Home / Strata Community Insurance Agencies Pty Ltd / Determination 801588

Determination 801588

Insurer declined a strata storm water damage claim for non-disclosure and exclusions; AFCA found the claim should be accepted for 17 units

FirmStrata Community Insurance Agencies Pty Ltd
Decided2023-03-02
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

A body corporate's strata storm water damage claim was declined for non-disclosure and policy exclusions. AFCA required the insurer to accept damage to 17 units, cash settle them plus interest, and pay $1,000 non-financial loss, but not for units 54 and 73.

The insurer did not prove prejudice from non-disclosure under s28(3) or that exclusions applied, and the storm was a sudden and accidental cause, except for two units with similar pre-existing damage.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial lossreassess claim

Related

All Strata Community Insurance Agencies Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 801588 Financial firm Strata Community Insurance Agencies Pty Ltd Determination | Case number: 801588 Page 1 of 13 Case number: 801588 21 February 2023 1 Determination overview 1.1 Complaint The complainant holds residential strata insurance with the financial firm (the insurer). In February 2019, the complainant lodged a claim after multiple apartments sustained water damage due to a significant storm event. The insurer assessed the damage and declined the claim on the following basis:  the complainant breached its duty of disclosure  loss or damage caused by known defects is excluded  damage was not accidental or sudden in nature  the policy exclusions of gradual deterioration, wear, tear or lack of maintenance apply to defeat the claim  loss or damage caused by non-rectification of an insured property defect which the insured would have reasonably known about, is excluded under the policy. The complainant disputes the insurer’s decision and seeks a review. The complain ant is seeking either of the following:  if it is deemed that the complainant breached its duty of disclosure, the insurer to refund the premiums from policy inception  if it is deemed the complainant did not breach its duty of disclosure, the insurer should accept and settle the claims as per the terms and conditions of the policy. The complainant has been assisted by a representative in this matter. Reference to the complainant in the determination includes both the complainant and its representative. 1.2 Issues and key findings Did the complainant breach its duty of disclosure? No. The insurer has not proven the complainant breached its duty of disclosure. Is the insurer entitled to decline the claim? No. The information shows 17 units were damaged from the February 2019 storm event. The insurer is required to accept damage to these 17 units. Has the insurer mishandled the claim? Yes. The insurer is required to pay $1,000 as non-financial loss compensation to the complainant Why is the outcome fair? The policy is clear and covers damage which is sudden and accidental. The exchanged information shows, on balance, that various units sustained damage due to the February 2019 event. It is fair the insurer accepts that damage. However, it would not be fair to require the insurer to pay the claim for the damage to the two units (54 and 73) which had similar pre- existing damage. Determination | Case number: 801588 Page 2 of 13 The insurer’s handling of the claim resulted in an unusual degree of time taken to resolve the complaint. It is fair the insurer pays compensation for non-financial loss in these circumstances. 1.3 Determination This determination is substantially in favour of the complainant. The insurer is required to accept damage to 17 units. These unit numbers are listed in section 2.2 under the heading ‘ Insurer to accept damage to the remaining units ’. The insurer is also required to pay $1,000 non-financial loss compensation to the complainant. Determination | Case number: 801588 Page 3 of 13 2 Reasons for determination 2.1 Did the complainant breach its duty of disclosure? Insurer says there was non-disclosure The complainant is a body corporate which consists of 92 housing units and common areas in Townsville, Qld. The complainant authorised the Strata Community Manager (BC) who in turn used the services of its broker (AO) to arrange the insurance policy with the insurer for the strata complex. There is no dispute water entered through the roof and windows in multiple units during previous storm events. In the body corporate’s meeting minutes, it had been recorded since 2016 that there were issues with the windows and roof. The insurer says there were non-disclosure issues as the complainant did not disclose these pre-existing issues with the building. It says the complainant was aware of the pre-existing issues with the roof and windows and the fact there had been previous water entry to several units. Further, the insurer says the insured property was constructed with inferior construction material and had expanded polystyrene (EPS) which was not disclosed to the insurer at the time of policy inception. The insurer says this is considered as a material non-disclosure from the complainant’s perspective as it was aware of these issues. The insurer says had it been made aware of these pre-existing issues, it would not have offered the policy. The complainant refutes there were any pre-existing defects at the property as it says