Home / Suncorp Group / Determination 802087

Determination 802087

Storm claim for box gutter, downpipes and flashing partly declined

FirmSuncorp Group
Decided2022-05-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$760
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed under their home insurance for storm damage to a box gutter, blocked downpipes and missing flashing. The insurer accepted internal damage but declined the other items. AFCA ordered payment of $760 for the missing flashing plus interest, and declined the remaining claimed items.

The complainants must show on the balance of probabilities that the damage was caused by the storm event; the flashing was probably blown off in the storm, but downpipes and box gutter damage was not established as storm-caused.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 802087 Financial firm AAI Limited Determination | Case number: 802087 Page 1 of 12 Case number: 802087 7 April 2022 1 Determination overview 1.1 Complaint The female complainant held a home and contents insurance policy issued by the financial firm (the insurer). She is represented by the male complainant. For the sake of brevity and convenience I shall refer to both as the complainants in this determination. The complainants lodged a claim for property damage following a storm event which occurred in late February 2020. The insurer accepted the claim for internal damage. However, it says it is not liable for replacing a box gutter, blocked downpipes, and a missing flashing (the claimed items) because the claimed items were not damaged by the storm event. The complainants disagree. They require the insurer to pay for the claimed items. The case analyst provided the parties with a recommendation on the issues in dispute. The recommendation was mostly in favour of the insurer as he found the insurer was to pay for the missing flashing only. The insurer accepted the recommendation, but it was not accepted by the complainant s . In the circumstances, the complaint has been referred to me for determination . 1.2 Issues and key findings Is the insurer required to indemnify the complainants for the claimed items? The available evidence does not establish on the balance of probabilities the downpipes or box gutter were damaged in the storm. Photographs show missing flashing which probably blew off during the storm. In these circumstances the insurer is required to indemnify the complainants for the missing flashing only. Why is the outcome fair? The insurer is entitled to rely on the available material and the policy terms. The available material establishes the flashing probably went missing in the storm and so it is fair the insurer indemnifies the complainants for this cost. Otherwise, the available material does not establish on the balance of probabilities the downpipes or the box gutter were damaged in the storm nor that it was unreasonable for the insurer to require repairs to the roof before internal repairs were cash settled. As the complainants have not established a valid claim, it would not be fair to require the insurer to indemnify the complainants for the claimed costs (save for the flashing). Determination | Case number: 802087 Page 2 of 12 1.3 Determination This determination is partly in favour of the complainants. Should the complainants accept this determination then within seven days of notification of acceptance the insurer is to pay to the complainants $760 for the missing flashing. The insurer is also to pay interest pursuant to section 57 of the Insurance Contracts Act 1984 (the Act) on $760 from 26 October 2020 (when the claim was first declined) until payment. Otherwise, the insurer is not required to take any further action in relation to t he claim or the complaint. Determination | Case number: 802087 Page 3 of 12 2 Reasons for determination I have decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). I have considered all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. After the recommendation was rejected, the complainants made further lengthy submissions in which their position was essentially reiterated. They also provided material including more photographs. Where relevant, these will be referred to in the determination. 