Home / IAG / Determination 803746
Determination 803746
Declined storm-damaged roof claim under defective workmanship exclusion, with cash settlement for internal damage
Summary
The complainant's storm claim for roof damage was declined under the defective workmanship exclusion, and the insurer cash settled the resultant internal ceiling damage at $3,531.10. AFCA found the expert evidence established the excluded cause, the cash settlement was fair, and no compensation was warranted.
Expert evidence established that the dominant cause of the roof damage was excluded defective building work, so the insurer may decline the roof claim and cash settle the resultant internal damage.
Issues
- Claim denial primary · not upheld
“The proximate cause of the roof damage is the structural defects and faulty workmanship, which are excluded, so the insurer is entitled to decline the claim.”
- Inadequate claim investigation secondary · not upheld
“The contractors' reports are comprehensive and supported by photographs, and the insurer's experts had the necessary expertise.”
- Offensive or intimidating behaviour secondary · not upheld
“I do not accept the insurer hung up on the complainant or that its staff were rude or would not answer questions.”
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case number 803746
Financial firm Insurance Australia Limited
Determination | Case number: 803746 Page 1 of 11
Case number: 803746 15 December 2021
1 Determination overview
1.1 Complaint
The complainant holds an accidental damage building policy with the financial firm (the
insurer).
In November 2019, he lodged a claim for storm damage to the roof and ceilings of the home.
Relying on expert opinion the insurer declined the claim for damage to the roof because the
damage to the roof was caused by defective building work which is excluded from cover. The
insurer offered to pay $3,157.30 for the resultant damage to the lounge and kitchen ceilings.
The complainant disagrees with the insurer‟s decision and requires payment for damage to
the roof. The complainant seeks $30,000 for the cost of repairs.
The case manager provided the parties with a preliminary assessment on the issues in
dispute. The preliminary assessment was mostly in favour of the insurer. The insurer
accepted the preliminary assessment, but it was not accepted by the complainant. In the
circumstances, the complaint has been referred to me for determination.
1.2 Issues and key findings
Is the insurer entitled to partially decline the claim?
Yes. The available information establishes on the balance of probabilities the damage to the
roof was caused by the policy exclusion relied on by the insurer and in those circumstances
the insurer is entitled to decline the claim.
Is the insurer liable for any further costs?
No. The insurer is required to pay to the complainant the cost of repairs of the internal
damage. After the preliminary assessment the insurer sent a cheque to the complainant for its
liability in the sum of $3,531.10. In the circumstances it is not liable for any further costs.
Is the complainant entitled to compensation?
No. The available material does not establish an award of compensation is warranted.
Why is the outcome fair?
The insurer is entitled to rely on the policy terms and its expert material. Based on that
material, it is not liable to pay to repair the roof because the available material establishes on
the balance of probabilities the damage to the roof was caused by an excluded cause. In
those circumstances, it would not be fair to require the insurer to pay the claim.
Determination | Case number: 803746 Page 2 of 11
1.3 Determination
This determination is in favour of the insurer.
The insurer is not liable for the cost of repairs to the roof.
The insurer is liable for the cost of repairs for the internal damage and has paid to the
complainant $3,531.10 (net of the policy excess of $550) for the cost of internal repairs.
In these circumstances, the insurer is not required to take any further action in relation to the
claim or the complaint.
Determination | Case number: 803746 Page 3 of 11
2 Reasons for determination
I have decided this complaint based on what is fair in all the circumstances, having regard to
legal principles, applicable industry codes or guidance, good industry practice and previous
relevant determinations of AFCA or predecessor schemes (which are not binding). I have
considered all the material submitted by the parties, both before and after the preliminary
assessment. I am satisfied that the documentation I have relied on has been provided to both
parties.
The parties have raised numerous issues in their submissions to AFCA. However,
commentary in this determination is restricted to those issues considered relevant to the
outcome.
No new material provided after preliminary assessment
After the preliminary assessment was rejected, no new material was provided by either party.