it had been diligently undertaking the maintenance of the roof and the property. Further, the complainant says it was not aware of EPS or inferior construction material being used at the property. The complainant also says the insurer has not proven there is in fact any EPS present at the property. Sections 21 and 28 of the Insurance Contracts Act 1984 is relevant to this issue. Section 21(1) of the Act sets out the insured’s duty of disclosure. Section 28 provides the remedies available to the insurer if an insured fails to comply with its duty of disclosure. In particular, section 28(3) of the Act is relevant. This says: If the insurer is not entitled to avoid the contract or, being entitled to avoid the contract (whether under subsection (2) or otherwise) has not done so, the liability of the insurer in respect of a claim is reduced to the amount that would place the insurer in a position in which the insurer would have been if the failure had not occurred or the misrepresentation had not been made. This means the insurer must show the extent of its prejudice from any alleged non-disclosure. Evidence does not establish the insurer’s prejudice The insurer was asked to provide information to support its position about non-disclosure. In response, the insurer provided a statutory declaration from SD, National Technical Manager. Determination | Case number: 801588 Page 4 of 13 This statutory declaration was provided on a previous AFCA dispute which was subject to the same claim. However, that dispute related to a single lot owner. SD has since left the insurer and the insurer has relied upon the same statutory declaration. In these circumstances, the panel is satisfied the insurer is able to rely on the statutory declaration. SD included excerpts of the relevant underwriting guidelines. Relevant to this were the following: Property situated North of the 23 rd Parallel constructed prior to 1995 and/or where construction of the walls is iron/steel, asbestos sheeting and/or roof comprises tiles (concrete/clay) and/or inferior walls, roof and floors. SD also refers to the fact there was EPS in the walls, which would require a referral to the policy underwriter. SD then said: Based on the fact that the Insured Property was located north of the 23 rd Parallel and the Insured Property was constructed with inferior building material, I would not even have considered this policy be referred to [A] for special consideration, but would have made the decision that the risk should not have been underwritten Firstly, based on the information available, it is not clear there is EPS at the property. Secondly, if there was, the panel is not satisfied that the body corporate knew this. SD says the ‘presence of EPS is something either the Insured knew of or ought reasona bly to have known of’. The insurer provided no evidence to show the insured knew there was EPS. Regarding whether it ought to have known, this misunderstands the duty of disclosure. An insured is required to disclose what they know, not what they should have known. Therefore, the panel does not accept there is any basis to conclude there was non-disclosure regarding EPS. In reviewing SD’s evidence, it seems his view was at least, in part, based on the fact EPS should have been disclosed. He makes numerous references to this. SD does not say that based on the pre-existing issues with the roof and windows alone, and excluding the EPS, this would have led to a policy decline. Further, having reviewed the underwriting evidence, it is not clear these pre-existing issues would have resulted in a decline. For instance, the insurer does not specifically identify, beyond the EPS, what inferior material was not disclosed which would have engaged the relevant guideline. Therefore, SD’s statutory declaration does not support the insurer’s position that it would have declined the risk due to the body corporate’s alleged non -disclosure about the pre- existing issues with the roof and windows. Insurer cannot deny the claim due to non-disclosure This means that even if the panel were to accept the body corporate failed to comply with its duty of disclosure regarding the property’s pre -existing issues (which it does not), the insurer has not established the extent of its prejudice under section 28(3) of the Act. It follows the insurer cannot decline the claim on this basis. Determination | Case number: 801588 Page 5 of 13 2.2 Is the insurer entitled to decline the claim? Complainant required to establish a valid claim The complainant is required to show that, on the balance of probabilities, it has suffered a loss caused by a risk insured against under the policy. This is known as establishing a valid claim. If the complainant is able to establish a valid claim, then the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to decline the claim. Reports indicate pre-existing issues with the complex Both the insurer’s loss adjuster (E) and the insurer’s expert (W) noted there were several pre - existing issues with the insured property. W provided a roof report. This identified various issues. This included rusty screws and roof debris, water ponding in new dektites, rust damage in sheets, water ponding in box gutters on the southern end of the building, numerous sheet punctures and holes, loose flashings, sealants around pipes having deteriorated. W advised the cause of the water ingress was a combination of excessive rainfall in a short period of time and