2.1 Is the insurer required to indemnify the complainants for the claimed items? Complainants must show claimed items damaged by the one storm event The complainants must show on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. It not in dispute there was a storm on 26 February 2020. The insurer has cash settled the complainants for the internal damage caused by the storm. The insurer says it is not required to pay for the claimed items as either they were not damaged in the storm, or the damage was not caused by a single storm or insured event as required by the policy terms. It says repairs completed to the roof were maintenance related, for which it is not liable. Both parties have made lengthy submissions and rely on expert material. A summary of the expert material relied on is set out in supporting section 3.3 of this determination. Extracts from the relevant policy terms are set out in section 3.2 of this determination. Claim does not respond to escape of liquid cover The complainants argued the claim should be paid pursuant to the escape of liquid cover. I do not agree. This is because the available information does not establish the claimed damage was caused by water overflowing or bursting from any roof gutter or rainwater drain pipe. Even if this was accepted as a cause of damage, the policy exclusion to this cover is clear. The policy does not cover the cost of repairing or replacing the item from which the liquid escaped. In short, even if it was established damage was caused because water overflowed from the drain pipes or from the box gutter, the policy does not cover the cost of repairing or replacing the item from which the liquid escaped. These items are the subject matter of the complainants’ cla im. Downpipes probably not damaged in the one storm event The complainants say the downpipes were blocked because of the one severe storm event. Determination | Case number: 802087 Page 4 of 12 They rely on experts, newspaper clippings and material from the Bureau of Meteorology. The complainants say the storm included intense rainfall in a short time. They argue there is no evidence the pipes are blocked from dirt and debris. They say the insurer’s inspections were inadequate or too removed from the storm event. The insurer relies on its assessor and builder (DW) who say as substantial trees surround the property, the gutters and downpipes had become filled with debris over time. The insurer asserts lack of regular maintenance over time has caused the downpipes to block to the point of requiring replacement. It says the downpipes have not been blocked to the point of needing replacement because of the one single storm event. Rather it contends a blockage of this severity is consistent with the downpipes not being regularly maintained over time. I have considered the photographs taken of the property. Photograph show trees in the front and back of the house. Photographs also show leaf litter in gutters. The quote to repair the pipes includes an observation that ‘ all down pipes on the property were blocked with dirt leaves and storm debris ’ . It describes the steps needed to clear the downpipes and drains. Although the quote refers to the storm debris being ‘ all storm related ’ it does not relate the blockage to the one single storm event in February 2020. The complainants ’ plumber (PD) refers to the need to provide a leaf guard which supports the insurer’s contention of the existence of leaf debris build -up. The complainants ’ roofer (GE) says the storm’s intensity ‘ blocked and busted ’ the back drainpipe and blocked the side drainpipe, but the report is insufficient in explanation to be persuasive. I note the material from the complainants’ experts AT and CJ. However, when considering the photographs and the opinions of the assessor and DW, these reports do not persuade me the claimed damage to the downpipes was caused in the one single storm event. Rather, I am persuaded there was debris and leaf build up over time which damaged the pipes. Therefore, I am not satisfied the complainants have established on the balance of probabilities the claimed damage to the downpipes was caused in the one storm event in February 2020. As the complainants have not established a valid claim, the insurer is entitled to decline this part of the claim. Insurer liable to pay complainants $760 plus interest for flashing The complainants say the wind in the storm blew off the flashing. Their roofer (GE) says the front porch has lost its flashing seal. The complainants say the glue where the flashing was attached to the parapet shows the flashing is now missing. DW says there is no visible adhesive showing there was additional flashing to the left-hand side of the roof. CJ said DW overlooked the remnants of black trim flashing seen as a black scuff mark on the metal. I have revi ewed CJ’s images of the flashing. I accept the photographs show metal flashing with black scuff marks where adhesive may have held black trim blown off by the wind. The complainants’ plumber quoted the cost to install new flashing on the front porch from the brick wall to the roof sheets in the sum of $760. The insurer provides no contrary amount. Should the complainants accept this determination the insurer is to reimburse the complainants $760 to replace the flashing. Determination | Case number: 802087 Page 5 of 12 The insurer is also to pay interest pursuant to section 57 of the Act on $760 from 26 October 2020 (when the claim was first declined) until payment. Insurer not required to pay claimed roof repairs costs The complainants say the box gutter did not leak in the storm. They rely on the make safe inspection. They say the box gutter did not leak when tested. They