Determination 804065

Claim denial for water damage to parquetry flooring attributed to seepage

FirmSuncorp Group
Decided2021-11-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed$16,000
SourceAFCA PDF

Summary

The complainants claimed about $16,000 for water damage to parquetry flooring, which they attributed to a blocked council drain. AFCA found the proximate cause was long-term seepage excluded by the policy, so the denial stands, but ordered $1,000 for non-financial loss due to claim handling delays.

The water seepage exclusion applied because the proximate cause of the damage was seepage over time from inadequate drainage and surface slopes, not escape of liquid from the stormwater pipe.

Issues

Subjects and remedies

pay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 804065 Financial firm AAI Limited Determination | Case number: 804065 Page 1 of 8 Case number: 804065 21 October 2021 1 Determination overview 1.1 Complaint The complainants hold home and contents insurance with the financial firm (the insurer). They lodged a claim on the policy on or about 16 April 2020 on the basis that a blocked local council drainage pipe nearby had caused water to enter the subfloor of the insured property resulting in damage to the parquetry floor. On 19 April 2021, the insurer denied the claim as its expert engineer had assessed the property and determined that the main source of the excessive moisture in the subfloor was seepage of water over time, with inadequate drainage and surface slopes within the property. On that basis, the insurer concluded that the damage was not due to the occurrence of an insured event and was caused by water seepage, which is excluded under the policy. The complainants disagree with the insurer’s decision and want the insurer to accept the claim for repairs estimated at approximately $16,000, and pay compensation. A reference in this determination to the complainants is a reference to either or both of them. 1.2 Issues and key findings Is the insurer entitled to deny the claim? Yes. The proximate cause of the damage to the parquetry flooring was water seepage over time caused by inadequate drainage and surface slopes within the property. The complainants have not demonstrated that the claimed loss was caused by an insured risk. Are the complainants entitled to non-financial loss? Yes. The extended delays in processing the claim caused the complainants undue inconvenience and the insurer has acted in a manner that was inconsistent with the General Insurance Code of Practice (‘Code’). The insurer is to pay the complainants $1,000 in compensation for non-financial loss. Why is the outcome fair? The outcome in relation to the claim denial is fair because the complainants have not established the existence of a valid claim. This means the insurer is entitled to deny the claim. It would not be fair for the insurer to have to pay the claim, when there is no policy requirement to do so. However, it is also fair that the insurer pay $1,000 in non-financial loss to the complainants for their stress and inconvenience caused by claim handling delays. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is entitled to deny the claim and is not required to take any further action in relation to it. However, the insurer is to pay the complainants $1,000 in non-financial loss. Determination | Case number: 804065 Page 2 of 8 2 Reasons for determination 2.1 Is the insurer entitled to deny the claim? Yes. The proximate cause of the damage to the parquetry flooring was water seepage over time caused by inadequate drainage and surface slopes within the property. The complainants have not demonstrated that the claimed loss was caused by an insured risk. Complainants must show a valid claim exists The complainants are required to show, on the balance of probabilities, they suffered a loss caused by a risk insured against under the policy. This is known as a valid claim. Subject to its conditions and exclusions, the policy provides cover for loss or damage caused by the insured event of escape of liquid. There is no dispute that the complainants’ parquetry flooring was damaged due to moisture in the subfloor. However, the parties disagree as to the cause of the moisture that resulted in the damage. Onus shifts to insurer to show it is entitled to deny valid claim If the complainants establish a valid claim under the terms of the policy, the insurer is liable for the loss or damage unless it shows, on balance, it is entitled to:  rely upon a condition or an exclusion contained within the policy to refuse the claim  otherwise deny the claim. In this case, the insurer relies upon the policy exclusion for damage due to water seepage. The insurer has the onus of proof to establish the application of this policy exclusion. P roximate cause Whether the complainants can demonstrate that a valid claim exists and, if so, whether the insurer can establish that the water seepage exclusion applies each depend on what caused the damage the subject of the claim. The complainants argue that the parquetry flooring was damaged by overflow from a blocked local council stormwater drainage pipe. The insurer says that the cause of the moisture was long term water seepage, due to inadequate drainage and surface slopes within the property. This means it is critical to identify the proximate cause of the loss. Proximate cause is the dominant, efficient or operative cause of the loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common-sense evaluation of the evidence. Proximate cause of damage was