.
The case manager provided the parties with a preliminary assessment on the issues in
dispute. The preliminary assessment was in favour of the insurer.
As the complainant did not accept the preliminary assessment, the complaint has been
referred to me for determination .
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
The available information does not establish on the balance of probabilities the claimed
damage was caused by storm or by flood. As the complainant has not established a valid
claim, the insurer is entitled to decline the claim.
Consideration of section 46 of the Act and policy exclusions are redundant as the
complainant has not established a valid claim.
Why is the outcome fair?
The insurer is entitled to rely on its expert evidence and the policy terms. In circumstances
where the available material does not establish a valid claim under the terms of the policy, it
would not be fair to require the insurer to pay the claim.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action in relation to the claim or the complaint.
Determination | Case number: 804691 Page 2 of 11
2 Reasons for determination
I have decided this complaint based on what is fair in all the circumstances, having regard to
legal principles, applicable industry codes or guidance, good industry practice and previous
relevant determinations of AFCA or predecessor schemes (which are not binding). I have
considered all the material submitted by the parties, both before and after the preliminary
assessment. I am satisfied that the documentation I have relied on has been provided to both
parties.
The parties have raised numerous issues in their submissions to AFCA. However,
commentary in this determination is restricted to those issues considered relevant to the
outcome.
No new material provided after preliminary assessment
After the preliminary assessment was rejected, the complainant made a further submission.
Where relevant it will be referred to in the determination. No new material was provided.
2.1 Is the insurer entitled to decline the claim?
Complainant has not established claimed damage caused by storm
The complainant must establish on the balance of probabilities he has suffered a loss caused
by an event to which the policy responds. This is known as a prima facie or valid claim.
In the context of this claim he must establish the claimed damage was caused by storm in
2020 or by flood in 2016.
Once so established, the onus shifts to the insurer to prove on the balance of probabilities
that an exclusion applies if it seeks to deny or limit its liability for the loss.
Relevant extracts from the policy are set out in supporting section 3.2 this determination.
The complainant lodged the claim via his broker. The claim form said the jetty had collapsed
during a storm on 19 July 2020; the complainant arrived at the property to find the jetty
collapsed; and nobody was at the premises at the time of the damage.
The complainant provided a quotation from his repairer (RMD) to replace the jetty and
riverbank abutment “due to storm damage” in the sum of $14,670.
The insurer’s assessor contacted RMD who advised the jetty had collapsed possibly due to
bad weather but also age had been a contributing factor.
The assessor arranged for the damage to be reviewed by an engineer.
A summary of the reports relied on by the insurer is set out in supporting section 3.3 of this
determination.
The insurer reviewed the material from the Bureau of Meteorology (BOM) and from its
engineer. Considering the BOM material which indicated there were no excessive storm
events around the date of the claimed loss, the insurer declined the claim because it says the
damage is not caused by a listed insured event but is due to erosion, gradual deterioration
and wear and tear, and atmospheric and climatic conditions which are excluded from cover.
Having reviewed the material from BOM and the engineer, I accept there was no significant
storm event contemporaneous with the claim or in 2020. The single sentence in RMD’s report
Determination | Case number: 804691 Page 3 of 11
attributing the damage to a storm is insufficiently compelling to persuade me the jetty was
damaged because of a storm.
I am not satisfied the available material establishes the complainant has established a valid
storm claim.
Complainant has not established claimed damage caused by flood
The complainant asked for review of the claim denial saying the insurer’s engineers referred
to water wash causing scouring which was the cause of the jetty collapse. The complainant
said after previous flooding in November 2016 the subsoil base of the jetty had been scoured
and had this been noticed at the time, a flood claim would have been made contemporaneous
with this flood damage.
The insurer continued to decline the claim for flood damage relying on its engineer (MB) who
said the damage to the jetty was not caused by storm or by flood.