The complainant made a further submission which is referred to in the determination. The
insurer said the further submission did not contain any expert reports or objective evidence
and so it made no further submission after the preliminary assessment.
2.1 Is the insurer entitled to partially decline the claim?
Parties’ material and submissions considered
The insurer accepts the complainant has established a valid claim. It accepts a storm
occurred in November 2019 causing rainwater to enter the property and damage the ceilings.
It relies on its expert opinion and a policy exclusion to decline the roof claim namely:
We will not cover any loss or damage as a result of, or caused by
• a defect in an item, structural defects, or faulty workmanship or design
The insurer says the proximate cause of the damage to the roof is not the storm but the
damage to the roof is a result of defective building work which is excluded from cover.
The insurer‟s expert opinion is summarised in supporting section 3.3 of this determination.
The relevant policy terms are summarised in supporting section 3.2 of this determination.
The complainant sought a cash settlement of $30,000. Although he would prefer the insurer
to repair, if he is paid a reasonable cash settlement, he will arrange repairs.
He says:
the insurer‟s experts were rough, quick, and not competent to comment
the experts were not able to find the source of the leak as there has not been a proper
investigation of the source and they only made assumptions and guesses
the solar panels (installed in 2015) did not leak for many years before the storm
storm damage was never taken into consideration – that is, high winds lifted the solar
panels which could cause the leak
the insurer made its decision based on the repair costs
Determination | Case number: 803746 Page 4 of 11
After the preliminary assessment, the complainant reiterated and expanded on his position.
He says he has spoken to a local builder who said the only way to determine where the leak
is coming from is to access the roof cavity (which cannot be done because of the nature of
the roof) as a proper investigation of the source of the leak, requires the removal of the roof
panels.
Relevantly, he says:
the insurer‟s experts assumed where the leak was and claimed that the roof did not meet
regulations which is not correct
the roof is an aluminium clip lock roof which can have a pitch of 2 degrees
the solar panels have rubber seals where they have been fitted to the roof by professional
solar installers
he put silicone around all the roof attachments which did not stop the leak which he says
explains why the leak is elsewhere
none of the insurer‟s experts checke d any other part of the roof
Expert evidence establishes insurer entitled to decline the claim
I have carefully read all the material and considered the photographs provided and the
insurer‟s claim file notes.
I do not accept the insurer has made its decision based on the price. This is because the
available information establishes the insurer‟s cash settlement offers were never for roof
repairs. The cash settlement offers were always for the resultant internal damage.
Although the complainant says the cause of damage cannot be properly investigated without
removing roof panels, he has not provided any independent expert evidence to support this
and other contentions he makes about the cause of the roof damage both before and after
the preliminary assessment.
T he roof has been inspected by on several occasions by the insurer‟s contractors. Although
the complainant criticises the conclusions drawn by the contractors and their methodology, he
has provided no independent expert material in support his contentions.
I consider the reports are comprehensive and are supported by photographs. I accept the
contractors have the necessary expertise to comment. Pertinently, both TC and CF
specifically say that they did not observe any storm related damage to the roof during their
inspections.
Both draw the same conclusion which is that rainwater is ingressing via the mounting
brackets of the solar system installed on the roof. They both also comment that water might
be ingressing under the roof sheet given its minimal pitch. CF makes the further observation
that the entire roof surface shows foot traffic causing the roofing profile to be damaged. CF
recorded the roof pitch of 1° noting the minimum pitch was 3°. He suggested the roof pitch
may have declined because of the foot traffic and the extra loadings from roof mounted items.
CF describes the mechanism of the water ingress which is that the low roof pitch along with
the damages sustained to the roof sheeting because of foot traffic has allowed water to pond
on the roof surface resulting in water tracking over the side laps of the sheets and into the
roof void eventually ingressing to the ceiling linings below.
CF also notes the support brackets for the solar panels were fixed through the pan/valleys of
the roof sheet with screws which he says is not recommended as it decreases the water
tightness of the roof.