agree there was a leak as the ceiling was damaged during the storm, but they do not know where the leak came from. They also contend the box gutter leaked due to the storm event because of the enormous volumes of storm water. They later contend there were loose screws on the roof. The complainants criticise the insurer’s builder’s opinion (DW) saying he only inspected the roof from a distance and did not have evidence of where the roof leaked. The insurer relies on DW who says the installation of the box gutter in 2018 was incorrect as the gutter was not installed in one single piece. The insurer says water leaked through the joint in the box gutter, causing the damage below. The insurer contends this is the dominant cause of the internal damage because the damage is localised in the area directly below the box gutter. The complainants challenge the insurer’s view regarding the roof damage . They argue they should not have been required to repair the roof as it did not leak and was not damaged in the storm. They say they only replaced it so the internal damage could be repaired and so they would not be prejudiced if there was a future insurance claim. The insurer relied on photographs from the make-safe contractor who said they did an internal inspection which showed damage under the box gutter. When they went onto the roof and attempted to replicate the leak with a hose, the volume of water could not be matched. The insure r also refers to the invoice from the complainants’ plumber (PD) which shows the installation of the new seal over the join in the valley. I have reviewed the material provided by the parties. I accept PD had worked on the complainants’ roof on several oc casions before the storm event. The box gutter was installed, and silicon sealed in 2018. I note DW makes several criticisms of the box gutter. I have reviewed the images provided. I accept the internal damage is beneath the box gutter. I also accept there is a seam in the box gutter. This is clearly seen in photographs taken by the insurer’s contractors contemporaneous with the first inspections not long after the storm event. Although the complainants’ plumber said the box gutter was watertight, nonetheless, after the storm in 2020 the plumber placed a new seal over the joint in the box gutter valley. I am satisfied it is probable water leaked through the seam when heavy rain fell during the storm. The fact the make-safe contractor could not duplicate the leak does not derogate from that opinion, in view of the photographs provided of the roof and the area of internal damage. In those circumstances, the complainants have not established the roof was damaged in the storm event. I agree the insurer required certain repairs to be undertaken before the interior damage would be repaired or cash settled. In view of the available material, I am satisfied this requirement by the insurer was reasonable. Taking all matters into account and for the reasons stated, the insurer is not required to indemnify the complainants for roof repair costs. Determination | Case number: 802087 Page 6 of 12 Other matters do not assist the complainants The complainants argued the claim should respond because of the negligence of the insurer. Firstly, I do not accept the insurer has acted negligently. Secondly, the dispute between the complainants and the insurer is governed by the terms of the policy and not by the law of torts. The complainants also argue the claim should be met because a previous claim was met by the insurer. This is not relevant to the facts and circumstances of the subject claim, which is governed by its own facts and circumstances and the policy terms at the time of this storm event. 2.2 Why is the outcome fair? The insurer is entitled to rely on the available material and the policy terms. The available material establishes the flashing probably went missing in the storm and so it is fair the insurer indemnifies the complainants for this cost. Otherwise, the available material does not establish on the balance of probabilities the downpipes or the box gutter were damaged in the storm nor that it was unreasonable for the insurer to require repairs to the roof before internal repairs were cash settled. As the complainants have not established a valid claim, it would not be fair to require the insurer to indemnify the complainants for the claimed costs (save for the flashing). Determination | Case number: 802087 Page 7 of 12 3 Supporting information 3.1 The AFCA process AFCA’s appro ach to this complaint It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Caselaw and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause.  A common-sense approach is taken to determine proximate cause. 