The complainant argued the policy defines flood to mean “the inundation of normally dry land”
which was what happened to the river bank during the scouring described by the insurer’s
engineer. He says there were several flood events including in 2016 in which normally dry
land supporting the jetty was inundated with water contributing to the scouring and the
eventual collapse of the jetty.
After the preliminary assessment the complainant reiterated the November 2016 flood was
the main contributing factor to the collapse of the jetty. He said even if the eventual cause of
the collapse after the preliminary damage was 'scouring', this is not a policy exclusion.
He says he no longer has access to the property to obtain a flood expert report to confirm
flooding was the main contributing factor.
He asked if there were other insurance claims from the actions of tidal waves, 'scouring' or
similar water movement that have been previously approved.
This determination is based on the available material, expert opinion and submissions which
are specific to the complainant’s claim and the AFCA complaint.
It is not in dispute a jetty is a building as defined in the policy.
The complainant must establish on the balance of probabilities he has suffered a loss caused
by flood to establish a valid claim.
The only expert opinion is provided by the insurer’s engineer. I am satisfied he has the
expertise to comment. His report is detailed and supported by photographs and by diagrams.
He is unequivocal in his opinion. The claimed damage was not caused by storm or by flood.
Having reviewed the engineer’s opinion, I accept damage to the jetty was caused because
the concrete slab which adjoined the wooden jetty lost its foundation support. I note the
comments the engineer makes about the appearance of the concrete slab which is supported
by his photographs. Photographs also show the development of horizontal cracking
supportive of his opinion which is that the earth adjacent to the slab has been undercut by
process described as scouring. He attributes the scouring to rising river levels and waves
from vessels all of which he says occurred over time rather than because of a single event.
Having reviewed the available material including the photographs and the diagrams provided
by the insurer’s engineer, I am not satisfied the claimed damage was caused by a flood or
Determination | Case number: 804691 Page 4 of 11
floods. I accept the policy now provides flood damage as defined. I accept a flood means the
covering of normally dry land by water that has escaped or been released from the normal
confines of the river.
The engineer specifically considered whether a flood event could have influenced the stability
of the bank and the distress to the jetty structure.
He says a flood event would not have any bearing on the stability of the concrete footing as it
would have been founded into natural soil below what would have been mostly below water
level.
Further, he holds his opinion because of the characteristics that he saw and photographed.
That is, the characteristic shape of the riverbank around the collapsed section of concrete and
the presence of tension cracks to the upper section of the bank.
Insurer entitled to decline the claim
Based on the available material, I am not satisfied even if the riverbank flooded in 2016 or at
other times, it caused the damage to the concrete slab which has resulted in the damage to
the jetty. This is because the engineer ’s opinion is compelling and persuasive and supported
by photographs and diagrams.
In short, I am not satisfied the proximate cause of the damage to jetty was flood. On the
available material, I am not satisfied the complainant has established on the balance of
probabilities a valid claim for flood damage.
In these circumstances, as the complainant has not established a valid claim for storm damage or
flood damage it is redundant to consider any policy exclusions applicable to the claim.
Section 46 Insurance Contracts Act 1984 does not provide a remedy
The complainant says the jetty collapsed due to damage caused to the concrete footings
during the flooding of the property in November 2016. He says this damage was under the
jetty and not noted by him until the jetty collapsed in July 2020. In the circumstances, he says
section 46 of the Insurance Contracts Act provides a remedy.
Section 46 of the Act precludes the insurer from declining a claim:
> based on an exclusion which operates by reference to a defect in a thing
> where the defect existed before the policy was taken out
> in circumstances where the insured was not aware (and a reasonable person in the
circumstances could not be expected to have been aware) of the defect at that time.
Section 46 has been considered by the courts where it was held that section 46 only applies
to exclusions that have a temporal or time-based aspect. In other words, section 46 only
applies to assist the complainant in circumstances where the insurer relies on an exclusion
which operates by reference to the time at which the relevant defect arose – that is, where the
exclusion expressly refers to the defect or design fault having been present before the policy
was taken out.