Determination | Case number: 803746 Page 5 of 11
Having reviewed the available information, I am satisfied the proximate cause (or the effective
or operative cause) of the damage to the roof is not the storm event or accidental damage but
the structural defects and faulty workmanship described in the insurer‟s expert reports.
As these causes of damage are excluded from cover, the insurer is entitled to decline the
claim for damage to the roof.
2.2 Is the insurer liable for any further costs?
Insurer not required to pay anything further to the complainant
Because it is not liable to pay for damage to the roof the insurer says the resultant damage to
the ceiling cannot be warranted and it is entitled to cash settle the claim. I accept a cash
settlement is fair in these circumstances.
The insurer‟s builder (MB) provided a quote to prepare and paint the ceilings to the
kitchen/dining/lounge rooms and prepare and paint exposed beams in the said rooms for
$2,631.09 including GST. The insurer allowed 20% uplift to the quoted amount for unforeseen
expenses bringing the total settlement offer to $3,157.30 less the policy excess of $550.
The complainant provided no information about the cost of repairs for the internal damage. In
those circumstances, this determination is based on the only available information namely the
quotations from MB and CF for the cost of repairs to the internal damage.
The preliminary assessment was based on CF‟s greater estimate. CF estimated internal
painting at $3,800. The preliminary assessment also made allowance for statutory interest.
Having considered the available information and photographs provided I am satisfied this
cash settlement assessment is fair and reasonable in the circumstances.
After the preliminary assessment the complainant provided correspondence showing the
claim settlement breakdown advice ($4,081.10 less policy excess for $550) and that a cheque
for $3,531.10 was sent to the complainant.
The complainant says the payment by the insurer of the amount awarded in the preliminary
assessment is unethical as the insurer attempted to close the claim. I do not accept this
contention. Rather, the insurer was complying with the preliminary assessment and continued
to comply with the AFCA process.
Should the complainant accept this determination then within seven days of notification of
acceptance he should cash the settlement cheque already provided.
Providing the complainant is able cash the settlement cheque already provided, the insurer is
not required to take any further action in relation to the claim or the complaint.
2.3 Is the complainant entitled to compensation?
Compensation paid in some circumstances
The complainant complained about the way the claim was handled. He says there were
multiple phone calls, that staff were rude and would not answer questions. He says on one
occasion a staff member hung up on him.
The insurer says it has met all its contractual and statutory obligations in the handling of the
claim. It provided the telephone recording of a call which took place on 5 May 2021.
Determination | Case number: 803746 Page 6 of 11
AFCA will award compensation (capped $5,400) if there has been an unusual degree or
extent of physical inconvenience, time taken to resolve a complaint or interference with the
complainant‟s e xpectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience and anxiety. AFCA
expects complainants to be moderately robust and to bear the normal degree of
inconvenience experienced when a problem occurs and to take reasonable steps to manage
the situation.
An award of compensation is not warranted
I have carefully reviewed all the information provided by the parties including the insurer‟s
claim file notes.
The claim was made on 18 November 2019. The insurer arranged for the damage to be
assessed a few days later. The file notes show that on 16 December 2019 the insurer
explained its position and offered to cash settle the claim for the ceiling repairs.
On 13 February 2020 the insurer telephoned the complainant‟s wife and asked for joint bank
details. No further action took place until 7 September 2020 when the complainant
telephoned to lodge a formal complaint. The claim file notes show several attempts by the
parties to get in touch with each other. On 5 November 2020 the parties spoke, and the
insurer offered to arrange a specialist builder‟s report which was acceptable to the
complainant. CF inspected the roof on 18 November 2020 and provided a report on 25
November 2020. The file notes show that on 9 February 2021 the parties spoke, and the
insurer declined of the claim relying on CF‟s report. The claim decline was confirmed in letters
on 12 February 2021 and again on 4 March 2021.
I have also listened to the phone call and read the file notes of the interaction on 5 May 2021.
I do not accept the insurer hung up on the complainant.
Having reviewed the available information, I do not accept the insurer‟s staff were rude or
would not answer questions. On occasion, the person answering the phone was not able to
deal with the claim but tried to put the complainant through to the relevant person. I accept
there were multiple phone calls, but this was often because of the complainant ‟s
unavailability.