water seepage Having carefully considered all of the available information, I have determined that while there was an issue with the stormwater drainage pipe in early 2020, this was not the proximate cause of the damage. I am satisfied on the balance of probabilities that the proximate cause of the damage was water seepage over time. The complainants rely on a leak detection expert, FL, who on 31 March 2020 inspected the insured property. In an invoice issued to the complainants, FL said ‘we believe the water to be coming from a neighbouring property or possibly the council’s drainage and we recommend having this checked’. Determination | Case number: 804065 Page 3 of 8 Similarly, the entity that installed the parquetry floor, ED, inspected the floor on 10 June 2020 at the complainants’ request. ED noted there was no evidence of leakage from the property’s ceilings or plumbing. ED considered it was highly possible the water incursion was taking place under the house ‘especially due to some wate r problems associated to [sic] neighbouring properties.’ ED makes no refere nce to an issue with the stormwater pipe. The complainants also rely on documents obtained from the local council which they say confirm that the stormwater pipe was blocked, leading to overflow into the compl ainants’ property. The council documents comprise of works order records relating to the stormwater pipe and include reference to a re quired maintenance activity of ‘ Clear Blocked Easement Drain’. However, that reference forms part of the documentation of the complainants’ report to council of the problem to be addressed. It was not an investigative conclusion. Further, the ‘ service level ’ listed on the same page refers to the need to undertake treatment to remove an obstruction that ‘impedes pipe flow’ , rather than that prevents pipe flow. In my view, council’s findings and views are better expressed in its letter dated 11 September 2020 to the complainants. The letter included the following statements: When concerns about local area flooding were raised with Council, we undertook an examination of the condition of the drain using CCTV footage. It was necessary at the time to provide cutting of tree roots within the pipe which were preventing camera access. Once CCTV footage was able to be captured, it was identified that water was flowing within the pipe, and appeared functional. … You have specifically asked as to whether Council can guarantee that the pipe was functional at the time of the first complaint being made. Given that a full CCTV investigation of the pipe was not possible until such a time as tree roots had been removed, I’m not in a position to categorically provide a response to this question, however in my view it is likely that the pipe was supporting water flow. The complainants have also each provided statutory declarations stating that during the period January to March 2020, they noticed an excessive amount of water flowing across the rear yard of their property and their drains overflowing due to the volume of water. The complainants attribute the excess water to the issues with the stormwater pipe. However, I consider that the observation of water does not of itself establish that the water seen caused the damage claimed. The insurer relies on an engineering report of MCS, dated 19 November 2020. MCS found: 8.2.2. The cupping and delamination damage to the parquetry floor is due to excessive moisture in the subfloor. The main source of that moisture is water ingress through the subfloor air vents which are level with the external paved surface as well as ground water seepage through subfloor brickwork which is below the external ground levels but above the subfloor surface level. 8.2.3. In general, the drainage around the property and the external surface slopes and levels are inadequate. Determination | Case number: 804065 Page 4 of 8 8.2.4. Increased overland flows due to blockages in the council drain at the rear the property is not likely to have any significant effect on the amount of moisture in the subfloor as the drain itself does not directly collect surface flows. MCS found evidence of efflorescence and other microbial growth on the property’s subfloor soil, which it advised indicated long term water issues. MCS concluded that the proximate cause of damage to the parquetry floor was excessive moisture in the subfloor, due to inadequate drainage and surface slopes within the property. MCS also subsequently verbally stated that it’s opinion was that the damage had occurred over an extended period of time and was not a result of the blocked drain. In all of the circumstances, the most definitive statement on the cause of the damage is that of MCS. MCS’s conclusion that the damage was not caused by the drainage pipe is supported by the findings and views of the council. In contrast, the complainants’ experts have not expressed definitive views and, in ED’s case, did not refer to the stormwater pipe at all. Insurer can deny the claim I have set out relevant extracts of the policy wording in section 3.2 of this determination. Given my finding that the proximate cause of the damage was water seepage over time rather than escape of liquid from the stormwater drainage pipe, the complainant has not established the existence of a valid claim. Therefore, the insurer is entitled to decline to indemnify the complainant. 