the poor condition of the roof with prolonged periods between maintenance. The information provided shows that both prior and after the event, the body corporate had been actively involved in attempting to address the maintenance related issues associated with the roof. The body corporate provided evidence of several reports, and numerous invoices paid, in attempting to address the roof issue. The body corporate also provided a report from the contractor it engaged (BM) to assist in maintaining the roof. Whilst BM acknowledged there were various issues, BM noted the following points:  dektites will be replaced over time  there is only surface rust and there is no issue with it  dints on the roof have not caused leaks  stainless steel box gutters will pond – replacing them would be a major structural change  several holes have been identified and repaired  other issues have been identified but have not resulted in leaks  the roof does not need to be replaced – there is still a lot of life to it. Historical records show pre-existing damage to some units In February 2019, there was a major storm event in Townsville which caused damage to multiple units in the strata complex. The complainant says during this storm event, the water entered multiple units through the external cladding for 12 days. A list revised on 8 April 2020 by the body corporate’s chairman noted 20 units were damaged. The panel notes AFCA has previously issued a decision related to one of the units (unit 83). Hence, this determination will consider the remaining 19 damaged units [2, 11,12, 34, 38, 54, 56, 58, 63, 64, 72, 73, 80, 81, 86, 88, 89, 90 and 91]. W inspected most of the damaged units and reported on the damage. There is information which shows some unit owners had reported pre-existing issues with their units in June 2018. The unit owners also provided the following information to the body corporate following the February 2019 storm event: Determination | Case number: 801588 Page 6 of 13 Unit numbers Damage reported in 2018 by unit owners Damage reported by unit owner after February 2019 storm W reported after February 2019 event 2 nil damage water damage to the walls and ceilings in the kitchen water entry in the kitchen from external windows and penetrations on external wall. 11 nil damage  w ater damage to carpet, architraves and bed .  three bedrooms including master bedroom became wet . due to the extreme rainfall, it is possib le the in - floor drain did not cope and water overflowed into the rooms . 12 nil damage three bedrooms sustained extensive water damage  walls in all three bedrooms suffered damage.  skirting in bedroom 1 and 3 also suffered damage 34 nil damage  water damage to front bedroom wall and carpet.  curtain mounts also pulled out of the wall due to the water - logged plasterboard nil further damag e observed 38 nil damage the window leaked causing carpentry damage around the master bedroom window unable to arrange access. 54 kitchen wall and ceiling water stained. History of rain entering through the window. kitchen ceiling had water damage kitchen cupboards were swollen and had mould Determination | Case number: 801588 Page 7 of 13 56 nil damage front bedroom wall had a hole in it from substantial water ingress  walls and cornice required replacement in bedroom 1.  metal channel was rusty in bedroom 1 which indicated water ingress had been happening over a period of time. 58 nil damage front RHS lower window was leaking into wall and pooling the carpet no comments 63 nil damage leak in main bedroom ceiling and front windows nil damage observed 64 staining to planter boxes which had happened in 2013.  master bedroom RHS leaking into wall and to cornice.  water ingress in bedroom 2 was substantial and the atrium was leaking. water came in under the skirting in bedroom 2 through the exterior wall. 72 nil damage front bedroom and main be droom leaking from architraves  ceiling, cornice and skirting damage to bedroom 1.  ceiling damage to bedroom 3.  water had entered in through the external cladding and travelled into bedroom 1 plasterboard wall linings resulting in mould on the sheeting and fixed external cladding. 73 the walls and ceiling in the main bedroom and kitchen had paint peeling and staining. There was also mould present in these areas. front bedroom experienced water ingress no comments - unable to arrange access. Determination | Case number: 801588 Page 8 of 13 80 ceiling damage in balcony. Previously this area had been repaired, however, the damage reoccurred. major window leaks on the LHS of the dining room.  cracked window sill which had previously been repaired  water had been entering through a window for a number of years  floorboards in the dining area damaged due to the ongoing water leak.  patio ceiling damaged due to the leak from the floor above  external cladding dislodged during the storm  walls and skirting in bedroom 3 damaged as the water entering through the wi ndow due to flashing or penetration failure during the storm event. 81 plaster, staining to ceiling/fan internal leaking as per AGM minutes from 2018 entry ceiling had water stains 86 nil damage significant water ingress in the main bedroom (through the windows and wall), lounge room and back bedroom water damage to the cornice and ceiling in bedroom 1. 88 nil damage nil damage reported  extensive mould throughout this unit  multiple leak points noticed above the lounge ceiling 89 nil damage nil damage reported  mould in the sunroom.  