The insurer says it will not cover loss or damage caused by several policy exclusions none of
which refer to the time of the defect occurring. That means section 46 does not operate to
assist the complainant because the exclusions relied upon by the insurer do not expressly
refer to the defect having been present before the policy was taken out.
Determination | Case number: 804691 Page 5 of 11
In any event consideration of section 46 and policy exclusions are redundant as I am satisfied
from the available information the complainant has not established a valid claim as he has not
established on the balance of probabilities the damage to the jetty was caused by an insured
event or by flood or storm.
Therefore, on the available information and for the reasons stated, I am satisfied the insurer is
entitled to decline the complainant’s claim.
2.2 Why is the outcome fair?
The insurer is entitled to rely on its expert evidence and the policy terms. In circumstances
where the available material does not establish a valid claim under the terms of the policy, it
would not be fair to require the insurer to pay the claim.
Determination | Case number: 804691 Page 6 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach to this complaint
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an event to
which the policy responds. This is known as a prima facie or valid claim. Once so established,
the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies
if it seeks to deny or limit its liability for the loss.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence. When we assess complaints, we consider available
documents, the recollections of the parties, and all relevant circumstances. We give more
weight to documents created at the time the events occurred. If there is no relevant
documentation, we will decide what is most likely to have occurred based on the information
provided to us. If there are conflicting recollections and these are evenly weighted, we may
find that a claim cannot be established.
Caselaw and proximate cause
Case law establishes:
The proximate cause of the loss is the dominant or effective or operative cause of the loss
whether or not that be the last in time or the sole cause.
If there are several causes operating contemporaneously, each must be examined for the
qualities of reality, predominance and efficiency as the active, efficient cause that sets a
relevant chain of events in action. If one cause would have caused the harm in any case,
and the other would not have done so in the absence of the first, the first is the proximate
cause.
A common-sense approach is taken to determine proximate cause.
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties and in
the insurer’s Notice of Response. Both the policy document and the Notice have been
exchanged with the complainant.
Words that have special meaning
Flood
The covering of normally dry land by water escaping or released from the normal confines of a watercourse
or lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir,
channel, canal, or dam.
Part A Buildings and contents
Listed Events cover
What is covered
Your buildings and/or your contents as set out in your schedule are covered if they are destroyed, lost, or damaged.
They are covered only if you own them or are liable for them.
…..
We will cover your buildings and your contents for loss or damage from the events listed below.
Determination | Case number: 804691 Page 7 of 11
…………….
Storm, rainwater, hail, or wind . This includes storm, rainwater, hail or wind damage to gates, fences or walls that are
entirely or partly at the situation. We will not cover storm, rainwater, hail, or wind damage:
– Where water enters your buildings because of a structural defect, faulty design, or faulty workmanship when your
buildings were constructed; or
– Where water enters your buildings through an opening made for any building renovation or repair work.
We will not cover loss or damage by flood.
Flood is the covering of normally dry land by water escaping or released from the normal confines of a watercourse or
lake, whether or not it is altered or modified. Flood also includes water escaping from the confines of any reservoir,
channel, canal, or dam.
Landslide or subsidence . This includes loss or damage to any gates , fences or retaining walls that
are entirely or partly at the situation. However, the cover only applies if the loss or damage occurs within 72 hours of,
and as a direct result of, one of the following listed events:
– Storm, tsunami, rainwater, hail, snow or wind;
– Earthquake;
– Explosion; or
– Liquid escaping from a fixed pipe or something attached to a pipe, fixed gutter, fixed tank apparatus or a drain.
What Parts A and B of the policy do not cover
We will not pay claims for loss, damage or liability arising from:
…
Mildew, atmospheric or climatic conditions
…
Flood, storm surge, the action of the sea, tidal wave, high water, or erosion
…
Landslide or subsidence except as detailed on page 19
Supplementary PDS
Preparation Date 8 March 2013
This SPDS is made up of two Parts (which operate in different situations):
• Part 1 replaces the definition of flood in the PDS with the new Government prescribed definition in the
circumstances specified in Part 1 below; and
• Part 2 only applies if your home /situation/risk address to be insured is one we offer the flood cover option for. We
will advise you if the option is offered before or during your application for this insurance or in any renewal invitation.