3.2 Key policy wording Page 8 of the PDS: Event or incident means a single event, accident or occurrence which you did not intend or expect to happen. Insured events means the insured events on pages 28 to 41. In addition, an insured event is always a single event, accident or occurrence which you did not intend or expect to happen. Page 30 of the PDS: What you are covered for – Insured events You can choose to take out insurance for your home or your contents at the Determination | Case number: 802087 Page 8 of 12 insured address, or both. The cover you have chosen will be shown on your certificate. If you have a home insurance policy, we cover your home for loss or damage at the insured address caused by an insured event during the period of insurance. Storm We cover Loss or damage caused by storm. Page 92 of the PDS: How we settle your claim We choose how we settle home claims If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will: • repair damage to your home; • rebuild your home; • pay you what it would cost us to repair or rebuild your home; • pay you the home sum insured shown on your certificate; • give you a voucher , store credit or stored value card for the amount it would cost us to repair or rebuild an item. If we rebuild (or pay you what it would cost us to rebuild), we will rebuild on a ‘new for old’ basis. If we repair (or pay you what it would cost us to repair), we will at our option repair on a ‘new for old’ basis or repair to a similar condition to what your home was in before the loss or damage occurred. Unless we tell you otherwise, we will deduct any amounts you owe us from any amount we owe you. Your responsibilities You must: • keep your home, unit and any contents well maintained and in good condition. …. Not meeting your responsibilities If you do not meet your responsibilities, it may lead us to do one or both of the following: • reduce or refuse to pay your claim; • ….. Well maintained and in good condition means your home or unit and contents do not have any faults or defects that might cause loss or damage to your home or unit or contents, loss or damage to Determination | Case number: 802087 Page 9 of 12 property of others or injury to people. This includes but is not limited to the following: • the roof does not leak when it rains ; … 3.3 Key reports and material Record Key points Complainants’ plumber (PD) Report 21 May 2017  Engage d to deal with leaking issues. Removed roof sheets and installed new flashing partially on existing .  S ection replaced resolves the leak . Complainants’ plumber (PD) Report 27 February 2018  Customer wanted roof leak issues reviewed.  Cut out valley to allow water to flow int o gutter correctly.  Cleaned gutter and valley.  If gutter continues to leak additional downpipe to be installed . Complainants’ plumber (PD) Report 1 November 2018  Second part of the box gutter installed, and silicone sealed.  No further roof leaks will come from the box gutter. Insurer’s builder (DW) Report 19 March 2020  Rainwat er entered through the poorly installed box gutter, collapsing the lounge’s ceiling.  Box gutter should have been installed in one piece wit h no joints.  Box gutter does not properly extend up behind the roof sheeting and must be fixed before repairs can proceed. Insurer’s builder (DW) Quotes 14 April 2020 & 23 July 2020  Internal work in lounge room $1,473.05 .  Additional repairs required t o facilitate repairs $5,415.08. Complainants’ plumber (PD) Report 22 May 2020  Installed new box gutter 2018. Joint for the two sections is fine. Watertight.  Recommend leaf guard be installed on the valleys as the re is leaf debris build - up and this will cause wat er to back up in heavy downpours and flow back under the roof sheets.  Install new flashing on front porch from brick wall to roof sheet s $760.  All downpipes blocked with dirt. Complainants’ plumber (PD) Report 16 June 2020  Completed roof repairs including new roof screws to replace loose screws and new seal over join in valley .  Ran hose onto roof and found all downpipes blocked with dirt.  Quoted to replace 90mm line on right side of hous e and new rear d ownpipe . Insurer’s builder (DW) Report 15 July 2020  Damaged ceiling directly below box gutt er joint.  Box gutter off - cut poorly designed as the edges are not turned in per manufacturer’s recommendations.  Caus e of damage is rainwater entering over the box gutter as it Determination | Case number: 802087 Page 10 of 12 Record Key points could not handle the rain’s volume.  Before repairs can commence , items require work including minor corrosion to valley gutter, roof sheets, ridge caps and some screws and replace timber ceiling boards as decay evident from long - term wat er ing ress .  Also recommended install box gutter in one piece. Asse ssment report 14 August 2020  Agree not only damage to plaster ceiling but also wall under ceiling .  Variation $5,415.08 involves wall repairs and further ceiling repairs .  On re - attend , builder noted box gutter is poorly installed with no turn ups and 2 lengths with silicon joins in middle. Gutter will leak again in future .  Cash settle until box gutter replaced as recommende d. Complainants’ plumber (JM) Quote 14 September 2020  All the downpipes are blocked by dirt, leaves, and storm debris.  