Water entry/subfloor damage claim declined for rain and escape of water; extent of liability disputed
Text of the determination
Determination
Case number 804187
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 804187 Page 1 of 5
Case number: 804187 22 April 2022
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (insurer). In May 2020,
he made a claim following a rain event during which water entered the subfloor of the home.
The insurer declined cover, and a complaint was lodged with AFCA (and dealt with as a
separate matter to this current complaint).
The previous complaint was closed after the complainant accepted the insurer’s offer of 5
March 2021 (made without any acceptance of liability) to:
pay $2,000 for customer service issues
obtain a scope of work from its engineer, HC, for the building repairs required
obtain a report from engineer HC apportioning the contributing causes of the damage
arrange a restorer to attend the property to report on and treat the mould.
The restorer, FR, provided a scope of work and quote for $8,403.64 for the mould
remediation work in April 2021. The complainant accepted a cash settlement for that, in the
amount of $8,403.64 plus 10% for contingencies.
In March 2021, t he insurer’s engineer HC provided a scope of works and a separate report
attributing and apportioning the various causes of the damage. Having received the
engineer’s report , the complainant is now disputing the extent of the insurer’s liability for the
identified damage and scope of work. He is seeking 100% of mould remediation costs (that is,
including the cost of demolishing and reinstating the mould-affected areas of the building);
40% of building repair costs, which includes restumping and any resultant damage from
these works; all works set out in the engineer’s scope of works ; temporary accommodation
costs; removal and storage of contents. He also remains concerned about the way the insurer
has handled the matter.
1.2 Issues and key findings
What is the extent of the insurer’s liability ?
The insurer is not liable for the repairs or damage identified in HC’s most recent scope of
works or report; nor for any of the additional costs/policy benefits being claimed by the
complainant. That is because the available evidence does not establish, on balance, the
proximate cause of the damage was a single insured event under the policy, or that the
insurer should otherwise be responsible for the loss.
Why is the outcome fair?
It would not be fair to require the insurer to cover damage which has not been shown to fall
within the scope of cover under the policy.
1.3 Determination
This determination is in favour of the insurer. It is not required to take any further action.
Determination | Case number: 804187 Page 2 of 5
2 Reasons for determination
2.1 What is the extent of insurer’s liability?
Policy covers rainwater and escape of liquid damage in certain circumstances
The policy covers specified insured events, including storm/rainwater and ‘water or liquid
damage’ (which includes damage from water escaping from a fixed pipe).
That cover only applies to events which occur within the period of insurance, and is also
subject to other exclusions and conditions.
The policy states, for example, the insurer will not pay for any loss or damage which was
caused ‘ directly or indirectly by ’ :
settling, shrinkage or any earth movement
settling, shrinkage or expansion in buildings, foundations, walls or pavements
roots from trees, plants, shrubs or grass
a defect in an item, structural defects, faulty or poor workmanship or design.
Evidence shows several factors contributed to the damage
The available evidence shows the complainant’s property had suffered cracking and
movement damage which was, based on engineer HC’s report, the result of differential
settlement of the footings caused by a combination of factors:
10% - tree root drying at the west and east sides of the residence
20% - seasonal changes in the moisture content of the foundation material
30% - inadequate stump footings
40% - blocked service pipes at the south-east corner of the residence.
I have seen no compelling evidence that refutes or challenges the engineer’s conclusions as
to the contributory causes or the apportionment of that contribution.
Damage, on balance, has been occurring over time
The house is about 40 years old, and the complainant has lived in it since February 2020.
The policy was taken out on 10 February 2020, before the claim arose in May 2020.
With regard to the timing of the damage, and the events causing it, builder BRMS reported
from their site visit in May 2020 that the damage appeared to be present for ‘a period of up to
3+ months ’. The complainant is reported as saying it was first noticed on 24 March 2020.
HC’s inspection in June 2020 identified ‘a history of differential movement’, e videnced by
cracking in walls and ceiling linings throughout, and signs of previous patching repairs.
HC also noted a brick being used to support the sub-floor framing (which I consider
indicates previous movement) and found the surface of the subfloor was approximately
100mm lower than the exterior level.
In support of his position that the damage was from the rainwater/escape of water as claimed,
and was not pre-existing, the complainant has provided statutory declarations from his real
estate agent and two builders who had ‘informally inspected’ the prope rty in January 2020,
before the complainant bought it. The statements say they found no evidence of moisture,
mould, previous flooding or major faults with the subfloor.