2.2 Are the complainants entitled to non-financial loss? Yes. The extended delays in processing the claim caused the complainants undue inconvenience and that the insurer has acted in a manner that was inconsistent with the Code. The insurer is to pay the complainants $1,000 in compensation for non-financial loss. Compensation is awarded conservatively Under the AFCA Rules, we may award compensation (capped at $5,400) for non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. It is not awarded when a person suffers the normal degree of inconvenience when a problem occurs. Claim handling delay The insurer denied the complainants’ claim on 19 April 2021, a few days over 12 months after it was lodged. I appreciate that the insurer required time to investigate the claim. However, I am satisfied that the investigation took longer than it should have done. For example, MCS did not inspect the insured property until 30 October 2020, six months after the claim was lodged. Further, MCS’s report was received by the insurer on 23 November 2021 yet the claim denial was not issued by the insurer for another five months. I also note that there was a delay of nearly three months in the insurer obtaining a pest inspection report (primarily concerned with termite damage) dated 17 March 2021. The Determination | Case number: 804065 Page 5 of 8 insurer did not rely on any aspect of that report or issues associated with termites in denying the claim. The Code requires the insurer to make a claim determination and inform an insured of that decision within ten business days of receiving all relevant information and completing all (relevant) enquiries. The decision is to be made within four months of receiving the claim unless specified circumstances apply. Even if those specified circumstances do apply, the insurer is to make a decision within 12 months of receiving the claim and if they cannot do so they are to tell the insured of their complaints process. On the information before me, the insurer did not:  make a claim determination within ten business days of receiving all relevant information and completing all (relevant) enquiries  make a claim determination within four months of receiving the claim  qualify for the longer claim determination period of 12 months as none of the specified circumstances in the Code applied  in any event, did not inform the complainants within 12 months of receiving the claim that it could not determine the claim within 12 months and of its complaints process. Accordingly, the insurer ’s handling of the claim was not consistent with the Code. Insurer to pay non-financial loss I consider that the insurer’s extended delay in progressing and determining the claim caused the complainants undue inconvenience and that the insurer has acted in a manner that was inconsistent the Code. It is therefore fair that the insurer pay $1,000 to the complainants in compensation for non-financial loss. 2.3 Why is the outcome fair? The outcome in relation to the claim denial is fair because the complainants have not established the existence of a valid claim. This means the insurer is entitled to deny the claim. It would not be fair for the insurer to have to pay the claim, when there is no policy requirement to do so. However, it is also fair that the insurer pay $1,000 in non-financial loss to the complainants for their stress and inconvenience caused by claim handling delays. Determination | Case number: 804065 Page 6 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. I have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, I have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 804065 Page 7 of 8 3.2 Extracts from policy wording Page 22 Escape of liquid We cover Loss or damage to the building caused by liquid leaking, overflowing or bursting from any of the following: any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage and sewage systems; … water main, fire hydrant or water supply pipe; Pages 38 and 39 You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Seepage of water water seeping or running: • through the earth (hydrostatic wat er seepage); • down the sides of earth or earth fill that is up against the building; • down the sides or underneath swimming pools or spas causing them to move, change shape, lift or leak through their hydrostatic valves; • against or through ret aining walls and for cing them to move or crack; • from agricultural pipes. Determination | Case number: 804065 Page 8 of 8 3.3 Extracts from Code 67. When we are assessing your claim, we will only ask for and rely on information that is relevant to our decision. If we ask you for information, then we will tell you why we need it. 76. Once we have all relevant information and have completed all enquiries, we will decide whet her to accept or deny your claim and tell you of our decision within 10 Business Days. 77. Our decision will be made within 4 months of receiving your c laim, unless paragraph 78 applies. If we do not mak e a decision within that time, we will tell you in writing about our Complaints process. 78. In circumstances where: a. your claim arises from an Extraordinary Catastrophe; b. your claim is fraudulent, or we reasonably suspect it is fraudulent; c. you do not respond to our reasonable inquiries or to our requests for documents or information about your claim; d. we have difficulty communicating with you about your claim due to circumstances beyond our control; or e. you request a delay in the claims process; then within 12 months of receiving your claim we will tell you our decision in writing. If we cannot make a decision wit hin 12 months, we will tell you in writing about our Complaints process.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.