Taking all matters into account I do not accept an award of compensation is warranted.
2.4 Why is the outcome fair?
The insurer is entitled to rely on the policy terms and its expert material. Based on that
material, it is not liable to pay to repair the roof because the available material establishes on
the balance of probabilities the damage to the roof was caused by an excluded cause. In
those circumstances, it would not be fair to require the insurer to pay the claim.
Determination | Case number: 803746 Page 7 of 11
3 Supporting Section
3.1 Process
AFCA’s approach to this complaint
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an event to
which the policy responds. This is known as a prima facie or valid claim. Once so established,
the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies
if it seeks to deny or limit its liability for the loss.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence. When we assess complaints, we consider available
documents, the recollections of the parties, and all relevant circumstances. We give more
weight to documents created at the time the events occurred. If there is no relevant
documentation, we will decide what is most likely to have occurred based on the information
provided to us. If there are conflicting recollections and these are evenly weighted, we may
find that a claim cannot be established.
Caselaw and proximate cause
Case law establishes:
The proximate cause of the loss is the dominant or effective or operative cause of the loss
whether or not that be the last in time or the sole cause.
If there are several causes operating contemporaneously, each must be examined for the
qualities of reality, predominance and efficiency as the active, efficient cause that sets a
relevant chain of events in action. If one cause would have caused the harm in any case,
and the other would not have done so in the absence of the first, the first is the proximate
cause.
A common-sense approach is taken to determine proximate cause.
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties and in
the insurer‟s Notice of Response. Both the policy document and the Notice have been
exchanged with the complainant.
Glossary
accidental loss or damage
damage to, loss or destruction of the buildings that make up your home, or your
contents and valuable items, when it is caused by an unintentional act, or an
unforeseen and uncontrollable incident.
Determination | Case number: 803746 Page 8 of 11
Accidental damage cover
We will cover your buildings or contents for any accidental loss or damage.
There are also a number of incidents we will cover under specific conditions –
these are listed on the following pages.
If you make a claim, you will need to pay any excesses that apply – you will only
need to pay this amount once.
Any cover we provide is subject to exclusions.
Exclusions To Your Cover
Any cover we provide is subject to the following exclusions
Accidental Damage cover, additional cover and Strata Title Mortgagee Protection
exclusions
We will not cover any loss or damage as a result of, or caused by:
……………………
• a defect in an item, structural defects, or faulty workmanship or design”
3.3 Extracts from material relied on by the insurer
Date Action
Insurer’s builder’s report
(MB)
Undated
19 November 2019 attended and photographed in the
presence of the complainant.
Over the last 12 months he noticed water damage to
the ceiling in the lounge room and it has slowly been
getting worse over time.
Damage was evident as there was a water stain to the
ceiling in the lounge room.
Water is ingressing over the lap of the sheet during
periods of rain or ingressing through screw fixings for
the solar panels during periods of rain.
Investigations conducted have identified the following
maintenance/ defect relat ed issues that are directly
responsible or a contributing factor to the damages
that exist: The roof itself is only 1 .25 degrees of pitch
and not the 3 degrees required for trim deck. All fixings
for the solar panels are in the lower pan of the roof
sheeting.
Concluded: The roof itself is top fixed aluminium there
Determination | Case number: 803746 Page 9 of 11
is no ridge cap in place. The roofing spans from one
side of the roof to the ot her with guttering to each side.
The roof is only 1 .25 degre e of pitch and believe water
is either ingressing under the lap of the roof sheet due
to its minimal pitch or penetrating through a screw
fixing for the solar panels. The solar panel fixings are
in the bottom of the pan. All damage has been ongoing
over a period of time.
Repair estimate including GST $3, 913. 19
Insurer’s builder’s quote
(MB)
22 February 2021
To prepare and paint ceilings to kitchen/dining/lounge
and prepare and paint exposed beams in the said
rooms $2,631.09 including GST.