….
However, if you have an existing policy when you receive this SPDS, the change applies to it from 19 June 2014, but
only in relation to events which occur from that date.
…..
Prescribed definition change - In the “Words that have a special meaning” section on page 14 and the “Storm,
rainwater, hail , or wind” listed event on page 19, the definition of flood is deleted and replaced with:
“flood” means the covering of normally dry land by water that has escaped or been released from the normal
confines of any of the following:
• a lake (whether or not it has been altered or modified);
• a river (whether or not it has been altered or modified);
• a creek (whether or not it has been altered or modified);
• another natural watercourse (whether or not it has been altered or modified);
• a reservoir;
• a can al; or
• a dam.
Part 2 – Flood cover
This Part 2 only applies if your home/situation/risk address to be insured is one for which we offer flood cover as an
option.
…….
Determination | Case number: 804691 Page 8 of 11
When we issue your policy, your schedule (including any renewal schedule) will specify if flood cover is included in
relation to that home/situation/risk address.
Where Part 2 applies, the PDS is amended as follows:
The following changes only apply in relation to the relevant home/situation/risk address if your current schedule states
flood cover is included in relation to that home/situation/risk address. For any home/situation/risk address where
flood cover is not included these changes do not apply.
The "Part A – Buildings and Contents" section changes
The “What is covered” section is amended by including a new listed event “Flood” as follows:
Flood
We will pay for loss or damage caused by flood or flood water combined with run-off and/or rainwater.
We will not pay for:
a. loss or damage caused by storm, rainwater, or run-off (except where the run-off and/or rainwater is combined with
flood water)
Note: You may be covered for storm, rainwater, or run- off under the listed event “Storm, rainwater, hail or wind”;
b. loss or damage caused by action of the sea, high water, tidal wave or tsunami;
c. loss or damage caused by:
• soil movement including erosion, landslide, mudslide, or subsidence, unless it is directly caused by and occurs within
72 hours of the flood;
• shrinkage or expansion of earth or land; or
• hydrostatic pressure;
d. loss or damage to gates or fences if they are not well maintained and are not in good order and repair;
e. loss or damage to retaining walls;
f. loss or damage to swimming pool and spa covers, their liners or their solar domes;
g. loss or damage to pontoons, jetties, or bridges; or
h. the cost of cleaning mud or debris out of tanks, swimming pools or spas.
“ What Parts A and B of the policy do not cover” section changes
This section is amended to replace the tenth bullet point with:
• Storm surge, the action of the sea, tidal wave, high water, or erosion.
Please note that discounts relevant to the policy premium may not be applied to the flood component of the
premium. You can contact us if you have any questions regarding your premium, the applicable discounts or the cover
outlined in this SPDS.
3.3 Extracts from material relied on by the insurer
Date Action
Asse ssor’ s report (S)
10 September 2020
Attended the site 7 September 2020 and spoke to
RMD who advised he attended and confirmed the jetty
had collapsed “possibly due to bad weather” but also
said that age may have been a contributing factor.
Requested the insured provide further photographs
a nd details in relation to age of the jetty.
Arranged for a caus ation report.
Engineer’s report (MB)
29 September 2020
Attended/ photographed site 23 September 2020.
Jetty comprises a concrete abutment which forms a
platform leading ont o the timber landing pad.
Landing pad formed of steel posts and RHS bearers
with timber decking.
Conc rete section of jetty extends about 1.3m from the
earth embankment and landing pad extends about
3.45m over the river
Determination | Case number: 804691 Page 9 of 11
Reviewed material from BOM and noted no signific ant
rain two months before the claim.
Landing part of the jetty is dilapidat ed including
splitting of timber and corrosion of fittings particularly
the steel RHS members
Conc rete landing plat form situated between the
embankment and the landing pad has suf fered
catastrophic failure due to loss of support where it
sounds onto the embankment.