unable to confirm the extent of damage. 90 rooftop ceiling damage and gutters were falling off.  water came through ceiling in the bedroom and through ex haust flue in the main  ceiling had been removed in the sports room due to mould  e xternal wall outside sports room had Determination | Case number: 801588 Page 9 of 13 Insurer’s expert does not identify the cause of damage to each unit The insurer’s expert, W, reported iss ues relating to water ingress at the strata complex. It reported the water entered the units through external façade/cladding, windows, roof and external walls. At the time of W’s inspection, the weather was dry. In its building report, W found there were numerous leak points. These include the external cladding, windows, roof and external walls. The roof report deals with the causes for water entry from the roof. The building report listed the following causes for these other areas:  external cladding – numerous areas where the sealant broke down or was degraded  most of the windows had evidence of event and old water entry – there were numerous reasons provided for this. bedroom  above entertaining area floor was also leaking in the guest bedroom. movement cracks which have been repaired previously.  bedroom 2 had movement cracks in the wall.  e n - suite ceil ing had water staini ng.  e xtensive water damage to the kitchen cabinetry in the roof top kitchen.  r oof top doors in the store room and entry had sustained water damage to their base.  the kitchen cabinetry and doors were used externally, however, they were only supposed to be used indoors.  bedroom 3 wall had water damage.  structural movement cracks in the wall near the steps on the first level 91 study ceiling had water damage study ceiling leaking and two large wet patches of ceiling in hallway  mould around the hallway vent near the entry.  mould in bedroom 3 robe ceiling.  water staining on bedroom 1 ceiling.  balcony unsafe and unusable Determination | Case number: 801588 Page 10 of 13 W reported sealant in the external cladding had deteriorated in a number of areas. W conceded it was not able to access the steel awning and external walls. In relation to the windows, W reported there was evidence of event related and old water entry. W listed a number of reasons for the water entry through the windows including blocked or insufficient drainage holes, faulty rubber seals, incorrectly placed drainage holes, poor or non-compliant installation of the windows, broken or damaged flashings, non- installation of approved flashings and deterioration of external sealants. After reviewi ng W’s report, the panel notes W sets out issues with the building as a whole and it provided commentary about the damage which it observed at the units it was able to access. However, W did not undertake any testing or provide any specific evidence which confirms the cause of damage to each unit. It appears the insurer infers the damage to all of the units are attributable to one of these issues (relating to the pre-existing issues with the external cladding, windows and roof). The panel is not persuaded there is sufficient basis to support such an inference. It is not apparent that all of the damage can be attributed to the pre-existing issues identified by W. The property sustained damage after a significant weather event. This, of itself, could have been sufficient enough to cause the water entry. It was therefore incumbent on the insurer to instruct W to identify the specific cause of water entry to each unit in order to show why the policy does not respond. W’s report is sile nt on this. The panel acknowledges W and the insurer attempted to access the property in 2021. This was not granted by the body corporate. However, it is not clear whether the expert could feasibly identify the cause of the water entry given the passage of time and any works undertaken in the meantime. Complainant’s expert has not provided any compelling information The complainant engaged its own expert (MB) to inspect the property and determine the property’s resilience to storm driven rain. The panel is not satisfied MB’s report determined how the water entered in these units. MB’s report appeared to be focussed on rebutting W’s report. The panel is not satisfied MB’s report advances the complainant’s position. The complainant is seeking the assessment fees it incurred in engaging MB. Given this report has not advanced the complainant’s position, the panel is not satisfied the insurer is required to pay MB’s fees. Insurer is not required to accept damage to two units After carefully reviewing the informat ion, including the body corporate’s meeting minutes, there is evidence which shows some of the units had suffered damage prior to the storm event. This is because several of these units did report damage pre-existing this event (54, 64, 73, 80, 81, 90 and 91). However, several of them reported pre-existing damage distinct from the claimed event or the claimed event resulted in new or more extensive damage (64, 80, 81, 90 and 91). Two of these units did report very similar water damage to that previously reported (54 and 73). There is no information to show the damage claimed for units 54 and 73 was caused by the claimed event as opposed to the pre-existing issues. Given the similarity of the damage, it Determination | Case number: 801588 Page 11 of 13 appears likely to have been caused by pre-existing issues. Therefore, the