Determination | Case number: 804187 Page 3 of 5
However, given the circumstances and nature of those inspections (and the lack of formal
written reports), I do not consider them persuasive as to the likelihood of pre-existing issues
and damage to the property, or the impact of factors apart from the reported rain/escape of
water event.
The policy covers ‘events/incidents’ , which are defined as ‘a single occurrence or series
of occurrences, including an accident or series of accidents, arising out of one event’. I
am not satisfied a single escape of water/rainwater event caused the damage , even
though it may have highlighted existing cracking/movement issues.
On the available evidence, I consider it is more likely than not there were issues with and
damage to the property (as identified by HC) which pre-existed the claimed event – and,
on balance, the policy period – and which had been occurring progressively over time.
That includes the blockages in the storm water drains from tree roots, as identified by
plumber GM, and to which HC attributed 40% of the contribution to the damage.
Proximate cause of the damage was not an insured event
In situations where there is more than one possible cause contributing to a loss, then it
becomes necessary to identify the proximate cause. The proximate cause is not necessarily
the first or last or the sole cause of the loss. It is the effective, dominant or operative cause.
The courts have said that if one cause would have resulted in the harm in any case, and the
other would not have done so in the absence of the first, then the first is the proximate cause.
In this case, HC identified four contributing causes to the cracking and movement in the
house, each with a different degree of input. The policy is clear that damage caused by
settling or any earth movement, by tree roots and structural defects is excluded.
The complainant appears to accept that means the insurer is therefore not liable for the 60%
contribution from the first three factors identified by HC. I agree those factors are excluded
under the policy. The complainant believes, however, he should still be covered for the
remaining 40% attributed to the blocked pipes/drains (and the overflow of water from that).
However, the available evidence shows, on balance, the drains/service pipes would not have
overflowed and water would not have backed up and entered under the house if it were not
for the impact of tree roots which had already blocked and compromised them. In other
words, the proximate cause of the escape of water from the pipes was the tree roots. As
already noted, that is a policy exclusion.
That means the insurer is also not liable for the 40% of damage attributed to blocked pipes.
Insurer not liable for further mould -related works or other benefits
The complainant previously accepted $8,403.64 (plus a 10% contingency) for mould
remediation. That was from FRA’s quote which was based on ‘non -invasive inspection and
the assumption there is some mould under the house in subfloor, joists and soil’. The quote
specifically states it excludes ‘structural reinstatement post remediation works; repositioning
of reloc ated contents items upon completion of building reinstatement works’ . When
accepting the settlement offer the complainant clearly acknowledged that limitation/exclusion.
Since HC’s scope of work and additional report, the complainant now believes the insu rer
should pay for demolition and reinstatement of the mould affected areas as well. However, I
do not consider there is anything in that further material which justifies or explains why any
such additional work should be covered.
Determination | Case number: 804187 Page 4 of 5
FRA indicated in their quote that the complainant would need to move contents from the
mould-affected areas of the house (said to be the extension/rumpus room and spare
bedroom) while the remediation work is being carried out. That does not suggest the
complainant could not continue to live in the property in the meantime.
The complainant believes the insurer should cover all costs he incurs to vacate the home to
enable repairs to be carried out (storage for contents, temporary accommodation).
However, the policy benefits for temporary accommodation and storage only apply if he is
unable to live in the house as a result of an event which the insurer has agreed to cover.
In this case, the insurer has not agreed to cover the circumstances leading to the claim;
nor (when m aking its settlem ent offer for the previous complaint) did it accept liability for
the mould. I also do not consider the evidence shows the complainant would be unable to
live in the house during repairs in any case.
Insurer is not liable for the damage/repair work in HC’s scope of work
For the reasons set out above, I am not satisfied the insurer is liable for the repairs identified
in HC’s scope of works; nor for any other additional costs or policy benefits being claimed by
the complainant following HC’s mos t recent report.
The insurer is not required to take any further action in response to the claim.
2.2 Why is the outcome fair?
It would not be fair to require the insurer to cover damage which has not been shown to fall
within the scope of cover under the policy.
The insurer has already made a $2,000 payment (under the previous complaint) in
recognition of customer service issues raised by the complainant. I have seen nothing to
indicate the insurer’s subsequent actions in handling the claim and this current complaint
have been unreasonable, or such that further compensation would be warranted.
The new material provided after the previous complaint was settled does not assist the
complainant.
Determination | Case number: 804187 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.