The blockages are all storm related.  Describes work required to clear downpipes and drains including new 90mm lines on right side and front of house: new rear downpipe total $4,869.01 . Complainants’ plumber (JM) Quote 1 6 September 2020  S tormwater replacement and remove and replace front right downpipe and supply flashing $3,245. Asse ssment report 7 October 2020  Reviewed quotations from JM.  Indicates downpipes and stormwater pipes are heavily bloc ked , indicating this has not happened from one storm event but accumulated over time .  Clearing of gutters and downpipes is a maintenance requirement.  Ask plumber to comment if flashing was blown off. Complainants’ roofer (GE) Letter 30 November 2020  The downpipes’ damage is due to the storm.  The storm’s intensity blocked and busted the back drainpipe and blocked side downpipe.  The front porch has also lost its flashing seal and the downpipe is blocked and busted Insurer’s builder (DW) Report 11 Decembe r 2020  Complainant said strong winds in storm blew loos e leaves into the gutters which blocked the downpipes.  Noted large amount of leaves and debris blocking gutters and downpipes.  Missing flashing is inconsistent as there is no visible fixing or adhesiv e showing there was an additional flashing to the left - hand side of the roof .  Blocked gutters and downpipes are due to lack of maintenanc e.  Maintenance issues required including cleaning all blocked Determination | Case number: 802087 Page 11 of 12 Record Key points gutters and downpipes, replacing downpipes that cannot be cleaned and install roof fixing to the hole in the roof covering where it had been removed. Insurer’s a sse ssor (LT) Report 8 March 2021  C laim for int ernal damages from storm already accepted. Flashing, box gutter and downpipes remain in dispute .  Reviewed CJ ’s report and complainant’s assertion delay in DW tending jeopardised their report.  Opinion remains the same. Blocked downpipes and sto rmwater pipes is not due to storm.  Based on ex perience, assessor has never seen a situation where whole stormwater pipes must be replaced due to leaf and dirt blockage.  The extent of blockage indic ates long - term damage because of maintenance issues and not storm damage . Complainants’ materials and durability scientist (AT) Report 31 July 2021  Storm was clearly severe. During a severe storm, strong winds and heavy rain can cause substantial leaf defoliation .  Heavy rain causes a surge of water from the roof into pipes. This means a sudden build - up of leaves will be compressed in the water, especially in pipes’ bends .  Some leaves were likely in the gutter, alth ough this cannot be established.  Heavy rain from the storm and leaf defoliation by winds is the ‘majo r contribut or’ to the complainants’ damage. Complainants’ plumber (PD) Email 8 August 2021  In about 2008 unblocked several downpipes following a storm. Complainants’ expert (CJ) Report Undated  Reviewed earlier reports and recommended $8,115 be paid to replace three downpipes and flashing to the front of the house .  Significant storm event as B urea u of M eteorology reported 66mm during one - hour storm.  There is almost no leaf debris without this storm.  DW report occurred eight months after initial storm , so it is invalid.  Photographs provided of the areas of the roof which has been replaced .  DW report inspected roof from a distance, meaning his inspection was flawed and did not see detail properly overlooking the remnants of the black trim flashing, seen as black scuff mark on metal.  Claim for black trim covering the flashing referred to in the plumber’s reports as flashing is trim at the front of the house , which was blown away in the storm .  Describes news paper report of southerly change bringing gusts of wind up to 90k m/h .  Re DW report, he did not look closely enough as after eight Determination | Case number: 802087 Page 12 of 12 Record Key points months adhesive is seen black scuff mark which was stuck on metal .  DW did not inspect downpipes properly. Blockage cannot be seen with ey e. Downpipes are not overflowing with leaves. Any leaf matter photos are recent. DW is too late to decide about maintenance.  The pipes could not be cleared. The blockage is somewhere in the middle aft er plumbers pushed debris from both sides .  DW did not hose test to see blockage .  S torm caused debris from trees to block the pipes.  If it was a long - term issue, the pipes would be overflowing wit h debris.  Three plumbers and roofers all state downpipes are blocked after the storm event. Two state it is due to storm. 3.4 Other relevant material considered and relied on  Parties’ submissions /emails and all attachments to all submissions/emails both before and after the recommendation.  Parties’ expert reports.  Photographs, invoices and quotations.  Newspaper clippings and other material in relation to the storm event.  Claim file notes.  Correspondence between the parties.