panel is not satisfied the insurer is required to accept damage to these two units. The policy responds to the rest of the claim There is no dispute the event which caused the water entry was a significant one. Further, W’s roof report accepts that one of the causes of damage is excessive rainfall in a short period of time. The policy responds in the following circumstances: We will pay up to the Sum Insured shown on the Schedule for Section 1, against Loss or Damage to Your Insured Pro perty … Loss or Damage is defined to mean: direct physical loss of, destruction of, or damage to property from any sudden and accidental cause not otherwise excluded by this Policy The complainant’s claim meets these criteria. The evidence shows the damage resulted from excessive rainfall. This would be damage to property from a sudden and accidental cause. The insurer says the following exclusions apply to the claim:  loss or damage caused by known defects  damage was not accidental or sudden in nature  gradual deterioration, wear, tear or lack of maintenance  loss or damage caused by non-rectification of an insured property defect which the insured would have reasonably known about. The panel is not satisfied these policy exclusions apply. This is because the panel is not satisfied the available information shows that the reason the water entered into the properties was due to these excluded factors. W’s report provides a general opinion on the overall property. W does not provide a specific view of how the water entered each property. W’s roof report makes it clear the excessi ve rainfall is a causal factor. Therefore, after careful consideration of all the available information, the panel is satisfied the policy responds to the rest of the claim. Insurer to accept damage to the remaining units The available information indicates some units have been repaired. For instance, W’s scope of works says units 72, 81, 88, 89 and 90 have already been repaired by it. Given W conducted the repairs, the insurer should reimburse the complainant for these invoices. The insurer is also required to pay interest pursuant to section 57 of the Insurance Contracts Act from the date of payment of the invoices until the settlement date. For the rest of the units (2, 11, 12, 34, 38, 56, 58, 63, 64, 80, 86 and 91), the panel notes W has prepared a scope of works and quotes for them in a document dated 22 April 2020. No other quotes have been prepared. There is no information from the complainant to show these quotes, or scope of works, were unreasonable at the time. Determination | Case number: 801588 Page 12 of 13 Accordingly, the panel accepts the insurer is required to cash settle these units for their property damage based on W’s quote along with a 25% contingency. Whilst this continge ncy is substantial, the panel considers it is fair given the possibility of any unforeseen items not being included as well as the fact costs have likely increased over time. The insurer should also pay interest on the relevant sums pursuant to section 57 of the Act. Interest is payable from 22 April 2020, being one month after W’s report was issued, until payment is made. 2.3 Has the insurer mishandled the claim? Insurer to pay $1,000 as non-financial loss compensation AFCA may award compensation (capped at $5,400) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainants’ expectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because a complainant has suffered some inconvenience. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. The complainant says this claim has caused significant disruption to the expectations of unit owners’ enjoyment at their property. The complainant says the insurer’s handling of the claim has been extremely questionable. Based on the availab le information, the panel is not satisfied the insurer’s claims handling was reasonable in the circumstances. The panel acknowledges the complainant rejected the insurer’s request to access the property in 2021 (after reviewing MB’s report). However, the panel considers the property should have been properly assessed prior to 2021 and more contemporaneous to the claim lodgement. The panel notes however the complainant is the body corporate, not the individual unit owners. Therefore, compensation can only be provided in context of the complainant’s experience. As the complainant is not a natural entity, then compensation can only be given for the unusual degree of time taken to resolve the complaint. Considering what is fair in the circumstances, the insurer is required to pay $1,000 as non- financial loss compensation to the complainant in recognition of the time taken to resolve the complaint. 2.4 Why is the outcome fair? The policy is clear and covers damage which is sudden and accidental. The available information shows, on balance, that most of the units sustained damage due to the February 2019 event. It is fair the insurer is required to accept that damage. However, it would not be fair to require the insurer to pay for the damage to two units (54 and 73). This is because the available information does not show their damage was caused by the claimed event. The insurer’s handling of the claim resulted in an unusual degree of time taken to resolve the complaint. It is fair the insurer pays compensation for non-financial loss in these circumstances. Determination | Case number: 801588 Page 13 of 13 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.