Insurer’s roof inspection
report (TC)
19 November 2019
Inspected and photographed roof 19 November 2019
Roof is about 30 to 50 years old. Made of aluminium.
In fair condition. Pitch 1.25°. No area of the roof is
damaged.
R oof inspection found aluminium metal deck roofing
was top fixed. The roof is approx. 160 sqm. The roof
itself was only 1.25 degree of pitch not the 3 degrees
current Australian standards require for top fixing
roofing. There is no roof cap and the roof she ets run
full length wit h guttering to each side with the roofing
forming its own ridge.
There is a solar PV system installed on the roof, the
mounting brackets for this solar system is fixed to the
bottom pan of the roofing material.
B elieve this is where water is entering through periods
of rain or possibly ingressing under the roof sheet
given its minimal pitch.
Insurer’s Building and
Engineer’s report (CF)
25 November 2020
Inspected and photographed roof 18 November 2020
with com plainant.
Complainant said he had lived in the house for 20
years and that after a heavy rain event a few years
prior he noticed water dripping from the ceiling linings
of the lounge room which occurred over time after the
installation of roof mounted sol ar panels in 2015.
T here was water staining to the ceilings in the lounge
room and kitchen.
O bserved that the roof sheeting over the entire roof
surface displays signs of damage associated with foot
traffic, particularly along the front Northern elevatio n of
the Residence where most of the solar panels are
located.
E ntire roof surface displays signs of foot traffic causing
the „crests‟ of the roofing profile to become damaged,
resulting in distortion of the crest profile. Because of
this damage, the alum inium roof sheets have been
Determination | Case number: 803746 Page 10 of 11
deflected downwards between the timber roof battens
below. This has resulted in result in zero or negative
fall in the roof sheeting, allowing water to pool on the
surface of the roof sheeting.
W ith a digital level we recorded a roof pitch (slope of
the roof) of 1 degrees. This does not comply with the
manufacturer‟s minimum pitch requirement of 3
degrees for Trimdek® roof sheets which has been
applicable since 1963. It is estimated that these roof
sheets were installed around 1 980. We believe lower
roof pitch than recommended may occurred after
completion of the Building as the result of settlement,
timber warping or shrinking, or extra loadings such as
roof mounted items.
L ow roof pitch along with the damages sustained to
the roof sheeting becaus e of misplaced foot traffic
during the installation of the solar panels has allowed
water to pond on the roof surface. “Capillary action”
has then resulted in water tracking over the side laps
of the sheets and int o the roof void, eventually
depositing on the cement sheet ceiling linings below.
A luminium support brackets for the solar panels have
been fixed through the lower „pans‟ or „valleys‟ of the
roof sheets with Tek® screws.
P ierce fixing though the pans and/or valleys is not
recommended for roofing sheets as it decreases the
water tightness of the roof covering, allowing for the
potential of water ingress.
F lexible sealant has installed to the perimeter of
several the support bases of the solar panels.
Insured said he had installed the flexible sealant to
prevent any potential water ingress.
P lacement of the brackets in the pans of the roof
sheeting increas es the risk of debris becoming trapped
on the roof surface during rai n events.
PVC conduit from the Solar Panels has been pierce
fixed through the pans of the roof sheeting.
I nstallation of the support bracket along with pierce
fixing through the pans of the sheet profile along with
the misplaced foot traffic during the installation of the
Solar Panels has res ulted in water ingress into the roof
cavity during Storm/ Rain Events .
T his is the result of Defective Building work.
E ntire roof cover requires replacement as a defective
Building Works item prior to repair of the water
damaged ceilings internally
Cost estimate to repair roof $37,356.
D id not observe any Storm Related D amage to the
roof cover of the Residence during our Inspection.
Determination | Case number: 803746 Page 11 of 11
Des cribed and photographed the storm related
damage to ceiling s in lounge room and kitchen.
3.4 Other relevant material considered and relied on
Parties‟ submissions /emails and all attachments to all submissions/emails
Expert reports
Photographs and quotes
Call recording
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.