Conc rete showed corrosion of steel carry beam and
the steel reinforcement to the concrete slab. The
concrete is cracking and exfoliating.
Inspection of the jetty struc ture revealed general wear
and tear to the decking timbers and varying degrees of
corrosion to the steel framing, as may have been
reasonably expected given age and relatively harsh
environment.
Although there are corrosion and maintenance issues
visible t o the jetty structure, apart from the concrete
landing, the main part of the structure does still appear
to be serviceable with an adequate level of
maintenance and where applicable upgrades.
Conc rete slab ex hibits exfoliation of its surface and
corrosion to its reinforcement. This suggests that the
moisture has been able to ingress the concrete for a
considerable time. When reinforcing steel corrodes,
the oxides produced effectively cause the steel to
expand creating formation of substantial internal
stres ses. This phenomenon is commonly termed oxide
jacking, which as a result of the build - up of the internal
stresses causes the face of the concrete to effectively
be pushed away or exfoliated, this often resulting in
the development of horiz ontal cracking as appears to
have occurred at this particular site.
Conc rete landing slab has very little bearing onto the
embankment and that the earth immediately adjacent
appears to have been undercut.
When this occurs, it is generally referred to as
scouring. Scouring is often accompanied by the
presence of tension cracking at the upper surface of
the embankment.
Scouring differs from erosion, with erosion tending to
occur over a larger surface of eart h or embankment,
as can occur during times of heavy prolonged rainf all,
whereas scouring occurs due to loss of soil around a
foundation element.
Local scour involves removal of material from around
piers, abutments, spurs, and embankments. It is
caused by an acceleration of flow and resulting
vortices induced by the flo w obstructions.
Local scour can also be either clear - water or live - bed
scour. Live - bed local scour is cyclic in nature; that is,
Determination | Case number: 804691 Page 10 of 11
the scour hole that develops during the rising stage
refills during the falling stage.
Rising river levels must be of a cycli c nature to cause
localised scour and are significantly time dependant,
rather than being attributable to a single event.
Much more likely scour will occur due to oscillating
waves derived by marine vessels i.e., propeller wash
or bow or stern thrusters, at times when the water level
is just above the base of the pier footings, or riverbed.
As the concrete slab has lost its foundation support it
has been caused to rotate downwards leading to
development of excessive stress where it is supported
by the tr ans verse carry beam. This has resulted in the
slab effectively cantilevering before it has effectively
sheared away from the carry beam support.
Engineer’s report (MB)
18 November 2020
Clarity required as the effect a flood event would have
on the stability of the bank and the distress to the jetty
structure, compared with scouring.
Water rising and overflowing a concrete slab will not
cause it to crack
Conc rete section of the jetty at this site should have
been founded into natural soil below what will have
been for the majority of the time below water level. As
such a flood event should not have any bearing on the
stability of the concrete footing.
At worst we believe that water flowing over the edge of
an embankment / riverbank such as this could have
caused some very minor loss of the top of the bank,
resulting in it developing a rounded edge or slope. It
should not have resulted in the bank becoming
undercut.
Whilst the dry land becomes inundated to such a
degree that storm water can back up and flow over the
surrounding area, the river too will be subject to the
same rainfall and as such would have also risen by a
commensurate level, greatly reducing the amount of
exposed riverbank face.
Maintain conclusions relating to the mode of failure for
t he concrete section of the jetty at this particular site
with the salient points being the weather data derived
via Bureau of Meteorology, coupled with the
characteristic shape of the riverbank around the
collapsed section of concrete and the presence of t he
tension cracks to the upper section of bank.
3.4 Other relevant material considered and relied on
Parties’ submissions /emails and all attachments to all submissions/emails
Assessor and engineers’ reports
Photographs and quote
Determination | Case number: 804691 Page 11 of 11
Claim file notes
Bureau of Meteorology extract
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.